WAYNE COUNTY COMMUNITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICTCOLLEGE DISTRICT
FROM VISION TO REALITY…
Pathways to the Future Program
As a result of the Board of Trustees’ Retreat in 1999, the District has been heavily engaged in a long-term capital facilities master planning process in order to provide a superior educational environment for our students. During this participative process, facility and site improvement priorities at all five campus locations are identified for expansion and development. These initiatives augment the strategic initiatives and mission of the District.
Dr. Curtis L. Ivery, Chancellor
TABLE OF CONTENTS
•Facilities Master Plan: Need and Recommendations
•Administrative Structure and Resource Management
•Academic and Career Programs
•Distance Learning
•Campus Updates
•Instructional Support
•Renovation and Remodeling
•Technology Infrastructure Improvements
Pathways to the Future ProgramGiving Students More…
Pathways to the Future is a transformational effort initiated in November 2001, following the passage of the millage, focusing on providing students with new and improved programs, facilities and services throughout the District.
Pathways program utilizes an effective dual administrative structure to design, implement and diligently monitor growth initiatives to meet the rapidly growing demand for WCCCD and respond dynamically to the ever changing needs of the communities served.
Facilities Improvement Needs Dictated By Dramatic Growth
10888
17089
3035227834
32316
36611
4079243830 43203
0
5000
10000
15000
20000
25000
30000
35000
40000
45000
50000
Spring2001
Fall2001
Spring2002
Fall2002
Spring2003
Fall2003
Spring2004
Fall2004
Spring2005
Semester
Hea
dcou
nt
Credit and non-credit courses
1) New Northwest Campus Facility
2) Internet and Computer Success Initiative
3) Multi-purpose Building on the Downriver Campus
4) Upgrading of Existing Campus Facilities and Campuses
5) Establishment of the Technology Careers of the Future
6)Initiative under the leadership of the District Career Commission
7) Investment in Learning and Information technologies
8) Investment in Laboratory and Classroom upgrading
Facility And Campus Master PlanRecommendations
ADMINISTRATIVE STRUCTURE
Staffing: PrimarilyFull-Time
Administrators
On-going District
Administration
Pathways to the Future
(Strategic Initiatives)
Staffing: PrimarilyTemporary Contract
Employees
Administrative Teams
Cross-CampusCouncils
ADMINISTRATIVE STRUCTURE
The dual administrative structure consists of administrative staff managing ongoing college operations and temporary part-time staff and consultants designs strategic institutional change initiatives.
ADMINISTRATIVE STRUCTURE OBJECTIVES
To expeditiously launch the transformational initiative of the Pathways program while optimizing human resources.
To serve as a catalyst for creating a new administrative structure that will ensure broad involvement, dialogue, and decision-making processes from all constituencies regarding strategic matters.
To ensure faculty and staff involvement through cross-campus and other related councils.
Resource Monitoring & Management
Expenditure Audit: In accordance with our high standards of accountability the District has engaged an external auditor to review “Pathways” expenditures. The process includes an expense analysis, book keeping and account classification propriety checks.
Monthly monitoring: Pathways expenditure reports are generated from the system, systematically categorized and given to a committee for review.
Quarterly Monitoring: Open or Inactive purchase orders are reviewed by Accounts Payable for any payments generated or cancellations and expenditure report is updated.
ACADEMIC AND CAREER PROGRAMS
Academic & Career Programs Investment Areas
Automotive
Computer Aided Design
Criminal Justice
Dental
Distance Learning
Electrical/Electronics Technology
Emergency Medical Technology
Fire Technology Program
Heavy Equipment Maintenance
Heating, Ventilation & Air
Conditioning
Humanities
Life Science
Machine Tool Technology
Nursing
Surgical Technology
WCCCD has more than 80 degree and certificate programs
Automotive Technology
HoistsAlignment rackTools & equipment
Computer Aided Design & Electrical/Electronics
TechnologyFurnitureSoftware
Robotic Technology
HVACHeating, Ventilation, and
Air Conditioning
•Boilers•Roof-top air units
•Furnaces•Coolers •Freezers•Refrigerators
Heavy Equipment Maintenance
Tire Repair UnitTruck Tire BalancerTruck Tire
ChangerTools
Life Science
Adams ModelsAnalytical BalancesAutoclavesIce makersLab SuppliesMicroscopesVarious human organ modelsSkeletonsSteam ScrubbersHuman Torsos
Machine Tool Technology
Computerized Machining Mill and Lathe
Surgical TechnologyAnesthesia MachineOperating TablesSurgical InstrumentsVital Signs MonitorsVarious Supplies
DISTANCE LEARNING
Distance Learning Initiatives
Online orientation (2003)Online orientation (2003)State of the art equipment upgrades in State of the art equipment upgrades in Interactive Television classrooms (2003Interactive Television classrooms (2003--2004)2004)Smart Classroom Installations (2003Smart Classroom Installations (2003--2005)2005)Recruiting and training faculty (2004Recruiting and training faculty (2004--2005)2005)Distance Learning Support Center Distance Learning Support Center Western Campus (2005)Western Campus (2005)Internet 2 Capability (2005)Internet 2 Capability (2005)
ITV Classrooms ITV Classrooms Smart ClassroomsSmart ClassroomsUpgrades to InfrastructureUpgrades to Infrastructure
Distance LearningMajor Pathways Expenditure AreasMajor Pathways Expenditure Areas
NEW CONSTRUCTION
Downriver Campus Education & Performing Arts Center
Exterior Rendering
Upper Level Interior
Lower Level Interior
Projected Construction Start Date: May 2005Projected Completion Date: July 2006Projected Cost: $12 – $14 million
Downriver Emergency Training Complex
Construction Began: August 2004Projected Completion Date: August 2005 Projected Cost: $6 million
Rendering
Exterior Rendering
New Northwest Campus
Health Sciences Building Rendering
Projected Construction Start Date: February 2006Projected Completion Date: August 2007 Projected Cost: $40 – 50 million
Exterior Rendering
Interior Rendering
Western CampusEducational Multipurpose Center
Projected Construction Start Date: June 2005Projected Completion Date: September 2006Projected Cost: $12 - $14 million
INSTRUCTIONAL SUPPORT
Instructional Support
•Student Photo ID
•LCD Projectors
•Copiers
•Computers
•Computer lab furniture: District wide
•Classroom furniture and whiteboards
Instructional SupportLRC Upgrades
BookshelvesFurnitureSecurity Detection System
Registration Stations Downtown and Northwest Campuses
“One Stop Shop”Downtown Campus
Instructional SupportStudent Services
Student Response Center
1-800-300-2118
Renovations & Remodeling
Renovations & RemodelingCAD, Electronics, HVAC, and MCSE Labs
Eastern Campus
Before, work in progress and after
Renovations & RemodelingSmart Classrooms, Downriver Campus
Before, work in progress and after
Renovations & RemodelingScience Labs
Before, work in progress and after
Renovations & RemodelingBookstore, Eastern Campus
Work in progress and after
Renovations & RemodelingCommunity Room, Downriver Campus
Before and after
Renovations & RemodelingCommunity Room, Downtown Campus
Before, work in progress and after
Renovations & RemodelingCommunity Room, Eastern Campus
Work in progress and after (rendering)
Deferred Maintenance
Deferred Maintenance ProjectsRoof Replacement at four
District facilities
Carpet Replacement at three
District facilities
Power wash building exteriors
Replacement of (2) A/C chillers -
Eastern
Upgrading of all District
elevators to A.D.A. compliance
Repair retaining wall -
Downtown
Upgrade entrance walkway with
lighting District-wide
Rebuild, repair and clean-out
storm drains - Western
Parking lot replacement and
patching
Replacement of condensate
tank for A/C Chiller - Downriver
Cooling coil replacement on
HVAC units - Downtown
Exterior caulking and sealing –
Downtown
Painting of interior classrooms
and offices District-wide
Replacement of heating system
and pump motors District-wide
Repair and upgrade
environmental controls District-
wide
Repair and replacement of
interior lighting fixtures District-
wide
Cooling Tower Replacement at
the Northwest Campus
Upgrading of energy
management system
Replacement of fan motors for
HVAC systems District-wide
A/C chiller pump and motor
impeller replacement at three
campuses
Air Compressor replacement for
Voc-Tech lab - Downriver
Deferred Maintenance Projects (Cont’d)
Replace second floor atrium tile
– Western
Replacement of condensation
pumps – Northwest
Replacement of skylight glass
in LRC – Downtown
Replacement of condensation
pipes on heating system -
Downriver
Re-route power lines in main
office floor – Western
Replacement of ceiling tile and
ceiling track District-wide
Replacement of float assembly
and cleaning of heating system
– Downriver
Replacement of domestic hot
water heating tank – Western
Repair and/or replace hallway
quarry tile - Downtown
Deferred Maintenance Projects (Cont’d)
Deferred Maintenance Projects
Powerwash Downriver and Downtown CampusesBuilding Tuckpointing Downtown Campus
Deferred Maintenance ProjectsRoof Replacement
District Office, Downriver, Downtown, Eastern and Western Campuses
Parking Lot and Lighting Replacement - Downriver
Network and Technology Infrastructure Improvements
New Telecommunications System
Upgrade of Network Cabling
District-wide
Server used for System Integration
Network and Technology Infrastructure Improvements
SCT Banner (Integrated Software System)
•Staging of Banner Project Office (January 2004)
•Hardware Installation (February 2004)
•Software Installation (February 2004)
•Initial Training and Technical Sessions (began March 2004)
WAYNE COUNTY COMMUNITY WAYNE COUNTY COMMUNITY COLLEGE DISTRICTCOLLEGE DISTRICT
….FORGING AHEAD