Weighted Average Item Price Report...Weighted Average Item Price Report By Item, Region and Quarter...

275
Weighted Average Item Price Report By Item, Region and Quarter Metric Contracts Let January 1, 2013 to December 31, 2013 Office of Engineering Design Quality Assurance Bureau New York State Department of Transportation

Transcript of Weighted Average Item Price Report...Weighted Average Item Price Report By Item, Region and Quarter...

  • Weighted Average Item Price Report

    By Item, Region and Quarter

    Metric Contracts Let January 1, 2013 to December 31, 2013

    Office of Engineering

    Design Quality Assurance Bureau

    New York State Department of Transportation

  • INTRODUCTION The Weighted Average Item Price Report (WAIPR) is a standard report produced using NYSDOT’s Trns*Port BAMS/DSS. It is a numerical listing of all items used in Department contracts that have been let within the time period indicated on the report. The report shows quarterly statistics for each item in each Region, as well as overall averages and totals for each item. Included in the report are the number of contract occurrences, total quantity, total dollars, weighted average awarded price, and weighted average price for the low three bidders. The WAIPR is prepared in March and September of each year by the Office of Engineering, Design Quality Assurance Bureau. The March report includes contracts let between January 1 and December 31 of the previous year. The September report includes contracts let between July 1 and June 30. An ADOBE ACROBAT document version of the WAIPR is available for download on the NYSDOT Internet Web Page. GENERAL INFORMATION Lump sum items, fixed price items and contracts with less than 3 bidders are excluded from the report. The weighted average prices are calculated as total dollars awarded divided by total quantity used. For statistics dealing with the low three bidders, the Bid positions are calculated from the contract bid totals, and the three unit bid prices are simply averaged to produce a single 'Low three bidders' value. Questions regarding the WAIPR should be directed to Arvind K. Salgam, Design Quality Assurance Bureau (518)-457-9773.

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 1 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CLEARING AND GRUBBING / SQM ------- -------- 201.07 04 11 2013Q4 1 62,000.00 $62,000 $1.00 $2.22 --------- ------------ --------------- ---------- ---------- 1 62,000.00 $62,000 $1.00 $2.22 ---------------------------------------------------------------------------------------------------------------------------------- REMOVAL OF SUBSTRUCTURES / CM 202.19 02 2013Q4 1 115.00 $5,750 $50.00 $56.67 04 2013Q1 1 80.00 $5,780 $72.25 $69.08 05 2013Q1 2 1,786.00 $97,100 $54.37 $101.61 07 2013Q1 1 82.00 $82 $1.00 $62.67 2013Q4 1 584.00 $69,940 $119.76 $117.21 09 2013Q1 1 139.00 $4,170 $30.00 $55.67 2013Q4 1 219.00 $16,425 $75.00 $66.00 --------- ------------ --------------- ---------- ---------- 8 3,005.00 $199,247 $66.31 $96.27 ---------------------------------------------------------------------------------------------------------------------------------- PAVEMENT REMOVAL / SQM 202.97 01 01 2013Q1 1 3,523.00 $112,736 $32.00 $35.00 --------- ------------ --------------- ---------- ---------- 1 3,523.00 $112,736 $32.00 $35.00 ---------------------------------------------------------------------------------------------------------------------------------- PAVEMENT EXCAVATION / SQM 202.9901 10 10 2013Q1 2 2,430.00 $17,400 $7.16 $54.75 11 2013Q3 1 54.00 $540 $10.00 $160.67 --------- ------------ --------------- ---------- ---------- 3 2,484.00 $17,940 $7.22 $57.05 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 2 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS UNCLASSIFIED EXCAVATION AND DISPOSAL / CM ------- -------- 203.02 01 2013Q1 2 7,878.00 $342,084 $43.42 $46.40 02 2013Q4 1 316.00 $5,372 $17.00 $21.33 04 2013Q1 1 8.00 $571 $71.38 $68.46 05 2013Q1 2 28,766.00 $355,365 $12.35 $17.16 2013Q4 1 6,855.00 $22,142 $3.23 $11.88 06 2013Q1 1 638.00 $7,656 $12.00 $12.50 07 2013Q1 2 36,442.00 $620,022 $17.01 $15.90 2013Q2 1 52,073.00 $348,889 $6.70 $6.23 2013Q4 1 3,465.00 $67,290 $19.42 $19.57 08 2013Q2 2 5,994.00 $392,001 $65.40 $61.44 09 2013Q1 3 6,034.00 $91,441 $15.15 $15.94 2013Q4 1 204.00 $7,140 $35.00 $31.00 10 2013Q1 2 72,614.00 $1,991,497 $27.43 $34.43 2013Q3 1 3,960.00 $39,600 $10.00 $18.00 11 2013Q3 1 130.00 $3,900 $30.00 $85.00 2013Q4 2 704.00 $31,385 $44.58 $56.64 --------- ------------ --------------- ---------- ---------- 24 226,081.00 $4,326,355 $19.14 $22.21 ---------------------------------------------------------------------------------------------------------------------------------- EMBANKMENT IN PLACE / CM 203.03 01 2013Q1 2 772.00 $48,584 $62.93 $38.67 02 2013Q4 1 685.00 $8,220 $12.00 $11.67 04 2013Q1 1 47.00 $3,108 $66.13 $38.71 05 2013Q1 2 20,586.00 $158,042 $7.68 $8.00 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 3 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS EMBANKMENT IN PLACE / CM ------- -------- 203.03 05 2013Q4 1 641.00 $2,865 $4.47 $13.69 06 2013Q1 1 575.00 $2,300 $4.00 $17.33 07 2013Q1 2 3,556.00 $10,656 $3.00 $4.76 2013Q2 1 6,021.00 $22,398 $3.72 $3.74 2013Q4 1 1,640.00 $31,685 $19.32 $15.01 08 2013Q2 2 1,285.00 $20,340 $15.83 $29.78 09 2013Q1 3 1,532.00 $24,450 $15.96 $17.92 2013Q4 1 1,094.00 $18,598 $17.00 $23.50 10 2013Q1 2 17,279.00 $78,475 $4.54 $12.56 2013Q3 1 13,051.00 $195,765 $15.00 $35.67 11 2013Q4 1 397.00 $17,865 $45.00 $41.67 --------- ------------ --------------- ---------- ---------- 22 69,161.00 $643,351 $9.30 $15.58 ---------------------------------------------------------------------------------------------------------------------------------- EXPANDED POLYSTYRENE FILL / CM 203.0395 17 05 2013Q1 1 1,517.00 $182,040 $120.00 $123.33 --------- ------------ --------------- ---------- ---------- 1 1,517.00 $182,040 $120.00 $123.33 ---------------------------------------------------------------------------------------------------------------------------------- SELECT GRANULAR FILL / CM 203.07 01 2013Q1 2 593.00 $31,379 $52.92 $68.10 02 2013Q4 1 8.00 $600 $75.00 $70.00 05 2013Q1 2 3,124.00 $134,010 $42.90 $38.33 2013Q4 1 73.00 $3,543 $48.54 $59.01 06 2013Q1 1 30.00 $1,980 $66.00 $69.67 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 4 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SELECT GRANULAR FILL / CM ------- -------- 203.07 07 2013Q1 2 8,748.00 $107,454 $12.28 $18.24 2013Q2 1 798.00 $12,736 $15.96 $33.32 2013Q4 1 1,330.00 $27,199 $20.45 $21.57 08 2013Q2 2 2,094.00 $151,614 $72.40 $62.13 09 2013Q1 2 724.00 $28,612 $39.52 $47.63 2013Q4 1 2.00 $200 $100.00 $87.75 10 2013Q1 2 12,253.00 $329,352 $26.88 $17.51 11 2013Q4 1 122.00 $8,540 $70.00 $40.00 --------- ------------ --------------- ---------- ---------- 19 29,899.00 $837,219 $28.00 $25.62 ---------------------------------------------------------------------------------------------------------------------------------- SEL GRANULAR FILL SLOPE PROT(TYPE A) / CM 203.0801 05 2013Q1 1 50.00 $3,500 $70.00 $72.50 --------- ------------ --------------- ---------- ---------- 1 50.00 $3,500 $70.00 $72.50 ---------------------------------------------------------------------------------------------------------------------------------- APPLYING WATER / PDD 203.1601 07 2013Q1 1 520.00 $520 $1.00 $1.07 2013Q2 1 50.00 $22,088 $441.75 $183.92 2013Q4 1 120.00 $1,511 $12.59 $96.37 --------- ------------ --------------- ---------- ---------- 3 690.00 $24,118 $34.95 $30.89 ---------------------------------------------------------------------------------------------------------------------------------- SELECT GRANULAR SUBGRADE / CM 203.20 07 2013Q1 1 11,458.00 $217,702 $19.00 $21.20 --------- ------------ --------------- ---------- ---------- 1 11,458.00 $217,702 $19.00 $21.20 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 5 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SELECT STRUCTURE FILL / CM ------- -------- 203.21 02 2013Q4 1 400.00 $22,000 $55.00 $56.00 04 2013Q1 1 116.00 $7,324 $63.14 $57.71 05 2013Q1 2 1,564.00 $63,980 $40.91 $57.43 2013Q4 1 146.00 $5,603 $38.38 $54.89 06 2013Q1 1 25.00 $1,275 $51.00 $73.67 07 2013Q1 1 97.00 $12,610 $130.00 $120.00 2013Q4 1 1,044.00 $34,536 $33.08 $32.53 08 2013Q2 1 132.00 $12,540 $95.00 $77.75 09 2013Q1 1 677.00 $6,770 $10.00 $26.33 2013Q4 1 600.00 $21,000 $35.00 $37.42 --------- ------------ --------------- ---------- ---------- 11 4,801.00 $187,638 $39.08 $46.85 ---------------------------------------------------------------------------------------------------------------------------------- SHOULDER BACKUP MATERIAL / MT 203.24 15 01 2013Q1 2 617.00 $34,152 $55.35 $37.73 05 2013Q1 2 761.00 $18,185 $23.90 $33.85 08 2013Q2 1 35.00 $7,000 $200.00 $123.12 --------- ------------ --------------- ---------- ---------- 5 1,413.00 $59,337 $41.99 $37.76 ---------------------------------------------------------------------------------------------------------------------------------- SAND BACKFILL / CM 203.25 08 2013Q2 2 136.00 $43,660 $321.03 $162.77 --------- ------------ --------------- ---------- ---------- 2 136.00 $43,660 $321.03 $162.77 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 6 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS HYDRAULIC FILL / CM ------- -------- 203.2802 11 08 2013Q2 1 14.00 $8,890 $635.00 $562.33 --------- ------------ --------------- ---------- ---------- 1 14.00 $8,890 $635.00 $562.33 ---------------------------------------------------------------------------------------------------------------------------------- ESTABLISHING NEW DITCHES AND SLOPES / M 203.5199 06 05 2013Q1 1 650.00 $5,200 $8.00 $11.33 2013Q4 1 240.00 $7,954 $33.14 $100.38 09 2013Q1 1 24.00 $960 $40.00 $26.00 --------- ------------ --------------- ---------- ---------- 3 914.00 $14,114 $15.44 $35.10 ---------------------------------------------------------------------------------------------------------------------------------- CONTROLLED LOW STRENGTH MATERIAL (CLSM) / CM 204.01 01 2013Q1 2 49.00 $10,180 $207.76 $241.69 04 2013Q1 1 14.00 $3,057 $218.36 $181.12 05 2013Q1 1 17.00 $1,360 $80.00 $90.00 07 2013Q1 1 1.00 $600 $600.00 $505.38 08 2013Q2 1 15.00 $5,550 $370.00 $232.43 09 2013Q1 2 24.00 $7,616 $317.33 $268.06 10 2013Q1 2 78.00 $45,980 $589.49 $526.39 11 2013Q3 1 57.00 $2,850 $50.00 $276.67 --------- ------------ --------------- ---------- ---------- 11 255.00 $77,193 $302.72 $326.13 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 7 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS FIELD ORGANIC VAP MONIT CONTAMINAT SOIL / HOUR ------- -------- 205.03 05 2013Q1 1 16.00 $1,600 $100.00 $87.50 07 2013Q1 1 62.00 $7,750 $125.00 $114.82 2013Q2 1 40.00 $3,736 $93.40 $104.47 2013Q4 1 60.00 $5,854 $97.56 $113.68 08 2013Q2 2 16.00 $2,760 $172.50 $144.27 --------- ------------ --------------- ---------- ---------- 6 194.00 $21,700 $111.85 $112.51 ---------------------------------------------------------------------------------------------------------------------------------- PETROLEUM CONTAMINAT PARAMETER ANALYSIS / EACH 205.0401 05 2013Q1 1 2.00 $440 $220.00 $360.00 07 2013Q1 1 55.00 $16,500 $300.00 $260.83 2013Q2 1 4.00 $722 $180.44 $186.81 08 2013Q2 2 2.00 $805 $402.50 $668.25 --------- ------------ --------------- ---------- ---------- 5 63.00 $18,467 $293.12 $272.22 ---------------------------------------------------------------------------------------------------------------------------------- LAB ANALYSIS FOR HAZARD WASTE RCRA TOXIC / EACH 205.0402 07 2013Q1 1 18.00 $18,000 $1,000.00 $935.05 2013Q2 1 4.00 $3,184 $796.07 $865.36 2013Q4 1 2.00 $1,663 $831.46 $769.11 --------- ------------ --------------- ---------- ---------- 3 24.00 $22,847 $951.97 $909.60 ---------------------------------------------------------------------------------------------------------------------------------- LABORATORY ANALYSIS FOR IGNITABILITY / EACH 205.0403 07 2013Q1 1 18.00 $630 $35.00 $30.49 2013Q2 1 4.00 $85 $21.23 $24.08 --------- ------------ --------------- ---------- ---------- 2 22.00 $715 $32.50 $29.32 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 8 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS LABORATORY ANALYSIS FOR PH / EACH ------- -------- 205.0404 07 2013Q1 1 18.00 $360 $20.00 $18.70 2013Q2 1 4.00 $64 $15.92 $17.31 --------- ------------ --------------- ---------- ---------- 2 22.00 $424 $19.26 $18.45 ---------------------------------------------------------------------------------------------------------------------------------- LAB ANALY PET HYDROCARBON - GAS ORGANICS / EACH 205.0406 07 2013Q1 1 18.00 $1,800 $100.00 $91.71 2013Q2 1 4.00 $297 $74.30 $71.43 --------- ------------ --------------- ---------- ---------- 2 22.00 $2,097 $95.33 $88.03 ---------------------------------------------------------------------------------------------------------------------------------- LAB ANAL PET HYDROCARBON DIESEL ORGANICS / EACH 205.0407 07 2013Q1 1 18.00 $1,800 $100.00 $95.30 2013Q2 1 4.00 $340 $84.92 $79.97 --------- ------------ --------------- ---------- ---------- 2 22.00 $2,140 $97.26 $92.51 ---------------------------------------------------------------------------------------------------------------------------------- DISPOS OF CONTAMIN NON-HAZARD WASTE SOIL / MT 205.050201 05 2013Q1 1 30.00 $1,350 $45.00 $37.50 07 2013Q1 1 831.00 $62,325 $75.00 $66.10 2013Q2 1 17.00 $1,078 $63.43 $92.81 2013Q4 1 99.00 $6,680 $67.47 $71.85 08 2013Q2 2 7.00 $1,025 $146.43 $210.15 --------- ------------ --------------- ---------- ---------- 6 984.00 $72,458 $73.64 $67.30 ---------------------------------------------------------------------------------------------------------------------------------- STRUCTURE EXCAVATION / CM 206.01 01 2013Q1 1 12.00 $2,544 $212.00 $133.00 02 2013Q4 1 1,100.00 $13,200 $12.00 $16.33 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 9 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS STRUCTURE EXCAVATION / CM ------- -------- 206.01 04 2013Q1 1 955.00 $8,566 $8.97 $18.99 05 2013Q1 2 12,088.00 $151,410 $12.53 $20.42 06 2013Q1 1 21.00 $735 $35.00 $48.33 07 2013Q1 1 1,148.00 $11,480 $10.00 $13.53 2013Q4 1 2,934.00 $72,382 $24.67 $30.91 08 2013Q2 1 350.00 $22,750 $65.00 $63.15 09 2013Q1 2 4,906.00 $71,203 $14.51 $14.62 2013Q4 1 1,649.00 $20,613 $12.50 $13.75 --------- ------------ --------------- ---------- ---------- 12 25,163.00 $374,883 $14.90 $20.20 ---------------------------------------------------------------------------------------------------------------------------------- TRENCH AND CULVERT EXCAVATION / CM 206.02 02 2013Q4 1 16.00 $1,040 $65.00 $38.33 04 2013Q1 1 96.00 $2,525 $26.30 $23.77 05 2013Q1 2 2,496.00 $71,152 $28.51 $24.28 06 2013Q1 1 75.00 $2,325 $31.00 $32.33 07 2013Q1 2 628.00 $21,705 $34.56 $30.12 2013Q2 1 1,238.00 $21,380 $17.27 $30.09 2013Q4 1 237.00 $10,049 $42.40 $49.60 08 2013Q2 1 2,584.00 $191,216 $74.00 $45.62 09 2013Q1 2 2,260.00 $18,712 $8.28 $18.61 2013Q4 1 192.00 $960 $5.00 $20.25 10 2013Q1 2 32,053.00 $327,209 $10.21 $7.98 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 10 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS TRENCH AND CULVERT EXCAVATION / CM ------- -------- 206.02 11 2013Q4 1 232.00 $32,480 $140.00 $138.33 --------- ------------ --------------- ---------- ---------- 16 42,107.00 $700,753 $16.64 $13.91 ---------------------------------------------------------------------------------------------------------------------------------- COND EXCAV AND BCKFIL INCLUDE SURF REST / M 206.03 01 2013Q1 2 315.00 $25,050 $79.52 $52.49 05 2013Q1 2 967.00 $31,620 $32.70 $39.68 07 2013Q1 1 63.00 $2,583 $41.00 $41.17 08 2013Q2 2 438.00 $23,454 $53.55 $72.05 09 2013Q1 2 538.00 $33,936 $63.08 $55.32 10 2013Q1 1 492.00 $169,740 $345.00 $158.33 2013Q3 1 20.00 $3,000 $150.00 $163.33 --------- ------------ --------------- ---------- ---------- 11 2,833.00 $289,383 $102.15 $70.59 ---------------------------------------------------------------------------------------------------------------------------------- ROCK EXCAV CULV PLACEM, NON-EXPLOSIVE / CM 206.03 02 02 2013Q4 1 30.00 $12,000 $400.00 $221.67 --------- ------------ --------------- ---------- ---------- 1 30.00 $12,000 $400.00 $221.67 ---------------------------------------------------------------------------------------------------------------------------------- CONDU EXCA BKFILL-DO NOT RESTOR TOP SURF / M 206.0301 10 10 2013Q1 1 2,484.00 $32,292 $13.00 $26.00 --------- ------------ --------------- ---------- ---------- 1 2,484.00 $32,292 $13.00 $26.00 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 11 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CONDUIT EXCAV BACKFILL (IN EXIST RDWAY) / M ------- -------- 206.0305 05 05 2013Q1 1 194.00 $194 $1.00 $21.00 --------- ------------ --------------- ---------- ---------- 1 194.00 $194 $1.00 $21.00 ---------------------------------------------------------------------------------------------------------------------------------- CONDUIT EXCAV BACKFILL (NOT IN RDWAY) / M 206.0306 05 05 2013Q1 1 286.00 $12,870 $45.00 $25.33 --------- ------------ --------------- ---------- ---------- 1 286.00 $12,870 $45.00 $25.33 ---------------------------------------------------------------------------------------------------------------------------------- TRAF SIG CONDUIT EXCAVATION AND BACKFILL / M 206.0310 10 10 2013Q1 1 1,015.00 $16,240 $16.00 $62.00 --------- ------------ --------------- ---------- ---------- 1 1,015.00 $16,240 $16.00 $62.00 ---------------------------------------------------------------------------------------------------------------------------------- CONDUIT INSTALL ON ABOVE GRADE STRUC / M 206.0312 10 10 2013Q3 1 55.00 $8,250 $150.00 $156.67 --------- ------------ --------------- ---------- ---------- 1 55.00 $8,250 $150.00 $156.67 ---------------------------------------------------------------------------------------------------------------------------------- CONDUIT INSTALLED ON ABOVE GRADE STRUC / M 206.0312 11 05 2013Q1 1 25.00 $3,000 $120.00 $67.33 --------- ------------ --------------- ---------- ---------- 1 25.00 $3,000 $120.00 $67.33 ---------------------------------------------------------------------------------------------------------------------------------- TRENCH AND CULVERT EXCAVATION - O.G. / CM 206.04 01 2013Q1 2 3,387.00 $83,887 $24.77 $43.89 05 2013Q1 2 4,467.00 $146,565 $32.81 $27.64 2013Q4 1 93.00 $1,986 $21.35 $19.98 07 2013Q1 2 21,566.00 $649,400 $30.11 $35.03 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 12 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS TRENCH AND CULVERT EXCAVATION - O.G. / CM ------- -------- 206.04 07 2013Q2 1 1,132.00 $17,444 $15.41 $26.14 2013Q4 1 3,830.00 $157,413 $41.10 $36.19 08 2013Q2 1 1,050.00 $152,250 $145.00 $112.45 09 2013Q1 1 315.00 $4,883 $15.50 $30.25 --------- ------------ --------------- ---------- ---------- 11 35,840.00 $1,213,827 $33.87 $36.98 ---------------------------------------------------------------------------------------------------------------------------------- TEST HOLES / CM 206.04 01 09 2013Q1 1 7.00 $1,085 $155.00 $185.00 --------- ------------ --------------- ---------- ---------- 1 7.00 $1,085 $155.00 $185.00 ---------------------------------------------------------------------------------------------------------------------------------- PNEUMATIC EXCV & BACKFILL OF TRENCHES / M 206.0401 11 11 2013Q3 1 150.00 $15,000 $100.00 $205.33 --------- ------------ --------------- ---------- ---------- 1 150.00 $15,000 $100.00 $205.33 ---------------------------------------------------------------------------------------------------------------------------------- TEST PIT EXCAVATION / EACH 206.05 05 2013Q1 2 7.00 $3,000 $428.57 $652.38 07 2013Q1 1 7.00 $3,850 $550.00 $700.09 2013Q4 1 4.00 $6,001 $1,500.13 $1,219.32 08 2013Q2 2 51.00 $29,760 $583.53 $820.21 --------- ------------ --------------- ---------- ---------- 6 69.00 $42,611 $617.54 $814.14 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 13 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS GEOTEXTILE BEDDING / SQM ------- -------- 207.20 04 2013Q1 1 1,122.00 $1,470 $1.31 $2.10 05 2013Q1 2 2,274.00 $6,105 $2.68 $3.43 2013Q4 1 1,167.00 $2,101 $1.80 $2.83 07 2013Q1 2 601.00 $2,152 $3.58 $3.31 2013Q2 1 63.00 $236 $3.75 $9.58 2013Q4 1 803.00 $2,441 $3.04 $3.31 08 2013Q2 2 375.00 $1,543 $4.11 $4.52 09 2013Q1 1 2,815.00 $8,445 $3.00 $3.33 2013Q4 1 248.00 $620 $2.50 $2.83 10 2013Q1 1 296.00 $1,480 $5.00 $3.67 --------- ------------ --------------- ---------- ---------- 13 9,764.00 $26,592 $2.72 $3.23 ---------------------------------------------------------------------------------------------------------------------------------- GEOTEXTILE SEPARATION / SQM 207.21 04 2013Q1 1 675.00 $1,195 $1.77 $2.09 05 2013Q1 2 13,112.00 $17,508 $1.34 $1.46 06 2013Q1 1 1,665.00 $3,247 $1.95 $1.63 07 2013Q1 1 95.00 $285 $3.00 $2.63 2013Q2 1 1,087.00 $1,707 $1.57 $2.19 09 2013Q1 1 2,650.00 $5,300 $2.00 $2.50 --------- ------------ --------------- ---------- ---------- 7 19,284.00 $29,241 $1.52 $1.68 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 14 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS GEOTEXTILE DRAINAGE / SQM ------- -------- 207.22 01 2013Q1 1 6,953.00 $6,953 $1.00 $1.67 07 2013Q1 1 429.00 $1,287 $3.00 $2.61 10 2013Q1 1 32.00 $128 $4.00 $8.00 --------- ------------ --------------- ---------- ---------- 3 7,414.00 $8,368 $1.13 $1.75 ---------------------------------------------------------------------------------------------------------------------------------- GEOTEXTILE SLOPE PROTECTION / SQM 207.23 02 2013Q4 1 52.00 $728 $14.00 $10.45 10 2013Q1 1 570.00 $2,850 $5.00 $4.78 --------- ------------ --------------- ---------- ---------- 2 622.00 $3,578 $5.75 $5.26 ---------------------------------------------------------------------------------------------------------------------------------- GEOTEXTILE STABILIZATION / SQM 207.24 05 2013Q1 1 19,447.00 $26,253 $1.35 $1.68 07 2013Q1 2 5,657.00 $11,314 $2.00 $1.77 2013Q4 1 187.00 $322 $1.72 $2.54 --------- ------------ --------------- ---------- ---------- 4 25,291.00 $37,889 $1.50 $1.70 ---------------------------------------------------------------------------------------------------------------------------------- GEOMEMBRANE / SQM 207.25 05 2013Q1 1 345.00 $2,588 $7.50 $9.83 --------- ------------ --------------- ---------- ---------- 1 345.00 $2,588 $7.50 $9.83 ---------------------------------------------------------------------------------------------------------------------------------- PREFAB COMPOSITE STRUCTURAL DRAIN / SQM 207.26 02 2013Q4 1 42.00 $504 $12.00 $15.43 04 2013Q1 1 75.00 $660 $8.80 $11.93 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 15 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS PREFAB COMPOSITE STRUCTURAL DRAIN / SQM ------- -------- 207.26 05 2013Q1 1 414.00 $5,382 $13.00 $11.50 07 2013Q1 1 137.00 $1,370 $10.00 $11.67 2013Q4 1 269.00 $5,759 $21.41 $15.14 09 2013Q1 1 161.00 $2,254 $14.00 $13.08 2013Q4 1 188.00 $2,820 $15.00 $16.17 --------- ------------ --------------- ---------- ---------- 7 1,286.00 $18,749 $14.58 $13.31 ---------------------------------------------------------------------------------------------------------------------------------- PREFAB COMPOSITE INTEGRAL ABUTMENT DRAIN / SQM 207.27 05 2013Q1 1 400.00 $4,800 $12.00 $13.33 --------- ------------ --------------- ---------- ---------- 1 400.00 $4,800 $12.00 $13.33 ---------------------------------------------------------------------------------------------------------------------------------- GEOSYNTHETIC REINFORCEMENT / SQM 207.96 17 01 2013Q1 1 10,599.00 $42,396 $4.00 $2.80 --------- ------------ --------------- ---------- ---------- 1 10,599.00 $42,396 $4.00 $2.80 ---------------------------------------------------------------------------------------------------------------------------------- BIORETENTION AND DRY SWALE SOIL / CM 208.0103 22 05 2013Q1 1 63.00 $6,300 $100.00 $93.33 07 2013Q1 1 38.00 $2,470 $65.00 $69.68 09 2013Q1 1 110.00 $13,750 $125.00 $80.67 --------- ------------ --------------- ---------- ---------- 3 211.00 $22,520 $106.73 $82.47 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 16 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS FILTER BERM(WD WSTE COMPST/BRK FLTR BRM) / M ------- -------- 209.0801 08 08 2013Q2 2 715.00 $41,965 $58.69 $80.79 --------- ------------ --------------- ---------- ---------- 2 715.00 $41,965 $58.69 $80.79 ---------------------------------------------------------------------------------------------------------------------------------- MULCH - TEMPORARY / SQM 209.100101 01 2013Q1 1 2,878.00 $1,439 $0.50 $0.83 08 2013Q2 2 18,500.00 $19,480 $1.05 $0.91 09 2013Q1 1 112.00 $522 $4.66 $27.33 --------- ------------ --------------- ---------- ---------- 4 21,490.00 $21,441 $1.00 $1.03 ---------------------------------------------------------------------------------------------------------------------------------- SEED AND MULCH - TEMPORARY / SQM 209.1003 01 2013Q1 1 3,553.00 $3,553 $1.00 $1.43 02 2013Q4 1 330.00 $660 $2.00 $1.57 04 2013Q1 1 665.00 $898 $1.35 $1.12 05 2013Q1 1 16,725.00 $5,018 $0.30 $0.40 06 2013Q1 1 4,229.00 $1,480 $0.35 $0.53 07 2013Q1 2 18,763.00 $2,156 $0.11 $0.28 2013Q2 1 54,350.00 $22,827 $0.42 $0.41 2013Q4 1 1,580.00 $869 $0.55 $0.94 08 2013Q2 2 17,474.00 $25,637 $1.47 $1.09 09 2013Q1 2 17,450.00 $8,990 $0.52 $0.82 2013Q4 1 250.00 $625 $2.50 $2.17 10 2013Q1 1 6,372.00 $1,593 $0.25 $0.28 --------- ------------ --------------- ---------- ---------- 15 141,741.00 $74,305 $0.52 $0.56 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 17 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS GEOTEXTILE FABRIC SEDIMENT COLLECTIN BAG / EACH ------- -------- 209.11 01 04 2013Q1 1 3.00 $546 $182.00 $394.00 --------- ------------ --------------- ---------- ---------- 1 3.00 $546 $182.00 $394.00 ---------------------------------------------------------------------------------------------------------------------------------- TEMP SEDIMENT FILTER BAG FOR DRAIN STRUC / EACH 209.11 10 08 2013Q2 2 36.00 $11,115 $308.75 $313.47 10 2013Q1 2 190.00 $44,525 $234.34 $265.90 11 2013Q4 2 53.00 $8,350 $157.55 $169.18 --------- ------------ --------------- ---------- ---------- 6 279.00 $63,990 $229.35 $253.67 ---------------------------------------------------------------------------------------------------------------------------------- CHECK DAM (DITCH BOTTOM WIDTH 1 TO 2.0M) / EACH 209.110102 05 2013Q1 1 1.00 $200 $200.00 $350.00 07 2013Q2 1 80.00 $15,870 $198.37 $291.12 08 2013Q2 1 2.00 $700 $350.00 $464.17 --------- ------------ --------------- ---------- ---------- 3 83.00 $16,770 $202.04 $296.00 ---------------------------------------------------------------------------------------------------------------------------------- CHECK DAM (DITCH BOTTOM WIDTH 1 TO 2.0M) / EACH 209.110202 05 2013Q1 1 13.00 $2,600 $200.00 $350.00 --------- ------------ --------------- ---------- ---------- 1 13.00 $2,600 $200.00 $350.00 ---------------------------------------------------------------------------------------------------------------------------------- CHECK DAM (DITCH BOTTOM WIDTH > 3.0 M) / EACH 209.110204 05 2013Q4 1 10.00 $6,533 $653.30 $455.10 --------- ------------ --------------- ---------- ---------- 1 10.00 $6,533 $653.30 $455.10 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 18 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CHECK DAM, PREFABRICATED - TEMPORARY / M ------- -------- 209.1105 01 2013Q1 1 63.00 $8,505 $135.00 $100.00 08 2013Q2 1 50.00 $2,000 $40.00 $33.27 09 2013Q1 1 26.00 $1,300 $50.00 $28.75 --------- ------------ --------------- ---------- ---------- 3 139.00 $11,805 $84.93 $62.67 ---------------------------------------------------------------------------------------------------------------------------------- CHECK DAM, STONE-PERMANENT / EACH 209.1106 07 2013Q2 1 24.00 $10,193 $424.72 $366.57 --------- ------------ --------------- ---------- ---------- 1 24.00 $10,193 $424.72 $366.57 ---------------------------------------------------------------------------------------------------------------------------------- STRAWBALE DIKE - TEMPORARY / M 209.1202 11 2013Q4 1 1,195.00 $26,290 $22.00 $19.83 --------- ------------ --------------- ---------- ---------- 1 1,195.00 $26,290 $22.00 $19.83 ---------------------------------------------------------------------------------------------------------------------------------- SILT FENCE-TEMPORARY / M 209.13 01 2013Q1 2 499.00 $5,230 $10.48 $10.86 04 2013Q1 1 166.00 $988 $5.95 $6.32 05 2013Q1 2 841.00 $6,010 $7.15 $8.95 2013Q4 1 355.00 $4,675 $13.17 $10.52 06 2013Q1 1 293.00 $2,930 $10.00 $7.33 07 2013Q1 2 1,172.00 $1,428 $1.22 $3.13 2013Q2 1 665.00 $5,539 $8.33 $9.78 2013Q4 1 203.00 $2,225 $10.96 $9.83 08 2013Q2 2 608.00 $8,686 $14.29 $15.01 (item continued)

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 19 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS SILT FENCE-TEMPORARY / M ------- -------- 209.13 09 2013Q1 3 1,192.00 $12,440 $10.44 $12.92 2013Q4 1 179.00 $3,580 $20.00 $12.58 10 2013Q1 2 3,025.00 $68,471 $22.64 $29.20 2013Q3 1 5,930.00 $77,090 $13.00 $17.67 11 2013Q3 1 340.00 $3,400 $10.00 $23.33 2013Q4 3 6,947.00 $43,139 $6.21 $9.31 --------- ------------ --------------- ---------- ---------- 24 22,415.00 $245,831 $10.97 $14.48 ---------------------------------------------------------------------------------------------------------------------------------- SEDIMENT TRAP, EARTH BERM - TEMPORARY / EACH 209.140101 05 2013Q4 1 6.00 $605 $100.90 $422.30 --------- ------------ --------------- ---------- ---------- 1 6.00 $605 $100.90 $422.30 ---------------------------------------------------------------------------------------------------------------------------------- TEMPORARY SEDIMENT TRAP / EACH 209.14010109 08 2013Q2 1 1.00 $755 $755.00 $1,339.17 --------- ------------ --------------- ---------- ---------- 1 1.00 $755 $755.00 $1,339.17 ---------------------------------------------------------------------------------------------------------------------------------- SEDIMENT TRAP, SAND BAG - TEMPORARY / EACH 209.140201 10 2013Q1 1 5.00 $1,300 $260.00 $1,820.00 --------- ------------ --------------- ---------- ---------- 1 5.00 $1,300 $260.00 $1,820.00 ---------------------------------------------------------------------------------------------------------------------------------- SEDIMENT TRAP, DITCH DAM - TEMPORARY / EACH 209.140301 09 2013Q1 1 2.00 $650 $325.00 $313.33 --------- ------------ --------------- ---------- ---------- 1 2.00 $650 $325.00 $313.33 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 20 