Warehousing and Logistics

17
MADHYA PRADESH WAREHOUSING & LOGISTICS SECTOR

description

Warehousing PPT

Transcript of Warehousing and Logistics

Page 1: Warehousing and Logistics

MADHYA PRADESHWAREHOUSING & LOGISTICS SECTOR

Page 2: Warehousing and Logistics

TABLE OF CONTENTS

About MADHYA PRADESH1

Advantage MADHYA PRADESH2

Success Stories4

Investment Facilitation & Incentives3

Key Investment Opportunities 5

Contact Details6

Page 3: Warehousing and Logistics

ABOUT MADHYA PRADESH

91LAKH MTOF CAPACITYIN 2011-12

151LAKH MTPROJECTEDIN 2013-14

20 LAKH MT THROUGH MP WAREHOUSING

& LOGISTICS POLICY

20 LAKH MT BY MPWLC & OTHER

GOVERNMENT AGENCIES

20 LAKH MT UNDER OTHER SCHEMES

WAREHOUSING & LOGISTICS FACTS

Page 4: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHAGRICULTURE

0.11

7

2.55

10.2 10.02

1.85

16.57

02468

1012141618

2008-09 2009-10 2010-11 2011-12

India MP

Growth Rate of Primary Sector

Page 5: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHAGRICULTURE

Area & Production: Agricultural Crops

204.27 208.00 206.02 214.78218.76235.76

276.57314.40

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

2008-09 2009-10 2010-11 2011-12

Area (Lakh ha) Production (Lakh MT)

Page 6: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHAGRICULTURE

Area & Production: Wheat

41.00 40.10 44.70 45.70 48.90

67.40 72.80

88.70 90.50

127.00

0.00

20.00

40.00

60.00

80.00

100.00

120.00

140.00

2007-08 2008-09 2009-10 2010-11 2011-12

Area (Lakh ha) Production (Lakh MT)

Page 7: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHAGRICULTURE

Wheat Procurement Under MSP

19.7

35.4

49.7

85

0

10

20

30

40

50

60

70

80

90

2009-10 2010-11 2011-12 2012-13

Procurement (Lakh MT)

Page 8: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHINFRASTRUCTURE

CLUSTERAPPROACH AKVNs

INDOREBHOPALUJJAIN

GWALIORREWAJABALPUR

SAGAR

L OGISTICSINFRA

Composite Logistics Hub at Pawarkheda ( Distt: Hoshangabad)Facilities like Inland Container Depot(ICD), Railside Warehouse etc Centre for Perishable Cargo

DMICDELHI – MUMBAIINDUSTRIAL CORRIDOR

Page 9: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHINVESTMENT CORRIDORS

BHOPAL - INDORE

BHOPAL - BINA

Early bird projects worth more than US $ 800 Mn

EducationPharma

IT/ITeS Real EstateAgro & food processing

Logistics Auto components

Electrical equipment

Early bird projects worth more than US $ 1 Bn

ChemicalsTourism & Hospitality

Agro & food processing

Logistics

Electrical equipment

Fabricated metal production, machinery and equipment

Page 10: Warehousing and Logistics

ADVANTAGE MADHYA PRADESHINVESTMENT CORRIDORS

JABALPUR – KATNI – SATNA - SINGRAULI

Early bird projects worth more than US $ 2 Bn

Real EstateCement & Gypsum

Power Plants

Basic Metals

Agro & food processing

Education

Coal Based Industries

Logistics

Page 11: Warehousing and Logistics

POLICY & INCENTIVES MADHYA PRADESHMP WAREHOUSING & LOGISTICS POLICY 2012

Capital Investment Subsidy

15% on more than INR 1 Cr.

Interest Subsidy

5% per annum on term loan of 7 years with investment of Rs.1 Cr.

Expansion of Existing Warehousing

capital investment of at least INR 1 Cr.

