VOLUNTARY DISCLOSURE UNDER SECTION 4 OF RTI ACT, 2005 …
Transcript of VOLUNTARY DISCLOSURE UNDER SECTION 4 OF RTI ACT, 2005 …
VOLUNTARY DISCLOSURE UNDER SECTION 4 OF RTI ACT, 2005
A FRAMEWORK FOR TRANSPARENCY AUDIT
The RTI Act under section 4 provides a comprehensive framework for promoting openness in the functioning of the public authorities.
While Section 4(1) (a) provides a general guideline for record management, so that the information could be easily stored and retained,
the sub- sections b,c and d of Section 4 relate to the organizational objects and functions. Sub-sections (b), (c) and (d) of Section 4 of
the RTI Act and other related information can be grouped under six categories; namely, 1-organsiation and function, 2- Budget and
programmes, 3- Publicity and public interface, 4-E. governance, 5-Information as prescribed and 6. Information disclosed on own
initiative.
4.5 Such other
information as
may be
prescribed under section
4(i) (b)(xvii)
(i) Grievance redressal mechanism
The grievances may be submitted in hard copies at the office premises or may be mailed on the e-mail ids provided on
http://www.vsez.gov.in
(ii) Details of applications received under RTI and information provided
http://www.vsez.gov.in/vsez_wsp__receipts.aspx
(iii) List of completed schemes/
projects/Programmes
Works - contracts 2020-2021 attached below
(iv) List of schemes/ projects/ programme underway
(v) Details of all contracts entered into including name of the contractor, amount of contract and period of completion of contract
http://www.vsez.gov.in/vsez_wsp__sez_awarded_tenders.aspx
(vi) Annual Report Annual Report attached below
(vii) Frequently Asked Question (FAQs)
http://vsez.gov.in/vsez_wsp__sez_FAQ.aspx http://vsez.gov.in/vsez_wsp__EOU_FAQ.aspx
(viii) Any other information such as
a) Citizen’s Charter
http://www.vsez.gov.in/app_doc/2020/Citizen%20Charter.pdf
b) Result Framework Document (RFD)
The information is being compiled and will be uploaded shortly
c) Six monthly against the benchmarks
set in the citizen’s charter The information is being compiled and will be uploaded shortly
d) Performance against the
benchmarks set in the Citizen’s Charter
The information is being compiled and will be uploaded shortly
ANNUAL REPORT 2019-20 OF VSEZ AUTHORITY
VISAKHAPATNAM SPECIAL ECONOMIC ZONE AUTHORITY, ADMINISTRATIVE
BUILDING, DUVVADA, VISAKHAPATNAM-530049
Background:
Govt. of India, with a view to overcome the shortcomings experienced on account
of the multiplicity of control and clearances; absence of world-class infrastructure, and an
unstable fiscal regime and with a view to attract larger foreign investments in India, introduced
the Special Economic Zone (SEZs) policy in the year 2000.
SEZ policy was mainly intended to make SEZs an engine for economic growth
supported by quality infrastructure complemented by an attractive fiscal package.
Both at the Center and the State level, with the minimum possible regulations.
To instill confidence in investors and signal the Government’s commitment to a stable
SEZ policy regime and to impart stability to the SEZ regime thereby generating greater
economic activity and employment through the establishment of SEZs. The Special Economic
Zones Act, 2005, was enacted by the Parliament in the year 2005 supported by SEZ Rules, which
came into effect on 10th February 2006.
The SEZ Act & Rules provides for drastic simplification of procedures and for single
window clearance on matters relating to central as well as state governments. The main
objectives of the SEZ Act are:
(a) Generation of additional economic activity;
(b) Promotion of exports of goods and services; (c) Promotion of investment from domestic and foreign sources;
(d) Creation of employment opportunities’ (e) Development of infrastructure facilities;
Setting up of Special Economic Zones in the Country:
Govt. of India had initially set up seven export processing zones at Kandla (Gujarat),
Santa Cruz (Maharashra), Cochin (Kerala), Noida (UP), Chennai (Tamil nadu), Falta (West Bengal), Visakhapatnam (Andhra Pradesh) and Surat (Gujarat) during the period 1965 to 1997
which were later converted to SEZs during 2000-2003.
Vsakhapatnam Special Economic Zone Authority (VSEZA)
Visakhapatnam Special Economic Zone, formerly known as Visakhapatnam Export
Processing Zone, was established in the year 1989 in a total area of 360.50 acres of land with a view to attract foreign investment, earn foreign exchange, create state of the art infrastructure
facility and generate employment. Following adoption of the SEZ Policy’2000 by the Govt. of
India, VEPZ was converted into VSEZ in 2003.
