Plant Biology Hintertheur Erika Olinger, Karrie Larson, Rachel Brown.
Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you...
Transcript of Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you...
![Page 1: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/1.jpg)
625 Burnell Street
Napa, CA 94559
Agenda - Final
Wednesday, September 2, 20205:00 PM
MEETING LOCATION: REFER TO COVID-19 SPECIAL NOTICE
Citizen Advisory Committee
****COVID-19 SPECIAL NOTICE*****PUBLIC MEETING GUIDELINES FOR PARTICIPATING
VIA PHONE/VIDEO CONFERENCE
Consistent with Executive Orders No. N-25-20 and N-29-20 from the Executive Department of the State of California and Napa County's Shelter in Home Order issued March 18, 2020 and further extended, a physical location will not be provided for the Napa Valley Transportation Authority Citizen Advisory Committee meeting. The public is invited to participate telephonically or electronically via the methods below:
To observe the meeting by video conference, click on (or copy and paste) the following link at the noticed meeting time: https://zoom.us/join and enter meeting ID 945 7310 0120.
Instructions on how to join a video conference are available at: https://support.zoom.us/hc/en-us/articles/201362193-Joining-a-Meeting
To observe the meeting by phone, call 1 (669) 900-6833 at the noticed meeting time, then enter Meeting ID 945 7310 0120. When asked for the participant ID or code, press #.
Instructions on how to join a meeting by phone are available at: https://support.zoom.us/hc/en-us/articles/201362663-Joining-a-meeting-by-phone
![Page 2: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/2.jpg)
How to Submit a Public Comment
1. Members of the public may submit a public comment in writing by emailing [email protected] by 11 a.m. onthe day of the meeting with PUBLIC COMMENT identified in the subject line of the email. For comments tobe read into record, emails with the equivalent of a maximum of 3 minutes shall contain in the subject line"Public Comment-Not on the Agenda" or "Public Comment-Agenda Item # (include item number)". All writtencomments should be 350 works or less, which corresponds to approximately 3 minutes of less of speakingtime. All other written comments received will still be provided to the Board of Directors and be included aspart of the meeting record.
2. To comment during a virtual meeting (Zoom), click the "Raise Your Hand" button to request to speak whenPublic Comment is being taken on the Agenda item. You will be unmuted when it is your turn to make yourcomment for up to 3 minutes. After allotted time, you will be re-muted.Instructions for how to "Raise Your Hand" are available at: https://support.zoom.us/hc/en-us/articles/205566129-Raise-Hand-In-Webinar.
3. To comment by phone, press "*9" to request to speak when Public Comment is being taken on the Agendaitem. You will be called upon by the last four digits of you phone number. Phone participants must unmutethemselves by pressing "*6" when called upon and will be provided up to 3 minutes to comment. After yourallotted time, you will be re-muted.
This Agenda shall be made available upon request in alternate formats to persons with a disability. Persons requesting a disability-related modification or accommodation should contact Karrie Sanderlin, NVTA Board Secretary, at (707) 259-8633 during regular business hours, at least 48 hours prio to the time of the meeting.
Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin, NVTA Board Secretary, at (707) 259-8633 no later than 48 hours in advance of the scheduled meeting
This Agenda may also be viewed online by visiting the NVTA website https://legistar.com/Calendar.aspx.
Note: Where times are indicated for agenda items, they are approximate and intended as estimates only, and may be shorter or longer as needed.
Acceso y el Titulo VI: La NVTA puede proveer asistencia/facilitar la comunicación a las personas discapacitadas y los individuos con conocimiento limitado del inglés quienes quieran dirigirse a la Autoridad. Para solicitar asistencia, por favor llame al número (707) 259-8633. Requerimos que solicite asistencia con tres días hábiles de anticipación para poderle proveer asistencia.
Ang Accessibility at Title VI: Ang NVTA ay nagkakaloob ng mga serbisyo/akomodasyon kung hilingin ang mga ito, ng mga taong may kapansanan at mga indibiduwal na may limitadong kaalaman sa wikang Ingles, na nais na matugunan ang mga bagay-bagay na may kinalaman sa NVTA Board. Para sa mga tulong sa akomodasyon o pagsasalin-wika, mangyari lang tumawag sa (707) 259-8633. Kakailanganin namin ng paunang abiso na tatlong araw na may pasok sa trabaho para matugunan ang inyong kahilingan.
![Page 3: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/3.jpg)
September 2, 2020Citizen Advisory Committee Agenda - Final
1. Call To Order
2. Roll Call
3. Introductions
4. Public Comment
5. Committee Member and Staff Comments
Note: Where times are indicated for the agenda items they are approximate and intended
as estimates only, and may be shorter or longer, as needed.
