We speak your language - WestConnex cove... · The Toelle Street and Callan Street intersections...

4
1800 660 248 | [email protected] | westconnex.com.au M4-M5 Link Iron Cove Link factsheet | 2017 WestConnex is part of the Australian and NSW governments’ vision for supporting Sydney’s growing population and keeping our economy strong. The M4-M5 Link is the third stage of WestConnex. It will link the New M4 Motorway at Haberfield to the New M5 Motorway at St Peters, with additional connections to the Iron Cove Bridge and Rozelle Interchange. We speak your language Need an interpreter? Call the Translating and Interpreting Service on 131 450. Iron Cove Link civil site To support the construction of the Iron Cove Link, a construction site would be established on Victoria Road between Springside Street and the Iron Cove Bridge. The site would mainly be used to support construction of the Iron Cove Link surface works, including tunnel entry and exit ramps, upgrades, and modifications to the eastbound and westbound carriageways of Victoria Road. It would also be used to support construction of a bioretention facility within an informal car park in King George Park, adjacent to Manning Street at Rozelle. As part of these works, a section of the existing car park would be upgraded, including sealing the car park surface and landscaping. Artist’s impression of Iron Cove Link 12 to 18 months after completion Keeping you informed We are committed to keeping you informed and will provide regular information on the M4-M5 Link through direct mail and email notifications, community updates, local papers and face-to-face activities. You can also contact the WestConnex info line on 1800 660 248, email [email protected] or visit westconnex.com.au/ m4-m5link for more information.

Transcript of We speak your language - WestConnex cove... · The Toelle Street and Callan Street intersections...

1800 660 248    |     [email protected]    |     westconnex.com.au

M4-M5 Link Iron Cove Link factsheet | 2017

WestConnex is part of the Australian and NSW governments’ vision for supporting Sydney’s growing population and keeping our economy strong. The M4-M5 Link is the third stage of WestConnex. It will link the New M4 Motorway at Haberfield to the New M5 Motorway at St Peters, with additional connections to the Iron Cove Bridge and Rozelle Interchange.

We speak your language

Need an interpreter? Call the Translating and Interpreting Service on 131 450.

Iron Cove Link civil site To support the construction of the Iron Cove Link, a construction site would be established on Victoria Road between Springside Street and the Iron Cove Bridge. The site would mainly be used to support construction of the Iron Cove Link surface works, including tunnel entry and exit ramps, upgrades, and modifications to the eastbound and

westbound carriageways of Victoria Road. It would also be used to support construction of a bioretention facility within an informal car park in King George Park, adjacent to Manning Street at Rozelle. As part of these works, a section of the existing car park would be upgraded, including sealing the car park surface and landscaping.

Artist’s impression of Iron Cove Link 12 to 18 months after completion

Keeping you informed

We are committed to keeping you informed and will provide regular information on the M4-M5 Link through direct mail and email notifications, community updates, local papers and face-to-face activities.

You can also contact the WestConnex info line on 1800 660 248, email [email protected] or visit westconnex.com.au/ m4-m5link for more information.

M4-M5 Link Iron Cove Link factsheet | 2017

Connect with us

Construction activity

Indicative construction timeframe

2018 2019 2020 2021 2022 2023

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

Site establishment and utility works

Traffic diversions and intersection works

Construction of cut-and-cover and tunnel portals and operational infrastructure

Site rehabilitation and landscaping

Testing and commissioning

Figure 1. Iron Cove Link civil site indicative construction program

Access routesIt is anticipated that construction vehicles would enter and exit the site to and from the southern (westbound) Victoria Road carriageway.

Vehicle movements

Location Daily vehicles (one way)

AM peak hour (7:30am - 8:30am)

PM peak hour (4:15pm - 5:15pm)

Heavy vehicles

Light vehicles

Heavy vehicles Light vehicles Heavy vehicles Light vehicles

Iron Cove Link civil site

42 140

Arrive

2

Depart

2

Arrive

15

Depart

N/A

Arrive

2

Depart

2

Arrive

N/A

Depart

140

Figure 2. Indicative construction vehicle movements at Iron Cove Link civil site

The site would include temporary offices, a workshop and storage facilities; sediment basin and construction water treatment plant; a temporary substation; workforce amenities; and car parking. During operation, a portion of the site would be occupied by the Iron Cove Link motorway operations complex, including the Iron Cove Link ventilation facility. In addition, a ventilation outlet would

be constructed between the eastbound and westbound carriageways of Victoria Road near Springside Street.

There is no intention to operate roadheaders at this site (as tunnel excavation of the Iron Cove Link is anticipated to occur from the Rozelle civil and tunnel site), however the site may be used to support limited excavation of the initial sections of the Iron Cove Link tunnels.

1800 660 248    |     [email protected]    |     westconnex.com.au

M4-M5 Link Iron Cove Link factsheet | 2017

Figure 3. Indicative Iron Cove Link civil site layout

Moodie Street

Toelle Street

Crystal LaneByrnesStreet

Man

nin g

Stre

et

McC

leer

Stre

et

Vict

oria

Roa

d

Callan Street

War

ayam

aPl

ace

Springside Street

Cam

brid

ge S

treet

Cry

stal

Str

eet

Yara Avenue

Clubb Street

Wellington Street

Terry Street

King

Geo

rge

Park

AECOM GIS Printed Date: 11/08/2017 \\AUSYD5FP001\Drive-P\60491677\4. Tech & Enviro work area\4.99 GIS\10_EIS\02_Maps\MXD_DDP\M4M5_EIS_CH06_001_60491677_A4L_CS_Construction_site_layout_option_A.mxd

060

120

m

T he

Bay

Run

Exis

ting

shar

ed p

ath

Tem

pora

ry d

iver

sion

M4-

M5

Link

Bou

ndar

ies

Proj

ect f

ootp

rint

Anci

llary

faci

lity

Surfa

ce w

orks

Surf

ace

cons

truc

tion

Acce

ss ro

adC

ut a

nd c

over

TUN

NEL

SU

nder

grou

nd c

onst

ruct

ion

Iron

Cov

e Li

nk tu

nnel

Gat

esA

cces

s an

d eg

ress

Site

gat

e

Arr

ows

Vehi

cle

mov

emen

tsLi

ght v

ehic

leH

eavy

veh

icle

Vent

sPr

ojec

t fea

ture

sVe

ntila

tion

outle

tVe

ntila

tion

faci

lity

!«N#

Iron

Cov

e

Ligh

t veh

icle

cr

oss

over

Hea

vy a

nd li

ght

vehi

cle

ingr

ess

an

d eg

ress

to/fr

om

Vict

oria

Roa

d

Ve

ntila

tion

exha

ust

faci

lity

Ligh

t veh

icle

pa

rkin

g

Tem

pora

ry

real

ignm

ent o

f th

e B

ay R

un

Wor

ksho

pan

d st

orag

e

Tem

pora

ry

wat

er tr

eatm

ent

faci

lity

and

sedi

men

t bas

in

Incl

udes

- U

tility

wor

ks m

anag

emen

t ch

ange

s an

d m

easu

res

- In

stal

latio

n of

saf

ety

and

envi

ronm

enta

l con

trols

- Es

tabl

ishm

ent o

f tem

pora

ry

pede

stria

n an

d cy

clis

t di

vers

ions

(if r

equi

red)

A

A

A

Hea

vy a

nd li

ght

vehi

cle

ingr

ess

an

d eg

ress

to/fr

om

Vict

oria

Roa

d

King

G

eorg

e Pa

rk

Iron

Cove

Brid

ge

Iron

Cov

e Li

nk

surf

ace

wor

ks

Indi

cativ

e Iro

n C

ove

Link

civ

il si

te

Subs

tatio

n

Iron

Cov

e Li

nk

vent

ilatio

n ou

tlet

Exis

ting

conn

ectio

n of

the

Bay

Run

und

er Ir

on C

ove

Brid

ge w

ould

be

reta

ined

Figu

re 6

-23

Indi

cativ

e Iro

n C

ove

Link

civ

il si

te (C

8) la

yout

6-65

LEG

END

G:\Studio\Jobs\JB000215_M4-M5 Link EIS report\Links\20170815_SMC_GD_EIS_Construction_Site_Layout_Figures_ArtiSharma\M4M5-EIS-FIG-CH-6.indd | 170816 12:40 [V12A]

