Watermill to microhydropower ethiopia

28
Identification and study of feasible watermill sites for Micro Hydropower Generation in Jimma Area Seminar Presentation Frezer Seid Awol 30.10.2012

Transcript of Watermill to microhydropower ethiopia

Page 1: Watermill to microhydropower ethiopia

Identification and study of feasible watermill sites for

Micro Hydropower Generation in Jimma Area

Seminar Presentation Frezer Seid Awol

30.10.2012

Page 2: Watermill to microhydropower ethiopia

Watermills

• Constructed by diverting water from river to hit a wheel which is connected to a mill

• Water driven mills used to grind grains • History in Ethiopia traced back to mid 19th century • Distributed in rural areas where electricity and diesel not reached • Privat or public Substitute hand-driven mills Small scale industry Multipurpose use of river X Slow operation X Flooded in rainy seasons X Inefficient water use

Hence, upgrading to small hydropower scheme was advocated and requested.

Page 3: Watermill to microhydropower ethiopia

Classification of Hydropower

By capacity

Large >100 MW

Medium 15-100 MW

Small 1-15 MW

Mini 100 KW – 1 MW

Micro 5 – 100 KW

Pico <5 KW

By design head

Low-head <15 m

Medium-head 15-50 m

High-head >50 m

By grid type

Off-grid

In-grid

By design type

Run-of-river

Pumped-Storage

Storage

Tidal

By Power supply system (Ethiopian context)

Inter-Connected System (ICS)

Self-Contained System (SCS)

The investigation sites are off-grid, low to medium head, micro, self-contained system run-of-river hydropower plants.

Page 4: Watermill to microhydropower ethiopia

• Memorandum of Understanding signed between Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH and Jimma University : – To actively involve stakeholders in hydropower development secter – To select and implement 2 joint pilot projects in Jimma area from proposed 6 sites for

demonstration and know how transfer – To establish a center of Excelence for research and capacity building

MoU for Rural Electrification

• BMZ and BMF • Since 1964 in Ethiopia • Energy Coordination

Office • Policy & stategy advice • Energy efficient

technology promotion • Rural electrification • Pilot projects evaluation • Funding

• 2nd largest University • Started as a college in

1952 • Institute of

Technology • Courses & Researchs • Proposal on

hydropower projects • Feasibility study for

pilot projects • Jimma Hydropower

Center of Excelence

Page 5: Watermill to microhydropower ethiopia

• Hydro – Scout • Consultancy and support • Customized training and lectures • Feasibility study and design • Research and thesis • 2 Pilot projects design and execution

Jimma Hydropower Center of Excelence

• Concept note and proposal • Awareness and promotions • Community setup • Supervision • Documentation

Source: Abera Melese, JHPCE, July 2010

Page 6: Watermill to microhydropower ethiopia

Feasibility Study - The final decision for or against the

recommended sites - Best 2 pilot projects selection and re-

assessment - Design of civil and electromechanical structures - Socio economic analysis

Detail Design - Preparation of the detailed layout of the Civil &

Electro Mechanical scheme - Cost-Benefit analysis

Pre feasibility study - Available flow at dry season - Available head - Topographic maps - Access to project site - Availability of local construction material at project

sites - To determine which sites are most attractive - Development options , conclusions and

recommendations are made

Desk Study - To be familiar with hydrologic and topographic profile

of the project sites - To be aware of rough location (distance) &

accessibility Reconnaissance visit

- Short Visit to the proposed sites - Identify if there is watermills at the sites & which are

functional or not - Identifying ownership & social structures - Nominate contact persons

Activities

• Desk study • Reconnaissance Visit • Pre – feasibility study • Feasibility study • Detailed design

Team assigned to select 2 most technically & socio-economically attractive watermills sites from the proposed 6 sites and design the HP scheme

Page 7: Watermill to microhydropower ethiopia

Proposed sites

Page 8: Watermill to microhydropower ethiopia

Site Name: Kersa-1 Distance (From Jimma): 23km GPS location: N 07o44’05.2’’ E 37o0’51.62’’ Elevation: 1760masl

Proposed sites

Watermills: 1 traditional Discharge: 120-160l/s Head: 11m Accessibility: Good Power Potential: 11 KW Remark: Attractive

Page 9: Watermill to microhydropower ethiopia

Proposed sites

Site Name: Kersa 2 Distance (From Jimma): 26km GPS location: N 07o 44’ 53.9’’ E 36o 57’ 41.8’’ Elevation: 1750masl

Watermills: NO Discharge: 200l/s Head: 4-5m Power potential : 5.5-6.9KW Accessibility: Bad Remark: Not Attractive for

MHP

Page 10: Watermill to microhydropower ethiopia

Proposed sites

Site Name: Kelecha Distance (From Jimma): 25km GPS location: N 7°39'30.40" E 37° 1'50.71“ Elevation: 1702masl

Watermills: 1 Not functional Discharge: 100 l/s Head: 5m Power output: 3.4KW Accessibility: Medium Remark: Not Attractive for

MHP

Page 11: Watermill to microhydropower ethiopia

Proposed sites

Site Name: Melka Qiltu Distance (From Jimma): 24km GPS location: 7°46'30.71"N 36°38'35.16"E Elevation: 1930masl

Watermills: 1 Not functional Discharge: 80 l/s Head: 15m Power output: 8.24KW Accessibility: Medium Remark: Not Attractive for MHP

Page 12: Watermill to microhydropower ethiopia

Proposed sites

Site Name: Fechie Distance (From Jimma): 23km GPS location: 7°44'8.11"N 36°40'49.06"E Elevation: 2017masl

Watermills: 1 Not functional Discharge: 90 l/s Head: 14m Power output: 8.65KW Accessibility: Bad Remark: Not Attractive for MHP

