We speak your language - WestConnex cove... · The Toelle Street and Callan Street intersections...
Transcript of We speak your language - WestConnex cove... · The Toelle Street and Callan Street intersections...
1800 660 248 | [email protected] | westconnex.com.au
M4-M5 Link Iron Cove Link factsheet | 2017
WestConnex is part of the Australian and NSW governments’ vision for supporting Sydney’s growing population and keeping our economy strong. The M4-M5 Link is the third stage of WestConnex. It will link the New M4 Motorway at Haberfield to the New M5 Motorway at St Peters, with additional connections to the Iron Cove Bridge and Rozelle Interchange.
We speak your language
Need an interpreter? Call the Translating and Interpreting Service on 131 450.
Iron Cove Link civil site To support the construction of the Iron Cove Link, a construction site would be established on Victoria Road between Springside Street and the Iron Cove Bridge. The site would mainly be used to support construction of the Iron Cove Link surface works, including tunnel entry and exit ramps, upgrades, and modifications to the eastbound and
westbound carriageways of Victoria Road. It would also be used to support construction of a bioretention facility within an informal car park in King George Park, adjacent to Manning Street at Rozelle. As part of these works, a section of the existing car park would be upgraded, including sealing the car park surface and landscaping.
Artist’s impression of Iron Cove Link 12 to 18 months after completion
Keeping you informed
We are committed to keeping you informed and will provide regular information on the M4-M5 Link through direct mail and email notifications, community updates, local papers and face-to-face activities.
You can also contact the WestConnex info line on 1800 660 248, email [email protected] or visit westconnex.com.au/ m4-m5link for more information.
M4-M5 Link Iron Cove Link factsheet | 2017
Connect with us
Construction activity
Indicative construction timeframe
2018 2019 2020 2021 2022 2023
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Site establishment and utility works
Traffic diversions and intersection works
Construction of cut-and-cover and tunnel portals and operational infrastructure
Site rehabilitation and landscaping
Testing and commissioning
Figure 1. Iron Cove Link civil site indicative construction program
Access routesIt is anticipated that construction vehicles would enter and exit the site to and from the southern (westbound) Victoria Road carriageway.
Vehicle movements
Location Daily vehicles (one way)
AM peak hour (7:30am - 8:30am)
PM peak hour (4:15pm - 5:15pm)
Heavy vehicles
Light vehicles
Heavy vehicles Light vehicles Heavy vehicles Light vehicles
Iron Cove Link civil site
42 140
Arrive
2
Depart
2
Arrive
15
Depart
N/A
Arrive
2
Depart
2
Arrive
N/A
Depart
140
Figure 2. Indicative construction vehicle movements at Iron Cove Link civil site
The site would include temporary offices, a workshop and storage facilities; sediment basin and construction water treatment plant; a temporary substation; workforce amenities; and car parking. During operation, a portion of the site would be occupied by the Iron Cove Link motorway operations complex, including the Iron Cove Link ventilation facility. In addition, a ventilation outlet would
be constructed between the eastbound and westbound carriageways of Victoria Road near Springside Street.
There is no intention to operate roadheaders at this site (as tunnel excavation of the Iron Cove Link is anticipated to occur from the Rozelle civil and tunnel site), however the site may be used to support limited excavation of the initial sections of the Iron Cove Link tunnels.
1800 660 248 | [email protected] | westconnex.com.au
M4-M5 Link Iron Cove Link factsheet | 2017
Figure 3. Indicative Iron Cove Link civil site layout
Moodie Street
Toelle Street
Crystal LaneByrnesStreet
Man
nin g
Stre
et
McC
leer
Stre
et
Vict
oria
Roa
d
Callan Street
War
ayam
aPl
ace
Springside Street
Cam
brid
ge S
treet
Cry
stal
Str
eet
Yara Avenue
Clubb Street
Wellington Street
Terry Street
King
Geo
rge
Park
AECOM GIS Printed Date: 11/08/2017 \\AUSYD5FP001\Drive-P\60491677\4. Tech & Enviro work area\4.99 GIS\10_EIS\02_Maps\MXD_DDP\M4M5_EIS_CH06_001_60491677_A4L_CS_Construction_site_layout_option_A.mxd
060
120
m
T he
Bay
Run
Exis
ting
shar
ed p
ath
Tem
pora
ry d
iver
sion
M4-
M5
Link
Bou
ndar
ies
Proj
ect f
ootp
rint
Anci
llary
faci
lity
Surfa
ce w
orks
Surf
ace
cons
truc
tion
Acce
ss ro
adC
ut a
nd c
over
TUN
NEL
SU
nder
grou
nd c
onst
ruct
ion
Iron
Cov
e Li
nk tu
nnel
Gat
esA
cces
s an
d eg
ress
Site
gat
e
Arr
ows
Vehi
cle
mov
emen
tsLi
ght v
ehic
leH
eavy
veh
icle
Vent
sPr
ojec
t fea
ture
sVe
ntila
tion
outle
tVe
ntila
tion
faci
lity
!«N#
Iron
Cov
e
Ligh
t veh
icle
cr
oss
over
Hea
vy a
nd li
ght
vehi
cle
ingr
ess
an
d eg
ress
to/fr
om
Vict
oria
Roa
d
Ve
ntila
tion
exha
ust
faci
