Wadsworth Road Intersections
Phase I StudyPublic Information Meeting #3
April 19, 2017
www.WadsworthIntersections.com
Purpose of Today’s Meeting
• Project Overview• Project Update• Next Steps• Seek your input on the
Preferred Intersection Alternative– Wadsworth Road at Dilleys
Road– Wadsworth Road at
Kilbourne Road• Seek your input on impacts
to Wadsworth Savanna Forest Preserve
Project Overview
Moving forward, Wadsworth Road at
US-41 will proceed as a separate study
anticipated completion late 2017.
Project Overview
PROBLEMS TO BE SOLVED Vehicular congestion and
mobility Existing roadway
geometric deficiencies Motorized and non-
motorized safety Non-motorized facility
gaps Adjacent property access
management/safety
Project Overview
• Public Information Meeting
• June 15, 2016• 104 Attended• Finalist Intersection
Alternatives presented for input
• 35 Comments Received
Project UpdatePublic Information Meeting #2
Dilleys Road Traffic Signal Roundabout
Kilbourne Road Add turn lane on Kilbourne Road &
maintain bypass lane Add turn lane on Wadsworth Road and
Kilbourne Road Roundabout Do nothing
Project UpdatePublic Information Meeting #2
42
Support Connectivity
Improve all intersections to increase safety and efficiency
Corridor businesses impacts
Add Southbound Turn lane on Kilbourne Road
Gratitude for project information
Consider non-motorized modes of travel
Project UpdatePublic Information Meeting #2
Purpose:• Provide input to the Project Study Group throughout
the project development processMeetings:• SIG #1 – January 2015
• Input on Issues and Needs• SIG #2 – April 2015
• Input on Problem Statement and Initial Concepts
• SIG #3 – January 2016• Input on Initial Alternatives
• SIG #4• Was scheduled prior to today’s Public Information Meeting #3 to provide a meeting preview, however, the SIG did not feel it was necessary to meet.
• SIG #5 – Late 2017• Input on Preferred Alternative (US-41)
All SIG meeting materials are posted to the project website
Project UpdateStakeholder Involvement Group (SIG) Overview
3Public
Information Meetings
3Stakeholder Involvement
Group Meetings
Project Website
Newsletters
12One-on-
One Meetings
11Agency
Meetings
Project UpdateStakeholder Involvement
Project UpdatePost Public Meeting #2
Additional Stakeholder Coordination Meetingso US-41 Business Owners & Village of Wadswortho Lake County Forest Preserve Districto Newport TownshipAgency Meetingso Federal Highway Administrationo Illinois Department of Transportation
Finalist Alternative Refinement & Further Evaluation
Selection of the Preferred Intersection Alternatives
Kilbourne Road
Preferred Intersection Alternatives
Dilleys Road Single Lane
Roundabout
Southbound right turn lane added on Kilbourne Road
Existing bypass lane remains Add a sidewalk from
Cashmore to Kilbourne Road
Public Information Meeting #3Station Guide
Station 1 Project Overview Purpose & Need Next Steps
Station 2 Existing Traffic Projected Traffic Crash Data Environmental Resources
Station 3 Public Involvement
Station 4 Preferred Intersection
Alternatives
Station 5 Project Reports
Station 6 Public Comment Area
EASTENTRANCE
HALLWAY STAIRWELL
STORAGE & CLOSETS
COAT CLOSET
SIGN IN TABLE
PRESENTATIONROOM
KITCHEN
TV
WASHROOMS
KILBOURNE ROAD
KILBOURNE ROAD
DILLEYS ROAD
DILLEYS ROAD
STATION 4
DILLEYS ROAD
KILBOURNE ROAD
Project Reports
Comm
ent Area
Comment Area
Comment Area
We Want to Hear From YOU
• Written comment forms
• Online comment forms at www.WadsworthIntersections.com
• Comments are encouraged throughout the study
Comments received by May 3, 2017
will become part of the Public
Information Meeting record
Next StepsNext Steps
• Dilleys Road and Kilbourne Road Final Project Development ReportsDesign Approval Summer 2017
• US-41 SIG Meeting – Anticipated Fall 2017• US-41 Public Information Meeting – Present Preferred
Intersection Alternative – Anticipated Fall 2017
THANK YOU FOR ATTENDING!
Please visit the exhibit room and meet with Project Study Group members.