Water Treatment Plant
ByErica Lopez
Tiffany Thomas Clay Montgomery
Tyler SimsGRA Celina Bochis
EMAP 2006
![Page 2: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/2.jpg)
Objectives
Build water treatment plant to serve the water park and surrounding communities (expand the city limits)
Build small water treatment plant just for the park with only a sand filter and chlorine disinfection involved
The location of the larger
treatment plant will not be on the park site
It will be on the nearest strip mine (brownfields)
![Page 3: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/3.jpg)
Treatment Plant Proposed Location
![Page 4: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/4.jpg)
• The strip mine is owned by the Gulf State Paper Corporation.
• This is the brownfields that thecity could pursue for development opportunities.
• Mr. Warner (owner) has been very generous in providing properties in the past for city projects.
• City needs ADEM and EPA approval and help with funding for cleaning.
• City may have funding to help clean and renovate the brownfields.
Plan for Treatment Plant Location
![Page 5: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/5.jpg)
Lake Nichol
• Built in 1954 and used as a water supply for city of Tuscaloosa.
• 380 acres and has a water capacity of 3.3 billion gallons.
• Originally designed for approximately 50,000 people.
• Use existing pipes and the pump station for our water plant in order to save cost.
![Page 6: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/6.jpg)
Treatment Plant Based on
Water Consumption• Domestic usage: 15-70
gal/cap-day• Public usage: 5-20 gal/cap-
day• Commercial/Industrial usage:
10-100 gal/cap-day • Maximum usage: between 6-
8 am and 6-8 pm.• Minimum usage:
– between 1 and 5 am.• Park water rides water usage
![Page 7: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/7.jpg)
Typical Water Treatment Plant
1. Chemical mixing basin
2. Flocculation Basin
3. Settling Tank
4. Rapid Sand Filter
5. Disinfection with Chlorine
6. Storage basin
7. Pump
![Page 8: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/8.jpg)
Water Usage(from literature)
Class of Usage Quantity (gal/cap-day)
Average Quantity
Domestic 15-17 50
Commercial/
Industrial
10-100 65
Public 5-20 10
Leakage 10-40 25
Total 150
Ed Love Plant
Water Storage Capacity: 25.4 mil. Gal
Water Treatment Capacity: 45.7 mil. Gal/ day
Population Served: 133,000 people
![Page 9: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/9.jpg)
Predicted Water Usage for Tuscaloosa
Consumption = (Water Treatment Capacity-Water Storage Capacity)/Population
Consumption = (45.7 mil-25.4 mil)gal-day/133,000people
Consumption = 153 gal/day-person
![Page 10: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/10.jpg)
Population Prediction
General population for the Lake Nichol area is about 2,400 people
We used the arithmetic method to predict the population growth
dP/ dt = K
where
dP/dt = growth rate
K = constant
Final population = Initial population + Kdt
We estimate the final population to be 10,000 people.
![Page 11: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/11.jpg)
Conceptual Design
• Period: 25 years
• Population: 10,000
• Flow: 100 gallons/cap-day
• Area: – Watermelon Rd.– Yellow Creek Rd.– Old Lock 15 Rd.
![Page 12: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/12.jpg)
Cost1) Building the water treatment
plant– $3/gallon of treated water– $25/linear foot of pipe
2) Cleaning the brownfields– Money from ADEM and EPA– City of Tuscaloosa funds
![Page 13: Water Treatment Plant By Erica Lopez Tiffany Thomas Clay Montgomery Tyler Sims GRA Celina Bochis EMAP 2006.](https://reader036.fdocuments.net/reader036/viewer/2022062802/56649ead5503460f94bb5179/html5/thumbnails/13.jpg)
So In Review…
• We are providing a conceptual design for consideration.
• We plan to create a separate treatment system for the area due to population increases.
• The property and design we use would need approval from ADEM and the EPA.
• We hope the city will use some of its funds to renovate the brownfields.