Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building...

31
Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist III Fairfax County DPWES, Land Development Services (LDS)

Transcript of Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building...

Page 1: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Water Re-Use in Construction Today

Newly Adopted Provisions of the VA Uniform Statewide Building

Code(USBC)

Presented by:Guy Tomberlin, CBO

Code Specialist IIIFairfax County

DPWES, Land Development Services (LDS)

Page 2: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Overview• Water conservation

provisions outlined in the 2006 building codes

• Identified water conservation measures not addressed in the building codes

• Issues under consideration

• Potential issues for future changes

Page 3: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

• How the building codes relates to the overall structure for utilizing water conservation methods

• How to overcome challenges to promote implementation

Page 4: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Objectives

• Provide updated building code regulations• Discuss the new building code provisions– Benefits– Details of applications

AND• Identify omissions–Determine what areas to focus on for next

code cycle….

Page 5: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Partnerships andworking together!

Health DepartmentDesigner/Customer

Site Regulation & Enforcement

Building Code Regulation & Enforcement(Possibly the Office of the Fire Marshal)

Page 6: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Residential Construction

Commercial Construction

http://www.dhcd.virginia.gov/StateBuildingCodesandRegulations/PDFs/2009/Code%20-%20VCC.pdf

Plumbing Regulations

Page 7: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.
Page 8: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Add Section 2901.1.1 to the IBC to read:2901.1.1 Use of Appendix C of the IPC for gray water and rain water recycling systems. In addition to other applicable provisions of the IPC, gray water recycling systems and rain water recycling systems shall comply with the provisions in Appendix C of the IPC. In the use of Appendix C of the IPC for rain water recycling systems, the term “rain water” shall be substituted for the term “gray water.” Gray water recycling systems and rain water recycling systems shall be separate systems and shall not be interconnected.

International Plumbing Code USBC Technical Amendments

Water System

Page 9: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Change Section 602.1 of the IPC to read:602.1 General. Every structure equipped with plumbing fixtures and utilized for human occupancy or habitation shall be provided with a potable supply of water in the amounts and at the pressures specified in this chapter. This shall not prohibit the use of reclaimed water distribution systems installed in accordance with this code and the Virginia Water Reclamation and Reuse Regulation (9 VAC 25-740).http://www.deq.virginia.gov/vpa/waterreuse.html

International Plumbing Code USBC Technical Amendments

Water System

Page 10: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Add Section 2901.1.2 to the IBC to read:2901.1.2 Changes to the IPC. The following changes shall be made to the IPC:1. Change Section 301.3 of the IPC to read:301.3 Connections to drainage system. All plumbing fixtures, drains, appurtenances and appliances used to receive or discharge liquid wastes or sewage shall be directly connected to the sanitary drainage system of the building or premises, in accordance with the requirements of this code. This section shall not be construed to prevent indirect waste systems required by Chapter 8.Exception: Bathtubs, showers, lavatories, clothes washers and laundry trays shall not be required to discharge to the sanitary drainage system where such fixtures discharge to an approved gray water system or rain water system for flushing of water closets and urinals or for subsurface landscape irrigation.

International Plumbing CodeUSBC Technical Amendments

Drainage system

Page 11: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Change Section 604.1 of the IPC to read:604.1 General. The design of the water distribution system, including any reclaimed water distribution systems governed by the Virginia Water Reclamation and Reuse Regulation (9 VAC 25-740), shall conform to accepted engineering practice. Methods utilized to determine pipe sizes shall be approved.

Add an exception to Section 608.8 of the IPC to read:Exception: Reclaimed water supply systems shall be identified in accordance with the provisions of the Virginia Water Reclamation and Reuse Regulation (9 VAC 25-740).

Change Section 608.8.2 of the IPC to read:608.8.2 Color. The color of the pipe identification shall be discernable and consistent throughout the building. The color purple shall be used to identify rain and gray water distribution systems.

International Plumbing Code USBC Technical Amendments

Water System

Page 12: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

International Residential CodeUSBC Technical Amendments

Water System

Add Section R328 Gray Water and Rain Water Recycling Systems.Add Section R328.1 to read:R328.1 Use of Appendix O for gray water and rain water recycling systems. In addition to other applicable provisions of this code, gray water recycling systems and rain water recycling systems shall comply with the provisions in Appendix O. In the use of Appendix O for rain water recycling systems, the term “rain water” shall be substituted for the term “gray water.” Gray water recycling systems and rain water recycling systems shall be separate systems and shall not be interconnected.

Page 13: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Change Section P2601.2 to read:P2601.2 Connections. Plumbing fixtures, drains and appliances used to receive or discharge liquid wastes or sewage shall be directly connected to the sanitary drainage system of the building or premises, in accordance with the requirements of this code. This section shall not be construed to prevent indirect waste systems.Exception: Bathtubs, showers, lavatories, clothes washers and laundry trays are not required to discharge to the sanitary drainage system where those fixtures discharge to an approved gray water or rain water recycling system.

International Residential Code USBC Technical Amendments

Drainage system

Page 14: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

General use and application of Appendix C of the IPC and Appendix O of the IRC for Rainwater/Gray Water Recycling Systems

Limited use for:Water Closets UrinalsSubsurface Lawn Irrigation

Page 15: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.
Page 16: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Collection reservoir

Reservoir shall be of “approved” construction and shall be a closed

and air-tight vessel.

Page 17: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Filtration

Gray/Rain water entering the reservoir shall pass through an “approved” filter.

Page 18: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Overflow

The overflow shall be indirectly connected to the sanitary drainage system.

Page 19: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Gray/Rain water used for flushing water closets and urinals

-Shall meet additional requirements-

Page 20: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

DisinfectionShall be accomplished by an “approved” method.

Page 21: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Makeup water

Potable water shall be supplied as a source of makeup water and backflow protection is required.

Page 22: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Coloring of water

Recycled water shall be dyed blue or green with food grade vegetable dye before being supplied to fixtures.

Page 23: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Identification

Piping and reservoirs shall be identified as nonpotable water. Piping shall be identified in purple.

Page 24: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Systems for Subsurface Irrigation

-Shall meet additional requirements-

Page 25: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

ReservoirsSized to limit storage retention to 24 hours -designed for gray water-

Page 26: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Soil percolation test

Extensive test procedures

Page 27: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

System Location Component placement andextensive absorption system criteria

Page 28: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Backfill and piping material

Page 29: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

Items not required for subsurface irrigation systems

• Make-up water• Disinfection• Color dye in the water

Page 30: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

What’s Next? Smooth implementation!

• Move towards more comprehensive coverage– VDH Guidelines for Rainwater Reuse– Separate Gray and Rain water provisions– Laundry usage– Equipment usage– Expanded irrigation coverage – ICC Green Codehttp://www.iccsafe.org/cs/IGCC/Pages/default.aspx

Page 31: Water Re-Use in Construction Today Newly Adopted Provisions of the VA Uniform Statewide Building Code(USBC) Presented by: Guy Tomberlin, CBO Code Specialist.

http://www.ecodes.biz/ecodes_support/Free_Resources/Virginia2009/09Virginia_main.html

Guy TomberlinCode Specialist III

DPWES - Land Development Services 12055 Government Center Parkway, Suite

630Fairfax, VA 22035–5504

703–324–[email protected]

Questions - Comments??

For a “read only” version of all the VA Building Codes visit: