WATERFALL MAPwaterfallcity.co.za/wp-content/uploads/2018/08/The-Ingress-Generic... · Waterfall...
Transcript of WATERFALL MAPwaterfallcity.co.za/wp-content/uploads/2018/08/The-Ingress-Generic... · Waterfall...
Waterfall is a signature mixed-use development located in Gauteng, South Africa’s commercial centre. It features everything you would expect in a vibrant, modern destination. It embraces urban living to the fullest with offices, residential, retail, a logistics hub, schools, hotels, a hospital, parks, restaurants, entertainment and more.
02
WATERFALL MAP
Retail
Office
Residential
Mixed Use
Educational
Warehousing/Distribution
Commercial
Future Roads
Other
KEY
A proud development by Attacq | 03
OUR 6VALUEDRIVERS
LOCALITYThe strategic positioning of this flagship precinct is changing the landscapeof Gauteng. Waterfall spans land on both sides of the N1 highway and is definedby excellent accessibility and visibility. Linked by multiple access roads, pedestrianwalkways and various modes of public transport, integrated mobility is a reality.
AMENITIESWaterfall connects infrastructure, technology, efficiency, convenience and quality of life with the full range of integrated facilities to support work/life balance.
INFRASTRUCTUREWith approx. 980 million m² GLA available for commercial and light industrialdevelopment, Waterfall offers the ability to custom build to specific requirements.Expect benchmark architecture, sophisticated technology as well as space andoperational efficiencies.
SAFETYEverything from 24-hour patrolled security, CCTV cameras and panic buttons every200 m to biometric access control and street lighting on back-up power offers peaceof mind.
SUSTAINABILITYA green philosophy is embedded in a total holistic urban design. Sustainablebuilding practices ensure every step of Waterfall’s development is efficient,cost-effective and sustainable.
VITALITYDesigned as a walkable, runnable, bikeable city, Waterfall promotes safe movementand healthy living. Interactive public spaces encourage a sense of community.
“ Waterfall is the whole package. It is an unparalleled business destination, offering fully-integrated lifestyle options.”
Melt Hamman, Chief Financial Officer, Attacq
SMARTcITyLOcATIOn
04
GautenG
N14
N1
N1
R21
Pretoria
Centurion
Johannesburg
Vereeniging
Soweto
N3
N4
N12
R59N1
N12N17
N12
N3
SITE
Waterfall
A proud development by Attacq | 05
Waterfall is setting new standards in real estate. It connects infrastructure, technology, efficiency, convenience and quality of life. This is a place created for people and their work/life requirements, today and well into the future.
06
WhygAUTEng
population in Gauteng (2016)
million14.3
Gauteng* is the economic engine of South Africa and is the country’s commercial and industrial heartland. It stretches from Pretoria in the north, to Vereeniging in the south. While it may be the smallest province, covering only 1.4% of South Africa’s land area, it contributes a third of the national economy and serves as the gateway to Africa.
* Gauteng is Sotho for Place of Gold
FAcTSABOUTgAUTEng
Africa%
SA
Generating 35% of SA’s GDP and 10% of Africa
GDP valued at
R811billion
A proud development by Attacq | 07
PLAcETOWORkBusiness and Finance
Accessibility
The province has a well-developed road network, with several arterial routes leading into the main centres of Johannesburg and Pretoria:
The Gautrain, Gauteng’s rapid rail network ensures ease of travel around and through cities and suburbs. The rail connection comprises of two links - between Pretoria and Johannesburg, and OR Tambo International Airport and Sandton. The service includes a dedicated bus service to transport passengers to and from stations.
OR Tambo International Airport is the hub of South Africa’s international and domestic air travel with direct flights to and from other African countries, as well as Europe and the United States. Lanseria, Rand, Grand Central and Wonderboom are smaller airports within the province.
The N1 is a north/south freeway that bisects Gauteng, linking Johannesburg and Pretoria, continuing to Cape Town in the south and Messina in the north.