VSEZ is a Zonal office under the Ministry of Commerce & Industry, Govt. of India with
its jurisdiction over Special Economic Zones (SEZs) and Export Oriented Units (EOUs) in
Andhra Pradesh, Telangana, Chhattisgarh & Yanam. Development Commissioner (DC) is the
Head of the office. Role of VSEZ is to :-
Guide entrepreneurs in setting up of SEZs and EOUs and grant/ recommend approvals,
Promote exports from SEZs and EOUs
Coordinate with Central and State Government departments and facilitate statutory clearances for SEZs and EOUs
Monitor the performance of SEZs and EOUs
The entire 360.50 acres of land was developed in three phases. In the initial stages, the
response for setting up of units in the EPZ regime was slow. After announcement of the SEZ
Policy, the response gradually increased. VEPZ has recorded its first exports in the year
1996-97. The zone has made a steady progress in exports from Rs.5.45 lakhs in 1996-97 to
Rs.1641.66 crores in the year 2019-2020. As on 31.03.2020, there are 62 operational units
and 09 units under implementation. The units in VSEZ are providing direct employment to
3921 persons, in addition to indirect employment to nearly 1214 persons and business
opportunities to many others. VSEZ Authority is also providing indirect employment to 125
members.
SEZ Authority:
The SEZ Act provides for creation of an Authority for each SEZ set up by the Govt. of
India. Vide notification dated: 1st October 2008, Sec.31 to 41 of the SEZ Act’2005 relating to
SEZ Authority was made effective.
VSEZ Authority was constituted by Central Government vide Notification No.2/1/2008-
SEZ dated 27.02.2009 headed by the Development Commissioner of the Zone who shall act as
the Chairman and Chief Executive Office of the Authority. VSEZ Authority has autonomous
powers, in respect of development of zone, creation of utilities and maintenance of the zone.
VSEZ Authority’s role is to develop VSEZ into a major export hub. VSEZ has made
significant progress in the field of export promotion and serves as a single point of service. The
entrepreneurs have the comfort of having all the approvals/clearance under single window
clearance mechanism. VSEZ has created an environment conducive to private investment due to
which it has been able to attract 71 units till 31.03.2020.
1.Structure and Functions:
The officials associated with the VSEZ Authority are:
Officer’s name
Designation
Shri A.Rama Mohan Reddy, IFS
Development Commissioner
Chief Executive Officer of the Authority
Jt.DGFT ,
Visakhapatnam
Member of the Authority
Shri V.Kiran Babu, IFS
Jt. Development Commissioner
Member of the Authority
Smt. O.Phani,
Dy Development Commissioner
Secretary VSEZ Authority
Functions of VSEZ Authority:
Overall supervision of the Zone
Development and maintenance of infrastructure facilities
Realization of Lease Rent, Water charges, Maintenance charges
Employment Generation
Promotion of investment from domestic and foreign source by offering world class infrastructure
Raising overall level of economic activity
Safety and Security of the Zone
2.EXPORT PERFORMANCE OF THE ZONE:
Year wise Export Performance of the Visakhapatnam Special Economic Zone is furnished
hereunder:
Financial Year Exports (Rs. In crores)
2005-2006 612.80
2006-2007 750.00
2007-2008 746.47
2008-2009 658.00
2009-2010 917.85
2010-2011 1582.75
2011-2012 2404.15
2012-2013 3123.00
2013-2014 2155.41
2014-2015 1707.99
2015-2016 972.55
2016-2017 1064.01
2017-2018 1302.93
2018-2019 2016.99
2019-2020 1641.66
Sector wise Export performance from VSEZ (Rs. in crores)
S.No. Product Sector 2013-
14
2013-
14
2015-
16
2016-
17
2017-
18
2018-
19
2019-
20
1 Biotech 160.12 160.12 80.16 0 0 0 0
2 IT/TES 35.16 35.16 76.62 61.55 64 34.12 42.02
3 Electronic 192.97 192.97 4.93 0.02 8.606 5.129 8.21
4 Engineering 25.01 25.01 53.60 48.54 110.245 122.95 70.12
5 Gems & Jewellery 643.44 643.44 23.13 30.84 39.633 39.403 103.62
6 Chemicals&
pharmaceuticals
204.78 204.78 381.09 638.89 756.096 1377.61 1005.86
7 Handicrafts 5.16 5.16 0.00 0 0 0 0
8 Food and Agro 3.57 3.57 11.71 10.57 0 0 0
9 Non-conventional
Energy
0 0 0.13 0 46.986 0 0
10 Service 32.54 32.54 5.19 15.08 125.937 110.173 21.12
11 Textiles&Garments 1.04 1.04 0.12 0.21 0.006 0 0
12 Tobbacco related
products
0 0 0.00 0 0 0 0
12 Miscellaneous 851.62 851.62 335.87 258.81 151.426 327.61 390.71
Total 2155.41 2155.41 972.55 1064.01 1302.93 2016.99 1641.66
Year-wise Imports:
S.N
o
Nature of
Goods
imported
2013-
14
2014-
15
2015-
16
2016-
17
2017-
18
2018-
19
2019-
20
1 Capital
Goods
112.63 23.37 129.16 121.58 176.437 93.981 253.639
2 Raw-
material/c
omponent
1921.67 1742.97 2126.74 2276.72 3065.62
1
3682.24
3
3518.80
6
Total 2034.30 1766.34 2255.90 2398.30 3242.05
8
3776.22
4
3772.44
5
3. Performance during the year indicating existing and projected activities, programmers,
continuing from the previous year and new programmers and their impact on Authority’s revenue collection and impact on the Zone’s export performance.
