Web 1-2-3 PPDM

20
Web 1-2-3 for Petroleum Andrew Zolnai Cambridge UK blog.zolnai.ca PPDM London User Group 28 January 2010

description

 

Transcript of Web 1-2-3 PPDM

Page 1: Web 1-2-3 PPDM

Web 1-2-3 for Petroleum

Andrew ZolnaiCambridge UK

blog.zolnai.ca

PPDM

London User Group

28 January 2010

Page 2: Web 1-2-3 PPDM

WHO

Page 3: Web 1-2-3 PPDM

Web 1.0

• Static websites

• One-way delivery mechanisms

• On-line communities

Page 4: Web 1-2-3 PPDM

Web 2.0

• Dynamic blogs

• Social networks

• Communities ofinterest of practice

Page 5: Web 1-2-3 PPDM

Web 3.0

• All of the above

• RSS feeds and twitterreach other people

• Interactive communitieswith feedback and measurable following

Page 6: Web 1-2-3 PPDM

WHAT

Page 7: Web 1-2-3 PPDM

Tim O’Reilly on Web 2.0

1. Embrace open standards

2. Make it simple

3. Design for cooperation

4. Learn from users

5. Lower the barrier to experimentation

6. Make it a culture of measurement

7. Open the doors to partners

Page 8: Web 1-2-3 PPDM

GeoVation Award submission

1. EPSG, OGC, and PPDM as standards

2. Web front-end for entire workflows

3. Intranet and links to extranets

4. Extend into document mgmnt.

5. Technology under the hood

6. Organised and served withsimple and affordable tools

7. Implementation partners

Page 9: Web 1-2-3 PPDM

Industry standards

• PPDM

– Petroleum schemas

• Energistics

– XML schemas

• OGC

– Web Mapping Services

• EPSG

– Projection parameters

Page 10: Web 1-2-3 PPDM

WHERE

Page 11: Web 1-2-3 PPDM

User needs

• Keep workflows location-based

• Augment rather than replace processes

• Subsumed technology to the process

• Let everything stay under thehood

Page 12: Web 1-2-3 PPDM

User links

• Internal intelligence – info, asset teams

• Joint intelligence – farm-ins, joint ventures

• Public data – agencies, permit rounds

• Exchanged data – vendors, data rooms

• Communities of interest

www.webdataview.com

portal.onegeology.org

Page 13: Web 1-2-3 PPDM

WHEN

Page 14: Web 1-2-3 PPDM

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

DEJ

OilVoice

PPDM

Zebradata

Linkedin

Zolnai blog

Zolnai web

2009 INM web traffic

Page 15: Web 1-2-3 PPDM

• Feedback loop

– societal web

• Metadata framework

– semantic web

• Enhanced protocol

– geolocation tags

When there is...

Page 16: Web 1-2-3 PPDM

HOW

Page 17: Web 1-2-3 PPDM

Link Communities and Processes

Twitter

Blog Web

Static Web 1.0Dynamic Web 2.0

Interactive Web 3.0

Page 18: Web 1-2-3 PPDM

Link Communities and Processes

SSoftwareSales

SupportConsulting

Partners

Standards

Associations

Sales

Adverts

Sales

Sales

Product

Page 19: Web 1-2-3 PPDM

Link Communities and Processes

SSoftwareSales

DiscoveryDrilling

Permit

Field

Basin

Sales

Play

Sales

Production

Sale

Page 20: Web 1-2-3 PPDM

Thank you

Andrew Zolnai

Sales & Marketing Director

[email protected]

Interactive Net Mapping Ltd.

PO Box 469

Exeter

EX1 9AS

United Kingdom

Tel: +44(0)1392 495 600

Fax: +44(0)1392 495 695

www.oilelefant.com