The N3 runs from Sandton through the south-east parts of the province.
The M1 connects the southern areas with the city centre and extends further north to the Ben Schoeman highway towards Pretoria.
The N4 runs east/west through Pretoria.
The N12 runs east/west through Johannesburg.
Gauteng is the financial capital of Africa:
• ItisthecentreforallSouth Africa’s banks, stockbrokers and insurance giants.
• Morethan70foreignbanks have their head offices in the province.
• TheJSELtdinJohannesburg is the largest securities exchange in Africa.
• It’sthecorporateHQfor most global companies with a presence in Sub-Saharan Africa.
08
R55
R21
N1
M2
N1
N3
N3
M1
TEMBISA
ALEXANDRA
BEDFORDVIEW
KEMPTON PARK
BOKSBURG
N1
R24 R21
JOHANNESBURG
R24
JHBCBD
R21
N1
M2N1
M1
M7
N1
M1
N12
SANDTON
RANDBURG
GERMISTON
ALBERTON
Fourways
Sunninghill
Rivonia
Rd
Witkoppen
Rd
BryanstonWoodmead Buccleuch
Sandton
Melrose
Rosebank
Parktown
Strijdom Park
Waterfall
Meadowdale
Jet Park
Benrose
City Deep Gosforth
OR TamboInternationalAirport
R512
R511
R564
R512
R51
R564
M5
R55
R24
R24
14th
Ave
Beyers
Naude
Dr
Jan
Smuts
Ave
William
Nicol
Dr
R25
R25
R24
R556
R29
R101
M3
M39
R25
Louis Botha Ave
Main
Reef
Rd
Allandale
Rd
R21
Illovo
JHBCBD
N1
M1
N3
N3
N1
N12
N4
Midrand
Tourism
The province has several of the country’s most important educational and health centres. The University of South Africa (UNISA) and The South African Medical Research Council (SAMRC) have achieved global recognition for their scientific excellence and pioneering medical research that has shaped global communities and saved lives.
*According to the 2016 Master Card Global Destinations Cities Indexwww.brandsouthafrica.com | www.mg.co.za
health & Education
The province has a large labour pool as well as a highly skilled workforce, earning at the highest per capita income level in the country.
The promotion of quality education and skills development is one of Gauteng’s focus areas to improve the business climate in the province.
Talent
3.6millioninternational overnight visitors
annually (2016)
$1.7billionspent by visitors annually (2016)
JHB is the most popular destination city in Africa*
Renowned for its sporting facilities Leader in conference and convention infrastructure
national employment
Accounts for
33%
PLAcETOADMIRE
A proud development by Attacq | 09
010
WhyWATERFALL
Waterfall City - Novartis
ALL ROADSLEAD TOWATERFALL
A proud development by Attacq | 011
WATERFALL
Easily accessible
Multiple access roads
Various modes of public transport, including Gautrain and a dedicated M4 Waterfall City Gautrain bus
Single taxi trip to Waterfall City: Greater Tembisa, Midrand, Alexandra, Randburg + JHB CBD
Two sheltered, WiFi enabled ‘Taxi Super Stops’ at Mall of Africa, accommodating a minimum of 21 minibus taxis
Pedestrian walkways and cycle tracks.
The node extends from the Woodmead interchange in the south through the bustlingBuccleuchinterchangetotheAllandale interchange in the north. It ranges from Modderfontein in the east to Kyalami in the west. With superb access, Waterfall is closing the gap between PretoriaandJohannesburg.
Major arterial highways
Current Gautrain routes
Airports
KEY
012
Mixed use (retail, office, hotel & residential)
Residential
Retail
Offices
Warehousing/Distribution
Commercial
Educational
Future roads
KEY
MASTERPLAnIntegration and access are at the core of this fast-growing city in the heart of Africa’s business hub.