Revenue collected during the Financial Year 2011-2012 -Rs. 7.77 crores
Revenue collected during the Financial Year 2012-2013 -Rs. 8.98 crores
Revenue collected during the Financial Year 2013-2014 -Rs. 8.94 crores
Revenue collected during the Financial Year 2014-2015 -Rs. 8.65 crores
Revenue collected during the Financial Year 2015-2016 -Rs.11.36 crores
Revenue collected during the Financial Year 2016-2017 -Rs. 13.04 crores
Revenue collected during the Financial Year 2017-2018 -Rs. 14.04 crores
Revenue collected during the Financial Year 2018-2019 -Rs. 13.73crores
Revenue collected during the Financial Year 2019-2020 -Rs. 15.01crores
The overall employment generated by the Zone till date is as follows:
Total Employment : 3921
Men : 2790
Women : 1131
4. Annual Statement of Accounts:
Annual Accounts as per regulatory framework prepared and placed before the VSEZ Authority
Members on 03.09.2020. Approved copy of the Annual Accounts of the VSEZ Authority is
enclosed herewith. Copies of the Annual Accounts of VSEZ Authority have been forwarded to
PDA for necessary certification.
5. Relevant Information on labour front –strike, lockouts, accidents, litigation involving
Authority’s estate: During the Financial Year 2019-20, there were no incidences of strike, lockouts, accidents, and
litigation involving VSEZ Authority.
6.General Industrial trends in the Zone, broad details of sick, closed Units and their impact
on the Zone’s performance and Authority’s estate including litigation:
There are 62 functional units. The overall export performance and generation of employment
opportunities of the functional units is impressive.
25 units are sick due to various reasons
7. Annual plan:
1. Construction of Foot Paths at VSEZ
2. Providing CC Road at Weigh Bridge, VSEZ
3. Repairs of SDF-II in the premises of VSEZ 4. Providing Incinerator services at VSEZ
Apart from the above, VSEZ Authority is taking steps for water and energy conservation and making the VSEZ a green SEZ. VSEZ Authority is also taking steps to develop a software
module for Estate Management. Further certain other developmental works are also taken up to
upgrade the infrastructure facilities.
8. Seminars, Conferences, Training programmers organized by the Authority
1. Regular meetings with the concerned Govt. Departments relating to implementation of Statutory requirements by the units were organized
2. Training programme on SEZ online Systems was organized.
9. Events of national and international importance in which the Authority participated:
Nil
10. Agreements with other Countries/International organizations:
Nil
11. List of Publications brought out
Nil
12. Welfare measures
As part of the Welfare measures, the zone has provided a Dining Hall-cum-Crèche,
Canteen for the welfare of the employees working in the zone. The same are maintained by the
VSEZ Authority. Regular health camps in coordination with Zone units were organized. Workers
are trained in safety and security measures at work place.
13. Use of Hindi as Official Language:
All necessary steps are being taken to implement Hindi as Official Language. The
correspondence is made in Hindi in respect of letters/ documents received in Hindi.
***
DETAILS OF ALL CONTRACTS ENTERED INTO INCLUDING NAME OF THE
CONTRACTOR, AMOUNT OF CONTRACT AND PERIOD OF COMPETION OF
CONTRACT
Sl.No. Name of the Work Name of the
Contractor
Amount per
Annum
Contract period
01 Operation and
Maintenance of Electrical
Installation and
Mechanical Installations
M/s. CPWD,
Visakhapatnam
Rs.45,36,751/- 01.04.2020 to
31.03.2021
02 Day to Day House-
keeping Services
M/s. Yamini
Engineering
Rs.56,39,916/- 01-05-2020 to 31-
03-2021
03 Landscape & Plantations
in VSEZ
M/s. Hitech
Horticulture
Rs.59,87,656/- 01-04-2020 to 31-
03-2021
04 Heavy VehicleParking &
Weigh Bridge
Smt. K. Devi Rs.7,84,188/- 21-06-2020 to 20-
06-2021
05 Accounting Services of
VSEZ Authority
M/s. SARC &
Associates
Rs.4,41,600/- 01-04-2020 to 31-
03-2020
06 Legal Adviser for
Visakhapatnam Special
Economic Zone Authority
(VSEZA)
Shri T.V.S.K.
