PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 1

AGENDA

• THE EIFS / ETICS SYSTEM

• WHY EIFS / ETICS?

• MOST IMPORTANT COMPONENTS

• NORMS AND REGULATIONS

• CRITICAL FACTORS

• EOTA WALL

• CASE STUDY CHINA

• COST MODEL

Page 3: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 2

THE EIFS / ETICS SYSTEM

substrate

adhesive

Expanded polystyrene panel EPS

glass fibre mesh

base coat

plaster

Page 4: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 3

WHY EIFS / ETICS?POSSIBILITIES FOR ENERGY SAVING: EIFS MAIN LEVER

Page 5: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 4

WHY EIFS?

• EIFS has proved to have a superior energy efficiency by reducing heat transmission by approx 50%

• Improved energy efficiency helps to reduce harmful emissions typically associated with energy productionsuch as CO2 emissions and other by-products

• Design Flexibility and Decorative Finishing

• Superior EIFS energy efficiency reduces required air conditioning equipment capacity and limits the physical effects of temperature fluctuations hence reducing structural stress

• EIFS can be applied to new and existing structures.

• EIFS is the ONLY solution for insulating existing buildings

Page 6: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 5

MOST IMPORTANT COMPONENTSREQUIREMENTS

Page 7: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 6

MOST IMPORTANT COMPONENTS

Page 8: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 7

MOST IMPORTANT COMPONENTSREQUIREMENTS ON THE FRESH AND HARDENED MORTAR

Page 9: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 8

MOST IMPORTANT COMPONENTSADHESIVE AND BASECOAT MORTAR

Page 10: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 9

MOST IMPORTANT COMPONENTSMEASUREMENT OF TENSILE ADHESION STRENGTH ON EPS

pull-off testbasecoat

EPS (Expanded Polystyrene Panel)

basecoat

EPS (Expanded Polystyrene Panel)

Force

with 50 N/s

Cut in the basecoat

Page 11: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 10

MOST IMPORTANT COMPONENTSADHESIVE AND BASECOAT MORTAR – SEM ANALYSIS

x 50 times

x 3000times

Polymer domain after film formationbase coat EPS

Page 12: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 11

MOST IMPORTANT COMPONENTSADHESIVE AND BASECOAT MORTAR – SEM ANALYSIS

Page 13: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 12

MOST IMPORTANT COMPONENT BASECOAT MORTARIMPACT RESISTANCE

Page 14: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 13

TEST AND CONVERSION JOULE IN CM OR CM IN JOULE

weight

Min. req..

Page 15: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 14

MOST IMPORTANT COMPONENT BASECOAT MORTAR IMPACT TEST WITH 500 GRAM STEAL BALL

e.g. 4% RDP

e.g. 1

% RDP

Page 16: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 15

MOST IMPORTANT COMPONENTSTOPCOAT

Page 17: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 16

MOST IMPORTANT COMPONENTS TOPCOATCAPILLARY WATER ABSORPTION

Page 18: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 17

MOST IMPORTANT COMPONENTSINSULATION PANELS

1.212088Concrete

0.731380Hollow brick

1.202000Plaster

0.281.25Air gap

0.0424.0Polystyrene boards

0.951400Roof bricks

0.381450Sand

1.352145Cement tiles

Thermal conductivity

(W/m °C)

Density

(kg/m3)

Construction material

Page 19: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 18

MOST IMPORTANT COMPONENTSINSULATION PANELS

8 - 500≥ 20≥ 14Density

(Kg/m3 )

Flame proofB1 or B2B1 or B2Flame class

18 - 25020 - 250The coefficient of watervapour resistance ‘’μ’’

0,0400,028 - 0,0310,033The coefficient of heat

conduction“λ”

MINERALWOOL

( MW )

EXTRUDED

POLYSTYRENE

( XPS )

EXPANDED

POLYSTYRENE

( EPS )

TECHNICAL

PROPERTIES

Page 20: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 19

MOST IMPORTANT COMPONENTSFLAMMABILITY STANDARDS CLASSIFICATION AS PER EN 13501-1: May 2007

Page 21: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 20

MOST IMPORTANT COMPONENTSFLAMMABILITY STANDARDS TEST METHODS

Page 22: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 21

MOST IMPORTANT COMPONENTSDOWEL

• To be applied 24 h after adhesive has dried.

• 2 – 4 pc/m² typically in Europe

• 10 pc/ m² as per Dubai Municipality requirements

• Fastening systems such as shot nails, screwed nails or expansion bolts.

• Minimum fastener penetration: 7cm for ALC block, 4cm for brick or concrete

Page 23: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 22

CRITICAL FACTORSTHERMAL BRIDGES

source ETAG 004 Edition 2004

Page 24: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 23

CRITICAL FACTORSHUMIDITY

• Water vapour diffusion has to beconsidered in order to prevent thebuilt up of condensate which cancause damages.

• In hot an humid climates with AC a permanent water vapourpressure difference betweenoutside and inside air exists.