Meticulously planned as a multi-purpose destination, the precinct is the epitome of peak functionality, access and visibility.
MOTOR, AUTO & TRANSPORTATION
FINANCIAL SERVICES
OTHER INDUSTRIES AT WATERFALL
FOOD & BEVERAGES
TECHNOLOGY & TELECOMMUNICATION
HEALTH, MEDICAL PHARMACEUTICAL
HOTEL, LEISURE & FITNESS
RETAIL
EDUCATIONAL
ENGINEERING, CONSTRUCTION SERVICES & ENERGY
centrafinRAPID | RELIABLE | RESPONSIVE
1 2 3 4 5
1 2 3 4 5 6
1 2 3
1 2 3 4 5 6 7 8
1 2 3 4 5
6 7 8 9 10
11 12 13 14
1 2 3 4 5
1 2 3 4
1 2 3 4
1 2 3 4
6 7
1 2 3 4 5 6 7 8
9 10 11 12 13 14
8 9 10 11
BLUEchIPnEIghBOURS
A proud development by Attacq | 013
The number of leading corporations that have already made the move to Waterfall sends a clear message as to its unrivalled location. Whether it was the need to
achieve greater operational efficiencies by consolidation or to benefit from the green technologies of a sustainable premise, the success stories are strong.
All industries welcome
“ We continue searching for better answers on how to best design for the management of waste, water and energy.” Giles Pendleton, Head of development, Attacq
74%ofSA’scorporateheadquartersaresituatedinGautengandWaterfall is proving a sensible consolidation location. PWC’s iconic tower is already a landmark in the area and Deloitte is a new addition to the number of leading corporations consolidating their operations inthecommercialhub.PremierFoods,Novartis,BMW,Buildersand Servest are just a few of the top brands who are realising the sustainable benefits of a Waterfall address.
BUSInESSDESTInATIOnOF chOIcE
14
74%Corporate headquartersare situated in Gauteng
The fact that the Waterfall node has a strong focus on environmentally sustainable development is a question not only of ethics, but also a sound business decision.
Green building is the base standard at Waterfall but the approach reaches beyond pure environmentally-sensitive construction. It is embedded in a total holistic urban design, where work and life intersects. In the South African context, with stricter regulations and rising utility costs and constraints, green design can reduce operating costs and mitigate risk.
As developers, Attacq is committed to growing Waterfall’s environmental sustainability across these important drivers:
• Businesssustainability:Areweoperatingataslowacost as possible? › Cost-effectiveness and efficiencies of all buildings › Includes energy and water efficiency and waste management
• Operationalsustainability:Howlongcanweoperate when we lose key services? › Continuity of utility supply through interruptions of service delivery › Includes back-up power for a range of realistic scenarios and water/waste continuity plans
• Environmentalsustainability:Areweenvironmentally conscious? › Being environmentally responsible › Includes green strategy, carbon footprint, light pollution and energy efficiency
A proud development by Attacq | 15
AgREEnPhILOSOPhy
16
• Keyaspectsincludegrassedgardens,afountain, three amphitheatres, recreational space & pedestrian walkways.
• Walkingdistancefromofficehubs.
• Idealvenueforpublicorprivateevents.
The1,2HaWaterfallParkisthecornerstoneofWaterfall’s philosophy to interweave architecture with public, green spaces. The park offers a safe and beautiful environment for the city’s residents and workforce to enjoy and relax.
cITyTORELAx
This is an incredible opportunity for developers and planners to create a new destination, based on contemporary urban design principles. With its integrated, fibre-ready environments and modern infrastructure, Waterfall is attracting deserved attention as a concept development. And there is space to grow.
Waterfall was recently lauded at the International Property Awards. It is the first time in the 25-yearhistoryoftheawardsthataSouthAfricancompanyhaswontheBestInternationalMixed-Use Development award.
A proud development by Attacq | 17
current available space
Nearly a dozen specialist land parcels make up the full commercial development.