Page 13: Watermill to microhydropower ethiopia

Proposed sites

Site Name: Wanja Distance (From Jimma): 38km GPS location: N 07o52’02.5’’ E 36o42’03.8’’ Elevation: 1520masl

Watermills: 1 traditional Discharge: 250l/s Head: 35m Accessibility: Good Remark: Irrigation scheme is being

constructed on the river without affecting the watermill, attractive

Page 14: Watermill to microhydropower ethiopia

Site Name Distance (km)

Discharge (m³/s)

Head (m)

Power output (KW)

Accessibility Existing Watermills

Social status

1 Kersa 1 23 0,14 12 11,5 Accessible 1 Operational Active

2 Kersa 2 26,03 0,2 4 5,5 Not accessible None Passive

3 Wanja 38 0,25 35 60,1 Accessible 1 Operational Active

4 Kelecha 25 0,1 5 3,4 Mostly Accessible 1 Abandoned Passive

5 Melka Qiltu 24 0,08 15 8,24 Accessible 1 Abandoned Passive

6 Fechie 23 0,09 14 8,65 Not accessible 1 Abandoned Passive

Proposed sites Summary

Page 15: Watermill to microhydropower ethiopia

Selection Criteria

Technically attractive sites fulfills ideally most of the following criteria • Available flow and head are substantial. • Topography is favorable. • Ratio of water head to canal length is 10% or better. • Firm capacity is more than demand estimate. • Low degree of difficulties / risks. • Distance of powerhouse to load center is less than 1 km per 100 kW

installed capacity. • Consumer density is greater than 30 connections per 1Km of

transmission and distribution lines.

Technically attractive projects are not necessarily promising projects and vise-versa!

Source: GIZ guide lines, MHP assessment standards

Page 16: Watermill to microhydropower ethiopia

Selection Criteria

Non-technical aspects should be considered equally. • Synergies with other projects or installations e.g. irrigation, water supply… • Large part of the equipment can be manufactured & maintained locally. • Limited number of technically critical parts. • Country's feed-in-tariff policy is encouraging. • Substantial equity contribution to project cost is available. • Broad political support at all relevant levels can be secured. • No social conflicts due to project implementation expected. • No major adverse environmental impacts to be expected.

Kersa-1 and Wanja sites are selected.

Source: GIZ guide lines, MHP assessment books, JU Civil Eng’g student thesis

Page 17: Watermill to microhydropower ethiopia

Kersa-1 • 124 households • Power Consumption: 45.276 KWh/household/month • Good access for transportation • Local construction material • Village out of gird line • Traditional weir of 6m length at 40o CCW • Main river 160 l/s, diverted canal 120l/s • 1200m earth canal

Selected sites

Page 18: Watermill to microhydropower ethiopia

Kersa-1 • Development option Option 1. At the existing watermill- To modify the existing site to get 11m

head and upgrade the trash-rack, forebay, penstock and powerhause Option 2. 50m upstream of the watermill- To construct new Civil and

Electro-mechanical structures, • Diverting water completely and using T-14 cross flow turbine(η = 70%),

has power potential of: Power = ηγQH = 0.7*9810 N/m*0.14 m³/s*12 m = 11.5 KW

Selected sites

Page 19: Watermill to microhydropower ethiopia

Wanja • 688 households • Power Consumption: 99.176 KWh/household/month • Site is easily accessible for transportation • Community is in remote area • Head - 35m • Discharge - 250 l/s • Ratio of water head to canal length about 16% • Synergy with Irrigation scheme • Local construction materials available • Power potential = 60 KW • the most attractive & promising feasible site

Selected sites

Page 20: Watermill to microhydropower ethiopia

Wanja

Kersa 1

Rough layout

Page 21: Watermill to microhydropower ethiopia

Hydraulic design Wanja Site

Intake structure – Weir

Page 22: Watermill to microhydropower ethiopia

Hydraulic design Wanja Site

Penstock

Forbay tank

Diversion canal

Length – 220m

Page 23: Watermill to microhydropower ethiopia

Hydraulic design Wanja Site

Penstock – Slide block

• Length = 67m • Type - Welded steel • Internal Diameter = 0.35m • Wall thickness = 6 mm • Anchor block size = 2.34 m3 • Slide block spacing = 8m

Slide block

Page 24: Watermill to microhydropower ethiopia

Hydraulic design Kersa-1 Site

Intake structure – Weir • Type – Diagonal Ogee-crested weir @ 40o

• Calculation according to USACE and Chow, 1959

• HQ50 = 58 m³/s • Length – 7.5m • Upstream height – 1m • Downstream height – 1.66m • Bottom Width – 2.66m

Page 25: Watermill to microhydropower ethiopia

Hydraulic design Kersa-1 Site

Diversion Canal • Modify the traditional canal • Length = 1150 m • Type - unlined earth • Total depth = 0.5m • Base width = 0.7m • Channel bed slope = 0.002 m/m

Page 26: Watermill to microhydropower ethiopia

T-15 Crossflow turbine is selected for both plants

Hydraulic design Turbine Selection

Page 27: Watermill to microhydropower ethiopia

• Design head 36.47m • Design discharge 230 l/sec • Diameter of the runner 0.3m • Calculated width of the runner = bo = 159mm • Calculated turbine speed = 765 rpm • Run away speed = 1377 rpm • Specific speed = 24.7 • Generator, belt and transmission efficiency = 85 % • Electrical power output = 54.28 KW

Hydraulic design Turbine sizing – Wanja site

Locally manufactured T-15 turbine @ Ererte site, a GIZ project

Page 28: Watermill to microhydropower ethiopia

Thank you!