10% land of all industrial areas

Earmarked for warehousing facilities in the existing and proposed green field industrial estates/clusters

Land for warehouses in green field industrial estates for long term lease basis at the SSI rate

EARLY BIRD INCENTIVES FOR 15 LAKH MT WAREHOUSING CAPACITY

Page 12: Warehousing and Logistics

POLICY & INCENTIVES MADHYA PRADESHMP WAREHOUSING & LOGISTICS POLICY 2012

Design-Build-Finance-Operate-Transfer (DBFOT) mode for Silos

30 Years lease for allotted Land

Up to 40% Viability Gap Funding (VGF) support by central and state government

10 years business guarantee and bidding on lowest VGF

Identified districts: Sehore, Dewas, Vidisha, Bhopal, Indore, Katni, Satna, Harda, Hoshangabad & Raisen

SILOS OF 5 LAKH MT IN MADHYA PRADESH

Page 13: Warehousing and Logistics

POLICY & INCENTIVES MADHYA PRADESHPRIVATE ENTREPRENEUR GUARANTEE SCHEME(PEG)

Business Guarantee for 10 years

9.66 Lakh MT of Storage Capacity to be developed

Land will have to be arranged by the entrepreneur

Construction of Godowns of the required capacity at approved locations with management and operation by the entrepreneur

Minimum capacity is 5000 MT and bidding to be carried out on lowest rental quote - Rs. per quintal per month

Entrepreneur allowed to develop additional storage capacity or value addition facility in the same premises

+ OTHERS

Page 14: Warehousing and Logistics

POLICY & INCENTIVES MADHYA PRADESHPRIVATE ENTREPRENEUR GUARANTEE SCHEME(PEG)

SILOS BUSINESS GUARANTEE for 20 years

3.5 LAKH MT OF STORAGE SPACE sanctioned for Madhya Pradesh

Construction of Railway Siding is a prerequisite under this scheme

Bidding to be carried out on lowest storage rate quoted

Identified District: Guna, Ujjain, Sehore, Raisen, Harda, Jabalpur and Hoshangabad

+ OTHERS

Page 15: Warehousing and Logistics

POLICY & INCENTIVES MADHYA PRADESHRURAL GODOWN SCHEME (RGS) OR GRAMEEN BHANDARAN YOJANA OF GOI

FISCAL INCENTIVES AVAILABLE construction of godowns in rural areas

NABARD SCHEME implemented through commercial bank

CAPITAL SUBSIDY OF 25% up to a maximum of 2.25 Cr. and to a

maximum capacity of 30,000 MT

SPECIAL INCENTIVES of SC/ST and Women Entrepreneurs

CONSTRUCT GODOWN outside the limits of Municipal Corporation area and

under this scheme can be combined with the incentives available under the

PEG scheme of Government of India

AND OTHERS...

Page 16: Warehousing and Logistics

CONTACT DETAILS

POLICY

CONTACTSDepartment of Food, Civil Supplies & Consumer Protection

Mr. Antony de SaAdditional Chief Secretary, Department of Food, Civil Supplies & Consumer Protection

Phone: +91 755 2441675Email: [email protected]

Madhya Pradesh Warehousing & Logistics CorporationMr. Sheo Shekhar Shukla

Managing Director, Madhya Pradesh Warehousing & Logistics CorporationPhone: +91 755 2600510

Email: [email protected] 

http://www.mptrifac.org/ http://www.mpwarehousing.com/

Page 17: Warehousing and Logistics

KEY INCENTIVES MP WAREHOUSING & LOGISTICS POLICY 2012

CAPITAL INVESTMENT SUBSIDYCAPITAL INVESTMENT SUBSIDY

Project to achieve financial closure

Investor to acquire land

Construction period of 1 year allowed

Subsidy to be released to bank once godown complex is built

Bank to adjust subsidy against the outstanding debt of the project

INTEREST SUBSIDYINTEREST SUBSIDY

Project to achieve financial closure

Investor to acquire land

Construction period of 1 year allowed

Subsidy to be disbursed in arrears to bank once godown complex is built