Capital Projects Division Recovery and Resilience
tinyurl.com/SANDYRECOVERY(212) 306-8532 — [email protected]
WALD HOUSES Development Information
Development Statistics
Elected Representative:
Tenant Association:
Buildings benefiting from FEMA funding:
Building heights:11-14 stories
TotalBuildings: 18
14
Property Size:
Congressional (D-7):
NYS Assembly (D-74):
NYS Senate (D-26):
NYC Council (D-2):
• Nydia Velazquez
• Harvey Epstein
• Brian Kavanagh
• Carlina Rivera
16.46 acres
Tenant Association President:• Freddina Fulton
Existing Funded Buildings
Back-up Generators
Annex Buildings
Unfunded Buildings
Funded Community Center / Childcare Center
888 East 6th
50 Avenue D
930 East 4th Walk
450 Lillian Wald
950
East
4th
Wal
k
484 East Houston
500 East Houston
691 FDR
10 A
venu
e D
30 Avenue D
20 Avenue D
60 A
venu
e D 890 East 6th
40 A
venu
e D 711 FD
R
709 FDR
920
East
6th
725 FDR
Project Scope
NYCHA’s Recovery & Resilience Department Questions/Problems, 疑 问/家 里 的 问 题,
Вопросы / проблемы, Preguntas/Problemas (212) 306-8532 — [email protected]
Resiliency• Install manual dry flood proofing in areas below the established FEMA flood level
Safety• Install new security cameras per funding availability• Install upgraded door security access systems per funding availability• Replace exterior site lighting fixtures and bulbs
Development Improvements• Restore 3 playgrounds• Resurface site pavement affected by construction• Replace underground electrical wiring system
Building Improvements• Construct new MEP equipment above the FEMA flood level to house automatic transfer switch,
current transformer cabinets and distribution panels• Replace roofs on buildings 4, 5, 7, 9-16, and 18• Replace and/or repair doors, door frames and hardware damaged by water• Replace and/or repair mechanical, electrical and plumbing equipment damaged by water to include:
sump pumps, vacuum/condensate pumps, piping, insulation of piping in crawlspace and hot water heaters in buildings 4, 7, 11, 12, 14, 15 and 16
• Install back water valves on sewer/storm plumbing lines• Install ADA ramps and modify building entrances for building 9, 11-16• Remove hazardous materials and clean building crawl spaces
Energy• Install full backup power generators in buildings 4, 5 and 7-18• Implement additional sitewide energy and sustainability measures (awaiting HUD approval)