Brid

gew

ater

Pa

rk

Clu

bb S

tree

t clo

sed

perm

anen

tly a

t th

e be

ginn

ing

of c

onst

ruct

ion

No

impa

cts

to tr

ees

on b

ound

ary

of

exis

ting

carp

ark

Con

stru

ctio

n of

bio

rete

ntio

n fa

cilit

y an

d ca

r par

k im

prov

emen

t wor

ks

Imag

ery

© N

earm

ap (2

017)

*

*Ven

tila

tio

n fa

cilit

ies

incl

ude

vent

ilati

on

sup

ply

an

d e

xhau

st f

acili

ties

, ax

ial f

ans,

ven

tila

tio

n o

utle

ts a

nd v

enti

lati

on

tunn

els.

1800 660 248    |     [email protected]    |     westconnex.com.au

M4-M5 Link Iron Cove Link factsheet | 2017

Standard hours of workSurface works Above-ground construction work would be carried out between the following standard construction hours:

● 7am to 6pm Monday to Friday

● 8am to 1pm Saturday

● Generally, no work on Sundays or public holidays

● Where work is required outside of these hours it would be conducted in accordance with conditions of approval and Environment Protection Licence conditions.

Traffic and TransportTemporary changes to the local road network would be necessary to allow for construction of the Iron Cove Link civil and tunnel site. The Clubb Street/Victoria Road intersection would be permanently closed.

The Toelle Street and Callan Street intersections with Victoria Road would generally remain open during construction. These sections may be closed temporarily but this would be short-term and conducted during non-peak times where practical.

Westbound pedestrian and cyclist routes along Victoria Road would be temporarily diverted via Moodie, Manning and Byrnes streets. These would connect with the westbound shared-path along Victoria Road via the terminus at Byrnes Street. Once construction is complete, the pedestrian and cyclist network would be reinstated.

A section of King George Park would be used to support the widening works along Victoria Road. The Bay Run would be temporarily realigned to retain pedestrian and cycle connectivity with the path over the Iron Cove Bridge. The existing arrangement would be reinstated once construction has been completed.

Minimising impacts on the community WestConnex is working to minimise the impact of construction on the community, with most of the proposed work to occur underground. However, some work would need to occur on the surface to construct the entry and exits to the tunnels and to build tunnel support facilities.

The M4-M5 Link Environmental Impact Statement outlines in detail the measures to mitigate any potential construction impacts.

Minimising noiseTo minimise noise impacts during construction, several mitigation measures will be in place. These include:

● Providing noise barriers and an acoustic shed to house tunnelling activity

● Undertaking noisy work during core work hours, where appropriate

● Ensuring all equipment is shut down when not in use and non-tonal reversing beepers used

● Ensuring there are periods where construction work is not scheduled to give residents respite.

Protecting propertyTo provide peace-of-mind to local residents and businesses, all properties within 50 metres of the outer edge of the underground tunnels will be offered a property condition survey before construction, with a follow-up survey (for the property) after construction. This will ensure there is a clear record of the property’s condition before and after construction. In the unlikely event there is any damage attributed to the project it would be repaired at no cost to the property owner.

Future land useFollowing construction there will be pockets of residual land remaining on Victoria Road between Springside Street and the Iron Cove Bridge. An Urban Design and Landscape Plan (UDLP) would be prepared prior to the commencement of permanent built-surface-works and landscaping. It would identify and establish urban design and landscaping initiatives for the area including any permanent noise mitigation structures such as noise barriers. The UDLP would be prepared in consultation with stakeholders and the community.