Transcript of VRSWG Update Renee Shields Height Modernization Manager National Geodetic Survey July 11, 2011.
• Identify common objectives, and find opportunities for cooperative projects, tasks (near-term)
– Tri-lateral agency datum standardization (NOAA/USGS/USACE)
– USGS Stream gage datum updates
– USACE levee datum updates
Vertical Reference System Work Group Work Plan
USGS Stream Gage at Pacific Creek near Moran, WY
• Identify Products and Services within each agency impacted by new vertical datums (near-term)
– Develop strategy to address changes that will be required to P&S (near- to mid-term)
– Develop pilot projects to address agency needs (near- to mid-term)
• Update existing guidelines, standards, specifications to support transition to new datums (long-term)
Vertical Reference System Work Group Work Plan
• Education, Outreach, Capacity Building for users (ongoing)
• Brief FGCS on accomplishments (ongoing)
• Identify POCs in agencies to join workgroup, perform tasks (ongoing)
Vertical Reference System Work Group Work Plan
• Teleconferences now held quarterly
– next meeting October 6, 2011
– Attendance by NGA, USGS, USACE, NPS, FCC, FEMA
– Meeting notes posted on FGCS web site
• Developed worksheet for each agency to identify their products/services that rely on vertical datums
VRSWG Accomplishments: May 2010-Present
• Monthly teleconferences to inform users – value-added with guest speakers
• Education and outreach activities
• Support projects designed to enhance vertical component of NSRS, present and future
– NC/FEMA Floodplain mapping pilot – see Poster session
– TX Geoid Slope project
– Surveys: So. LA, IGLD, MS and others
Height Modernization Program Accomplishments: May 2010-Present
• Discuss transition strategies with new datum project managers
• Support for GRAV-D and geoid model updates
• Develop National Height Modernization Plan (NHMP)– Internal Draft by end of FY2012
– Tie to NGS 10-year plan; incl. strategic plan and short-term operating plan
– Emphasize coordination with federal partners
– Include budget requirements/strategy
Height Modernization Program Accomplishments: May 2010-Present
• Infrastructure– Gap analysis
– Modernize NGS geodetic control datasheets
• Guidelines, Models, Tools– Geoid12
– H- AND VTDP
– OPUS: e.g. OPUS Projects workshop, July 11-12, San Diego
– Update HM Guidelines, NGS58 and 59
Align NHMP with NGS Business Plan model
• Education, Capacity Building– Update height modernization web site– Lidar workshop – August 18, 2011, Silver Spring, MD– 2ND Federal Geospatial Summit, July 2012, San Diego, CA
Align NHMP with NGS Business Plan model
Questions
Renee ShieldsHeight Modernization Manager301-713-3231, [email protected]
http://www.ngs.noaa.gov/heightmod/EventsArchive.shtml
Fast is fine, but accuracy is everything. – Wyatt Earp
A witty saying proves nothing. - Voltaire