Warehousing Opportunity at Bhiwandi - Siddhi Realty
Transcript of Warehousing Opportunity at Bhiwandi - Siddhi Realty
Prepared by: Siddhi Realty
Demand & supply and Bhiwandi scenario
Title of Property
1
2
Project Approvals3
Utilitiesc
Common Facilities4
Warehouse Buillding Specifcations5
Project Management Facilities & Services to Customers6
Design Specificationsa
Infrastructureb
Warehousing in Bhiwandi
Prepared by: Siddhi Realty
DEMAND FOR WAREHOUSES IN BHIWANDI & MMR : YEAR 2008-
2013
Sources :• IES Report (Indian Economic Survey)
2007-08
• ESM Report (Economic Survey of
Maharashtra) 2007-08
• All Sector-wise Ministries Annual
Report for 2007-08
• CMIE (Centre for Monitoring Indian
Economy) Survey
• CII (Confederation of Indian Industry)
Survey
• Global Retail Development Index
• AT Kearney Retail Study
• India Retail Study
• Images F&G Research
• Forrester Research
• KPMG Survey Report
• RREEF Survey Report
• FICCI Survey Report
• ICICI Survey Report
• Assocham Survey Report
• ICRA Market Research Report
• CRISIL Market Research Report
Sn Particulars Area in Mln Sq.Ft.
1 Switchover of Corporates from illegal Warehouses in Bhiwandi 15.00
2 Agro & Industrial Need for Warehouses 2.40
3 Retailing Sector Need for Warehouses 25.00
4 Export & Import (Cargo Handling) Need for Warehouses 15.08
Total Warehouses Space Demanded 57.48
Prepared by: Siddhi Realty
Switch of Corporates
ESTIMATED NEED TO BE
GENERATED :
SWITCHOVER OF EXISTING CORP.
15.00AREA IN MLN
SQ.FT.
1. Switchover of Corporates from Existing Illegal Warehouses in Bhiwandi• In Bhiwandi, the total existing Warehouse Space is 30 million Sq.ft.
• 90% of Total Warehouses located in Bhiwandi are illegal.
• All kinds of Corporates; small, medium & large have no option other than to utilize
such unlawful warehouses.
• All such Corporates direly needs legal warehousing complex.
• We assume atleast 50% of corporate will switch to 100% Legal warehouse given an
option
Prepared by: Siddhi Realty
2. Agro & Industrial Need for
Warehouses
I Agriculture Sector 8.67 (Area in Lacs Sq.Ft.)
II Metal Industry 2.40 (Area in Lacs Sq.Ft.)
III Pharmaceutical Industry 8.00 (Area in Lacs Sq.Ft.)
IV Food Processing & FMCG 3.00 (Area in Lacs Sq.Ft.)
V Auto Engineering 4.96 (Area in Lacs Sq.Ft.)
Total ( I to V ) 24 (Area in Lacs Sq.Ft.)
Converted into Million Sq.Ft. 2.40 (Area in Million Sq.Ft.)
• Maharashtra, the leading state of India, is the economic powerhouse.
• Its Per Capita Gross Output is 2.5 Times the National Average and per capita income is 55%,
which is more than the national average.
• Maharashtra contributes to 22% of country’s net value added and 30% of software industry.
• Maharashtra has the highest rate of implementation of investment projects at 48%.
Summary : Need to be Generated in Mumbai & MMR Region : From 2008-2013
Prepared by: Siddhi Realty
Contd…Retail Sectors Need for Warehouses - Mumbai : 2008-2011
i. Estimated No. of Units to be Established :
ii. Estimated Retail Space Required :
Sn ParticularsNo. of
UnitsAppx Area Req.
Sq.Ft. Sq.Ft.
1 Shopping Malls 225 400,000 to 1,000,000
2 Hyper Market 280 100,000 to 200,000
3 Dept. Stores 400 50,000 to 60,000
4 Super Market 3,200 25,000 to 30,000
5 Mega Specialty Stores 1,200 10,000 to 200,000
6 Exclusive Brand Outlets 20,000 1,000 to 3,000
Sn Particulars
Area
Assumed
(Sq.Ft.)
Retail Space Req.
Sq.Ft. Mln Sq.Ft.