6. CONSENT AGENDA ITEMS (6.1)
6.1 Meeting Minutes of July 1, 2020 (Danielle Schmitz) (Pages 8-10)
CAC action will approve the meeting minutes of July 1, 2020.Recommendation:
5:15 p.m.Estimated Time:
Draft MinutesAttachments:
7. REGULAR AGENDA ITEMS
7.1 Executive Director's Report (Kate Miller) (Pages 11-13)
Information onlyRecommendation:
5:15 p.m.Estimated Time:
Staff ReportAttachments:
7.2 Vine Transit Update (Alan Budde) (Pages 14-18)
Information onlyRecommendation:
5:30 p.m.Estimated Time:
Staff ReportAttachments:
Page 3 Napa Valley Transportation Authority Printed on 8/26/2020
![Page 4: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/4.jpg)
September 2, 2020Citizen Advisory Committee Agenda - Final
7.3 Draft Imola Avenue Complete Streets Corridor Improvement Plan
(Diana Meehan) (Pages 19-20)
Information onlyRecommendation:
5:45 p.m.Estimated Time:
Staff ReportAttachments:
7.4 State Route 29 Comprehensive Multimodal Corridor Plan (SR 29
CMCP) and American Canyon Project Initiation Document (PID)
(Rebecca Schenck) (Pages 21-23)
Information onlyRecommendation:
6:00 p.m.Estimated Time:
Staff ReportAttachments:
7.5 Update on Large Capital Projects in the North Bay (Danielle
Schmitz) (Pages 24-26)
Information onlyRecommendation:
6:15 p.m.Estimated Time:
Staff ReportAttachments:
8. FUTURE AGENDA ITEMS
9. ADJOURNMENT
9.1 Approval of Next Regular Meeting Date of November 4, 2020 and
Adjournment
6:30 p.m.Estimated Time:
Page 4 Napa Valley Transportation Authority Printed on 8/26/2020
![Page 5: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/5.jpg)
September 2, 2020Citizen Advisory Committee Agenda - Final
I hereby certify that the agenda for the above stated meeting was posted at a location freely accessible
to members of the public at the NVTA offices, 625 Burnell Street, Napa, CA by 5:00 p.m., on Friday,
August 28, 2020.
___________________________________
Karalyn E. Sanderlin, NVTA Board Secretary
Page 5 Napa Valley Transportation Authority Printed on 8/26/2020
Karalyn E. Sanderlin (e-sign) August 26, 2020
![Page 6: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/6.jpg)
Glossary of Acronyms
Latest Revision: 05/20
AB 32 Global Warming Solutions Act
ABAG Association of Bay Area Governments
ADA American with Disabilities Act
ATAC Active Transportation Advisory Committee
ATP Active Transportation Program
BAAQMD Bay Area Air Quality Management District
BART Bay Area Rapid Transit District
BATA Bay Area Toll Authority
BRT Bus Rapid Transit
BUILD Better Utilizing Investments to Leverage Development
CAC Citizen Advisory Committee
CAP Climate Action Plan
Caltrans California Department of Transportation
CASA Committee to House the Bay Area
CEQA California Environmental Quality Act
CIP Capital Investment Program
CMA Congestion Management Agency
CMAQ Congestion Mitigation and Air Quality Improvement Program
CMP Congestion Management Program
CalSTA California State Transportation Agency
CTP Countywide Transportation Plan
COC Communities of Concern
CTC California Transportation Commission
DAA Design Alternative Analyst
DBB Design-Bid-Build
DBF Design-Build-Finance
DBFOM Design-Build-Finance-Operate-Maintain
DED Draft Environmental Document
EIR Environmental Impact Report
EJ Environmental Justice
FAS Federal Aid Secondary
FAST Fixing America’s Surface Transportation Act
FHWA Federal Highway Administration
FTA Federal Transit Administration
FY Fiscal Year
GHG Greenhouse Gas
GGRF Greenhouse Gas Reduction Fund
GTFS General Transit Feed Specification
HBP Highway Bridge Program
HBRR Highway Bridge Replacement and Rehabilitation Program
HIP Housing Incentive Program
HOT High Occupancy Toll
HOV High Occupancy Vehicle
HR3 High Risk Rural Roads
HSIP Highway Safety Improvement Program
HTF Highway Trust Fund
HUTA Highway Users Tax Account
IFB Invitation for Bid
ITIP State Interregional Transportation Improvement Program
ITOC Independent Taxpayer Oversight Committee
IS/MND Initial Study/Mitigated Negative Declaration
JARC Job Access and Reverse Commute
LCTOP Low Carbon Transit Operations Program
LIFT Low-Income Flexible Transportation
LOS Level of Service
LS&R Local Streets & Roads
MaaS Mobility as a Service
MAP 21 Moving Ahead for Progress in the 21st Century Act
MPO Metropolitan Planning Organization
MTC Metropolitan Transportation Commission
MTS Metropolitan Transportation System
ND Negative Declaration
NEPA National Environmental Policy Act
NOAH Natural Occurring Affordable Housing
NOC Notice of Completion
NOD Notice of Determination
NOP Notice of Preparation
NVTA Napa Valley Transportation Authority
NVTA-TA Napa Valley Transportation Authority-Tax Agency
OBAG One Bay Area Grant
PA&ED Project Approval Environmental Document
6
![Page 7: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/7.jpg)
Glossary of Acronyms
Latest Revision: 05/20
P3 or PPP Public-Private Partnership
PCC Paratransit Coordination Council
PCI Pavement Condition Index
PCA Priority Conservation Area
PDA Priority Development Areas
PIR Project Initiation Report
PMS Pavement Management System
Prop. 42 Statewide Initiative that requires a portion of gasoline sales tax revenues be designated to transportation purposes
PSE Plans, Specifications and Estimates
PSR Project Study Report
PTA Public Transportation Account
RACC Regional Agency Coordinating Committee
RFP Request for Proposal
RFQ Request for Qualifications
RHNA Regional Housing Needs Allocation
RM2 Regional Measure 2 (Bridge Toll)
RM3 Regional Measure 3
RMRP Road Maintenance and Rehabilitation Program
ROW Right of Way
RTEP Regional Transit Expansion Program
RTIP Regional Transportation Improvement Program