Kanaka Raju,
Advocate
Rs.1,20,000/- 01-04-2020 to 31-
03-2021
07 Maintenance of Executive
Canteen
Shri Suresh
Kumar
Rs. 47,000/- 20.10.2020 to
19.10.2021
08 Hiring of Vehicle for M/s. Sri Ram Rs.59,500/- (per 19-04-2020 to 18-
VSEZ Authority Travels month) 04-2021
09 Manpower on outsourcing
basis
M/s. Yamini
Engineering
Rs.77,992/- per
month
10 Security Services in
Administrative building
and Surroundings, Main
Security entrance at
VSEZ premises
M/s. Arjun
Security and
Intelligence
Services Pvt. Ltd.
Rs.10,53,970/-
(per month )
01-04-2020 to 31-
03-2021
11 AMC of CCTV Cameras M/s. Arine
Systems
Rs.60,000/- 01.07.2020 to
30.06.2021
12 AMC of Solar Panels M/s. Power
Solutions
Rs.6,45,705/- 08-09-2020 to 07-
09-2021
13 AMC of 13 Passenger
ESCON make Lift at
SDF-IV Building
M/s. Escon
Elevators Pvt. Ltd
Rs.90,936/- 01-07-2020 to 30-
06-2021
14 AMC for
Passenger/Goods lift at
SDF-I Building
M/s. Johnson
Lifts Pvt. Ltd
Rs.1,50,000/- 01-07-2020 to 30-
06-2021
15 AMC for 13 Passenger
Lift & 2 Ton Cargo lift at
SDF-II Building
M/s. Johnson
Lifts Pvt. Ltd
1,31,936/- 01-09-2020 to 31-
08-2021
16 Replacement of Goods
Lift at SDF-I (WDM
Block)
M/s. Industrial
Engg. Systems
Warranty Period
01-09-2020 to
31-08-2022
Warranty Period
01-09-2020 to 31-
08-2022
***
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
Period 2020-2021
1 Development of Chandan Divine park near trading sheds in
VSEZ.
Completed Sri Challa Jogi Naidu 130095 129564 129038
2 White washing on tree circumferences to prevent termites in
Admn Bldg premises and surroundings in VSEZ.
Completed Sri Challa Jogi Naidu 16178 16070 16065
3 Provision of water supply line and electric supply to newly
constructed Incinerator at VSEZ, Visakhapatnam.
Completed M/s S.S. Enterprises 93300 93280 85440
4 Repairs to right side ramp of weigh bridge in VSEZ. Completed Sri CH. Eswara Rao 133599 130608 121200
5 Repairs and replacement of sewage line, man hole, pipe line
and tank covers at VSEZ family accomodation.
Completed M/s S.S. Enterprises 253400 237140 213719
6 Construction of RCC retaining wall 20m long on left side near
boundary wall.
Completed Sri K. Rambabu 499709 496431 356021
7 Proposed Stainless steel hand railing for out side lawn near
BioMax gate.
Completed M/s S.S. Enterprises 157879 157025 156405
8 Repairs to road patches from weigh bridge road to 1st main
gate of Synergies Ltd.
Completed M/s S.S. Enterprises 333500 332350 332208
9 Provision of wall paneling in conference hall of Admn building. Completed Sri CH. Eswara Rao 221402 221303 215991
10 Rising of RCC retaining wall 20m long on left side near
boundary wall including desilting of drain and disposal of silt.
Completed Sri K. Rambabu 363287 360067 267644
11 Construction of two percolation tanks in VSEZ area Completed Sri CH. Eswara Rao 226220 222941 217419
12 Rising of left side drain walls and repairs to existing drains at
Security main gate to Gayatri circle.
Completed Sri CH. Eswara Rao 490056 488634 487971
13 Rising of right side drain walls and repairs to existing drains
between Gayatri company to Trading sheds cross road & drains
between In gate and out gate of Admn building.
Completed Sri Challa Jogi Naidu 303767 302180 301922
14 Construction of new drain, rising and repairs to existing drains
on Fysolate road.
Completed M/s S.S. Enterprises 481136 478416 474030
VISAKHAPATNAM SPECIAL ECONOMIC ZONE
A. LIST OF WORKS COMPLETED as on 25-5-2021
Page 1 of 11
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
15 Dismantling of existing old dilapidated building on rear side of
Admn Building.
Completed Sri K. Rambabu 142317 139810 139810
16 Provision of name boards and stickers. Completed M/s S.M.L. Contractors
and Man power suppliers.
16660 16660 16660
17 Rising of left side drain walls and repairs to existing drains
between Gayatri company to Trading sheds cross road.
Completed Sri Challa Jogi Naidu 301981 299712 299693
18 Rising of existing side drains near Fly over and repairs to left
side drains from Synergies old gate to Gayatri circle.
Completed Sri K. Rambabu 415835 413486 413150
19 Provision of stainless steel railing for left side lawn near In gate
and right side of out gate of Admn building.
Completed M/s S.S. Enterprises 193661 193527 184415
20 Repairs to side drains for road from ATM to weigh bridge. Completed Sri K. Rambabu 355590 349498 349165
21 Development of parking area with paver blocks at back side of
Admn building in VSEZ.
Completed Sri Challa Jogi Naidu 196916 193874 193843
22 Construction of septic tank and replacing the old damaged rain
water drainage pipe with new RCC pipe near Excise Security
Gate in VSEZ.
Completed Sri K. Rambabu 362176 358555 333911
23 Rising of right side drain walls and repairs to existing drains at
Security main gate to Gayatri circle.
Completed Sri K. Rambabu 296224 295233 295094
24 Painting to outside elevation walls at top of VSEZ Admn
building and top of Excise Security building.
Completed Sri K. Rambabu 104751 104227 104134
25 Repairs to pot holes and laying of seal coat for area of
approach and surroundings opp to Excise security gate in VSEZ.
Completed M/s S.S. Enterprises 497080 497080 496953
26 Desilting of drains in Phase-I of VSEZ premises. Completed Sri CH. Eswara Rao 499400 492590 491505
27 Desilting of drains in Phase-II of VSEZ premises. Completed M/s S.S. Enterprises 418000 412300 412300
28 Repairs for conversion of old weigh bridge room as Guard’sroom opp to In gate of Admn building
Completed Sri Challa Jogi Naidu 176996 176736 176362
29 Provision of Footpaths on left side of road from ATM to weigh
bridge road.
Completed Sri CH. Eswara Rao 378081 376936 376749
Page 2 of 11
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
30 Provision of Footpaths on right side of road from ATM to weigh
bridge road.
Completed M/s S.S. Enterprises 352945 352922 352857
31 Construction of RCC retaining wall 20m long on right side near
boundary wall.
Completed Sri K. Rambabu 492912 492863 488784
32 Rising of RCC retaining wall 20m long on right side near
boundary wall.
Completed Sri K. Rambabu 80084 79684 43119
33 Repairs to parking area by providing CC on opposite right side
of Admn building and on both sides of parking area near
Executive Canteen.
Completed Sri CH. Eswara Rao 168195 167775 167683
34 Widening of BT road by 2m from weigh bridge road upto Curve
of Synergies road.
Completed Sri Challa Jogi Naidu 495387 494396 493642
35 Widening of balance length of BT road from weigh bridge road
and repairs to pot holes, longer road end cuts to level with
Lorry parking area, weigh bridge road etc.,
Completed M/s S.S. Enterprises 418834 417787 417474
36 Supply, erection and commissioning of 50Kg/hr Solid waste
Incinerator at VSEZ, Visakhapatnam.
Completed M/s M.K.R. Enterprises 1400000 1390000 1390000
37 Repairs to existing damaged flooring beside bus shelter and
water cooler near Excise Security gate.
Completed Sri K. Rambabu 46902 46621 41605
38 Provision of arrow mark sign board on right side of In gate at
Admin building, VSEZ.
Completed M/s A.S.R. Constructions 43958 43562 43562
39 Painting of road surface marking in the premises of Admin
building and Security Excise Gate in VSEZ.
Completed Sri CH. Eswara Rao 179527 178629 167580
40 Construction of new drain wall in place of badly damaged
collapsed drain opposite to Fysolate company and
improvements to existing drain on left side.
Completed M/s S.S. Enterprises 104053 103783 99394
41 Desilting of drains in Phase-III of VSEZ premises. Completed M/s Maheaswari Tech 241955 241955 241955
42 Provision of security fencing to Electrical transformers in VSEZ
area.
Completed M/s Maheaswari Tech 489701 489701 339278
43 Provision of covers for valve chambers and security chain link
fencing to electrical transformers in VSEZ area.
Completed M/s Maheaswari Tech 255403 255403 191755
44 Painting of road surface marking in the premises of Admn
building and security Excise gate in VSEZ.
