A Presentation on Live Example -Implementation of
24/7 water supply in Ramagundam
By
Somarapu Satyanarayana
MLA,Ramagundam
Dist: Karimnagar
Training programme on
“Effective Water Supply Distribution System in ULBs”
from 4.10.2010 to 6.10.2010.Dr. M.C.R.H.R.D Institute of A.P
![Page 2: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/2.jpg)
General condition of Normal Municipalities
Poor Administration Low income Less Collection Insufficient Infrastructure Poor & Insufficient Water supply Poor & Ineffective Sanitation Poor & Improper Illumination Public Dissatisfaction
![Page 3: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/3.jpg)
ACTIVITIES OF MUNICIPALITY
CLEAN ENVIRONMENT
GOOD WATER SUPPLY EFFECTIVE ILLUMINATION GOOD INFRASTRUCTURE PERFECT SERVICE DELIVERY POVERTY REDUCTION EFFECTIVE ADMINISTRATION STRONG FINANCE
![Page 4: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/4.jpg)
We need Change Management
Involve Councillors, Public Representatives and Voluntary Organization.
Motivate staff Simplify the systems with system controls. Set Good Principles and practices Set Goals and plans to reach Goals. Aim to get Public Satisfaction at Every step Improve Financial Resources & Reduce wasteful Expenditure Provide Transparent Administration Try for cost effective, innovative Technologies Improve Efficiency and Cost effectiveness in every department
![Page 5: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/5.jpg)
Few Steps taken to
Create Confidence in the citizen that the council is
committed for
Development
![Page 6: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/6.jpg)
Water, has the power to move millions of people,
Since the very birth of human civilization, people have moved to settle close to it,
People move when there is too little of it,
People move when there is too much of it,
People journey down it,
People write, sing and dance about it,
People fight over it,
And all people everywhere and every day, need it.
But still we neglect about it.
WATER IS IMPORTANT
![Page 7: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/7.jpg)
Steps taken for
Water Supply Initiatives
Finally for Transformation to Continuous Water
Supply Regime
At Ramagundam Municipality
![Page 8: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/8.jpg)
Ramagundam Municipality has got the following facilities to serve 2.5 lakh population.
Infiltration Gallery and intake well with a capacity of 21 MLD.
Two stage pumping with 1000 KL Capacity Sump
1 Reservoir with a capacity of 2400 KL
4 Reservoirs with a capacity of 1200 KL
Distribution Mains Network with a coverage of 31 km.
WATER SUPPLY
![Page 9: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/9.jpg)
Ramagundam Municipality had the following Problems:
Poor consumer relations.
Insufficient & Inexperienced Staff
Losses in the distribution network & Service Connections.
Intermediate Supplies, Irregular Timings & Low Line Pressures
Free Water through Illegal Connection from SCCL Mains
WATER SUPPLY
![Page 10: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/10.jpg)
Ramagundam Municipality had the following Problems:
People at Lower elevations used to misuse and waste the water.
People at Intermediate levels used to dig pits to fetch the water and some used pumps
People at Higher elevations were not getting water.
There were problems in attending to complaints and providing new connections
Municipality used to face public dissatisfaction.
WATER SUPPLY
![Page 11: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/11.jpg)
Better Service Delivery to Consumer Complaints were Registered either personally
or over Telephone in the Service Center.
Complaints were attended with in 24 Hours. Consumers Signature was obtained for
complaints redressal Internal Reporting system developed.
New connections were issued with in Three days.
WATER SUPPLY
![Page 12: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/12.jpg)
Appointed licensed plumbers who are also undertaking the responsibility for operation of valves at a nominal cost
The licensed plumbers shall prepare the drawings for new connection after approval provide water connection at the rates fixed by the Municipality
Watch & Ward Operation of Pump houses were privatized through contract system.
WATER SUPPLYPrivatised the Operation and Maintenance
![Page 13: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/13.jpg)
Licensed plumbers shall monitor and organize the repairs to leakages as per rates approved.
Plumbers were made responsible to see that there are no illegal water connections.