RTP Regional Transportation Plan
SAFE Service Authority for Freeways and Expressways
SAFETEA-LU Safe, Accountable, Flexible, and Efficient Transportation Equity Act-A Legacy for Users
SB 375 Sustainable Communities and Climate Protection Act 2008
SB 1 The Road Repair and Accountability Act of 2017
SCS Sustainable Community Strategy
SHA State Highway Account
SHOPP State Highway Operation and Protection Program
SNTDM Solano Napa Travel Demand Model
SR State Route
SRTS Safe Routes to School
SOV Single-Occupant Vehicle
STA State Transit Assistance
STIC Small Transit Intensive Cities
STIP State Transportation Improvement Program
STP Surface Transportation Program
TAC Technical Advisory Committee
TCM Transportation Control Measure
TCRP Traffic Congestion Relief Program
TDA Transportation Development Act
TDM Transportation Demand Management Transportation Demand Model
TE Transportation Enhancement
TEA Transportation Enhancement Activities
TEA 21 Transportation Equity Act for the 21st Century
TFCA Transportation Fund for Clean Air
TIGER Transportation Investments Generation Economic Recovery
TIP Transportation Improvement Program
TIRCP Transit and Intercity Rail Capital Program
TLC Transportation for Livable Communities
TLU Transportation and Land Use
TMP Traffic Management Plan
TMS Transportation Management System
TNC Transportation Network Companies
TOAH Transit Oriented Affordable Housing
TOD Transit-Oriented Development
TOS Transportation Operations Systems
TPA Transit Priority Area
TPI Transit Performance Initiative
TPP Transit Priority Project Areas
VHD Vehicle Hours of Delay
VMT Vehicle Miles Traveled
7
![Page 8: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/8.jpg)
625 Burnell Street
Napa, CA 94559
Napa Valley Transportation
AuthorityMeeting Minutes - Draft
Citizen Advisory Committee
5:00 PMMEETING LOCATION: REFER TO COVID-19 SPECIAL NOTICEWednesday, July 1, 2020
1. Call To Order
Chair Baldini called the meeting to order at 5:05 p.m.
2. Roll Call
Michael Baldini
Doug Weir
Aisha Nasir
Patricia Lynch
Alex Crown
Linsey Gallagher
Hans Korve
Present: 7 -
Jean Vincent Deale
Nicole Cummings
Christina Benz
Matthew Schmitz
Larry Kromann
Gary Woodruff
Absent: 6 -
3. Introductions
New CAC members Hans Korve and Linsey Gallagher were introduced.
4. Public Comment
None
5. Committee Member and Staff Comments
6. CONSENT AGENDA ITEMS (6.1)
Motion MOVED by NASIR, SECONDED by LYNCH to APPROVE Consent Item 6.1. Motion carried
by the following vote:
Aye: Baldini
Weir
Nasir
Lynch
Crown
Gallagher
Korve
7 -
Page 1Napa Valley Transportation Authority Printed on 8/26/2020
September 2, 2020CAC Agenda Item 6.1Continues From: New
Action Requested: APPROVE
8
![Page 9: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/9.jpg)
July 1, 2020Citizen Advisory Committee Meeting Minutes - Draft
Absent: Deale
Cummings
Benz
Schmitz
Kromann
Woodruff
6 -
6.1 Meeting Minutes of March 4, 2020 (Danielle Schmitz) (Pages 8-10)
Draft MinutesAttachments:
CAC action approved the meeting minutes of March 4, 2020.
7. REGULAR AGENDA ITEMS
7.1 Executive Director's Report (Kate Miller) (Pages 11-16)
Staff ReportAttachments:
Information Only / No Action Taken
Staff briefed the CAC on NVTA’s staffing changes, project and program updates and on the
economic effects associated with the COVID-19 stay at home order on NVTA’s operations.
7.2 Vine Transit Update (Alan Budde) (Pages 17-21)
Staff ReportAttachments:
Information Only / No Action Taken
Staff provided information on the current operational performance of the Vine family of services
including recent measures taken in response to the COVID-19 pandemic and related Stay at
Home order.
7.3 Draft Community Based Transportation Plan (CBTP) (Danielle Schmitz) (Pages
22-25)
Staff ReportAttachments:
Information Only / No Action Taken
Staff provided and overview of the draft CBTP.
Page 2Napa Valley Transportation Authority Printed on 8/26/2020
9
![Page 10: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/10.jpg)
July 1, 2020Citizen Advisory Committee Meeting Minutes - Draft
7.4 Draft Environmental Document for the Napa Valley Vine Trail Project - St.
Helena to Calistoga Segment (Rebecca Schenck) (Pages 26-30)
Staff ReportAttachments:
Information Only / No Action Taken
Staff provided information on the Vine Trail Environmental document. CAC members were
encouraged to review the full plan document.
8. FUTURE AGENDA ITEMS
• State Route (SR) 29 CMCP [Comprehensive Multimodal Corridor Plan]
• North Bay large transportation projects - highway projects like Jameson Canyon
• CTP [Countywide Transportation Plan] update
9. ADJOURNMENT
9.1 Approval of Next Regular Meeting Date of September 2, 2020 and Adjournment
The next regular meeting is scheduled for Wednesday, September 2, 2020 at 5:00 p.m.
Chair Baldini adjourned the meeting at 6:16 p.m.
Page 3Napa Valley Transportation Authority Printed on 8/26/2020
10
![Page 11: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/11.jpg)
September 2, 2020 CAC Agenda Item 7.1 Continued From: New
Action Requested: INFORMATION
NAPA VALLEY TRANSPORTATION AUTHORITY CAC Agenda Letter ______________________________________________________________________
TO: Citizen Advisory Committee
FROM: Kate Miller, Executive Director
REPORT BY: Kate Miller, Executive Director (707) 259-8634 / Email: [email protected]
SUBJECT: Executive Director’s Report ______________________________________________________________________
RECOMMENDATION
Information only
EXECUTIVE SUMMARY
This report will brief the ITOC about NVTA project and programs and provide an update about the impacts of COVID-19 on the Vine Transit System.