1 Shopping Malls 400,000 90,000,000 90.00
2 Hyper Market 100,000 28,000,000 28.00
3 Dept. Stores 50,000 20,000,000 20.00
4 Super Market 25,000 80,000,000 80.00
5 Mega Specialty Stores 10,000 12,000,000 12.00
6 Exclusive Brand Outlets 1,000 20,000,000 20.00
Total 250,000,000 250.00
Prepared by: Siddhi Realty
Contd…
ESTIMATED NEED TO BE GENERATED :
ORGANIZED SECTOR25.00 AREA IN MLN SQ.FT.
iii. Estimated Warehouse Space Required in Mumbai & MMR for Retail Sector :
Sn Particulars
Warehouse Space
Required (Mln sq.ft.)
Need in Mumbai & MMR Region
(Mln Sq.Ft.)
Retail : WH = 1 : 0.50 20%
1 Shopping Malls 45.00 9.00
2 Hyper Market 14.00 2.80
3 Dept. Stores 10.00 2.00
4 Super Market 40.00 8.00
5 Mega Specialty Stores 6.00 1.20
6 Exclusive Brand Outlets 10.00 2.00
Total 125.00 25.00
Prepared by: Siddhi Realty
Export & Import (Cargo Handling) Need for
Warehouse Space :
Sn Particulars2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
Base Estd. Proj. Proj. Proj. Proj.
1 JN Port Trust
Cargo Handling : Import 207.22 245.45 290.74 344.38 407.92 483.18
Cargo Handling : Export 240.93 285.38 338.03 400.40 474.28 561.78
Total 448.15 530.83 628.77 744.78 882.19 1,044.96
Growth Rate Base 18.45% 18.45% 18.45% 18.45% 18.45%
2 Trust
Cargo Handling : Import 310.90 368.82 437.53 519.04 615.74 730.45
Cargo Handling : Export 212.74 252.37 299.39 355.17 421.33 499.83
Total 523.64 621.19 736.92 874.21 1,037.08 1,230.28
Growth Rate Base 18.63% 18.63% 18.63% 18.63% 18.63%
3 Grand Total ( 1 + 2 ) 971.79 1,152.03 1,365.70 1,618.99 1,919.27 2,275.24
Total Additional Cargo Handling 1303.00 (Weight in Lacs MT)
Total Stock for 7 days 25.00 (Weight in Lacs MT)
Total Space Req. = 1 Tonne : 6 Sq.Ft. 150.00 (Area in Lacs Sq.Ft.)
Fig. in Million MT
Prepared by: Siddhi Realty
Expected Air Cargo Handling
Capacity in Mumbai : 2008-13A. Domestic & International Mumbai Airport : Cargo Loaded
Sn Particulars2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
Base Estd. Proj. Proj. Proj. Proj.
1 Mumbai - Domestic 86.26 96.35 112.44 136.84 173.38 228.34
Growth Rate Base 11.70% 16.70% 21.70% 26.70% 31.70%
2Mumbai -
International203.90 222.37 253.64 301.98 374.64 483.51
Growth Rate Base 9.06% 14.06% 19.06% 24.06% 29.06%
3 Total (1+2) 290.16 318.73 366.08 438.83 548.02 711.85
Sn Particulars
2007-
08
2008-
09
2009-
102010-11 2011-12
2012-
13
Base Estd. Proj. Proj. Proj. Proj.
1 Mumbai - Domestic 76.68 78.47 98.24 123.00 153.99 192.80
Growth Rate Base 2.33% 25.20% 25.20% 25.20% 25.20%
2Mumbai -
International169.30 203.21 222.72 244.10 267.53 293.22
Growth Rate Base 20.03% 9.60% 9.60% 9.60% 9.60%
3 Total ( 1 + 2) 245.98 281.68 320.96 367.10 421.53 486.01
B. Domestic & International Mumbai Airport : Cargo Unloaded
Prepared by: Siddhi Realty
Contd…
Total Additional Loading 4.22 (Weight in Lacs MT)
Total Additional Unloading 2.40 (Weight in Lacs MT)
Total Loading + Unloading 6.62 (Weight in Lacs MT)
Total Stock for 7 days 0.13 (Weight in Lacs MT)
Total Space Req. = 1 Tonne : 6 Sq.Ft. 0.76 (Area in Lacs Sq.Ft.)
