WALES Rev Date Description Chk'd Made App'd 0 14/11/2017 PEIR KC ZF SG Drawn: KC Date: Approved: Checked: ZF SG 14/11/2017 Document Type: Scale: Rev: Sheet Size: Sheet: FIGURE 0 1 OF 1 A3 (420 mm x 297 mm) 1:55,000 ° Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.1.mxd Scheme Name: 0 1 2 0.5 Kilometres PREFERRED LINE ROUTE (OF THE 132 kV OVERHEAD LINE) CONSTRUCTION AND OPERATIONS CORRIDOR 40m CONSULTATION BOUNDARY PROPOSED 132 kV UNDERGROUND CABLE PROPOSED TEMPORARY ACCESS PROPOSED TEMPORARY LAYDOWN PROPOSED UNDERGROUND ROUTE OF EXISTING LOWER VOLTAGE OVERHEAD LINE BEING REMOVED CHAPTER 1: INTRODUCTION FIGURE 1.1 PROPOSED PROJECT BOUNDARY OVERVIEW KEY Chapter: REINFORCEMENT TO NORTH SHROPSHIRE ELECTRICITY DISTRIBUTION NETWORK: 132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM Document Title: The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated. The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m. BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE. CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017. Notes:

Transcript of WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv...

Page 1: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

WALESRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 1

A3 (420 mm x 297 mm)1:55,000

°

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.1.mxd

Scheme Name:

0 1 20.5

Kilometres

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED CHAPTER 1: INTRODUCTION

FIGURE 1.1 PROPOSED PROJECT BOUNDARYOVERVIEW

KEY

Chapter:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

Document Title:

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

Page 2: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

CON

TIN

UES

ON

PAG

E2

OF

6

1 2 3 4 5 6 7 89

10 1112

13

1415

1617

1819

2021

22 23

2 3 4 5 61

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

01 OF 6

A3 (420 mm x 297 mm)1:10,000

°

PAGE 1 OF 6

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd

Scheme Name:

CHAPTER 1: INTRODUCTION

FIGURE 1.2 PROPOSED PROJECT BOUNDARY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 150 30075

Metres

Page 3: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

CON

TIN

UES

ON

PAG

E1

OF

6

CON

TIN

UES

ON

PAG

E3

OF

6

1819

2021

22

23

24 25 2627

2829

30

31 32 33 34 35 36 37 38 39 40 41 42 43 44

45

4647 48 49

50 51 52

13 4 5 6

2

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

02 OF 6

A3 (420 mm x 297 mm)1:10,000

°

PAGE 2 OF 6

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd

Scheme Name:

CHAPTER 1: INTRODUCTION

FIGURE 1.2 PROPOSED PROJECT BOUNDARY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 150 30075

Metres

Page 4: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

CON

TIN

UES

ON

PAG

E2

OF

6

CON

TIN

UES

ON

PAG

E4

OF

6

45 4647 48 49

50 51

52

53

54 55 56 57 58 59 60 61 62 63 64

65

66

67

68

69 70 71 72

7374

75

76

77

78

79

80

81

82

1 24 5 63

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

03 OF 6

A3 (420 mm x 297 mm)1:10,000

°

PAGE 3 OF 6

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd

Scheme Name:

CHAPTER 1: INTRODUCTION

FIGURE 1.2 PROPOSED PROJECT BOUNDARY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 150 30075

Metres

Page 5: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

CON

TIN

UES

ON

PAG

E3

OF

6

CON

TIN

UES

ON

PAG

E5

OF

6

76

77

78

79

80

81

82

83

84

8586

8788

8990

9192

9394

9596

97 98 99100 101 102 103 104 105 106 107 108

1 2 35 64

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

04 OF 6

A3 (420 mm x 297 mm)1:10,000

°

PAGE 4 OF 6

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd

Scheme Name:

CHAPTER 1: INTRODUCTION

FIGURE 1.2 PROPOSED PROJECT BOUNDARY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 150 30075

Metres

Page 6: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

CON

TIN

UES

ON

PAG

E4

OF

6

CON

TIN

UES

ON

PAG

E6

OF

6

104 105 106 107 108 109 110 111

112

113

114

115

116117

118119

120121

122

123

124 125126

127128

129

130

131

132

133

134

135

136137

138

1 2 3 4 65

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

05 OF 6

A3 (420 mm x 297 mm)1:10,000

°

PAGE 5 OF 6

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd

Scheme Name:

CHAPTER 1: INTRODUCTION

FIGURE 1.2 PROPOSED PROJECT BOUNDARY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 150 30075

Metres

Page 7: WALES - SP Energy Networks · proposed 132 kv pole positions preferred line route (of the 132 kv overhead line) construction and operations corridor 40m consultation boundary proposed

CON

TIN

UES

ON

PAG

E5

OF

6

134

135

136137

138

139140

141

142

143

144

145

146

147

148 149 150 151 152 153 154 155 156 157 158159

160161

162

163164

165

166

167

168

169

170

171172

173

174

175

176

1 2 3 4 5 6

KEYRev Date Description Chk'dMade App'd

0 14/11/2017 PEIR KC ZF SG

Drawn:

KCDate:Approved:Checked:

ZF SG 14/11/2017

Document Type: Scale:

Rev:

Sheet Size:

Sheet:

FIGURE

06 OF 6

A3 (420 mm x 297 mm)1:10,000

°

PAGE 6 OF 6

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE 132 kVOVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUND CABLE

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWN

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\PEIR Figures\P10787_PEIR_Figure_1.2.mxd

Scheme Name:

CHAPTER 1: INTRODUCTION

FIGURE 1.2 PROPOSED PROJECT BOUNDARY

Chapter:

Document Title:

REINFORCEMENT TO NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROM OSWESTRY TO WEM

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding of the new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a width of 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Notes:

0 150 30075

Metres