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS TURBIDITY CURTAIN - TEMPORARY / M ------- -------- 209.1501 07 2013Q4 1 115.00 $7,733 $67.24 $45.85 --------- ------------ --------------- ---------- ---------- 1 115.00 $7,733 $67.24 $45.85 ---------------------------------------------------------------------------------------------------------------------------------- DRAINAGE STRUCTURE INLET PROT, SILT FENC / M 209.1701 01 2013Q1 1 121.00 $1,573 $13.00 $7.33 06 2013Q1 1 6.00 $480 $80.00 $71.67 07 2013Q1 1 113.00 $3,390 $30.00 $25.10 09 2013Q1 1 14.00 $678 $48.40 $44.20 11 2013Q4 1 36.00 $468 $13.00 $37.67 --------- ------------ --------------- ---------- ---------- 5 290.00 $6,589 $22.72 $21.13 ---------------------------------------------------------------------------------------------------------------------------------- DRAINAGE STRUCTURE INLET PROT, GRAVEL BG / CM 209.1702 05 2013Q1 2 13.00 $1,675 $128.85 $300.64 09 2013Q1 3 5.00 $1,476 $295.20 $419.82 --------- ------------ --------------- ---------- ---------- 5 18.00 $3,151 $175.06 $333.75 ---------------------------------------------------------------------------------------------------------------------------------- DRAINAGE STRUCTURE INLET PROT, PREFAB TM / M 209.1703 09 2013Q1 1 104.00 $208 $2.00 $37.68 --------- ------------ --------------- ---------- ---------- 1 104.00 $208 $2.00 $37.68 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 21 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS ROLLED EROS CNTR PROD,CL II TYPE A, INT / SQM ------- -------- 209.1901 09 2013Q1 1 1,250.00 $2,500 $2.00 $2.25 10 2013Q1 1 7,363.00 $44,178 $6.00 $6.22 11 2013Q3 1 300.00 $1,500 $5.00 $7.33 --------- ------------ --------------- ---------- ---------- 3 8,913.00 $48,178 $5.41 $5.70 ---------------------------------------------------------------------------------------------------------------------------------- ROLLED ERSN CNTRL PROD,CLASS II TY B,INT / SQM 209.190201 09 2013Q1 1 1,250.00 $2,500 $2.00 $2.60 10 2013Q1 1 5,070.00 $33,462 $6.60 $6.10 --------- ------------ --------------- ---------- ---------- 2 6,320.00 $35,962 $5.69 $5.41 ---------------------------------------------------------------------------------------------------------------------------------- ROLLED ERSN CNTRL PROD,CLASS II TY C,INT / SQM 209.190301 02 2013Q4 1 15.00 $255 $17.00 $14.67 05 2013Q1 1 252.00 $1,008 $4.00 $4.33 --------- ------------ --------------- ---------- ---------- 2 267.00 $1,263 $4.73 $4.91 ---------------------------------------------------------------------------------------------------------------------------------- ROLLED ERSN CNTRL PROD,CLASS II TY D,INT / SQM 209.1904 07 2013Q1 1 243.00 $851 $3.50 $3.75 2013Q2 1 5,800.00 $15,370 $2.65 $2.38 --------- ------------ --------------- ---------- ---------- 2 6,043.00 $16,221 $2.68 $2.44 ---------------------------------------------------------------------------------------------------------------------------------- SOIL STABILIZERS, CLASS IV TYPE C / SQM 209.2103 06 2013Q1 1 808.00 $1,697 $2.10 $6.20 --------- ------------ --------------- ---------- ---------- 1 808.00 $1,697 $2.10 $6.20 ----------------------------------------------------------------------------------------------------------------------------------

  • New York State Department of Transportation 18:28 Tuesday, August 12, 2014 22 Metric Contracts Let January 1, 2013 to December 31, 2013 WEIGHTED AVERAGE ITEM PRICE REPORT BY ITEM, REGION AND QUARTER CALENDAR NUMBER OF TOTAL TOTAL AVERAGE AVERAGE ITEM REGION QUARTER OCCUR'S QUANTITY DOLLARS AWARDED OF LOW 3 ------ -------- -------- --------- -------- ------- PRICE BIDDERS CONSTRUCTION ENTRANCE / SQM ------- -------- 209.22 05 2013Q4 1 150.00 $909 $6.06 $16.79 06 2013Q1 1 224.00 $2,912 $13.00 $16.00 07 2013Q1 1 50.00 $750 $15.00 $17.88 2013Q4 1 404.00 $8,044 $19.91 $15.86 08 2013Q2 1 140.00 $2,520 $18.00 $31.14 10 2013Q1 2 256.00 $5,525 $21.58 $67.65 11 2013Q4 1 732.00 $27,816 $38.00 $53.33 --------- ------------ --------------- ---------- ---------- 8 1,956.00 $48,476 $24.78 $37.90 ---------------------------------------------------------------------------------------------------------------------------------- REMOVE DISPOSE UNDERGRND PIPE ACM (BV14) / M 210.3111 07 2013Q1 1 42.00 $4,116 $98.00 $101.83 2013Q4 1 324.00 $68,963 $212.85 $202.62 --------- ------------ --------------- ---------- ----------