For more information email [email protected] | 32 | For more information email [email protected]
Product OverviewAdjust casing to Weave Radiant Textile Panels are upholstered in Kvadrat textiles to provide colour
and texture options for seamless integration with any design scheme. Capable of both heating and
cooling, Weave can be applied to most spaces.
Typical applications include office buildings, schools and public buildings.
For further information regarding product or installation, please contact [email protected].
FIG. 1: ISO VIEW
Threaded Rod
Unistrut
Weave PanelCore mounting system
by PARC
For more information email [email protected] | 32 | For more information email [email protected]
WARNING! Read and save these instructions before beginning to install Weave Radiant
Textile Panels.
To reduce the risk of fire, electric shock, or injury to persons, observe the following:
• When cutting or drilling into wall or ceiling, do not damage electrical wiring and other
hidden utilities.
• Use this unit only in the manner intended by the manufacturer. If you have any
questions, contact the manufacturer or PARC Technical Support.
• When installing Weave Radiant Textile Panels, a team of at least two installation
technicians is required.
• Torsion spring tips could pierce skin if not handled with caution.
• Drain system prior to removing panels.
• Keep hands away from torsion springs and pinch points when pushing a panel up
into the installed position.
Before You StartInspect all product parts for flaws and shipping damage.
If anything is discovered to be damaged, contact the shipping company and manufacturer immediately.
Tools Required
6’ level Laser level Measuring tape
4 mm Hex Key Driver 5/16” / 8mm socket or wrench T25 Torx Driver
Cordless Drill Hammer Drill (optional)
For more information email [email protected] | 54 | For more information email [email protected]
Site Conditions, Storage and Handling • Read the Installation guide before handling.
• Always wear clean, nonabrasive gloves when handling panels.
• Only store in clean dry conditions.
• Store upright and face to face.
• Do not remove protective plastic wrap on textile until panel is installed in ceiling.
• Reference the tags and labels associated with each panel and component.
• Do not place panels on their corners.
• Do not over stack.
• Do not stack in a way likely to cause falls.
Poor or rough handling, rolling or dropping of the product on corners or edges may cause damage
to the product or the product to deteriorate.
Consideration should be given to the advice of the Occupational Health & Safety Representative
regarding manual handling. An assessment should be made of any risk and if necessary mechanical
lifting equipment should be used.
The storage space must be cleared of debris and, in general, should be enclosed. The Weave Radiant
Textile Panels should be kept clean, dry and protected from the elements.
Installation of Weave panels will require a minimum of at least two installation technicians.
For more information email [email protected] | 54 | For more information email [email protected]
Core Mounting System Installation SequenceCore is specially designed to integrate with Weave to provide a simple and efficient mechanism to
install the panels.
FIG. 2: TORSION SPRING INTERFACE WITH CORE MOUNTING SYSTEM
Weave Panel
Torsion Springs
Core Runners
NOTE: All mounting hardware and suspension system to be supplied by the contractor and installed
alongside the Weave Radiant Textile Panel and Core mounting system.
The Core cross members are set out and suspended from the soffit using the suspension system
provided by the installer, in the specified locations.
FIG. 3: CORE CROSS MEMBERS
Core Cross Member
Core Runner
Core Runner
Core Cross Member
For more information email [email protected] | 76 | For more information email [email protected]
The Core mounting slots allow for accurate setting out of suspension system.
FIG. 4: CORE MOUNTING SLOT DIMENSIONS FIG. 5: CORE MOUNTING SLOT POSITION
FIG. 6: TYPICAL CORE LAYOUT
2.38[60]
.38[10]
Core Runner
Core Cross Mem
ber
Core Cross Mem
ber
Core Cross Mem
ber
Core Cross Mem
ber
Core Runner
5.90150
5.90150
3.94100
For more information email [email protected] | 76 | For more information email [email protected]
The Core cross members are fixed to the Core runners, using factory installed hardware and key slots.
FIG. 7: CORE FIXING FIG. 8: CORE FIXING
FIG. 9: CORE FINAL ASSEMBLY
Keyhole slot foreasy cross member
installlation
Hex head screws to attach runner to cross members
Detail C
Detail D
Detail E
Symmetric butterfly slots for orientation flexibility
E
KK
D
COffset slots to avoid lateral torsion spring forces
Opening towards outsidefor easy torsion spring install
Slot for threaded rod adjustment
Cross member alignment between Core panel sets
For more information email [email protected] | 98 | For more information email [email protected]
Install runner alignment bars between assembled Core mounting systems for every panel where
permissible.
Once the Core mounting system is installed, install the Weave panels.
FIG. 10: ALIGNING MULTIPLE CORE SYSTEMS
G
H
Detail H
Detail G
Runner alignment bars between Core panel sets
Cross member alignment bars between Core panel sets
For more information email [email protected] | 98 | For more information email [email protected]
Weave Panel InstallationNOTE: Do not remove protective plastic wrap on textile panels textile panels until panel is installed in
ceiling. Leave plastic wrap on the panels for as long as possible, only removing at the very end of the
construction programme.
Access Cables
Using the provided access cables, clip each cable to a corresponding mounting slot in the Core runner.
FIG. 11: ACCESS CABLE MOUNTING SLOT
FIG. 12: ADJUSTABLE TORSION SPRING POSITION
The panels are connected to the Core mounting system using torsion springs.
The torsion springs will be attached to the panels in the factory and should not require adjustment
by the installer.
They can be adjusted down the length if needed by loosening the screws and moving the bracket
down the channel in the frame extrusion.
Torsion springs mounted on the Weave panel interface with slots in the Core runners to provide a
secure connection and access to each individual panel.
Access cablemounting slot
Torsion spring bracketadjustable along length
For more information email [email protected] | 1110 | For more information email [email protected]
Torsion Spring Connection
Install each panel by compressing the torsion springs and inserting them into the butterfly receiving
slots in the Core runners.
Ensure that the access cable wire is fully latched onto both the Panel Bracket and the Core substructure.
FIG. 14: TORSION SPRING SLOT FIG. 15: TORSION SPRING DETAIL
FIG. 13: WEAVE PANEL SUSPENDED FROM ACCESS CABLES
14.49[368]
Access cable clipsinto mounting system
Butterfly torsionspring slot
Opening towardsoutside for ease oftorsion spring placement
For more information email [email protected] | 1110 | For more information email [email protected]
FIG. 16: TOP-DOWN VIEW OF TORSION SPRING IN ALTERNATE NOTCHES
The torsion spring should be clipped into the butterfly receiving slot with each leg of the torsion spring
hooked into alternate notches in the receiving slot to ensure the torsion spring is centred.
For more information email [email protected] | 1312 | For more information email [email protected]
Once all torsion springs are attached to Core, push the panel up by its edges into the mounted
position, until the Weave panel engages with the Core Runners.
FIG. 17: ENGAGING THE TORSION SPRINGS WITH CORE
FIG. 18: WEAVE PANEL IN ENGAGED POSITION
3.4387
1.0026
1.5038
6.24159
Mounting to building structure
For more information email [email protected] | 1312 | For more information email [email protected]
The final installation should come together as shown below.
Check final installation for line and level of all panels.
Hoses and Connections
The panel-to-panel and panel-to-header hydronic circuits are connected using the flex hoses provided
and should be connected in accordance with the hydronic layout drawings.
To connect the hoses, push the hose all the way onto the end of the copper tubing.
FIG. 19: SECTION VIEW OF WEAVE IN FINAL ENGAGED POSITION
FIG. 20: HOSE INSTALLATION FIG. 21: HOSE ENGAGEMENT
3.0377
Radiant hose with push-fit connection forsupply / return and header connections
Copper ends angled upwards –for radiant hose installation
Push tab in and simutaneously pulling hose
Push the hose all the way onto the end of the copper tube
The other end of the hose must be pushed all the way onto the main, header or adjacent panel by a
qualified person.
To release the hose, push the release tab in while simultaneously pulling the hose off.
NOTE: Never remove hose without first checking that system has been drained.
The flex connection hose connection is 5/8 in. (15.875 mm) OD actual.
For more information email [email protected] | 1514 | For more information email [email protected]
End Cap Option
Using the supplied hardware, fasten all end cap mounting brackets to the top of the frame assembly
using the pre-drilled locating holes.
FIG. 22: END CAP ASSEMBLY
Brackets can be rotated 180°to change grain direction
Magnet connectionto panel bracket
Alignment slot
For more information email [email protected] | 1514 | For more information email [email protected]
Completed end cap installation should appear as below.
Each of the end cap assemblies are supplied with magnet cups pre-installed. Magnets must be
inserted into each of the magnet cups before installing the end cap.
End cap mounting brackets on the end cap and the Weave frame need to align for installation.
Lateral adjustments can be made to the end cap mounting bracket on the end cap if additional
alignment is required.
FIG. 23: END CAP MAGNET INSTALLATION
FIG. 24: COMPLETED END CAP INSTALLATION
Front profile Side profile
End cap bracket
Magnet cup
Magnet
For more information email [email protected] | 1716 | For more information email [email protected]
Panel Removal and Hinging CapabilitiesNOTE: Do not remove any panels without first checking that the system has been drained and it is
safe to do so.
NOTE: A minimum of two technicians required to remove panels.
To remove a panel from its mounted position, gently pull down on the two corners.
This will compress the torsion springs and result in the panel dropping into its hanging position.
FIG. 27: WEAVE PANEL HINGING ON TORSION SPRINGS
FIG. 25: SUSPENSION ON ACCESS CABLES FIG. 26: TORSION SPRING DISENGAGED
Ensure that the access cables are correctly installed before removing the torsion springs.
Remove the torsion springs along one side of the Core runner by compressing the torsion springs
and removing them from the butterfly receiving slots.
Disconnect the access cables on disconnected side of the panel and gently lower the panel into the
hinged position.
Panel hinges 90°on torsion springs
Disconnect radiant hose and drainpanel prior to hinging (by others)
For more information email [email protected] | 1716 | For more information email [email protected]
Repeat operation on opposite side if panel needs to be removed from the ceiling.
Ensure that panels are stored in accordance with storage guidance in this guide.
Waste Disposal ManagementWeave Radiant Textile Panels are shipped and packaged with protective material that should be
disposed of in an appropriate manner.
Please remove or recycle waste and packaging materials per your local requirements.
The information contained in this document only provides guidance for the installation of
PARC products. All PARC products should only be installed by trained professionals and
installation responsibility remains with the installer. PARC reserves the right to review, alter,
amend or remove published data without notice as our policy is one of constant improvement.
The information contained in this installation guide is believed to be correct at the date of
publication. Whilst PARC will endeavor to keep its publications up to date, readers will
appreciate that between publications there will be changes in laws or other developments
affecting the accuracy of the information contained in this installation guide.
Product Improvement is a continuing endeavour at PARC. Therefore, specifications are subject to change without notice.Consult your PARC Sales Representative for current specifications or more detailed information. Not all products may be
available in all geographic areas. All goods described in this document are warranted as described in the Limited Warrantyshown at parc-ceilings.com. The complete PARC product catalog can be viewed online at parc-ceilings.com.
® PARC is a registered trademark of Price Industries Limited. © 2021. v004