All feature similar valuable nodal benefits:
Good visibility and accessibility
Close to major road networks
Zoning rights
Services installed
5min drive from the Gautrain Station at Grand Central Airport
Direct power supply secured from Eskom
Sophisticated security
IMAgInEA BLAnkcAnVAS
shops in Mall of Africa plus boulevard-style shoping centres
300+ job opportunities on completion
residential unitson completion
80,000
28,000
LARgEST MIxED-USE DEVELOPMEnT In AFRIcA
Mall of Africa’s total area
designated for office/light industrial space
Destination of choice for blue chip companies
Approx.
131,000m2
980 million m2 gLA
DESTInATIOnOF chOIcE
18
LOcATIOn &AccESSIBILITy:
BUS ROUTES
A proud development by Attacq | 19
20
PLAcETOcELEBRATE
A proud development by Attacq | 21
SAPOA Innovative Excellence in Property Development Awards
2015 Industrial developments | Innovation Excellence - Westcon Group
2016 Industrial developments | Innovation Excellence - Hilti2017 Industrial Developments - Amrod 2017 Retail Developments - Mall of Africa
International Property Awards
2017/2018 Best International Mixed-Use Development - Waterfall Estates
International council of Shopping centres (IcSc)
2017 Honoree: VIVA (Vision, Innovation, Value, Achievement) Design/Development Awards - Mall of Africa
SAcSc Retail Design & Development Awards (RDDA)
2015 Category B: Neighbourhood and Convenience Centre - Waterfall Corner2015 Spectrum Award Winner - Waterfall Corner 2016 Category A: Super Regional Shopping Centre - Mall of Africa 2016 Category D: (Shops bigger than 1000 m2) - CheckersHyper(MallofAfrica)2017 Spectrum Award Winner - Mall of Africa
MScI South Africa Real Estate Awards
2016 Best performing property fund - office sector - Attacq
Waterfall and its developers have been the fortunate recipient of a sizeable number of awards in the last three years. This recognition showcases superior property performance and quality management. It is also affirmation to future corporate tenants considering consolidation in our prime business locations.
Awards and Accolades
22 | Waterfall City - Mall of Africa
MALLOF AFRIcA
A proud development by Attacq | 23
WATERFALLcITy
An InTEgRATED cITy ThATWORkS
24
A proud development by Attacq | 25
Netcare
Maxwell Office Park
AllandaleBuilding
Novartis
Gateway West
Gateway East
City Lodge
Deloitte
PwC
Mall of Africa
The Ingress
KEY
26
Direct accessibility to Mall of AfricaDirect visibility onto Allandale Rd and N1Corporate consolidation destinationDesigned as a walkable city
OppOrtunity lanD uSe
Urban mixed-usePremium grade office, retail, residential and other
COmpleteD prOjeCtS
Mall of Africa - 131,000 m2
Maxwell Office Park - 38,204 m2
Allandale - 14,848 m2
Novartis - 7,982 m2
Gateway West - 13,306 m2
PwC & the Annex - 63,760 m2
Current anD future prOjeCtS
DeloitteThe IngressResidentialMixed-use Conference
685,000 m2
882,000 m2DEVELOPMENT SITE AREA
WATERFALLcITy
Allandale and Waterfall Drive
lp 10
DEVELOPMENT RIGHTS
A proud development by Attacq | 27
Office
Retail
Residential
Hotel
Other
Mixed-use
Iconic buildings
KEY
LAnD USEPLAn
28
WhyThE IngRESS