Municipal Staff was well trained. Proper job distribution was made and responsibilities
were fixed Improved consumer relation maintained through
weekly meetings
WATER SUPPLYPrivatised the Operation and Maintenance
![Page 14: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/14.jpg)
WATER SUPPLY
Better Maintenance for Loss Reduction:
Isolation valves were introduced for better maintenance facility
Sufficient Inventory was maintained for timely repairs
Leak reporting system developed.
Plumber wise House Connection Register maintained
![Page 15: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/15.jpg)
WATER SUPPLY
STEPS TAKEN TO IMPROVE THE TAP CONNECTIONS Donation was being collecting on Easy Installments
Installation rates & procedures were simplified to reduce the burden over the consumer.
Subsidized Donation from the poorest in a block of 10 houses on easy installments.
Improved quality of water. Submitted proposals under world bank scheme to
cover water supply system to entire area
![Page 16: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/16.jpg)
WATER SUPPLY
Donation were collected on easy Installments
Donations Installments were divided in Two packages
Package I “ABOVE BPL “
Donation = Rs. 5000.00
Advance = Rs. 1000
( Payment at the time of connection)
EMI = Rs. 500.00
Total Installments = 8 EMI
![Page 17: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/17.jpg)
WATER SUPPLY
Donation were collected in easy Installments
Package II “BPL CONNECTION “
Donation = Rs. 2500.00
Advance = Rs. 500.00
( Payment at the time of connection)
EMI = Rs. 250.00
Total Installments = 8 EMI
Rs. 2500.00 is subsidised from NSDP funds
![Page 18: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/18.jpg)
WATER SUPPLY
PROBLEMS YET TO BE REDRESSED FOR BETTER PERFORMANCE
System getting contaminated due to low pressure in the system due to intermittent supply
System getting damaged due to water hammer in intermittent supply
loss of water due to misuse in lower areas. With low pressures elevated areas were not
getting water. Lot of domestic pumps were used in the system Wastage of water due to storage and throwing out
when got fresh supply.
![Page 19: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/19.jpg)
WATER SUPPLY
How to solve these problems
?
![Page 20: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/20.jpg)
WATER SUPPLY
The only way out was to switch over to 24/7 water supply
![Page 21: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/21.jpg)
Local M.L.A., & Chairperson addressing to the people regarding Water Supply programme
LAUNCHED 24/7 WATER SUPPLY FROM 1ST JANUARY, 2003
![Page 22: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/22.jpg)
LAUNCHED 24/7 WATER SUPPLY FROM 1ST JANUARY, 2003
Chairperson S.Satyanarayana answering the queries from consumers regarding 24/7 Water Supply Programme.
![Page 23: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/23.jpg)
Local MLA Inaugurating the24/7 Water Supply Programme
WORLD BANK TEAM VISIT
LAUNCHED 24/7 WATER SUPPLY FROM 1ST JANUARY, 2003
![Page 24: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/24.jpg)
WATER SUPPLY
Transformation to 24/7 Water Supply:
The Tariff was reduced from Rs. 60.00 flat rate to minimum of Rs. 40.00 per month
The consumers were assured that they will not be taxed high by providing meters for normal consumption.
The Area under each over head tank was divided in to zones
Meters were fixed zone wise and charged for continuous water supply by isolating other system
One Overhead tank area was transformed in to continuous water supply over a period of 2 months.
![Page 25: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/25.jpg)
WATER SUPPLY
Donations Installments were divided in Three packages
Package I “ABOVE BPL “Donation = Rs. 5000.00, Advance= Rs. 1000, 8 EMI= Rs. 500
Water Charges Rs. 40.00for 1st 12,000 Lpm and than @Rs. 5.00 per KL
Package II “BPL CONNECTION “ Donation = Rs. 2500.00, Advance= Rs. 500, 8 EMI= Rs. 250
Water Charges Rs. 40.00for 1st 12,000 Lpm and than @Rs. 5.00 per KL
Package III “GROUP TAP CONNECTION “ Donation = Rs. 2500.00, Advance= Rs. 500, 8 EMI= Rs. 250
Water Charges Rs. 40.00for 1st 18,000 Lpm and than @Rs. 5.00 per KL
Rs. 2500.00 is subsidised from NSDP funds for Package –II & III
![Page 26: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/26.jpg)
Better Service Delivery to Consumer
Water supply Bills were Computerized Billing System was Privatized.
Monthly Spot Billing has improved payments. Every Saturday Billing Disputes were settled
by Senior Officers
Wireless Systems was introduced for Quick Maintenance and better service delivery
WATER SUPPLY
![Page 27: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/27.jpg)
WATER SUPPLY - EFFECTIVE SERVICE DELIVERY
Black Board showing the particulars of Sl. No. of Applications received for New Water Tap connection, Sl. No. up to sanctioned and Connected.
Black Board showing the particulars of Sl. No. of Complaints received for service delivery and Sl. No. upto which attended.
![Page 28: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/28.jpg)
There were No Public Stand posts at Ramagundam There were No Illegal tap connections Group Taps were encouraged for poor groups of 4 to
10 families BPL Connections and Group Taps were provided on
installment basis 24/7 Helped in reduction of wastage of water by
consumers Reduced shocks, water hammers on the Pipe lines
WATER SUPPLYGood Practices and Their Advantages
![Page 29: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/29.jpg)
Reduces Operation & Maintenance problems Retain pressure in the line and help in
consumer satisfaction Avoid pollution through leakage due to
positive head in the lines Reduction in loss of water through leakages
by continuous remedial measures,
WATER SUPPLY
Good Practices and Their Advantages
![Page 30: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/30.jpg)
Pressure Control In The System
Meter Reading at Overhead tank out let
Manual Operation of Main Valve
![Page 31: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/31.jpg)
Pressure Control In The System
Operator taking Tail End Meter reading at Laxminagar
Operator taking Tail End Meter reading at Addaguntapalli
![Page 32: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/32.jpg)
Pressures at ELSR and Tail End Points in Ramagundam Municipality – Under 24/7 Water Supply
Sl. No.
TimeOpening of Main Valve
Pressure at ELSR
Pressure at
Addaguntapalli
Pressure at
Swathanthra Chowk
Pressure at
Laxminagar
1 5:00 AM 4 R 0.9 Kg 0.4 Kg 0.5 Kg 0.45 Kg2 6:00 AM 5 R 0.9 Kg 0.45 Kg 0.7 Kg 0.45 Kg3 7:00 AM 8 R 1.20 Kg 0.5 Kg 0.75 Kg 0.5 Kg4 8:00 AM 8 R 1.20 Kg 0.5 Kg 0.7 Kg 0.5 Kg5 9:00 AM 7 R 1.00 Kg 0.4 Kg 0.5 Kg 0.45 Kg6 10:00 AM 7 R 1.00 Kg 0.4 Kg 0.55 Kg 0.4 Kg7 11:00 AM 7 R 1.00 Kg 0.4 Kg 0.5 Kg 0.4 Kg8 12:00 PM 5 R 0.8 Kg 0.4 Kg 0.55 Kg 0.4 Kg
![Page 33: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/33.jpg)
Sl. No.
TimeOpening of Main Valve
Pressure at ELSR
Pressure at
Addaguntapalli
Pressure at
Swathanthra Chowk
Pressure at
Laxminagar
9 1:00 PM 5 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg10 2:00 PM 5 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg11 3:00 PM 5 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg12 4:00 PM 5 R 0.8 Kg 0.4 Kg 0.55 Kg 0.4 Kg13 5:00 PM 6 R 0.8 Kg 0.4 Kg 0.55Kg 0.4 Kg14 6:00 PM 6 R 1.00 Kg 0.4 Kg 0.5 Kg 0.4 Kg15 7:00 PM 6 R 1.00 Kg 0.4 Kg 0.5 Kg 0.4 Kg16 8:00 PM 6 R 1.00 Kg 0.4 Kg 0.55 Kg 0.4 Kg
Pressures at ELSR and Tail End Points in Ramagundam Municipality – Under 24/7 Water Supply
![Page 34: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/34.jpg)
Sl. No.
TimeOpening of Main Valve
Pressure at ELSR
Pressure at
Addaguntapalli
Pressure at Swathanthra
Chowk
Pressure at
Laxminagar
17 9:00 PM 5 R 1.00 Kg 0.4 Kg 0.6 Kg 0.4 Kg
18 10:00 PM 4 R 1.00 Kg 0.5 Kg 0.75 Kg 0.4 Kg
19 11:00 PM 4 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg
20 12:00 AM 4 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg
21 1:00 AM 4 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg
22 2:00 AM 4 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg
23 3:00 AM 4 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg
24 4:00 AM 4 R 0.8 Kg 0.4 Kg 0.5 Kg 0.4 Kg
Pressures at ELSR and Tail End Points in Ramagundam Municipality – Under 24/7 Water Supply
![Page 35: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/35.jpg)
Introduction of Auto control Values
Procure leak detective equipments
Develop Quick/Online leakage system
Introduce more values to isolate area wise, block wise and street wise.
Problems further to be attended to sustain 24/7
WATER SUPPLY
![Page 36: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/36.jpg)
Provide Water level indicators at Pump House and Municipal Office through Wireless Network
Improve O & M system to meet the demand
To spread the Network to cover 30,000 House connections to make the system profitable
To Arrange generators to cover power failures which affects on the system
Problems further to be attended to sustain 24/7
WATER SUPPLY
![Page 37: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/37.jpg)
Ramagundam had successfully covered three overhead tank areas out of five with 24/7 Water Supply
The consumers were day by day accustomed for avoiding wastage of water
WATER SUPPLY
Good Practices and Their Advantages
![Page 38: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/38.jpg)
Monthly Summary Report of Over Head Tank-1Ramagundam Municipality
Month Total
Jan-04 927 31% 714 24% 542 18% 817 27% 3000Feb-04 950 32% 802 27% 550 18% 698 23% 3000Mar-04 1331 32% 995 24% 702 17% 1129 27% 4157Apr-04 1320 32% 1004 24% 800 19% 1033 25% 4157May-04 2054 49% 1122 27% 523 13% 458 11% 4157Jun-04 2036 49% 1150 28% 500 12% 471 11% 4157
Bill amount upto Rs. 40/-
per month
Bill amount between Rs. 40/- to Rs.60/-
per month
Bill amount between Rs.60/- to
Rs.100/- p.m
Bill amount above Rs.100/-
per month
![Page 39: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/39.jpg)
With the co-operation of Consumers, Elected Representatives & Municipal Staff.
We could establish that the poor is benefitted by 24/7 water supply as they have to pay less.
Our Aim was to Achieve
To Provide 24/7 Water Supply with best Quality to complete population to make the system economically viable and profitable.
WATER SUPPLY
![Page 40: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/40.jpg)
WATER SUPPLY
In the next elections new council was elected.
One of the item in their manifesto was to remove the meters and charge at flat rates
With the pressure of 11% of people (Rich & Commercial Consumers) who were paying above Rs.100/- the meters were removed and charged @ Rs.60/- flat rate per month.
![Page 41: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/41.jpg)
WATER SUPPLY
Results of this decision Intermediate supply 2 hrs /day was introduced Leakages increased due to water Hammers & irregular
maintenance System used to get contaminated from the point of leakages Use of domestic pumps increased System pressure reduced and people started digging pits for
collection of water Higher level people were not getting water
![Page 42: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/42.jpg)
WATER SUPPLY
Results of this decision The Government the flat rate from Rs.60/- to Rs.100/- More than 50% people who were getting 24hrs water supply at
Rs.40/- were forced to pay Rs.100 for Intermittent supply. The system continued to get detoriated due to improper
maintenance and resulted in supply of water from alternate day to once in week with regular timings
More man power is being used to isolate zone wise/street wise to give water .
![Page 43: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/43.jpg)
WATER SUPPLY
Resulted in big public dissatisfaction
“If you do not follow good practices you will end with bad results”
![Page 44: Water supply mcrhrd](https://reader033.fdocuments.net/reader033/viewer/2022052909/559752d61a28abec5b8b4688/html5/thumbnails/44.jpg)
THANK YOU….THANK YOU….
Somarapu SatyanarayanaSomarapu SatyanarayanaM.L.A ,Ramagundam