WEEKLY REPORT St. Phillip’s College — Norris Technical Building March 16 — March 20 This week activities: Next week activities: Cont. Exterior Framing on South Elevation Start fur-downs Level 4 Elevator Shaft Protection Start Prime & 1st coat of Paint Level 4 Star Data Cable Install Double Sided Walls Level 1 Cont. Exterior Framing on South Elevation Cont. Final Paint on Level 4 Walls Cont. Data Cable Install Cont. Framing and Drywall at Ele- vator Shaft Cont. Prime & 1st coat of Paint Level 4
Transcript of WEEKLY REPORT - alamo.eduWEEKLY REPORT St. Phillip’s College — Norris Technical Building...
WEEKLY REPORT St. Phillip’s College — Norris Technical Building
March 16 — March 20
This week activities: Next week activities:
Cont. Exterior Framing on South Elevation
Start fur-downs Level 4
Elevator Shaft Protection
Start Prime & 1st coat of Paint Level 4
Star Data Cable Install Double Sided Walls Level 1
Cont. Exterior Framing on South Elevation
Cont. Final Paint on Level 4 Walls
Cont. Data Cable Install Cont. Framing and Drywall at Ele-
vator Shaft
Cont. Prime & 1st coat of Paint Level 4
Fur down at Level 4 Final Paint Level 4
Data Cable Elevator Shat Protection
Drywall Level 1 Spray Fireproofing