Addl. Coastal Cargo Handling 150.00 (Area in Lacs Sq.Ft.)
Addl. Air Cargo Handling 0.76 (Area in Lacs Sq.Ft.)
Total 15.08 (Area in Mln Sq.Ft.)
ESTIMATED NEED TO BE GENERATED
:
EXPORT & IMPORT (CARGO
HANDLING)
15.08AREA IN MLN
SQ.FT.
Demand and Supply Analysis -
Warehousing
Sources :
IES Report (Indian Economic Survey) 2007-08
ESM Report (Economic Survey of Maharashtra) 2007-08
All Sector-wise Ministries Annual Report for 2007-08
FUTURE DEMAND FOR WAREHOUSES IN MMR: YEAR 2009-2013
Future LI & Warehousing Demand in India – Year 2007 - 15
• Indian Government plans to spend USD $24 billion over the coming 8 years on Cold or Supply Chain Infrastructure
• About 110 Logistics Parks spread over approximately 3,500 acres are expected to be operational by 2012
• RREEF (Deutsche Bank’s Asset Management Division) projects that logistics sector would add around 125 million sq ft
by 2010, almost the same amount of development pipeline as retail.
• India’s Logistics Sector attracted investments worth Rs. 23,200 Crore in first half of 2008, according to a study by
Assocham
• Mumbai, Kolkata, Chennai and Hyderabad have become preferred locations for Logistics Parks because of excellent
port, rail, and road connectivity and significant investment in infrastructure
• Eight Logistics Parks with an approximate investment of $200 mn in 600 acres of land around Mumbai
~ 75 mill sq ft (2009-13)
Upgradation
15
Agro + Indlgrowth
10
Retail
35
EXIM
15
Page 11
Prepared by: Siddhi Realty
Market trend of Rental Rates
Sr.
No.
Subject Organised Unorganised
1 A Grade
Warehouse
Rs. 14 to 18 per sq
ft
Rs.8 to to 10 per
sq ft.
2 B- Grade
Warehouse
Rs. 11 to 14 per sq
ft
Rs. 5 to 8 per sq ft
3 C- Grade
Warehouse
Rs. 8 to 10 per sq ft Rs. 4 to 6 per sq ft
Prepared by: Siddhi Realty
Comparison of Organized and Unorganized market
Sr.
No.
Subject Organised Unorganised
1 Location Projects are strategically located Taking
factors such as connectivity to National
highways, ports & Airprts into consideration
Not Located as per the
requirement of corporates
2 Land Acquisition Organised projects execute all legal
documents of Land acquisition such 7/12
Extract,
Registered Development agreement,
Agreement for sale, Conveyance deed
No such legal process of Land
acquisition followed
3 SPV Project is constructed and professionally
managed by Special Purpose Vehicle
No such SPV is formed
4 Land Clearance Clear and Marketable Title, Location
clearance from Ministry of Industries,
Environmental clearance – MOEF, MPCB
clearance
No such documents are executed
5 Zone Conversion – I Zone Project is converted into Service and
Industrial by getting special approvals
Project are not in I Zone, but in
U1 or Green zone
6 F.S.I 1.0 Violation of FSI
Prepared by: Siddhi RealtyPage 14
Comparison of Organized and Unorganized market
Sr. No. Subject Organised Unorganised
7 CFC & Open Space 8% & 10% of land is allotted is for CFC &
Open space
No CFC and No Open Space
8 Permissions Permissions are taken from Fire Officer,
Highway Authority, No Reservation
Certificate for the project
No such permissions are taken
9 Common Facilities Exclusive Common facilities are provided in
the project such as Truck Terminal, Food
court, Hospitals, Hotels, Mechanical
workshop, Bank premises with ATM etc.
Not provided
10 Infrastructure Best in class infrastructure in the project is
provided such as Road systems, Utlity
Ducts, Power, Water supply, Storm water
management etc.
Low quality of Infrastructure
11 Customised warehousing Construction of warehouses as per clients
needs and specifications.