BACKGROUND AND DISCUSSION
Calistoga to St. Helena Vine Trail Project The NVTA board approved the Calistoga to St. Helena California Environmental Quality Act (CEQA) Initial Study/Mitigated Negative Declaration (IS/MND) at its Special Meeting on August 19th. The CEQA draft was released for public comment on June 26, 2020. The comment period closed on July 27, 2020.
This project will connect the cities of Calistoga to St. Helena along a mostly 10’ wide class 1 path that is parallel to SR 29. This IS/MND includes a description of the proposed Project; an evaluation of the Project's potential environmental impacts; the findings of the environmental analyses; and recommended standard conditions and mitigation measures to lessen or avoid the project's potential significant adverse impacts on the environment.
Based on the environmental checklist form completed for the proposed Project and supporting environmental analysis, the Project would have no impact or a less than significant impact on the following environmental issue areas: aesthetics, air quality, energy, greenhouse gas emissions, hydrology, land use, mineral resources, population and housing, public services, recreation, transportation, utilities and service systems, and wildfire. The proposed Project's impacts on the following issue areas would be less than
11
![Page 12: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/12.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.1
Page 2 of 3 ____________________________________________________________________________________
significant with the implementation of mitigation: agriculture, biological resources, cultural resources, geology and soils, hazards, noise, and tribal cultural resources. All impacts would be less than significant after mitigation. Comments were received on the IS/MND from the California Department of Forestry and Fire Protection (CALFIRE), Napa Valley Vine Trail Coalition and local residents and property owners. A total of 11 entities or people made comments regarding environmental issues. Staff and Kimley Horn worked closely with affected agencies and jurisdictions to address the comments. These comments were addressed in a Response to Comments Appendix included with the Final IS/MND. A Mitigation Monitoring and Reporting Program has been prepared to ensure CEQA compliance during project implementation. Following NVTA Board approval of the adoption of the IS/MND, staff will file a Notice of Determination for the CEQA document. Imola Park and Ride This project will upgrade the existing park and ride at Imola and Golden Gate adjacent to SR 29. The project will also improve passenger facilities on the highway ramps and add pedestrian facilities connecting the north bound and southbound ramps on the south side of Imola. At your last meeting, staff had advised that NVTA apply for $300,000 in Metropolitan Transportation Commission’s (MTC) sub-Housing Incentive Pool (sub-HIP) Program. This request was approved and the project is now fully funded and staff anticipates that the project will break ground in spring of 2021. MTC’s Blue Ribbon Task Force At the last CAC meeting, staff provided the committee with an overview of MTC’s Blue Ribbon Task Force. As a reminder, the Task Force was convened, in part, to identify a distribution formula for the $1.3 billion in Coronavirus Aid, Relief, and Economic Security (CARES) Act funds. NVTA received $2.7 million from the first tranche of funds and $1.6 million from the second tranche totaling $4.3 million. The CARES Act funds addresses the $1 million deficit in NVTA’s budget for the current fiscal year. The Task Force also oversaw the development of a single safety plan in response to the pandemic to ensure both riders and drivers are protected from contracting the virus. The Plan, Riding Together Bay Area Health Transit Plan, which has been vetted and approved by the region’s transit systems, acknowledges that riders transfer between systems. The Plan establishes vehicle, station, driver, and rider protocols which includes regular cleaning and sterilizing of equipment and stations, adherence to wearing masks and using other personal protective equipment, and regularly washing hands and using hand sanitizers. Vehicles carrying more vulnerable populations, such as paratransit vehicles, must also be spot cleaned before a new passenger may board. The Task Force will also oversee how the 28 Bay Area transit systems can work together and improve connectivity to create a more seamless transit experience for riders.
12
![Page 13: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/13.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.1
Page 3 of 3 ____________________________________________________________________________________
NVTA Revenue Projections As reported to you during our last meeting, the economic impacts of the COVID-19 Stay At Home Order has had a significant impact on the agency’s revenues – particularly the Vine Transit. The Vine Transit system is funded through multiple fund sources, however, the majority of funds come from two sources, Federal Transit Administration (FTA) and Transportation Development Act (TDA) Funds. The Federal Transit Administration funds make up approximately 17% of NVTA’s budget and they are anticipated to remain stable. TDA funds are generated from a statewide ¼ cent sales tax. NVTA receives the TDA sales tax revenues generated in Napa. TDA makes up roughly 55% of the Transit revenues. Smaller sources of revenues include State Transit Assistance (STA), which makes up roughly 12% of NVTAs budget. STA funds are generated from sales tax on diesel fuels.
Typically, TDA generations are between $800,000 and $1,000,000 monthly depending on the month – peak period tourist season is generally higher. Subsequent to the pandemic, the revenues have ranged from between $278,000 and $670,000. NVTA staff anticipates that revenues for FY 2020-21 are likely to be down by more than 15% from prior year generations. NVTA has not received recent STA revenue amounts but gas prices remain depressed and consumption has not yet rebounded to prior year levels so staff is assuming that STA generations will be significantly lower this year.
NVTA collects fares from its riders. Fares are 12% of NVTA’s Transit revenues. During the Stay at Home Order, the agency suspended fares in order to ensure safe distances between drivers and riders. NVTA is working with its contractor, Transdev, to install driver protective barriers on its buses. The barriers are expected to be completed by early September and the agency plans to resume collecting fares on September 13th. Long term, NVTA anticipates that fare revenues will likely rebound faster than other revenues because there is growing unemployment and typically more people take transit during severe economic recessions. Nevertheless, ridership is still significantly down; ridership on the express bus and regional services is on average 48% of normal, Napa City services are about 15% of normal, shuttles services are on average 30% of normal and paratransit services is about 10% of normal. Consequently, fares are likely to be down by more than 50% for the current fiscal year. A more comprehensive update of Vine Transit services is being provided under a separate cover.
SUPPORTING DOCUMENTS
Attachment: (1) Riding Together – Bay Area Healthy Transit Plan http://www.healthytransitplan.org/
13
![Page 14: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/14.jpg)
September 2, 2020 CAC Agenda Item 7.2 Continued From: New
Action Requested: INFORMATION
NAPA VALLEY TRANSPORTATION AUTHORITY CAC Agenda Letter ______________________________________________________________________
TO: Citizen Advisory Committee
FROM: Kate Miller, Executive Director
REPORT BY: Alan Budde, Transit Manager (707) 259-8635 / Email: [email protected]
SUBJECT: Vine Transit Update _____________________________________________________________________
RECOMMENDATION
Information only.
EXECUTIVE SUMMARY
This report will provide the operational performance of the Vine family of services for the third and fourth quarter of Fiscal Year (FY) 2019-20, which is January 2020 to June 2020, as well as July 2020. The report will also provide an update on operational and service changes related to the pandemic.
FINANCIAL IMPACT
Is there a fiscal impact? Not for this report.
BACKGROUND AND DISCUSSION
In response to the COVID-19 pandemic and public health orders issued by the State and County of Napa starting in March, a series of service modifications were instituted. Service hours were reduced, fare payment was suspended, seat spacing was introduced, and buses began using rear door only boarding whenever feasible. In mid-March, service hours on Routes 10 & 11 were reduced to a Saturday schedule during weekdays. Routes 10X and 11X were suspended – after already showing mixed ridership performance in the months preceding the pandemic. On April 27th, local fixed route services in the City of Napa (A-H) were suspended and Vine began operating only On-Demand service for local trips. On May 13th following the County of Napa’s revised Shelter at Home order, NVTA posted notices requiring use of face coverings by passengers and staff.
14
![Page 15: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/15.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.2
Page 2 of 5 ___________________________________________________________________________________
NVTA is working with the Vine operator, Transdev, to install plexi-glass barriers in the driver’s compartments for transit buses, which is expected to be complete in early September. Currently, there is not an established option for the smaller, cutaway shuttle buses. Tentatively, Vine will recommence fare collection on Sunday, September 13th on all services. Napa On-Demand riders will pay the same local $1.60 full, $1.10 student, and $0.80 reduced fare that was previously established for local routes. NVTA continues to support auxiliary EOC functions that include meal delivery to residents in isolation and quarantine sites, food bank distribution while centers are closed to the public, and related transportation. NVTA was also activated as part of the Napa Lightning Complex response on August 19 to support potential evacuation requests. Fixed Route Performance The entire Vine system experienced steep ridership declines starting in March with a low in April and May. During June and July, ridership on Regional and Express Services increased by 18% compared to the prior two months (Table 1 and Chart 1). Taking into consideration reduced service hours, passengers per hour performance was relatively better (Table 2 and Chart 2) for Routes 10 and 11. Table 1: Fixed Route Ridership
Passengers Carried
January February March April May June July
Route 10 16,261 16,936 6,255 5,525 6,693 8,214 8,122
Route 11 18,464 19,827 8,027 7,285 7,228 8,012 7,973
Route 10X 167 1,019 462 0 0 0 0
Route 11X 553 1,589 882 0 0 0 0
Route 21 3,091 2,985 1,462 1,372 1,334 1,483 1,559
Route 29 5,639 5,209 3,801 2,908 2,310 2,500 3,270
TOTAL 44,175 47,565 20,889 17,090 17,565 20,209 20,923
Table 2: Passengers per Hour by Route
Passengers per hr January February March April May June July
Route 10 10.7 11.6 4.3 4.3 5.2 6.3 6.3
Route 11 11.45 13.06 5.43 5.77 5.96 6.59 6.56
Route 10X 0.63 4.34 2.62 N/A N/A N/A N/A
Route 11X 1.98 6.33 4.67 N/A N/A N/A N/A
Route 21 6.0 6.3 2.8 2.6 2.8 2.9 2.9
Route 29 7.55 7.63 5.07 3.90 3.41 3.34 4.19
15
![Page 16: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/16.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.2
Page 3 of 5 ___________________________________________________________________________________
Chart 1: Fixed Route Ridership
Chart 2: Passengers per Hour by Route
0.0
2.0
4.0
6.0
8.0
10.0
12.0
14.0
Route 10 Route 11 Route 10X Route 11X Route 21 Route 29
Passengers per hour
January February March April May June July
0
5,000
10,000
15,000
20,000
25,000
Route 10 Route 11 Route 10X Route 11X Route 21 Route 29
Ridership by Route
January February March April May June July
16
![Page 17: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/17.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.2
Page 4 of 5 ___________________________________________________________________________________
VineGO and Community Shuttle Performance Ridership on VineGo remains at about 10% of pre-COVID levels. VineGO is scheduling all requested trips for eligible ridership, however many community services are closed due to the pandemic and vulnerable riders may be less likely to use paratransit due to health concerns. Reopening of community centers and social service offices are expected to coincide with new ridership. New ADA certifications are being conducted by phone appointment only at this time. Total ridership on the four Community Shuttles has recovered to approximately 30% of pre-COVID levels with all services showing monthly improvement. Starting in March, all shuttles had a reduction in hours due to lower demand. Overall, the shuttles transported 1.9 passengers per hour in July compared to 4.9 passengers per hour in February. Part of the change can be associated with the elimination of fixed route trips on some services, which had high student ridership. (Table 3 and Chart 3) Table 3: VineGo and Community Shuttle Ridership