• Close proximity and access to Mall of Africa• Safe and secure• HighvisibilityfromN1highway• Each building has its own Individual Identity• Located on the dedicated M4 Gautrain bus route• Fibre optics deployed through precinct• Urban design principles• Green rated buildings• Pop up coffee shop in central piazza• Social and breakaway spaces• Catered for gathering• Highqualitycorporateofficepark• Pedestrian friendly• Green infused paving and shading• Visible street address
Why MAkE ThE IngRESS yOUR BUSInESSADDRESS
A proud development by Attacq | 29
Office
Retail
Residential
Hotel
Other
Mixed-use
Iconic buildings
KEY
30
SITELOcATIOn
ALLANDALE ROAD
LO
NE
CR
EE
K C
RE
SC
EN
T
MAGWACRESCENT
PE
DE
ST
RIA
N W
ALK
WA
Y A
LO
NG
LO
W L
EV
EL
BOUNDARY LINEFENCE LINE
N
BUILDING 1
+-4500m²
BUILDING 2
+-4500m²
BUILDING 3
+-4000m²
BUILDING 4
+-4000m²
BUILDING 5
+-4000m²
E
S
W
SITEPLAn
A proud development by Attacq | 31
32
DEVELOPMEnT DATA
SITE AREA 16 353m²
Coverageallowed@70% 11447.1m²
Coverage provided @ 62% 10 211.0m²
FAR ALLOWED @ 1.415 2 23 144m²
FARPROVIDED:
PHASE1 13591m²
Building1–4500m²
Building2–4500m²
Building3–4000m²
PHASE2 8302m²
Building4–4000m²
Building5–4000m²
[email protected] 21893m²
HEIGHTRESTRICTION 4levelsaboveground
HEIGHTPROPOSED 4levelsaboveground
SITEDEVELOPMENTDATAERF 3598, Extension 67
A proud development by Attacq | 33
GREEN INFUSED PAVINGAND
SHADING
SUBTLESECURITY SCREENS
VISIBLESTREET ADDRESS
34
PARKINGCALCULATIONSPHASE1:FAR PROVIDED:PHASE1(exclservices&storerooms) 13020m²
PARKINGREQUIRED:Total Area = 13 020m² * 4 / 100m² = 520.8 baysTOTALPARKINGREQUIRED =521bays
PARKING PROVIDED:Phase1–Structured 478baysPhase1–Open 50baysTOTALPARKINGPROVIDED(Phase1) 528bays
Overprovisionof 7bayslOWer GrOunDpHaSe One
FLOORPLAnS
OPEN DECK
BASEMENT PARKING
EX
IST
ING
GA
BIO
N W
ALLS
BO
UN
DA
RY
LIN
E
NE
W F
EN
CE
LIN
E
A proud development by Attacq | 35
PARKINGCALCULATIONSPHASE2:FAR PROVIDED:Phase 1 (excl services & store rooms) 13 020m²Phase 2 (excl services & store rooms) 8 081m²[email protected] 21101m²
PARKINGREQUIRED:TOTAL AREA = 21 101m² * 4 / 100m² =844.04 baysTOTALPARKINGREQUIRED =844bays
PARKING PROVIDED:Phase1&2–Structured 713baysPhase1&2–Open 134baysTOTALPARKINGPROVIDED(Phase2) 847bays
Provision of 4.0/100m²Overprovision of 3 bays
lOWer GrOunDpHaSe tWO
FLOORPLAnS
BUILDING 4
+-4000m²
BUILDING 5
+-4000m²
OPEN DECK
BASEMENT PARKING
NE
W F
EN
CE
LIN
E
EXISTING
GABION
TERRACES
BO
UN
DA
RY
LIN
E
LOWER GROUND FLOOR
upper GrOunDpHaSe One
FLOORPLAnS
36
PEDESTRIAN FRIENDLY
BUILDING 1
+-4500m²
BUILDING 2
+-4500m²
BUILDING 3
+-4000m²
FE
NC
E L
INE
UPPER GROUND FLOOR
PE
DE
ST
RIA
N W
ALK
WA
Y A
LO
NG
LO
W L
EV
EL
BOUNDARY LINE
EXISTING VACANT SITE
EXISTING FENCE TO
BE MOVED
A proud development by Attacq | 37
BUILDING 1
+-4500m²
BUILDING 2
+-4500m²
BUILDING 3
+-4000m²
BUILDING 4
+-4000m²
BUILDING 5
+-4000m²
FE
NC
E L
INE
PE
DE
ST
RIA
N W
ALK
WA
Y A
LO
NG
LO
W L
EV
EL
LOWER GROUND FLOOR
UPPER GROUND FLOOR
BOUNDARY LINE
FENCE LINE
upper GrOunDpHaSe tWO
FLOORPLAnS
LANDSCAPEDFOCUS
38
BUILDINGAREAS:
BUILDING1LETTABLEAREAOfficeArea 4087m²BuildingCommonArea 535m²(includes basement lobbies and service area)TOTALGLAOFBUILDING1 4622m²SUPPLEMENTARY AREA (Optional) 168m²GFExternalBalcony 137m²GFExternalBalcony 31m²
