Water cooler manual

4
Water Dispenser Installation & Operation Guide Point of Use IMPORTANT: THIS GUIDE MUST BE READ BEFORE ATTEMPTING TO CONNECT THE MACHINE

description

 

Transcript of Water cooler manual

Page 1: Water cooler manual

Water DispenserInstallation & Operation Guide

Point of Use

IMPORTANT: THIS GUIDE MUST BE READ BEFORE ATTEMPTING TO

CONNECT THE MACHINE

Page 2: Water cooler manual

Installation and Operation Guide

Point of Use Water Dispenser

Congratulations on your wise choice of water cooler. Your water cooler will provide you with a continuous supply of clean water 24 hours a day. To ensure that this product will always preform as it truly should, the user should initially read this manual thoroughly and follow all instructions before operation of the unit commences.

WC-16LG-X-52AWC-50LG-SX-BWC-T40

Diagram and Parts List

Introduction

1. Top cover2. LCD display3. Warm water button4. Cold water button5. Warm water outlet6. Cold water outlet

7. Water tray8. On/off switch9. Drainage valve10. Power cord11. Condensor12. Water inlet

Operation Process

Page 3: Water cooler manual

Installation and Operation Guide

Point of Use Water Dispenser

Installation

The water connection to the water cooler is via a ¼” supply. The connection can be made utilising the bulk head connector found at the rear of the machine. It is advisable that an in-line rail kit ( water block, pressure reducing valve and isolation valve) should be installed on the supply just behind the machine in case of emergency. It is important that the dispenser is connected to an RCD supply ensuring the voltage supply is compatible with the dispenser.

Product SpecificationRated Voltage 220V Inlet Pressure 1.0 - 3.5 KG/CM2 (BAR)Rated Frequency 50Hz Inlet Temperature 5 - 45˚CRefrigerating Power 100W Tank Capacity 3.7 LCold Water Capacity 2L/h ≤ 10˚C Refriferant R134aAmbient Temperature 10 - 38˚C Refrigerant Filling 30gAmbient Humidity ≤ 90% Electric Shock Protection Class Class 1

Operation Method

Having connected the water supply to the rear of the machine the water and mains power supply should be turned on. You will hear the header tank start to fill. It is recommended the first tank of water is drained to ensure the system is flushed prior to normal use.

NB If your water cooler has a hot water facility please allow 30 minutes for the hot tank to fill up before turning on. This applies for the first use and after sanitisation is carried out.

1. It is important that at least 20mm is left between the back of the machine and the surface against which it is placed. This is to ensure the machine does not overheat.

2. The machine must be kept away from any direct sunlight.

3. Wall fix brackets can be used for high volume footfall areas.

Machine Positioning

Sanitisation & Cleaning

1. To commence sanitisation, simply isolate the water supply and remove the filter cartridge (if applicable)2. Having removed the filter cartridge you can now connect the dosing cartridge supplied by your dealer with 125ml of sanitisation fluid inside.3. Simply hold the cold button down until the sanitisation fluid has been thoroughly flushed through the system.4. The last stage is to fully clean the external casing with sanitisation wipes.

If you have any questions in relation to sanitisation please do not hesitate to ring our technical department on 0800 328 5708.

Page 4: Water cooler manual

FW3 LTD, DripDropDryWest Hill, Exeter, EX11 1LQtel: +44(0)1404 814292 • email: [email protected]