Standard warehousing structure
12 Labor Management Common rates for whole complex
24 x 7 operations facility
Varai issues will be handled by SPV
Management of complex handle with
Local unions of labors. (Regular issues
need to manage personally)
13 Maintenance Quality maintenance by SPV by executing
maintenance agreement
No such provision and poor
maintenance
Prepared by: Siddhi Realty
Bhiwandi warehousing
Total 5 cr square feet hub of warehousing
1st Kalher, Anjurphata and purna started developing as ACC & RCC warehousing Stuctures.
Movement of development from these area’s towards Mankoli naka and then on main Nasik highway (NH 3), here major complexes comprises of PEB structure with 18’ & 25’ height (Dome shape) and now structure with pentagon shape and height of 26’ & 32’
Latest development with specific built to suit requirement of 40’ & 50’ height
Prepared by: Siddhi Realty
Warehousing Complex
Warehousing complexes comprise of warehouse
buildings, common facility centre, Roads, terraces,
Utilities, street lights , Open spaces, Gardens, Parking
spaces, etc.
Warehousing complexes are located in octroi free zones
for reducing cost to corporates.
These are accessible from national and state highways,
Ports & Airports
Page 18
Prepared by: Siddhi Realty
Title of Property
List of title checks
Step 1 to 6 to make property 100% marketable to freehold
1
2
Land Approvals
Prepared by: Siddhi Realty
Land Approvals
1. Land Acquisition Approvals
Tenancy Clearances
Mortgage/Loan/Burden Clearances
Court Matters clearances
Varas Takta
Gram Panchayat NOC
7/12 opening for all LAA (Land Acquisition Approvals
2. Land Title search
Index II Search for 30 Years
Court Search
Search vide claims / objections
Public notices
Revenue Search
Public Notice
Forest search from 1957
Following are the details & complete land Acquisition & Approvals processes to
ensure that every Buyer’s of property are ensured complete clear and marketable
title to the property. Concise lists of Land Acquisition & Approvals ti be taken are
listed here under.
Prepared by: Siddhi Realty
Contd…
3. TILR Survey and Land Mojani
4. Pre Construction Land
development Approval
Royalties for Earth movement
NOC of Petroleum pipeline
H.T shifting
5. Documentation, registration
and post registration are in favor
of the SPV. All documents with
the with the land owners will be
registered in the name of SPV
with complete payment of stamp
duty and registration charges.
6. Documentation, registration
and post registration are in favor
of the Buyer/s . SPV’s name will
be in every record of title
transferred to buyer, ensuring
100% Clear and Marketable Title,
buyer/s / buyers’ name will be
entered on all the land records
vide mutation entries.
Prepared by: Siddhi Realty
F.S.I.FSI is Floor Space Index means Ratio of Area to be
constructed in proportion to land used for project
Land in MMR Zone Permitted FSI as per MMR
Development Control Rules and
Regulations (DCR)
G1 Zone 0.1
G2 Zone 0.1
U1 Zone 0.35
U2 Zone 0.35
I Zone 0.5
Page 22
Special sanction FSI for project above 40 hectors (100 acres) - 1.00
Prepared by: Siddhi Realty
USP OF LEGAL PROJECT
Clear and Marketable Title
Order of Development Commissioner - DIC
Environmental clearance - MOEF
Height and Margin relaxation
Location clearance from Ministry of
Industries
1 FSI
Industrial Zone
Permission from Fire officer
NOC from Grampanchayat
Permission for Communication from BSNL
Permission for the access from Highway authorities
Approved Layout by Town Planning, MIDC, MMRDA.
