Water Proofing On Century Old Building
TARFELT LM – Single Component Cold Applied Water Based Bituminous Liquid Membrane,
ShaliGrout 65 – Single Component Free Flow Non-shrink High Strength / Fluidity Grout
ShaliSBR Latex – Bonding Admixture For Adhesion & Repairs Of Concrete Structures
ShaliCryl 215 R – Single Component UV Resistant Elastomeric Exterior Coating
Authorised Applicator
![Page 2: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/2.jpg)
Pre Treatment
Ingress of Water from Terrace affecting Electrical Ducts
![Page 3: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/3.jpg)
Pre Treatment
Vegetation Formation
![Page 4: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/4.jpg)
Pre Treatment
Cracks formed due to Vegetation grown on the Terrace
![Page 5: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/5.jpg)
Pre Treatment
Dust, Muck, Algae Formation on the Terrace
![Page 6: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/6.jpg)
Pre Treatment
Cracks in the Joints and Corners
![Page 7: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/7.jpg)
Treatment Process
Removal of Vegitation
![Page 8: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/8.jpg)
Treatment Process
Clearing the Dust, Musk, Algae using steel Brush
![Page 9: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/9.jpg)
Treatment Process
Cleaning and washing the surface using High Pressure Water Jet
![Page 10: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/10.jpg)
Treatment Process
Using Water as a Vehical
![Page 11: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/11.jpg)
Treatment Process
Applying TarFelt LM Primer as a Base Material for Water Proofing
![Page 12: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/12.jpg)
Treatment Process
Applying TarFelt LM as Water Proofing on the Base Surface.
![Page 13: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/13.jpg)
Treatment Process
Applying ShaliCryl 215 R as UV Protection
![Page 14: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/14.jpg)
Treatment Process
Filling of Joint and Cracks using Shali SBR Latex and Shali Grout
![Page 15: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/15.jpg)
Post Treatment
Situation after 15 Days after Treatment
![Page 16: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/16.jpg)
Post Treatment
Drying and Pealing of Paints
![Page 17: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/17.jpg)
Post Treatment
Drying of wall near Electrical Duct
![Page 18: Water proofing of century old building sbm](https://reader030.fdocuments.net/reader030/viewer/2022020105/559574031a28ab635c8b46d6/html5/thumbnails/18.jpg)
Project Executed by Team D K Associates