BUILDING2LETTABLEAREAOfficeArea 3947m²BuildingCommonArea 504m²(includes basement lobbies and service area)TOTALGLAOFBUILDING2 4451m²SUPPLEMENTARY AREA (Optional) 84m²GFExternalBalcony 20m²GFExternalBalcony 64m²
BUILDING3LETTABLEAREAOffice Area 3 546m²BuildingCommonArea 546m²(includes basement lobbies and service area)TOTALGLAOFBUILDING3 3919m²SUPPLEMENTARYAREA(Optional) 127m²GFExternalBalcony 63m²GFExternalBalcony 64m²
GrOunD flOOr planpreCinCt SQuare leVel
FLOORPLAnS
BUILDING1
BUILDING2
BUILDING3
A proud development by Attacq | 39
BUILDING1
BUILDING2
BUILDING3
typiCal OffiCe leVel
FLOORPLAnS
AHIGHQUALITY,
CORPORATEOFFICEPARK
BUILDING1
BUILDING2
BUILDING3
FIRSTFLOOR
THIRDFLOOR
Drawing Status
REVISIONS
Drawing NoProject No REV
A1
PROJECT
DRAWING
Scale Drawn Checked
Drawing Status
Drawing NoProject No REV
Print Date
A1
CLIENT
GENERAL NOTES
According to the Copyright Act (Act No 98 of 1978) No part of this document may be reproduced, Stored in a retrieval system or transmitted in any form or by any means whatsoever including mechanical, Electronic, Photocopying, Microfilming or any other system of information storage without the writen permission of ARC MU:V
GENERAL NOTES
Quality of all materials and workmanship to comply with the relevant S.A.N.S. specifications and/or specified international codes where applicable in the Architectural specifications. the recommendations and requirements of such documents to be considered a minimum standard for the works.
All work to be executed by competent persons qualified for the specific trade.
All work is to be done in accordance with the National building Regulations.
The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from ARC MU:V and all other consultants related to the project.This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters and Levels are in meters, unless otherwise stated.All dimensions and levels must be checked on site by the contractor. Any discrepancies between consultant's documentation are to be verified before putting any work in hand.
A
H:\1201.01 - Waterfall Ext 67\H - INFORMATION DATA\H03 - DRAWINGS\H03.2 - SKETCHPLANS\H03.2.1 - Revit Model\1201.01~THE INGRESS MADI 02.rvt
1 : 250 2018/05/076:28:13 PM
A
200A1201.01
Author Checker
THE INGRESS
ELEVATIONS PRES
ERF 3598, EXTENSION 67, WATERFALL
200A1201.01
No. Date Description AuthA 20180428 Access and facade updated MF
BUILDING1&2EAST
40
BUILDING1NORTH
EXTERNALLOUVRESFLUSHGLASING DEEPSETWINDOWS
ALTERNATIVEGLASSSOLUTIONS
B U I L D I N G 1B U I L D I N G 2
Drawing Status
REVISIONS
Drawing NoProject No REV
A1
PROJECT
DRAWING
Scale Drawn Checked
Drawing Status
Drawing NoProject No REV
Print Date
A1
CLIENT
GENERAL NOTES
According to the Copyright Act (Act No 98 of 1978) No part of this document may be reproduced, Stored in a retrieval system or transmitted in any form or by any means whatsoever including mechanical, Electronic, Photocopying, Microfilming or any other system of information storage without the writen permission of ARC MU:V
GENERAL NOTES
Quality of all materials and workmanship to comply with the relevant S.A.N.S. specifications and/or specified international codes where applicable in the Architectural specifications. the recommendations and requirements of such documents to be considered a minimum standard for the works.
