SM CITY ROSARIO
11
Waterproofing Rectification
Update April 2014
Engr. Eric Bambo – ROMJomar Profeta/Felix Rabago - RE
SMRO Water leak update | 04.01.14
Engineering
Design &
Development2 SMRO Water leak update | 04.01.14
Engineering
Design &
Development3
Above Substation RoomDate of Occurrence: April 27, 2013Date Rectified: July 28, 2013 & January 19, 2014
Status:Already rectified but upon raining leak still occurs.
SMRO Water leak update | 04.01.14
Engineering
Design &
Development4
Above Cinema Back AlleyDate of Occurrence: Feb. 22, 2013Date Rectified: March 25, 2013 (3 leak point)
Status:2 leak point were already rectified. But still no movement on five remaining leak
SMRO Water leak update | 04.01.14
Engineering
Design &
Development5
Above Dept. Store Infant WearDate of Occurrence: July 14, 2013Date Rectified : January 19, 2014
Status:Leak Re-occurred
SMRO Water leak update | 04.01.14
Engineering
Design &
Development6
Above GlobeDate Rectified : May 25, 2013Date of Re-Occurrence: August 19, 2013
Status:For Above Globe, rectification of waterproofing was already done, but recurrence was reported, and upon latest raining, no leak was observed. For above Genset, still under monitoring due to big crack on slab beneath.
Above GensetDate Rectified : Janury 19, 2014
SMRO Water leak update | 04.01.14
Engineering
Design &
Development7
Other remaining water leak location that are currently no update on rectification starting from the date of its occurrence and re-occurrence
SMRO Water leak update | 04.01.14
Engineering
Design &
Development8
Above Vacant Call CenterDate of Occurrence: Feb. 22, 2013
Status:Rectification not yet started
SMRO Water leak update | 04.01.14
Engineering
Design &
Development9
Above Food Court HallwayDate of Occurrence: April 27, 2013
Status:Rectification not yet started
Above Food Court DiningDate of Occurrence: June 12, 2013
SMRO Water leak update | 04.01.14
Engineering
Design &
Development10
Above FC Back AlleyDate of Occurrence: April 27, 2013
Status:Rectification not yet started
Above FC Belgian WaffleDate of Occurrence: February 26, 2014
SMRO Water leak update | 04.01.14
Engineering
Design &
Development11
Above SKK and Star Mobile KIOSKDate of Occurrence: April 27, 2013
Status:Rectification not yet started
Above DermcareDate of Occurrence: July 28, 2013
SMRO Water leak update | 04.01.14
Engineering
Design &
Development12
Above David’s ForeverDate of Occurrence: April 27, 2013
Status:Rectification not yet started
Above Tom’s WorldDate of Occurrence: February 26, 2014
SMRO Water leak update | 04.01.14
Engineering
Design &
Development13
Above Dept. Store Storage (W. Brown)Date of Occurrence: April 27, 2013
Status:Rectification not yet started
SMRO Water leak update | 04.01.14
Engineering
Design &
Development14
Thank you