Page 23
Prepared by: Siddhi Realty
Development Approvals
Approvals for 100% Legal project
Step 1 to 5
List of Approvals
1
2
Prepared by: Siddhi Realty
Development Approval
1. Development Approvals
a a. State c Local
Zoning
Additional FSI
Location clearance
Planning Authority NOC
Gram Panchayat / Municipal
Council/Corporation NOC
Regional Authority NOC
NOC from Irrigation Department
NOC from Highway Authority
b b. Collectors d Approvals from various Authorities
Sanad
N.A
Consolidation of 7/12
Approvals
Plot sub division approvals
Plot N.A Assessment tax
Town planning
Special planning Authorities
Urban Development Department
All the development Approvals from various authorities needed for ensuring 100%
legally compliant project are listed all below,
Prepared by: Siddhi Realty
Contd…
2 Environmental Approval 4 Utilities Approvals
Environmental Clearances
Consent to Establish
Consent to Operate
Compliance Reporting to
respective authority
Power
Water
Accesses
Sewage/ Drainage
Fire station
Police station
Communication – Telecom
Bus services/stop
3 Plan Approvals
(MIDC,ADTP,MMRDA)
5 Other Approvals & No Reservation
Certificate
Land Layout Approval
Infrastructure Layout
Approval
Building Layout Approval
Common facilities Approvals
1 step higher incentives
From Land Acquisition
Department
From PWD and MIDC
Prepared by: Siddhi Realty
Project Design Specifications
Basic Infrastructure
Utilities of the project
1
2
Common Facilities Centres
Warehouse buldings
3
4
Prepared by: Siddhi Realty
Basic Infrastructure
S.N Infrastructure S.N Infrastructure
1 ROAD SYSTEM 3 STORM WATER MANAGEMENT
121 ft. Complex Central Road
68 ft. Main Road
50 ft. Branch Road
Industrial Tonnage Cement Concrete
Road
Road Illuminated with Sodium Vapor
Lamp
32 %of Land area as Road
Storm water drainage
Slopes of Roads & Building planned to
drain water
Drainage of storm water in Nala
The site Maintain 3 to 5 mtrs high from
Nala
2 UTILITY DUCTS 4 OPEN SPACE AND GARDEN
Road side utilities ducts reaching
each plot of complex
Ducts for Power, Water, Drainage,
Sewage and Fire Fighting
10 %of land area as open space
Open space made as gardens
Gardens with Recreation area
Prepared by: Siddhi Realty
Contd…S.N Infrastructure S.N Infrastructure
5 23 MTR BUFFERZONE AND USAGE 7 DEDICATED WATER SUPPLY STATION OF 2
MLD
23 Mtr Rounding Area
Usage for Ancillary Building i.e.
Essential Staff Quarter
Canteen
Parking Bays
Water Tanker etc.
Dedicated Pumping Station at Village
Pise Dam supplying water to Complex
Approval from Department
Dedicated Pipe Line from Pumping
Station to Water Tanks in Complex
6 100 MVA EXCLUSIVE POWER
SUBSTATION
8 TRAFFIC MANAGEMENT SYSTEM
15 Acres land allotted by Complex
for providing dedicated Power Sub
Station
Power to Sub Station Directly from
Power Grid by system of LILO
50 MVA Back Up Transformer in case
of any power failure
Internal Signaling and Traffic
Management System
Left Side Movement Of Traffic
Traffic Management Staff
Toeing Vehicle dedicate to Complex
Prepared by: Siddhi Realty
Contd…S.N Infrastructure S.N Infrastructure
9 COMPLEX SECURITY SERVICES 11 ENVIRONMENT FRIENDLY
INITIATIVES
24 hrs Complex Security
Services
Barbed Fencing for Entire
Complex
Lighting and Illumination of
Complex
Police Chowky
Solar Panels Power
Wind Turbine Power
Rain Water Harvesting
Reuse of Drainage Water
10 UNIFORM RECTANGULAR
BUILDINGS
12 SIGNAGES, BOARDS
Rectangular building System
Recognized World over
Roads and Inter Section with
Excellent Traffic Mobility
Building size of 36,000 sq. ft to
1,20,000 sq. ft
Merger and Partition of
Buildings Possible
Flexible Complex Design
Pot Signages
Road Signages
CFC Signages
Recreation Signages
Map Boards
Sector Maps & Direction Boards
l
Prepared by: Siddhi Realty
Utilities in Warehousing ComplexSN Utilities SN Utilities
1 Power 3 Drainage & Sewage
24 hrs. power supply by Express Feeder
Numerous transformer throughout the
project area
Separate transformer yard for entire
project
Underground distribution network
HT / EHV supply
Sanction Power supply of 100 MVA from
MSEDCL
Sewage designed for nature flow using
gravity to avoid stagnant water
Designated for economical maintenance
- minimum downstream system
Solid waste collection & dumping
system
Consent from MPCB for discharge of
water
Waste water effluent treatment plant
2 Water 4 Waste Management
Designed for 24 hr water supply
Recycling of water for industrial use
Pipe size of 100 mm
2 overhead tank with 2 MLD storage
capacity
Separate connection for drinking water
to maintain good hygiene
Permission to supply 2MLD water by
Maharashtra Jeevan Pradhikaran
Collection bins for individual units
Treatment for Bio-degradable waste
Recycling of various recyclable items
viz. paper, metal etc.