Passengers Carried January Februar
y March April May June July
VineGo 2,009 1,960 1,052 214 247 262 216
Calistoga Shuttle 1,999 1,783 985 308 322 678 724
St. Helena Shuttle 1,207 1,317 789 111 252 302 380
Yountville Trolley 1,085 1,425 660 48 67 175 225
American Canyon Transit 2,055 2,802 1,373 292 433 567 615
Chart 3: VineGo and Community Shuttle Ridership
0
500
1,000
1,500
2,000
2,500
3,000
VineGo Calistoga Shuttle St. HelenaShuttle
YountvilleTrolley
AmericanCanyon Transit
VineGo and Shuttle Ridership
January February March April May June July
17
![Page 18: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/18.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.2
Page 5 of 5 ___________________________________________________________________________________
City of Napa - On Demand Performance
On April 27, local fixed route services in the City of Napa (A-H) were suspended and Vine began operating only On-Demand service for local trips Monday through Saturday, 7:30 AM to 5:30 PM. Since the implementation weekday ridership has consistently increased every month. For the first half of August, the system is carrying 2.6 passengers per hour on weekdays, approaching the target of 4.0 passengers per hour. Saturday ridership has increased more slowly. (Table 4 and Chart 4)
Use of mobile application as a booking method has increased from 16.7% of riders in May to 20.3% in July and August. While ridership has increased, average wait times and average ride times have remained stable at about 10 minutes each, for a typical total trip time of 20 minutes.
Table 4: Napa Local On-Demand Ridership
Passengers Carried
Fixed Routes A-H February May June July August
Weekday Average 1,512 133 175 181 204
Saturday Average 759 104 118 102 118
Chart 4: Napa Local On Demand Ridership
SUPPORTING DOCUMENTS
None
133
175 181
204
104118
102118
320 320 320 320
0
50
100
150
200
250
300
350
May June July August (8/12)
Napa On Demand Ridership
Weekday Avg Saturday Avg Target
18
![Page 19: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/19.jpg)
September 2, 2020 CAC Agenda Item 7.3 Continued From: New
Action Requested: INFORMATION
NAPA VALLEY TRANSPORTATION AUTHORITY CAC Agenda Letter ______________________________________________________________________
TO: Citizens Advisory Committee
FROM: Kate Miller, Executive Director
REPORT BY: Diana Meehan, Senior Planner/Program Administrator (707) 259-8327 / Email: [email protected]
SUBJECT: Draft Imola Avenue Complete Streets Corridor Improvement Plan ______________________________________________________________________
RECOMMENDATION
Information only
EXECUTIVE SUMMARY
The Imola Avenue Complete Streets Corridor Improvement Plan provides the framework and recommendations for the transformation of a crucial east/west transportation corridor from a vehicle-centric arterial to a complete streets multimodal corridor, which serves low-income communities, multiple schools, employment centers and retail.
The plan has been under development since December 2018 and is now complete and will go before the NVTA Board for approval on September 16. Chapters 1-3 describe the plan purpose, coordination with local agencies, and establishes the vision and goals for the corridor. Chapters 4 & 5 provide an evaluation of existing conditions and economic analysis of the corridor while describing potential strategies for improvement. Chapter 6 includes detailed project recommendations for both near-term and long-term improvements. The final chapters evaluate and prioritize the Plan’s project recommendations and describes the potential funding sources for project implementation. Finally, the appendices include all of the technical analysis used to produce the plan.
FISCAL IMPACT
None
19
![Page 20: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/20.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.3
Page 2 of 2 ____________________________________________________________________________________
BACKGROUND AND DISCUSSION
NVTA received a Caltrans Sustainable Communities Planning Grant to plan for improvements along the Imola Avenue Corridor. NVTA contracted with GHD, an engineering firm with expertise in complete streets corridor planning to assist in producing the Plan. The Imola Avenue Complete Streets Corridor Improvement Plan will create a new vision for the corridor, to transform it into a place where people of all ages and abilities can travel safely and comfortably, whether walking, bicycling, riding transit, or driving. These changes will allow Imola Avenue to better serve the diversity of destinations along the corridor, including residential neighborhoods, commercial properties, schools, and trails like the Ridge Trail, Bay Trail, and Napa Valley Vine Trail.
The Imola Avenue Corridor has been identified as a high priority corridor in need of significant multimodal improvements. The corridor is complex because it serves various land uses and needs and because it is owned by three jurisdictions - Caltrans, the County of Napa, and the City of Napa. The corridor lacks some of the basic elements to serve all users on the corridor and consequently it was identified as an ideal candidate for a more complex and detailed corridor improvement plan.
The project objectives are to achieve significant increases in multimodal transportation access, improved mobility, and connectivity along the corridor to schools, retail nodes, residential neighborhoods, and open space by developing safer, complete streets infrastructure improvements. The plan integrates local planning objectives with a focus on enhancing public health, safety and security through cooperative planning and development for functional improvement of the built transportation environment along the corridor.
There are several stakeholders along the corridor, including Napa County Office of Education, Napa State Hospital, and Napa Valley College. In 2014, NVTA staff in cooperation with jurisdiction staff, elected officials and Caltrans walked the corridor to identify needs and potential improvements. The project is identified in the Countywide Transportation Plan, Vision 2040, Moving Napa Forward.