lity
Ligh
t veh
icle
pa
rkin
g
Tem
pora
ry
real
ignm
ent o
f th
e B
ay R
un
Wor
ksho
pan
d st
orag
e
Tem
pora
ry
wat
er tr
eatm
ent
faci
lity
and
sedi
men
t bas
in
Incl
udes
- U
tility
wor
ks m
anag
emen
t ch
ange
s an
d m
easu
res
- In
stal
latio
n of
saf
ety
and
envi
ronm
enta
l con
trols
- Es
tabl
ishm
ent o
f tem
pora
ry
pede
stria
n an
d cy
clis
t di
vers
ions
(if r
equi
red)
A
A
A
Hea
vy a
nd li
ght
vehi
cle
ingr
ess
an
d eg
ress
to/fr
om
Vict
oria
Roa
d
King
G
eorg
e Pa
rk
Iron
Cove
Brid
ge
Iron
Cov
e Li
nk
surf
ace
wor
ks
Indi
cativ
e Iro
n C
ove
Link
civ
il si
te
Subs
tatio
n
Iron
Cov
e Li
nk
vent
ilatio
n ou
tlet
Exis
ting
conn
ectio
n of
the
Bay
Run
und
er Ir
on C
ove
Brid
ge w
ould
be
reta
ined
Figu
re 6
-23
Indi
cativ
e Iro
n C
ove
Link
civ
il si
te (C
8) la
yout
6-65
LEG
END
G:\Studio\Jobs\JB000215_M4-M5 Link EIS report\Links\20170815_SMC_GD_EIS_Construction_Site_Layout_Figures_ArtiSharma\M4M5-EIS-FIG-CH-6.indd | 170816 12:40 [V12A]
Brid
gew
ater
Pa
rk
Clu
bb S
tree
t clo
sed
perm
anen
tly a
t th
e be
ginn
ing
of c
onst
ruct
ion
No
impa
cts
to tr
ees
on b
ound
ary
of
exis
ting
carp
ark
Con
stru
ctio
n of
bio
rete
ntio
n fa
cilit
y an
d ca
r par
k im
prov
emen
t wor
ks
Imag
ery
© N
earm
ap (2
017)
*
*Ven
tila
tio
n fa
cilit
ies
incl
ude
vent
ilati
on
sup
ply
an
d e
xhau
st f
acili
ties
, ax
ial f
ans,
ven
tila
tio
n o
utle
ts a
nd v
enti
lati
on
tunn
els.
1800 660 248 | [email protected] | westconnex.com.au
M4-M5 Link Iron Cove Link factsheet | 2017
Standard hours of workSurface works Above-ground construction work would be carried out between the following standard construction hours:
● 7am to 6pm Monday to Friday
● 8am to 1pm Saturday
● Generally, no work on Sundays or public holidays
● Where work is required outside of these hours it would be conducted in accordance with conditions of approval and Environment Protection Licence conditions.
Traffic and TransportTemporary changes to the local road network would be necessary to allow for construction of the Iron Cove Link civil and tunnel site. The Clubb Street/Victoria Road intersection would be permanently closed.
The Toelle Street and Callan Street intersections with Victoria Road would generally remain open during construction. These sections may be closed temporarily but this would be short-term and conducted during non-peak times where practical.
Westbound pedestrian and cyclist routes along Victoria Road would be temporarily diverted via Moodie, Manning and Byrnes streets. These would connect with the westbound shared-path along Victoria Road via the terminus at Byrnes Street. Once construction is complete, the pedestrian and cyclist network would be reinstated.
A section of King George Park would be used to support the widening works along Victoria Road. The Bay Run would be temporarily realigned to retain pedestrian and cycle connectivity with the path over the Iron Cove Bridge. The existing arrangement would be reinstated once construction has been completed.
Minimising impacts on the community WestConnex is working to minimise the impact of construction on the community, with most of the proposed work to occur underground. However, some work would need to occur on the surface to construct the entry and exits to the tunnels and to build tunnel support facilities.
The M4-M5 Link Environmental Impact Statement outlines in detail the measures to mitigate any potential construction impacts.
Minimising noiseTo minimise noise impacts during construction, several mitigation measures will be in place. These include:
● Providing noise barriers and an acoustic shed to house tunnelling activity
● Undertaking noisy work during core work hours, where appropriate
● Ensuring all equipment is shut down when not in use and non-tonal reversing beepers used
● Ensuring there are periods where construction work is not scheduled to give residents respite.
Protecting propertyTo provide peace-of-mind to local residents and businesses, all properties within 50 metres of the outer edge of the underground tunnels will be offered a property condition survey before construction, with a follow-up survey (for the property) after construction. This will ensure there is a clear record of the property’s condition before and after construction. In the unlikely event there is any damage attributed to the project it would be repaired at no cost to the property owner.
Future land useFollowing construction there will be pockets of residual land remaining on Victoria Road between Springside Street and the Iron Cove Bridge. An Urban Design and Landscape Plan (UDLP) would be prepared prior to the commencement of permanent built-surface-works and landscaping. It would identify and establish urban design and landscaping initiatives for the area including any permanent noise mitigation structures such as noise barriers. The UDLP would be prepared in consultation with stakeholders and the community.