Completed Sri CH. Eswara Rao 179527 178629 167580
Page 3 of 11
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
45 Execution of miscellaneous works in VSEZ, like provision of
water pipe line, repairs to wash room, painting to walls of
conference hall, repairs to doors for main door & room near
weigh bridge, painting to kerb walls etc.,
Completed Sri CH Eswara Rao 294407 - 294407
46 Execution of miscellaneous works in VSEZ, like fixing of water
supply fittings, removal of electrical pole, clearing of work
sites, provision of parking area opposite to Excise security gate
(Nitin cylinders road), repairs to damaged boundary walls etc.,
Completed Sri K. Rambabu 279257 - 294407
47 Provision of pavered blocks in the old dismantled building area
and extension of wall for ladies wash room on back side of
VSEZ Admn building.
Completed Sri K. Rambabu 266367 264636 264422
48 Repairs to existing damaged road on the way from Excise
security out gate to Admn building side by providing seal coat.
Completed M/s S.S. Enterprises 110629 110518 110394
49 Repairs to drain walls including shifting of GI water pipe line
and construction of new drain wall on left side of road leading
to out gate of VSEZ Admn building.
Completed Sri K. Rambabu 428620 428191 428180
50 Provision of double-door opening system includes supply &
fixing of new ply wood door and repairs to the existing door for
battery room in conference hall in VSEZ.
Completed Sri CH. Eswara Rao 10998 - 10998
51 Painting of compound walls alround VSEZ Admn building and
on kerb walls from Excise security gate to temple on both sides
of roads, Duvvada, Visakhapatnam.
Completed Sri Challa Jogi Naidu 165698 165284 159077
52 Construction of RCC ramp on left side of weigh bridge. Completed M/s Maheaswari Tech 155711 155337 155081
53 Re-fixing of existing back ground stickering at left side of
entrance of Admn building and fixing of Ashok pillar with
walling and SATYAMEVA JAYATE letters.
Completed Sri B.V. Bhaskar Murthy 5000 5000 5000
54 Provision of pavered blocks in front/right side/back of
Incinerator building, construction of CC platform, tiles on plinth
protection and rising of drain walls.
Completed M/s S.S. Enterprises 261048 260421 260356
55 Provision of glazed tile flooring in corridor at back side of
Admn building.
Completed Sri CH. Eswara Rao 78716 78519 75205
Page 4 of 11
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
56 Laying of VSEZ's RCC pipes for arrangement of connection to
opening of retaining wall from the existing earthen drain on
the right side and painting of retaining wall on inner faces, near
boundary wall at back side of Vijnan college.
Completed Sri CH. Eswara Rao 170829 170487 170231
57 Provision of route map board opposite to Excise Security office. Completed M/s SML contractors and
manpower suppliers
272555 183499 183478
58 Repairs to divider walls in central media on main road from
Security main gate to BioMax in VSEZ area.
Completed M/s S.S. Enterprises 495653 493720 493622
59 Repairs to leaky roof slab of Lotus building (Excise security ) in
VSEZ, Visakhapatnam.
Completed Sri CH. Eswara Rao 235965 235540 234582
60 Repairs to existing drains on main road from Chandan Park to
Gland Pharma by rising the drain walls, patch works and
desilting of drains in VSEZ area.
Completed Sri Challa Jogi Naidu 297506 297208 297141
61 Repairs to existing drains in front of Gland Pharma by rising the
drain walls and patch works in VSEZ area.
Completed Sri K. Rambabu 365139 365102 365070
62 Provision of radium stickered indication boards for branch
roads of VSEZ.
Completed M/s SML contractors and
manpower suppliers
115000 109500 106500
63 Provision of cement concrete road outside Phase III gate and
repairs to compound wall & building of pump house near
Security office near BioMax gate in VSEZ.
Completed Sri CH. Eswara Rao 481364 480161 480145
64 Cleaning of septic tank, pumping out overflow water including
jungle clearing and construction of outlet manholes on right
side of service road behind Dr. Reddy’s Labs in VSEZ area.
Completed Sri K. Rambabu 380990 378361 378350
65 Repairs to existing damaged pump house at back side of
VACHHI company on service road in VSEZ.
Completed M/s S.S. Enterprises 312751 311813 311031
66 Repairs to Kerb walls on main road from 17 acres gate to
BioMax gate.
Completed Sri Challa Jogi Naidu 454710 454255 449000
67 Repairs to wall & floor of store room near reception of Admin
building & wall tiling on tree guard in the front lawn near In
gate & inside of Admn building.
Completed M/s SML contractors and
manpower suppliers
52227 52096 52035
Page 5 of 11
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
68 Execution of additional works executed by Sri Rambabu in
connection with (i) Repairs to drain walls including shifting of
GI water pipe line and construction of new drain wall near way
to out gate of VSEZ Admn building and (ii) Cleaning of septic
tank, pumping out overflow water including Jungle clearing
and construction of outlet Man holes on right side of service
road behind Dr. Reddy' s Labs in VSEZ area.