SUPPORTING DOCUMENTS
Link to Draft Plan https://www.imolacorridorplan.org/about
20
![Page 21: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/21.jpg)
September 2, 2020 CAC Agenda Item 7.4 Continued From: New
Action Requested: INFORMATION
NAPA VALLEY TRANSPORTATION AUTHORITY CAC Agenda Letter ______________________________________________________________________
TO:
FROM:
REPORT BY:
SUBJECT:
Citizens Advisory Committee
Kate Miller, Executive Director
Rebecca Schenck, Principal Program Planner/Administrator (707) 259-8636 / Email: [email protected]
State Route 29 Comprehensive Multimodal Corridor Plan (SR 29 CMCP) and American Canyon Project Initiation Document (PID)
______________________________________________________________________
RECOMMENDATION
Informational only. The Citizens Advisory Committee (CAC) will receive information on the State Route Comprehensive Multimodal Corridor Plan (SR 29 CMCP) adopted by the NVTA Board in May of 2020 and an update on the progress on the American Canyon Project Initiation Document (PID).
EXECUTIVE SUMMARY
The Napa Valley Transportation Authority (NVTA) contracted with GHD to complete the SR 29 Comprehensive Multimodal Corridor Plan (SR 29 CMCP) to better define improvements along the corridor in March 2019. The NVTA Board released a draft of the SR 29 CMCP to the public on April 15, 2020 and adopted a final document on May 20, 2020. The CMCP needed to be finalized and adopted by the Board in order to apply for Senate Bill 1 (SB1) Solutions for Congested Corridor Program in July of 2020. The American Canyon PID is now underway under the same contract with GHD.
BACKGROUND AND DISCUSSION
NVTA developed the SR 29 Comprehensive Multimodal Corridor Plan to better define and prioritize improvements in the corridor and to be eligible for SB 1 SCCP funding in the summer of 2020. In March of 2019, Napa Valley Transportation Authority (NVTA) contracted with GHD to complete both the 1) SR 29 Comprehensive Multimodal Corridor Plan (CMCP) and 2) the Project Initiation Document (PID) for SR 29 through American Canyon.
The purpose of the SR 29 CMCP is to identify a preferred SR 29 corridor concept and associated infrastructure improvements that will best meet both the local and regional goals, while providing the highest return on investment of limited regional transportation
21
![Page 22: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/22.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.4
Page 2 of 3 ____________________________________________________________________________________
funding for the next 20 years. The plan will serve as an update to SR 29 Gateway Plan and be developed consistent with the 2018 Comprehensive Multimodal Corridor Plan Guidelines (California Transportation Commission, December 2018) and the draft SB-1 Solutions for Congested Corridors Program Guidelines (California Transportation Commission). To be competitive for procuring limited discretionary transportation funding, the CMCP must document how the recommended CMCP capital improvements address recent federal and state transportation planning objectives/initiatives including multimodal considerations, social equity, climate change, goods movement, economic development and return on investment. The CMCP now serves as the formal update to the SR 29 Transportation Corridor Concept Report (Caltrans System Planning). Acquiring grant funding is the primary impetus for this effort. NVTA submitted improvements associated with Soscol Junction in a Cycle 2 Solutions for Congested Corridor grant application and a Local Partnership Program grant application to the State. NVTA submitted applications to both program with the goal of receiving a total of $25 million in funding. The remaining improvements will be submitted as part of Cycle 3 grant application (2023). The NVTA Board released the draft document to the public on April 15, 2020. NVTA staff then held a virtual public meeting on April 23rd to present the draft and answer questions in real-time. NVTA continued to collect public comments on the document through the project’s website and by email through May 8, 2020. The final document presented as Attachment 1 reflects all comments received. The second part of the GHD contract, the American Canyon PID, is now underway. Caltrans requires that a PID be developed and approved before any major or high complexity project can be programmed and constructed on the State Highway System. The draft purpose and need for the PID is outlined below. Need The SR 29 corridor between American Canyon Road and Napa Junction Road experiences significant safety and operational issues during weekday and weekend peak hour conditions. The most pronounced issues in the corridor include:
Lack of multimodal connectivity, particularly for bicycle and pedestrian access along and across SR 29;
Lack of low-stress routing options for bicyclists;
Lack of continuous parallel routes to support local and regional travel demand;
Capacity constraints at intersections that cause extensive queuing and delays, extensive bottleneck durations, and unreliable travel times for both motorists and public transit;
Compromised feasibility to provide enhanced transit service due to travel time unreliability; and
Increased safety risks and conflicts between motorists and active transportation users.
22
![Page 23: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/23.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.4
Page 3 of 3 ____________________________________________________________________________________
Purpose
Provide a multimodal and complete streets corridor that improves mobility, relieves congestion, and provides improved accessibility for all modes of transportation along SR 29 between American Canyon Road and Napa Junction Road.
SUPPORTING DOCUMENTS
Attachment: (1) Final State Route 29 Comprehensive Multimodal Corridor Plan and Appendices, including the Executive Summary in Spanish https://www.nvta.ca.gov/sr-29-cmcp
23
![Page 24: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/24.jpg)
September 2, 2020 CAC Agenda Item 7.5 Continued From: New
Action Requested: INFORMATION
NAPA VALLEY TRANSPORTATION AUTHORITY CAC Agenda Letter ______________________________________________________________________
TO: Citizens Advisory Committee
FROM: Kate Miller, Executive Director
REPORT BY: Danielle Schmitz, Director of Capital Development and Planning (707) 259-5968 / Email: [email protected]
SUBJECT: Update on Large Capital Projects in the North Bay ______________________________________________________________________
RECOMMENDATION
Informational only.
