Waxahachie CorridorStrategy Meeting
June 24, 2010
http://www.nctcog.org/trans/spd/transitrail/sdallas/index.asp
Agenda2
Welcome & introductions
Vehicle development update
Conceptual Engineering & Funding Study
Stakeholder meetings
Project summary
Next steps for corridor implementation
Vehicle Development
Previous presentation on December 17
Will meet DART Board commitments
Compliant with FRA safety regulations
EPA Tier 4 non-road engine standards
“Off-the-shelf” technology when possible
Light Rail New Technology (LRNT)
3
Current Activity & Next Steps
Engineering consultant – Interfleet Technology Drafting vehicle performance specifications Accurate & current ridership projections critical Key design and performance issues
Low floor boarding Vehicle height and width Tier 4 engine availability Width of seats
4
Current Activity & Next Steps (cont.)
Continue meetings with Federal Railroad Administration (FRA)
Develop technology solutions Complete paperwork requirements
Commuter rail community Gauge industry interest in vehicle
Vehicle manufacturers Gauge interest in producing vehicle
Update local community as needed
5
FRA Engineering Task Force
Task Force Reports to Rail Safety Advisory Committee’s Passenger Rail Safety Working Group Mission: Produce technical evaluation criteria and
procedures for passenger rail equipment Four major meetings – September, November, January
and March DART is APTA lead voting member on task force
Final task force report due by late September Report will benefit project
Defined and agreed upon standards for waivers
6
Projected Schedule
June 2010 – Task force issues draft report Industry currently reviewing document
October 2010 – FRA Alternative Compliance Evaluation Criteria and Procedures to be published
Aug.-Oct. – Industry reviews vehicle specifications Nov.-Dec. 2010 – Issue RFP for regional vehicle Nov.-Dec. 2011 – Award contract & NTP June 2013 – Vehicle delivery begins
Delivery at 2-4 cars per month
7
Questions or Comments
8
Stakeholder Meetings
City of Dallas
Ellis County
City of Lancaster
City of Red Oak
City of Waxahachie
9
Stakeholder Comments
Resolve conflicts with freight Vehicle technology not critical Service implementation is critical Service to employment centers Accurate demographics Funding initiatives Glenn Heights park-n-ride usage Possibly form a corridor advocacy group Transit oriented development (TOD) Update cost estimates to 2010 dollars Corridor leadership changes
10
City of Waxahachie11
City of Red Oak 12
City of Lancaster13
City of Dallas14
Five alternatives identified Various station locations All alternatives include Light Rail New Technology (LRNT)
and Commuter Rail Technology (CRT)
Alt. 1 – LRNT/CRT (Union Station – Selected Stations) Alt. 2 – LRNT/CRT (Union Station – All Stations) Alt. 3 – LRNT/CRT (Southport – Selected Stations) Alt. 4 – LRNT/CRT (Southport – All Stations) Alt. 5 – LRNT/CRT (Union Station continuing along TRE – All Stations)
Summary of Findings15
Access
Population
Employment
Ridership projections
Development potential
Local support
Station spacing
Station Location Variables16
Roadway data Transit data Land use and zoning Demographics Community resources Air quality Water quality Noise Biological
Corridor Level Variables17
Headways (Train arrival frequency ) LRNT/CRT
20 minutes during peak periods
60 minutes during off-peak periods
Demographics 2030 Demographic Forecast – Year 2030
Published in April 2003
To be updated as part of Mobility 2035 MTP
Ridership Modeling Assumptions18
