WATER MANAGEMENT INFRASTRUCTURE BHP Iron Ore Case Study 1
UON was engaged by BHP as the head contractor to Design, Supply, Install and Commission thirteen downhole bore packages, GMC Generator and Headworks Trailers, Fuel Tanks and associated equipment including UON’s (Patent Pending) PROPOWER™ GMC Generator Technology.
1O Team members
58 Items of equipment
46,000 Hours worked LTI-free
KEY SUCCESS UON minimised the loss of dewatering across these BHP sites during the removal of existing infrastructure and replacement with new infrastructure. This project required a high level of planning from our Projects and Production and Fabrication Facilities. UON achieved this safely and on time with zero recordable incidents for the duration of the project.
UON Project Case Study
• 18 x 4000L UON Fuel Tanks
• 16 x 92 to132kW Downhole Bore Pump Packages
• 6km of HDPE
• Hydro Testing, Installation & Commissioning
• Delivered on-time and in-budget
UON Project Case Study