Survey by the Numbers

Total Responses 72 Started 45 Completed* Similar breakdown of

completed surveys (52% Public AC, 18% Tribal AC, 18% State Agency, 12% Misc.)

2

Public AC

Tribal AC

State Agency

Misc.

Q1

Page 3: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

How successful was Water Update 2013 in accomplishing the following:

3

Q 2a

Page 4: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

How important will it be for the Water Plan process to accomplish this in

Update 2018?

4

Q 2b

Page 5: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

How familiar are you with the key activities of Water Plan Update 2013?

5Q3

Page 6: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

For Update 2018 what emphasis or priority should be placed on the following activities?

6

Q4

Page 7: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

For Update 2018 what emphasis or priority should be placed on the following activities?

7

None or Less

About the Same

More Priority

Q5

Page 8: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Assume the Water Plan team could only work on FIVE activities. What are your top five choices?

8Q6

Other

Progres

s Rep

ort

Docum

ent P

roduc

tion

Outrea

ch an

d Colla

borat

ion

Water T

echn

ology

Flood M

anag

emen

t

Land

Use

Water Q

uality

Financ

e Plan

ning

Sustain

ability

Climate

Chang

e

Strateg

ic Plan

ning

Future

Scena

rios

Region

al Plan

ning

Resou

rce M

gmt S

trateg

ies

Ground

water

0.0%10.0%20.0%30.0%40.0%50.0%60.0%70.0%

Top Five Choices

Page 9: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

What advice would you give to improve the effectiveness of the Update 2018 Progress Report?

9

"Not everything that can be counted counts, and not everything that counts can be counted." Einstein

.

Reduce # of actions by 1/2-2/3. Use smaller number of key parameters

Ask others what metrics they use. Collect info from the IRWM plans

Use the Internet & different reports for different audiences

More facts / less emotion, subjective views

Make objectives-actions measurable/ monitor-able

Get information out to Tribal offices.

Focus on a region or two. Cover remaining in summary fashion. Rotate regions in subsequent plans.

Devote less effort to measurement & and more to helping regions achieve their goals.

More time for information synthesis

Q7

Page 10: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

What, if any, new or different activities should Water Plan Update 2018 address?

10

17 Responses wide range of topics

Q8

Page 11: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

What should be the role of the Water Plan advisory body members in advancing CWP objectives?

11

Q9

Page 12: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

How can the Water Plan process better enable you to fulfill your roles?

Communication materials -  talking points - water & land use planning/ CA water resources, case studies

 Maintain engagement between meetings. Make more info available, including drafts. Recommendations tailored to my stakeholders. Open up access to all work groups Continue Tribal Water Summit. Get top level people there. Improve characterization of some of the regional plans. Encourage stronger collaboration between Committee's. Leverage efforts of sister agencies. Paint a better picture

how those plans all work together.

12Q 10

Page 13: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 11 - eNews

13

ENEWs Content (items included) Frequency0

5

10

15

20

25

30

Water Plan eNews was an important communication tool during Update 2013. Thinking about receiving this

weekly newsletter, how would you rate the information provided?

Don't Read It

Too Much

Just Right

Not Enough

Page 14: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 12 - If concerns could be resolved, which Water Plan activities would lend to a Wiki-based update approach?

No/ None I cannot see this approach working. Caution. It could -- this is a good idea. Anything we can do to share

information and collaborate online would be helpful. All  

14

•Regional Reports•Document Review•Actions (crowd source)•Identification of alternatives and scenarios•Outreach and communication•Regional coordination

•Integrate diverse sectors like land use and water supply decision making•Resource management strategies description update•Tool box approaches for water technologies, conservation, permaculture activities, policies

Page 15: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 13 - What other Water Plan venues were you involved in?

15

Other: Tribal Summit (2) / Tribal Leaders Mtg (1) / Climate Change TAG (1)

Page 16: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

16

Q 14 - Thinking about the Advisory or Steering Committee you are a member of, what are your thoughts about the frequency of just those meet-

ings?

The number of meetings were about right.

We met too much.

We didn't meet often enough.

Page 17: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 15 - What are your thoughts about having more on-line/phone meetings?

17

Page 18: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 16 - What changes would you make to the Caucus approach for Update 2018?

20 responses. Most felt it worked well. Several offered suggestions. Some concerns expressed including:

Too much focus on consensus Potential tunnel vision/ lack of big picture Schedule demands / too much focus on

schedule Diminished role of ACs/ State Agencies

18

Page 19: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 17 -What advice do you have related to facilitation in Update 2018?

23 responses. Most respondents were supportive of the current approach

Many comfortable with DWR & other staff taking on more facilitation

Concerns related to staff neutrality/ not deferring to higher-ups & level of skill

High standards for professional facilitation suggested

19

Page 20: Water Plan Update 2013 Wrap-Up Session Pre-work Survey Recap March 26, 2014.

Q 18 - OTHER 11 other comments plus  Many reflections and/or thanks and kudos to the team.

Several compliments for other members  Some ready to sign up for duty on 2018 Other suggestions/comments

20

•Break out of the box•Focus. Focus. Focus.•Less time on status and process.•Did I mention sustainability???

•Address drought and climate change impacts.•Focus on lessons learned that can be used going forward•Groundwater regulation is needed