NCTCOG CE&F StudyPotential Stations
Ledbetter
Illinois
MLK
Corinth
Union Station
Loop 12
Simpson Stuart
Southport
All Potential Stations Options
South Red Oak
Downtown Red Oak
North Red Oak
Lancaster CBD
North Waxahachie
US 287
Waxahachie CBD
Cedar Valley College
Stations Modeled
Simpson Stuart
Illinois/Ledbetter/Loop 12
Corinth/MLK
Union Station
Cedar Valley College
Southport
Downtown Red Oak/South Red Oak
North Red Oak
North Waxahachie
US 287
Waxahachie CBD
Lancaster CBD
19
Alternative 1Waxahachie CBD to Union Station – Selected Stations
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
780
230
1,800
570
190
80
100
180
340
Total Ridership:
4,300
20
Alternative 2Waxahachie CBD to Union Station – All Stations
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
770
1,900
480
200
90
40
160
330
170
60
150
220
Total Ridership:
4,600
21
Alternative 3Waxahachie CBD to Southport – Selected Stations
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
380
360
170
940
40
220
Total Ridership:
2,100
22
Alternative 4Waxahachie CBD to Southport – All Stations
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
370
360
160
940
40
220
Total Ridership:
2,10030
60
23
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
880
2,900
520
210
100
50
160
370
180
60
240
260
Total Ridership:
5,900
Alternative 5Waxahachie CBD to Union Station – Interlining with TRE
24
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
890
2,800
600
270
120
350
270
Total Ridership:
5,300
Alternative 5aWaxahachie CBD to Union Station – Interlining with TRE
25
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
870
2,780
620
460
300
Total Ridership:
5,000
Alternative 5bWaxahachie CBD to Union Station – Interlining with TRE
26
2030 Ridership Estimates
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
Alt 1 – 4,300
780
230
1,800
570
190
80
100
180
340
770
1,900
480
200
90
40
160
330
170
60
150
220
Alt 2 – 4,600
380
360
170
940
40
220
Alt 3 – 2,100
370
360
160
940
40
220
30
60
Alt 3 – 2,100
880
2,900
520
210
100
50
160
370
180
60
240
260
Alt 5 – 5,900
27
2030 Ridership EstimatesAlt 5a – 5,300
890
270
2,800
600
270
120
350
870
2,780
620
460
300
Alt 5b – 5,000
28
Lancaster CBD
Cedar Valley College
Simpson Stuart
Illinois/Ledbetter/Loop 12
Union Station
North Red Oak
Downtown/South Red Oak
US 287
Corinth/MLK
Southport
North Waxahachie
Waxahachie CBD
DRAFT
Conceptual Engineering & Funding StudySummary of Findings
29
Project Measure AlternativeNo-Build 1 2 3 4 5
Length (miles) 0 30.9 30.9 20.7 20.7 64.5
Primary Mode N/A LRNT/CRT LRNT/CRT LRNT/CRT LRNT/CRT LRNT/CRT
Interlining Service N/A None None None None TRE
Interlined Terminus N/A Union Station Union Station Southport Southport Union Station
Number of Stations 0 12 16 6 9 16
TransitEstimated Daily RidershipLinked Regional Transit TripsCorridor Travel Time (minutes)Interlined Ridership
0296,276
N/AN/A
4,300298,805
41.3N/A
4,600298,485
42.1N/A
2,100297,174
26.9N/A
2,100297,264
27.7N/A
5,900298,915
95.91,400
Property Acquisition(ROW Needed for Alignment) None None None None None None
Total Cost (millions, 2009 dollars)LRNTCRT
N/AN/A
$533$475
$578$520
$328$299
$362$341
$701$576
Land UseCompatibility with Local Plans Low High High Medium Medium High
Major Employers 41 60 60 11 11 60
Activity Centers 75 117 122 22 27 122
Community Facilities 87 144 151 35 43 151
Historic and Archeological ResourcesExisting Historical SitesArcheological InvestigationsPotential Historical Structures
258
87
7024
1,785
7226
2,278
4413
881
4613
1,294
7226
2,278