Completed Sri K. Rambabu 127171 - 127171
69 Execution of balance works outside Incinerator building and
pump house building in Phase -I of VSEZ.
Completed M/s S.S. Enterprises 107355 - 107355
70 Provision of M.S. grills on drains at back side of Admn buidling,
near lorry parking area, on the way left side to out gate of
Admn building and near water cooler near Security gate.
Completed M/s Maheaswari Tech 297296 294323 275981
71 Extension of Parking area opp to SBI ATM near VSEZ Admn
building.
Completed M/s S.S. Enterprises 206765 206455 205963
72 Repairs to ladies rest room in first floor of Admin building. Completed Sri CH. Eswara Rao 138013 137875 118215
73 Provision of glazed tile flooring in front corridor of VSEZ Admn
building .
Completed Sri CH. Eswara Rao 234609 234022 233979
74 Construction of RCC drain walls in place of damaged and
collapsed drain walls due to heavy rains at 3 locations i.e., opp
Excise security office, near Fly over and in front of Maxworth in
VSEZ.
Completed Sri CH. Eswara Rao 421504 420450 420375
75 Painting on Main gate, Security back gate, grills, arches,
reception area of VSEZ Admin building in GF, FF and SF and for
VSEZ boundary wall near retaining wall site in VSEZ.
Completed Sri K. Rambabu 234303 234256 234073
76 Repairs to overhead tank and compound wall near Synergies
Limited in VSEZ.
Completed M/s S.S. Enterprises 221969
+271545
=493514
221636
+271138
=492774
492756
77 Filling the low lying areas on right side of retaining wall and
container site with the available earth to be brought from the
adjacent drain area in VSEZ.
Completed M/s Manoj Transport 46000 45770 45770
78 Rising of drains on service road of Lee Pharma, near Chandan
Divine park and near Chandan Divine park and near SDF-2 in
VSEZ.
Completed Sri K. Rambabu 425927 424777 424555
Page 6 of 11
Sl No Name of work Status of work Name of contractor(s)Estimated
cost (Rs)
Value of Work
order (Rs)
Cost of completion
as per final bill (Rs)
79 Painting of boundary wall from ICICI ATM upto In road of
weigh bridge, right side boundary wall near Flyover and repairs
to elevation windows of SDF-4 in VSEZ.
Completed Sri Challa Jogi Naidu 260145 259573 259549
80 Repairs to wall & floor of store room near reception of Admin
building & wall tiling on tree guard in the front lawn near In
gate & inside of Admn building.
Completed M/s SML Contractors and
manpower suppliers.
52227 52096 52035
81 Provision of glazed tile flooring in front corridor of VSEZ Admn
building .
Completed Sri CH . Eswara Rao 234609 234022 233979
82 Painting to road safety guard railing on Flyover, painting to
boundary wall from TGI Company to Fly over, construction of
wall between gate and 17 acres site wall in VSEZ.
Completed Sri CH . Eswara Rao 491775 490447 482164
83 Painting of left side drain walls from Security Excise In gate to
Hibiscus Garden, Jemini Company to Globex Company in VSEZ.
Completed M/s SML contractors and
manpower suppliers
60394 60334 60190
84 Provision of LED name board at Solar Plant, VSEZ. Completed M/s ASR Constructions 105000 104895 104895
85 Construction of kerb walls at 2 locations i.e., at Hibiscus park
and back side of Admin building, execution of balance works of
Lee Pharma drains and balance works of painting of walls
inVSEZ.
Completed Sri K. Rambabu - - 246014
86 Construction of Lift room for VSEZ Administrative building. Completed M/s S.S. Enterprises 499068 498519 498128
Page 7 of 11
Sl No Name of work Name of contractor(s) Status of workEstimated
cost (Rs)
Value of
Work order (Rs)
Cost of completion as
per final bill
Period 2020-2021
1 Construction of new building for Housekeeping,
Horticulture, Electrical and store at back side of
Admn building.
Sri K.Rambabu In progress. 1480000 1297516
2 Construction of Lift room for VSEZ Admn office
building.
M/s S.S. Enterprises In progress. 499068 498519
3 Repairs to 3 wash rooms in first floor of SDF-1
building in VSEZ.
Sri Challa Jogi Naidu In progress. 495500 495005
4 Repairs to boundary wall by providing barbed wire
fencing from Obel Bellows to Phase-1 pump house in
VSEZ near Vignan College.
Sri K. Rambabu In progress. 491119 491070
5 Repairs to boundary wall by providing barbed wire
fencing from Phase-1 pump house to Security Tower
in VSEZ near Vignan College.
Sri K. Rambabu In progress. 323472 323407
6 Repairs & rising of drain walls from culvert to gate of
power office in front of VSEZ Admn building mai
road.
A-41 Civil Engineering
Consultants
In progress. 182981 182798
7 Supply and Installation of 3 KW Solar off-grid system
on new building of House keeping/Horticulture dept
in VSEZ premises.
M/s Power Solutions In progress. 225000 218250
8 Provision of tiling for 5 tree guards and 2 Dining huts
in the premises of Executive canteen in VSEZ area.
M/s SML contractors and
manpower suppliers
In progress. 342844 342433
9 Repairs to existing concrete boards and ACP boards
on stainless steel supports, supply of new boards
and stickering plot numbers and Installation at
various locations in VSEZ.
M/s Pujitha Stickering In progress. 62100 61000
VISAKHAPATNAM SPECIAL ECONOMIC ZONE
B. LIST OF WORKS IN PROGRESS as on 25-5-2021
Page 8 of 11
Sl No Name of work Name of contractor(s) Status of workEstimated
cost (Rs)
Value of
Work order (Rs)
Cost of completion as
per final bill
10 Execution of additional works for construction of lift
room for VSEZ Administrative building.
M/s S.S. Enterprises In progress. 325323 324868
11 Supply, erection and functioning of Lift in VSEZ
Admin building.
M/s Industrial Engg.
Systems
In progress. 1150000 1270000
Page 9 of 11
Sl No Name of work Status of work
Estimated cost
(Rs) Value of
Work order (Rs)
Cost of
completion as per
final bill
1 Extension of left and right side foot paths from way-out road
of lorry parking to way-in road of weigh bridge on Synergies
road in VSEZ.
Approved by DC/VSEZ. Tenders to
be invited.
991900
2 Widening of existing service road by cement concrete road
from culvert of Globex to Security Tower in VSEZ.
Approved by DC/VSEZ. Tenders to
be invited.
2558200
3 Construction of RCC drain walls from culvert of Gland Pharma
to RCC pipe of retaining wall in VSEZ.
Estimate kept pending as instructed
by DC/VSEZ
9474000
4 Provision of cement concrete lining, bed concreting, rising the
drain wall by RCC and desilting on left and right sides of
culvert near retaining wall.
Estimate kept pending as instructed
by DC/VSEZ
4790400
5 Modifications to existing building to create Doctor's
consultation room near Electronic Weigh Bridge in connection
with India @75 Azadi ka Amrit Mahotsav in VSEZ.
Estimate put up for approval.
Approval of DC/VSEZ is awaited.
495625
6 Ancillary works for modifications to existing building to create
Doctor's consultation room near Electronic Weigh Bridge in
connection with India @75 Azadi ka Amrit Mahotsav in VSEZ.
Estimate put up for approval.
Approval of DC/VSEZ is awaited.
454427
7 Construction of circular water fountain with LED lights in front
of VSEZ Admin building.
Kept pending as instructed by
DC/VSEZ.
498622
8 Provision of Shahabad stone flooring in front of new building
for house keeping staff and in front of Doctor's consultation
room.
Estimate under preparation.
9 Improvements to second floor of Admn building to utilise as
dining hall.
Estimate under preparation.
10 Repairs to SDF-II building viz., windows, rolling shutters,
realignment of sanitary lines to Septic tank construction of
soak pit etc.,
Estimate under preparation.
11 Repairs to all pot holes on BT roads in VSEZ area. Estimate under preparation.
VISAKHAPATNAM SPECIAL ECONOMIC ZONE
STATEMENT SHOWING THE LIST OF WORKS, FOR WHICH ESTIMATES ARE UNDER PREPARATION/PROCESS as on 25-5-2021
Page 10 of 11
Sl No Name of work Status of work
Estimated cost
(Rs) Value of
Work order (Rs)
Cost of
completion as per
final bill
12 Provision of water taps with sensor working. Estimate under preparation.
13 Provision of auto-power off lights in Admin building Estimate under preparation.
14 Repairs to leakages of sheds in OWS in VSEZ area. Estimate under preparation.
15 Repairs to wash rooms in first floor of SDF-1 for STPI Estimate under preparation.
16 Wall painting on left-over back and left sides of SDF-1 building
in VSEZ.
Estimate under preparation.
17 Wall painting on left-over back and left sides of SDF-2 building
in VSEZ.
Estimate under preparation.
18 Construction of car paking shelter behind VSEZ Admin
building
Estimate under preparation.
19 Repairs to ceiling of ASO's chamber, Excise office chamber
and old lift room in VSEZ.
Estimate under preparation.
Page 11 of 11