Street sweeping
Storm water management
Prepared by: Siddhi Realty
Contd…
Contd..
5 Fire Fighting System
Individual base tank for every Warehouse building
Underground pipeline network for fire fighting upto every Warehouse building
Placing fire extinguishers and buckets in each Warehouse building
Bottom fire buckets as per ISI grade
Red color painted buckets with capacity of 9 ltrs.
6 Telecom and Data Communication
Exclusive Private Telecom Company
Prepared by: Siddhi Realty
Contd…
Sr. No Approvals Authorities
1 Access from Highway NHAI
2 Permission for the fire fighting station Fire Officer
3 Permission for Height and Margin Norms Fire Officer
4 Permission for Power Supply MSEDCL
5 Permission for Water Supply MJP - New Panvel
6 Clearances for Sewage and drainage MPCB
7
Permission for Communication- Telephone, Internet &
Cable BSNL, TATA, Reliance
8 Permission for Transportation within Park: RTC
9 Bus Diversion / Service Stop
State Transport
Division
10 Sanction for Petrol Pump & CNG Station Reliance, BPCL, IOC, HP
11 Permission for Police Station SP & State
Page 33
Prepared by: Siddhi Realty
Dimensions, Blocks & Units
1 Building = 200 x 500 sq. ft.
1 Building = 10 units
1 Building = 100000 sq. ft. carpet area + 20% loading
1 Building = 120000 sq. ft. built up area
1 unit = 10,000 sq. ft. carpet area + 20% loading
1 unit = 12,000 sq. ft. built up area
Page 37
Prepared by: Siddhi Realty
Sr.
NO COMPONENTS SPECIFICATION VALUE CREATION
1 Flooring
State of the art - Floor laying by using
Truss Screening system, 150mm thick
Steel fiber reinforced controlled
concrete (SFRC floor), Abrasion
resistance Top coat using Dry shake
hardener and surface sealant Liquid
Surface Hardener (LSH). Flatness
tolerance of FM3 standards.
Floor Panels sizes designed in accordance
to the Racking layout minimizing the
longitudinal joints in the aisle. Floor
designed considering installation of
heavy duty racking system with use of
Stackers, reach trucks and fork lifts,
creating a point load of 3.2 tons on a
plate size of 120mm x 100mm. .
Abrasion, Crack and dust
resistant. Floor Flatness to
facilitate safe and precession
movement of material
handling equipment.
2 Loading platform Continuous platform providing 2.175m of
clear space for external marshalling.
Angular docking at 20 degrees, Width of
platform 2175 mm + Angular bay,
aggregating to 2820mm width.
Facilitating the docking of 40 feet
containers in the docking yard and
free movement of incoming and
outgoing vehicles.
3 Dock Fenders Dock Fenders of High density rubber fitted
on anchor bolts for protection of Platform
edge.Protects platforms with truck
impact damage
4 P.E.B. Pre Engineered Building design by Everest
Standardized, factory fabricated,
optimized building.
5 Clear & Mid Height 8m (26'-3")
Designed to accommodate heavy
duty racking system and optimum
use of stackers reach.
Prepared by: Siddhi Realty
Sr.
NO COMPONENTS SPECIFICATION VALUE CREATION
6 Wall Sheet Cladding
0.45mm (BMT) and 0.50mm (TCT) Color
Coated above 3.9m Block wall. Manufactured
and imported from Dongboo, Korea Class A sheet quality.
7 Roof Sheeting 0.55mm TCT 'Bare galvulum' for reflection of
sunlight & reduction in Room temperature.
Manufactured and imported from Dongboo,
Korea of continuous length from ridge to
eaves gutter. Seamless roofing system, reducing
possibilities of leakage.