Parks, Trails and Recreational FacilitiesFacilities adjacent to Rail CorridorFacilities near Stations
012
1640
1644
514
517
1644
Hazardous/Regulated MaterialsSites adjacent to Rail CorridorSites near Stations
00
98
913
34
37
913
Air Quality Impact None Minimal Minimal Minimal Minimal Minimal
Noise (linear feet)Potential Sensitive Land Uses 0 35,480 35,480 22,084 22,048 35,480
Vibration (linear feet)Potential Sensitive Land UsesCategory 1Category 2Category 3
000
019,74415,737
019,74415,737
013,4568,592
013,4568,592
019,744715,737
Water ResourcesFloodplain Crossings (in linear feet)Stream Crossings
00
37,38513
37,38513
10,8628
10,8628
37,38513
Ecosystems 0 0 0 0 0 0
Prime Farmlands (acres) 0 1,027.5 1,899.5 1,027.5 1,657.9 1,899.5
Constructability N/A Medium Medium Medium Medium Medium
Capital Cost30
Alt. Service Area DescriptionNew
Length(miles)
Required Vehicles
(LRNT/CRT)
Total Capital Cost
(million 2009 $)(LRNT/CRT)
Cost / Mile(million $)
(LRNT/CRT)
1 Waxahachie CBD to Union StationLRNT/CRT Service to selected Stations 30.9 12/6 $ 533/475 $ 17/15
2 Waxahachie CBD to Union StationLRNT/CRT Service to all Stations 30.9 12/6 $ 578/520 $ 19/17
3 Waxahachie CBD to SouthportLRNT/CRT Service to selected Stations 20.7 7/4 $ 328/299 $ 16/14
4 Waxahachie CBD to SouthportLRNT/CRT Service to all Stations 20.7 7/4 $ 362/341 $ 18/16
5 Waxahachie CBD to T&P StationLRNT/CRT Service interlined with TRE 64.5 26/13 $ 701/576 $ 23/19
Source: NCTCOG, June 2010
Notes: 1. Cost estimates are “rough order-of-magnitude” estimates based on a conceptual level of planning 2. Cost estimates do not include costs for environmental and/or hazardous materials impacts DRAFT
Capital Cost & Ridership31
AlternativeCapital Cost
(million 2009 $)(LRNT/CRT)
2030 Annual Ridership
AnnualizedCost / Rider(LRNT/CRT)
1 $ 533/475 1,204,000 $ 31/28
2 $ 578/520 1,288,000 $ 31/28
3 $ 328/299 588,000 $ 39/36
4 $ 362/341 588,000 $ 43/41
5 $ 701/576 1,652,000 $ 30/24
Source: NCTCOG, June 2010
Notes: 1. Cost estimates are “rough order-of-magnitude” estimates based on a conceptual level of planning 2. Cost estimates do not include costs for environmental and/or hazardous materials impacts
DRAFT
32
Innovative Finance Initiative (IFI)
DART and T requested IFI DART and T providing financial models IFI Goal
Develop innovative financial plan Identify funding sources for 62 mile Cotton Belt
Corridor Construct Operate Maintain
33
Possible Innovative Elements
Vehicle manufacturing facility
New non-member city policies
New fare structure
Cost/revenue linkage
Economies of scale
34
IFI Schedule
Proposals due July 2
Consultant interviews July 16
NCTCOG Executive Board selection July 22
Estimated start date July 26
Contract length Approximately 6 – 9 months
35
RTC Roles
Solicit and contract with Financial Advisory Firm(s)
Investigate candidate funding sources Identify needed local, state, and national
actions Collaborate with DART and The T to identify
cost savings NCTCOG Staff will collaborate on
environmental process
36
Transportation Agency Roles
Initiate & lead environmental process
Develop LRNT vehicle
Collaborate on engineering issues
Construction
General Discussion/Next Steps
Moving forward
Ideas and suggestions
37
Questions & Comments
Tom Shelton, P.E., AICPSenior Program Manager
Streamlined Project [email protected]
(817) 704-5633
Kevin Feldt, AICPProgram Manager
Streamlined Project [email protected]
(817) 704-2529
Nathan DrozdTransportation Planner III
Streamlined Project [email protected]
(817) 704-5635
http://www.nctcog.org/trans/spd/transitrail/sdallas/index.asp