• High humidity penetrating in theconcrete in combination with high temperatures can acceleratecarbonation and corrosion of thereinforcement.

source „WDVS in anderen Klimazonen“ by Dr. Künzel

Page 25: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 24

NORMS AND REGULATIONS

• The Insulation Requirement by Dubai Municipality (Administrative order No 77 in 2001)

U value less 0.1 Btu/ U value less 0.1 Btu/ °°F.ftF.ft²². h or 0,57 W/(m. h or 0,57 W/(m²².K) for walls..K) for walls.

Page 26: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 25

NORMS AND REGULATIONS THE MOST IMPORTANT GUIDELINE ETAG 004

Page 27: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 26

STANDARDS AND NORMS

Page 28: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 27

Two individual walls at the climate chamber tested at the same time

(appr. 24 tests/year)

Test wall preparation for the hygro-thermal test

NEW EOTA RIGBETTER SERVICE FOR OUR CLIENTS

Page 29: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 28

STANDARDS AND NORMS (EOTA WALL)(ETAG 004 5.1.3.2.1)

Page 30: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 29

Cold & Dry Area

Tropic Climate Area

Hot Humid Summer& Cold Winter Area

Beijing

Shanghai

Guangzhou

30°

20°

40°

50°

North

TESTING THE EFFECTS OF EIFS UNDER PRACTICAL CONDITIONS IN DIFFERENT CLIMATIC ZONES IN CHINA

Page 31: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 30

AimProve effectiveness of EIFS to the Chinese buildingindusty under the existing climatic conditions

Approach• Two identical model houses – one with, one without

EIFS – in Beijing, Shanghai, Guangzhou• Cooperation with Customers to build houses• Cooperation with the Universities Tsing Hua, Tongji

and South China Science & Technology for data collection and interpretation

• Spreading message in seminars, media, to associations, government etc.

Time line Oct. 2002 – Oct. 2003

AimProve effectiveness of EIFS to the Chinese buildingindusty under the existing climatic conditions

Approach• Two identical model houses – one with, one without

EIFS – in Beijing, Shanghai, Guangzhou• Cooperation with Customers to build houses• Cooperation with the Universities Tsing Hua, Tongji

and South China Science & Technology for data collection and interpretation

• Spreading message in seminars, media, to associations, government etc.

Time line Oct. 2002 – Oct. 2003

Beijing北京

North

Shanghai上海

East

Guangzhou广州

South

ONE YEAR MODEL HOUSE PROJECT WITH CHINESE UNIVERSITIES PROVES EFFECTIVENESS OF EXTERIOR INSULATION FINISHING SYSTEMS

Page 32: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 31

SAMPLES HOUSES WITH AND WITHOUT EIFS

Page 33: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 32

SAMPLES HOUSES WITH AND WITHOUT EIFS

Page 34: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 33

SAMPLES HOUSES WITH AND WITHOUT EIFS

Page 35: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 34

TEMPERATURE VARIATIONS INSIDE THE MODEL HOUSES WITH AND WITHOUT EIFS DURING THE COLD AND HOT SEASON IN CHINA

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31-10-8-6-4-202468

101214161820

time/d

Tem

pera

ture

[deg

r. C

]

During coldest month

1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 3118

20

22

24

26

28

30

32

time/d

During the hottest month

Page 36: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 35

0

10

20

30

40

50

Beijing Shanghai Guangzhou

WinterSummer

Average reduction of electricityconsumption in %,Oct. 2002- Oct. 2003

EIFS ACHIEVE CONSIDERABLE REDUCTION OF ENERGY USED TO HEAT AND COOL IN THREE DIFFERENT CLIMATIC ZONES

Page 37: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 36

COST MODELENERGY SAVING CALCULATION

• Consider a house of 200 m² without EIFS

• The Total Thermal Resistance = 0.104+0.03 = 0.17 m².K/W

• Total U value = 1/ 0.17= 5.8823 W/mk

• Heat loss = U * Area * dT( standard temp difference) = 5.8823* 200 * 17 = 20000 W

= 0.015/0.50= 0.03

0.500.015Normal Plaster

= 0.24/ 2.29 = 0.104

2.290.24Brick wall

Thermal Resistance

U value (W/m²k)Thickness (m)Media

Page 38: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 37

COST MODELENERGY SAVING CALCULATION

• Consider a house of 200 m² with EIFS

• The Total Thermal Resistance = 0.104+0.03 + 0.45 = 0.548 m².K/W

• Total U value = 1/ 0.548 = 1.71 W/m²k

• Heat loss = U * Area * dT( standard temp difference)= 1.71* 200 * 17 = 5821 W

= 0.15/ 0.33= 0.45

0.330.15EIFS

= 0.015/0.50=0.03

0.500.015Normal Plaster

= 0.24/ 2.29 = 0.104

2.290.24Brick wall

Thermal Resistance

U value (W/m²k)Thickness (m)Media

Page 39: Wacker Chemicals

PERFORMANCE REQUIREMENTS AND STANDARDS FOR EIFS

Mohammed Sanaobar, L-B-E-T/TC Dubai, 25-06-2008, Slide 38

COST MODELENERGY SAVING CALCULATION

• Conclusion: The Energy Saving between the two cases

= 20000- 5821 = 14718 W

• In average you can save between 60-70 % of the heating oil required.