Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting...

50
Waste Site Cleanup Advisory Committee Waste Site Cleanup Advisory Committee Meeting Agenda Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston 9:30 am General updates - Assistant Commissioner Ben Ericson 10:00 Forms/guidance to be updated to support MCP amendments- Liz Callahan/Paul Locke 10:15 Gardening BMPs & outreach/implementation - Paul 10:30 Consideration of new approaches to define & evaluate short-term risk/Imminent Hazards under the MCP (Note: longer term discussion; not part of the current amendments) - Paul 11:00 Source control scenarios & proposed provisions - Liz 11:30 Adjourn 1

Transcript of Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting...

Page 1: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Waste Site Cleanup Advisory Committee Meeting Waste Site Cleanup Advisory Committee Meeting AgendaAgenda

April 25, 2013, MassDEP, One Winter Street Boston9:30 am General updates - Assistant Commissioner Ben Ericson

10:00 Forms/guidance to be updated to support MCP amendments- Liz Callahan/Paul Locke

10:15 Gardening BMPs & outreach/implementation - Paul 10:30 Consideration of new approaches to define & evaluate

short-term risk/Imminent Hazards under the MCP (Note: longer term discussion; not part of the current amendments) - Paul

11:00 Source control scenarios & proposed provisions - Liz 11:30 Adjourn

1

Page 2: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Amendment Implementation Amendment Implementation – Guidance & Form Updates

• Timeframes – by effective date, close to effective date, can wait

2

Page 3: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Guidance Revision PrioritiesGuidance Revision Priorities

• LNAPL amendments – revisions to the VPH/EPH guidance (2002) or separate document LNAPL Workgroup

• Interim Final Vapor Intrusion Guidance (2011)• Draft AUL Guidance (2010) - finalize;

incorporating earlier public comment and changes to reflect amendments

• New Q&As to assist in implementation of amendments

3

Page 4: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Other Guidance UpdatesOther Guidance Updates

• Retire NRS Guidance Manual • Lower priority - Update references/terminology

in other guidance, old Q&As, fact sheets and technical updates

4

Page 5: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Forms/Database...Forms/Database...

5

Page 6: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Permanent Solutions With Conditions But No AUL

For Potential Gardening Exposures

Page 7: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Issue #1: What Are the Recommended BMPs?

Page 8: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Other People’s Information

We don’t have to… don’t want to… reinvent the wheel or BMPs…

just Google® it

Page 9: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Page 10: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Page 11: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Page 12: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Page 13: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Page 14: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.
Page 15: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Issue #2: What Is DEP’s Enforcement Angle?

Page 16: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

• As Proposed, the MCP would REQUIRE that the Permanent Solution Statement contain RECOMMENDATIONS for the use of Gardening BMPs under certain conditions.

• The relevant question is:“Does the PSS contain the appropriate BMP

recommendations?

Page 17: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

DEP’s Goal is to educate & inform & minimize potential exposures where the direct contact

risks are already demonstrated to pose NSR, and the incremental exposure – even without BMPs – is thought to be minimal but difficult to quantify.

Question for Public Comment:Would the proposal do this?

Page 18: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Source Elimination/ControlSource Elimination/Control

• Source elimination or control is an existing requirement (40.1003(5))

18

Page 19: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Why Change It?Why Change It?• Other proposed amendments – Permanent Sol’n

with Active Pathway Elimination Systems and elimination of the LNAPL UCL - remove requirements that now define the endpoint for cleanup

• Providing more specificity re: adequate source control intended to ensure that the source is stable, prevent occurrence of new/unforeseen exposures after Permanent Sol’n and minimize the time period for existing impacts

19

Page 20: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Some MCP Context Some MCP Context • Difference between source elimination/control

for sudden releases versus historical sites• Other MCP requirements:

– expedite source elimination and control activities...

2- and 72-hour notifications trigger Immediate Response Actions, SRM & CEP require response

– aim at ensuring adequate temporal/spatial characterization of site conditions and risk, e.g., nature and extent, CSM, risk characterization, representativeness

20

Page 21: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Source Elimination/ControlSource Elimination/Control• Provide basic definition of “Source of OHM

Contamination” – refers to the original OHM release location and/or

contaminated media from which OHM can migrate

• Source of OHM Contamination shall be eliminated, if feasible

• If not feasible, then Source must be controlled; performance standards for “Source Control” are specified

Page 22: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Proposed DefinitionProposed DefinitionSource of OHM ContaminationSource of OHM Contamination

means a point of discharge of OHM into environmental media and/or OHM within environmental media, that is migrating or likely to migrate in a dissolved or vapor state or as a separate phase liquid. Sources of OHM may include, without limitation:

1. leaking storage tanks, vessels, drums and other containers;

2. dry wells or wastewater disposal systems that are not in compliance with regulations governing discharges from those systems;

3. contaminated fill, soil and sediment;4. sludges and waste deposits; and5. Nonaqueous Phase Liquids.

Page 23: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Source Control Source Control Performance StandardsPerformance Standards

• Absence of Non-Stable NAPL• Removal of LNAPL to extent feasible

(using LCSM principles)• OHM plumes in any media not expanding• Absence of DNAPL constituent

concentrations greater than 1% of their solubility limit

Page 24: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Scenario #1

Page 25: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#1

Page 26: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

LEAK

TANK

#1

Page 27: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

LEAK

TANK

#1

Page 28: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#1

Page 29: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

• Tank removed• Soil removed

#1

Page 30: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

• Tank removed• Soil removed

#1

Page 31: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

• Tank removed• Soil removed

#1

Page 32: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Scenario #2

Page 33: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#2

Page 34: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

LEAK

TANK

#2

Page 35: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

LEAK

TANK

#2

Page 36: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#2

Page 37: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#2

Page 38: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#2

• Tank removed• Soil removed

Page 39: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#2

• Tank removed• Soil removed

Public Water

SSDS

Page 40: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

Scenario #3

Page 41: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#3

Page 42: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

LEAK

TANK

#3

Page 43: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

TANK

#3

Page 44: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#3

• Tank removed• Soil removed

Page 45: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#3

• Tank removed• Soil removed

Page 46: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#3

• Tank removed• Soil removed

Page 47: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#3

• Tank removed• Soil removed

Public Water

SSDS

Page 48: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

OVERBURDEN

GROUNDWATER

BEDROCK

#3

• Tank removed• Soil removed

Public Water

SSDS

Page 49: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

BEDROCK

#3

• Tank removed• Soil removed

Public Water

SSDS

Page 50: Waste Site Cleanup Advisory Committee Meeting Agenda Waste Site Cleanup Advisory Committee Meeting Agenda April 25, 2013, MassDEP, One Winter Street Boston.

BEDROCK

#3

• Tank removed• Soil removed

Public Water

SSDS