8 Roof type
FM Compliant - Screw less - Standing Seam
(SS 2000)
Puncture free roof system, free
floating roofing system, facilitating
expansion and contraction of the
sheets during high temperature
variations and avoiding corrosion
9 Turbo Ventilation 24" Dia, Turbo Ventilators on roof Good exhaust of internal air and
free inflow of fresh air.
10 Ridge Ventilators 24" throat Ridge Ventilators at each bay with
Bird mesh.Further outflow of hot air.
Protecting the warehouse from
inflow of birds.
11 Side Ventilators 2.0m x 0.6m 'Z" type side ventilators
with glass panel and wired mesh.Dual purpose - Illumination
and air flow fixture. Protecting
the warehouse from inflow of
birds.12 Canopy Continuous canopy of 6.0m over hang
with Soffit Weather protection during the
vehicle handling process.
Prepared by: Siddhi Realty
Sr.
NO COMPONENTS SPECIFICATION VALUE CREATION
13 Racking Compliance -
Layout Design
Compliant and Optimized for Selective pallet
racking.
The warehouse layout ( Length,
breadth and height) is compliant to
positioning of heavy duty racking
system and designed to maximise
the number of pallet positions.14 Building Insulation Fitted with Aluminum reflective insulation Heat insulated building, leading to
an average reduction of 7 degrees
C from ambient. Fire retardant.
Improving the worker efficiency
and safer storage of goods.
15 Electrical All installations in accordance with Industrial
Norms for Warehouse with IS specification.
Provision for Stacker charging stations and
other gadgets. Metal helide High Bay lamps,
Focus lights at loading bays, Canopy
lighting and street lighting.
16 Fire Fighting Fire hydrant with Hose Reels
Fire Egress Exit Doors
Emergency Exit Signs Compliance to Fire safety norms.
17 Exclusive Road 17 m (56'-0") exclusive road with
loading/Unloading platform with Gate &
Security cabin at Entry & Exit
Dedicated road for each
warehouse for convenient and
secure operations.
18 Landscaped area Landscaped area at entry & exit points to
enhance aesthetics of Warehouse.
19 Signage's Signage on Entrance, Roads, Warehouse,
Objects, Items - Reflective, Non-reflective
signage's.
Objective to Identify structures,
Areas, Guide people, vehicle and
material, Caution and instructions
20 Surveillance Features Provision for fixing of Cameras internally
and at periphery
Prepared by: Siddhi Realty
Sr.
NO COMPONENTS SPECIFICATION
1 Interiors - Office & toilet
design
Provision of office at Entrance of the
Warehouse.
Toilets at entry side of the warehouse for
executives and at Exit side for Labor and
drivers.
3 Mezzanine floors
Provision of mezzanine floors of required size
for office purpose as per requirement.
4 Heavy Duty Racking System
Provision of Racking System - Pallet location
- 11457 nos.
5 Dock Levelers
Provision of dock leveler for easy
Loading/unloading as per requirement.
6 Air-conditioning Provision air conditioning of required tonnage.
BTS in Warehouse
Prepared by: Siddhi RealtyPage 42
Project Lifecycle
Land
Acquisition
&
Land
Acquisition
Consulting
Project
Design &
Detailed
Engineerin
g
Project
Approvals
,
Fiscal
Benefits
&
Subsidies
Project
Conceptualization
Project
Marketing,
Leasing &
Investor
Services
Occupier
Support
Project
Developm
ent
PMC
Project
Marketing
UMC
Project
Funding
Page 43
Common Issues in Existing Warehouse
Project
Most Warehousing and Industrial projects are
illegal due to FSI Violations and absences of
Legal Applications and Approvals
Poor Maintenance by Warehouse Authorities led
to fire e.g GEO Logistics
Poor road quality & width leading to traffic
congestion
Page 44
Common Issues in Existing Warehouse
Project
Lack of Docking system
Water logging due to inadequate maintenance
by Complex authority
Drainage issues
Lack of adequate sewage systems
70 + Ways In Which Organize
projects are Different
Sr. No.