EXECUTIVE SUMMARY
The Citizen Advisory Committee (CAC) requested a high-level overview on larger North Bay projects underway.
BACKGROUND AND DISCUSSION
U.S. 101 Marin-Sonoma Narrows The Marin Sonoma Narrows extends 16-miles from State Route 37 in Marin County to Corona Road in Santa Rosa. The project has been divided into smaller projects to correspond with funding availability. The Marin-Sonoma Narrows Project is broken into 14 phases and is a total of $761 million dollars. Many segments have been completed with one major segment underway currently and one project still waiting to receive funding.
Projects currently under construction:
MSN C2: Construct 3.3 miles of northbound and southbound HOV lanes throughPetaluma, replace Petaluma Bridge, and build sound walls in Petaluma. The totalproject cost for this segment is $121.5 million. The Project began construction inAugust 2019 and is scheduled to be complete in in late 2022.
Future Projects, unfunded:
B7: Funding: Construct northbound and southbound HOV lanes between the MarinCounty/Sonoma County line and Atherton Avenue. The total project cost for thissegment is estimated to be $135.6 million.
24
![Page 25: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/25.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.5
Page 2 of 3 ____________________________________________________________________________________
SR 121/SR 116 Intersection Improvements This project would remove a right turn lane and install a roundabout at the intersection of Highway 121 and 116. The project would relocate the park and ride lot, and widen the roadway to allow for turn lanes into and out of existing commercial uses. The park and ride lot will be relocated and the capacity will remain the same in the new location. The Environmental Documentation and project approval was completed in April 2018. Project Status Design and Right of Way are expected to be complete by 2022. Construction funding is programmed in the State Highway Operation and Protection Program and the project will start construction in 2023. The project cost estimate is $24 million. State Route 37 NVTA is working in partnership with the other North Bay County Transportation Agencies, the Metropolitan Transportation Commission (MTC) and Caltrans on the SR 37 Resiliency Project. The ultimate SR 37 project would be to widen and elevate SR 37 to four lanes throughout the entire 21-mile corridor from I-80 to SR-101. The ultimate project is a $4.5 billion dollar project with multiple stakeholders and moving pieces. The SR 37 near-term priority project is the Traffic Congestion Relief Project. This project spans from Mare Island to west of the SR 121 interchange in Sonoma, where the road narrows to two lanes. The project is focused on traffic congestion relief by improving traffic flow during peak travel times and increasing vehicle occupancy within the travel corridor. Three project alternatives are under consideration, including converting existing shoulders to part-time or full-time travel lanes, and/or installing a movable median barrier to provide a three-lane facility within the project limits. Any additional lanes are intended to be High Occupancy Vehicle (HOV) lanes, to provide an incentive to shift to multi-occupant vehicles. The cost range for the interim project is between $200-500 million. Project Status Caltrans, MTC and the North Bay agencies are working on the environmental work for the Traffic Relief Project. The timeline is to have the project environmental cleared by May 2022. I-80/I-680/SR 12 The I-80/I-680/SR 12 Interchange Project - Construction Package 2A, will complete the construction of the I-80 connection to SR 12 that was started with Construction Package 1. The existing eastbound SR 12 to eastbound I-80 connector will be removed. A new two-lane highway alignment and bridge structure for the eastbound SR 12 to eastbound I-80 will be constructed that meets the design requirements for future project phases. The new bridge structure will be designed to accommodate a future connector to southbound I-680. The project will construct the off-ramp from eastbound SR 12 to Green Valley Road. A braided ramp connection for eastbound I-80 to Green Valley Road and southbound I-680 will also be constructed.
25
![Page 26: Wednesday, September 2 PM MEETING LOCATION ......2020/09/02 · Translation Services: If you require a translator to facilitate testimony to the NVTA, please contact Karrie Sanderlin,](https://reader033.fdocuments.net/reader033/viewer/2022060517/604a5c8b777a4268a636bf6c/html5/thumbnails/26.jpg)
CAC Agenda Letter Wednesday, September 2, 2020 Agenda Item 7.5
Page 3 of 3 ____________________________________________________________________________________
Project Status The project will start construction in September 2020 with completion expected by early 2022. The total project cost is $93.7 million.
I-80 Managed LanesThe project will construct managed lanes in the westbound and eastbound directions ofI-80 from west of Red Top Road to east of I-505, a distance of approximately 18 miles,through the conversion of High Occupancy Vehicle (HOV) lanes and highway wideningfor new managed lanes. The new managed lanes in the East Segment would extend forapproximately 10 miles but provide congestion relief for nearly 12 miles, as backups oftencause issues starting at Abernathy Road. Assuming free-flow conditions, the managedlanes project in coordination with other planned improvements along the corridor wouldsave approximately 17 minutes for each bus or other HOV traveling on eastbound I-80during the PM peak period. The time savings would result from increased average speedsalong the corridor, with average speeds in the managed lanes being approximately 15mph faster than in the general-purpose lanes. Any time savings realized from themanaged lanes will be put back into the transit system in the form of increased frequency.This could mean that, during peak times, transit service could increase from every 20minutes to every 15 minutes.
Project Status The project is currently in the design phase with anticipated completion in April 2021. The project is going after discretionary funding to complete the funding package, with a total project cost of $249.4 million. There is a $123 million shortfall on the project.
SUPPORTING DOCUMENTS
None. A PowerPoint presentation will be provided at the meeting.
26