All work to be executed by competent persons qualified for the specific trade.
All work is to be done in accordance with the National building Regulations.
The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from ARC MU:V and all other consultants related to the project.This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters and Levels are in meters, unless otherwise stated.All dimensions and levels must be checked on site by the contractor. Any discrepancies between consultant's documentation are to be verified before putting any work in hand.
A
H:\1201.01 - Waterfall Ext 67\H - INFORMATION DATA\H03 - DRAWINGS\H03.2 - SKETCHPLANS\H03.2.1 - Revit Model\1201.01~THE INGRESS MADI 02.rvt
1 : 250 2018/05/076:28:13 PM
A
200A1201.01
Author Checker
THE INGRESS
ELEVATIONS PRES
ERF 3598, EXTENSION 67, WATERFALL
200A1201.01
No. Date Description AuthA 20180428 Access and facade updated MF
BUILDING2WEST
BUILDING2&3SOUTH
A proud development by Attacq | 41
METALSCREENS CLADDING TIMBERSCREENSFIBRECEMENTWALLCLADDING
VERTICALFACADE FINS
ELEVATIOnS
Drawing Status
REVISIONS
Drawing NoProject No REV
A1
PROJECT
DRAWING
Scale Drawn Checked
Drawing Status
Drawing NoProject No REV
Print Date
A1
CLIENT
GENERAL NOTES
According to the Copyright Act (Act No 98 of 1978) No part of this document may be reproduced, Stored in a retrieval system or transmitted in any form or by any means whatsoever including mechanical, Electronic, Photocopying, Microfilming or any other system of information storage without the writen permission of ARC MU:V
GENERAL NOTES
Quality of all materials and workmanship to comply with the relevant S.A.N.S. specifications and/or specified international codes where applicable in the Architectural specifications. the recommendations and requirements of such documents to be considered a minimum standard for the works.
All work to be executed by competent persons qualified for the specific trade.
All work is to be done in accordance with the National building Regulations.
The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from ARC MU:V and all other consultants related to the project.This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters and Levels are in meters, unless otherwise stated.All dimensions and levels must be checked on site by the contractor. Any discrepancies between consultant's documentation are to be verified before putting any work in hand.
A
H:\1201.01 - Waterfall Ext 67\H - INFORMATION DATA\H03 - DRAWINGS\H03.2 - SKETCHPLANS\H03.2.1 - Revit Model\1201.01~THE INGRESS MADI 02.rvt
1 : 250 2018/05/076:28:13 PM
A
200A1201.01
Author Checker
THE INGRESS
ELEVATIONS PRES
ERF 3598, EXTENSION 67, WATERFALL
200A1201.01
No. Date Description AuthA 20180428 Access and facade updated MF
Drawing Status
REVISIONS
Drawing NoProject No REV
A1
PROJECT
DRAWING
Scale Drawn Checked
Drawing Status
Drawing NoProject No REV
Print Date
A1
CLIENT
GENERAL NOTES
According to the Copyright Act (Act No 98 of 1978) No part of this document may be reproduced, Stored in a retrieval system or transmitted in any form or by any means whatsoever including mechanical, Electronic, Photocopying, Microfilming or any other system of information storage without the writen permission of ARC MU:V
GENERAL NOTES
Quality of all materials and workmanship to comply with the relevant S.A.N.S. specifications and/or specified international codes where applicable in the Architectural specifications. the recommendations and requirements of such documents to be considered a minimum standard for the works.
All work to be executed by competent persons qualified for the specific trade.
All work is to be done in accordance with the National building Regulations.
The contractor shall in all aspects of the works comply with the provisions of the Occupational Health and Safety Act, 1993 (Act No 85 of 1993) and any regulations promulgated in terms of that Act This drawing must be read in conjunction with all the relevant drawings, schedules and specifications from ARC MU:V and all other consultants related to the project.This drawing is not to be scaled. Figured dimensions to be used. All dimensions are in millimeters and Levels are in meters, unless otherwise stated.All dimensions and levels must be checked on site by the contractor. Any discrepancies between consultant's documentation are to be verified before putting any work in hand.
A
H:\1201.01 - Waterfall Ext 67\H - INFORMATION DATA\H03 - DRAWINGS\H03.2 - SKETCHPLANS\H03.2.1 - Revit Model\1201.01~THE INGRESS MADI 02.rvt
1 : 250 2018/05/076:28:13 PM
A
200A1201.01
Author Checker
THE INGRESS
ELEVATIONS PRES
ERF 3598, EXTENSION 67, WATERFALL
200A1201.01
No. Date Description AuthA 20180428 Access and facade updated MF
B U I L D I N G 2B U I L D I N G 3
42
SUSTAInABLyRESPOnSIBLE
LOCATIONANDTRANSPORTATIONOptimal access to a range of public transport, and facilities to encourage bicycle use. SUSTAINABLESITESVarious measures to reduce the impact of building construction on the environment.
WATER EFFICIENCYWater usage reduction through low flow fittings and effective water metering.
ENERGY&ATMOSPHEREIntegrated design approach to energy efficiency and building optimisation.
MATERIALS&RESOURCESWastemanagementtoensureatleast75%ofconstruction waste is diverted from land fill.
INDOORENVIRONMENTALQUALITYPrioritisation of fresh air and natural light while ensuring thermal comfort.
INNOVATIONDesigned to drive innovative building features and sustainable practices and strategies.
A proud development by Attacq | 43
44
URBAnWORk SPAcE
A proud development by Attacq | 45
46
ABOUTATTAcQ
Attacq delivers exceptional and sustainable growth to its investors through its strategic property holdings and developments and has a total asset value exceeding R28.2 billion and a market capitalisation of R14.80 billion (as at 5 April 2018). Attacq has a quality investment portfolio that includes landmark commercial and retail property investments and a 22.7%shareholdinginMASReal Estate Inc.
Attacq is a premium property company in the real estate sector, founded in 2005 and acquired the Waterfall development rights in 2008. The company listed on the JohannesburgStockExchangein2013.
Corporate Campus
A proud development by Attacq | 47
BrooklynBridge MooiRivier Mall
Gateway West
PwCAmrod
Novartis
BMW
K101 Warehouse
ATTACQ’SVISION&UNIQUEVALUEPROPOSITION
To be the premier property company in South Africa, delivering exception and sustainable growth through real estate investments and developments
This vision is achievable through:• A focused approach• Our Waterfall development portfolio• Qualitypropertiesandinvestments
Our emphasis is on four key value drivers while making good progress towards converting to a REIT.
“Our operational excellence drives competitive advantage”
Jackie Van Niekerk, COO, Attacq
waterfallcity.co.za
Contact
Proud members of
ATTACQATT House, 2nd Floor, Maxwell Office Park37 Magwa Crescent, Waterfall City087 845 1136
COMMERCIALLEASINGChantell Latilla-Campbell081 283 [email protected]
INDUSTIALLEASINGDavid Oosthuizen083 561 [email protected]
BROKERENQUIRIESBianca Barnes071 362 [email protected]