Subject Renaissance Infrastructure Rest Others
1 Location Project located on first proposed ring road of MMR
Any other State or National Highway
2 Exclusive 3 entrance to Project Only 1 entrance
3 Frontage of 2 km for entire Project
Maximum 100 feet
4 Land Acquisition Order of Development Commissioner
No such order
5 Registered Development agreement
Not Registered
6 Registered Power of Attorney Not Registered
7 Registered Agreement for sale Not Registered
8 Registered Conveyance deed Not Registered
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
9 7/12 Extract In the name of SPV which is Renaissance Infrastructure
No such Mutation entry in 7/12 extract
10 Land Clearance Clear and Marketable Title None of these orders or clearances
11 Location clearance from Ministry of Industries
12 Environmental clearance - MOEF
13 MPCB clearance
14 Height and Margin relaxation
15 Maximum ground Coverage
16 Zone Conversion Existing to Industrial No such zone conversion is undertaken
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
17 F.S.I 1.0 Violation of FSI
18 Layout Plan , Building plan approvals
Layout Plan , Building plan approvals obtained from concerned authorities
No such approvals are obtained
19 CFC 8% No CFC
20 Open Space 10% No Open Space
21 Buffer Zone around the Project
23 Meter No Buffer Zone
22 Permissions Permissions from Fire Officer No such Permission are obtained
23 Permissions for the Access from Highway Authority
24 No Reservation Certificate from Collector
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
25 Land Development Existing land use survey No such surveys are conducted
26 Contour survey
27 Boundary Fixation
28 Geo-technical survey- Soil Investigation
29 Civil Work By ‘A Grade’ construction company By local contractors
30 PEB structure Butler technology based PEB structure
No such technology is used
31 CRS sheets 10 years leak proof warranty No warranty
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
32 Amenities Earthquake resistant RCC plinth No such strength
33 6'' thick Industrial Trimix Flooring 3 - 4'' thick trimix Flooring
34 Underground Water tank for each building of warehouse
No such provision
35 Provision for Internal Office Block on Meznine floor
No such provision
36 2 shutters in each unit of 12000 sq ft 1 shutter in each unit of 12000 sq ft
37 2 loading bayes in each unit of 12000 sq ft
1 loading bay in each unit of 12000 sq ft
38 Common Facilities Hospital with Ambulance Service No such facilities are available
39 Truck Terminal
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
40
Common Facilities
Common toilets for outsiders No such facilities are available
41 Parking Space for 2 & 4 Wheeler
42 Weighing scale
43 Drivers rest rooms
44 Mechanical workshop with repair and maintenance shop
45 Accessories , electrical goods, spare parts supply shop
46 Bank premises with ATM
47 Restaurant
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
48 Common Facilities Office premises No such facilities are available
49 Brodband Service
50 Infrastructure Industrial tonnage cement concrete roads
No such tonnage capacity of roads
51 Independent road for each building 1 common road for 2 buildings
52 Roads illuminated with sodium vapor lamp
No such facility
53 90 ft. width Central road No Central road
54 65 ft. width Main roads 60 ft. width Main road
55 50 ft width Branch roads 40 – 50 ft width Branch road
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
56 Infrastructure Internal Signaling and Traffic management system
No such system
57 Left side movement of traffic
58 Well planned & connected drainage and sewage network
59 Solid waste disposal system
60 No flooding due to storm water management
61 Fire fighting System through out the complex
62 Security service 24 hrs complex security service No such security service
63 Power supply 24 hrs. power supply by Express Fedder
Daily load shedding of 8-12 hrs
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
64 Water Supply Separate connection for drinking water
Not available
65 Separate connection for Borewell water
No separate connection
66 Fencing Barbed fencing for whole complex No fencing
67 Operation 24 hrs operation (loading and unloading) can be done
Only 8-10 hrs in a day
68 Varai Common rates for whole complex Various rates in 1 complex
69 Varai issues will be handled by SPV Not concerned about Varai issues
70 Complex Bus Service From Kalyan and Thane station No such service given
71 Corporate Leasing Having own corporate leasing team Depends on Brokers
Contd.
Sr. No.
Subject Renaissance Infrastructure Rest Others
72 Customised warehousing Construction of warehouses as per clients needs and specifications.
Standard warehousing structure
73 Maintenance Separate maintenance agreement will be executed between SPV & Licensee for quality maintenance
No such provision and poor maintenance