VMS5 Optimization Weekly Report Feb26 2012

download VMS5 Optimization Weekly Report Feb26 2012

of 18

Transcript of VMS5 Optimization Weekly Report Feb26 2012

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    1/18

    HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Feb 26, 2012

    VMS5 Optimization Report

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    2/18

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    3/18

    HISILICON SEMICONDUCTOR

    HUAWEI TECHNOLOGIES CO., LTD. Page 3

    Key Optimization Target and Result

    3

    Decrease customer com2

    Improve the coverage

    1Improvenetwork KPI

    Network Quality Improvement

    Call center had a little coThe VIP subscriber comp

    4Improve through

    Use two carrier wCS and PS

    After new site on air, RSCP increase, but EcIodecrease especially in the dense area

    Handover suc Rate increase,handover request times decrease

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    4/18

    HISILICON SEMICONDUCTOR

    HUAWEI TECHNOLOGIES CO., LTD. Page 4

    Optimization structure

    VIP Assurance

    User Complaint Handling

    Problems &Demands

    Operation &Maintenance

    Tools &Platform

    Decrease customercomplaint andhandle in time

    Core NetworkOptimization

    NetworkPerformance

    Monitoring PlatformPRS iManager MService QualityEvaluation Tool set

    Troubleshooting& Optimization

    3G 2G inter operationperformance, let useras long as 3G is avail

    RNO: TopN bad cell Opt, TopN user failure, 2G-3G inter-operation, Call Drop, Downloa

    Ensure the quality for newsite, swap site, expansion siteand reuse site

    TOP worst Celltroubleshooting

    Result Evaluation & Assessment

    Top worstexperience userhanding

    Wireless NetworkOptimization

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    5/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 5

    Content

    Optimization Work Summary

    Optimization Target and Result

    Pending issue

    Optimization content, plan and support

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    6/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 6

    Optimization Work Summary

    3G to 2G handover:

    CS inter-RAT handover successful ratio is about 98.5%

    PS inter-RAT handover successful ratio increased, around 95.2%

    Action to improve PS handover successful ratio:

    1- Changed the 2G target threshold from 20 to 25

    2- Troubleshooting for top N worst cell, rechecked and configured the inter-RAT neighbor and parameters

    Plan to improve PS handover successful ratio:

    1- Continue to troubleshooting worst cell

    2- Adjust the HO threshold to reduce to HO times, but not decrease performance

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    7/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 7

    Optimization Work Summary

    Complaint troubleshooting:

    Quay 153 Cho Sat Pham Hung Thoi HBSignal is not so good although there is one site nearby, as it

    is too deep in the building

    Solution:1- check and adjust the site HPG_LCN_CHO_SAT direct to thebuilding, but it is still not so good

    2- adjust HPG_HBG_NGUYEN_THAI_HOC_1800, as 900cover import area, so only 1800 can be adjustedPlan to finish: Feb28

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    8/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 8

    Optimization Work Summary

    Complaint troubleshooting:

    145 PhCm Gia Vin NQFast connection speed is low, 3G signal is

    weak, camp on 2G most time

    Solution:1- lock 3G only, data throughput is higher,but 3G signal still low

    2- two new 3G site nearby are not on air,will check again after the two sites on air

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    9/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 9

    Optimization Work Summary

    Complaint troubleshooting:

    869 Trng Chinh K.AnWeak indoor coverage

    Solution:1- increase the transmit power of sitearound

    2- adjust the HPG_KAN_QUAN_TRU_A tiltfrom 9 to 6

    Result:Signal improved, but still weak in deepinside, mainly because of the distance, thenearest site is 630m

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    10/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 10

    Optimization Work Summary

    Subscriber complaint:

    Totally checked 10 customer complaint area, 8 of them is about the weak coverage, the reason is that

    the area far is from the site

    Bad performance in two cell of HPG_HBG_THUONG_LY

    After upgrade to double carrier, the performance is bad in second carrier, but no alarm, last week HQ

    analyzed the log and found the problem caused by the fault WBBP, replaced the board, the

    performance become normal

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    11/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 11

    Content

    Joint Team Optimization Work Summary

    Optimization Target and Result

    Pending issue

    Optimization content, plan and support

    P di i

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    12/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 12

    Pending issue

    Weak coverage indoor in some area

    HW will try to adjust the nearest site to improve, but may not improve so much

    Coverage improve after new sites on airAfter most of the new sites on air, HW will start the cluster optimization

    Bad coverage indoor, Quay 153 Cho Sat Pham Hung Thoi HB

    Adjust the nearest G1800 to the area, and check result after adjust

    Drop complaint in Cty CPTM Phu My Hung Cum CN Vinh NiemNo alarm in the serving cell, will check the call drop record and trace the subscriber Number to find the solve the pro

    PS inter-RAT performance improvement

    Decrease the HO times, and optimization for old system

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    13/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 13

    Content

    Joint Team Optimization Work Summary

    Optimization Target and Result

    Pending issue

    Optimization content, plan and support

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    14/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 14

    Optimization Content

    1. Coverage optimization (plan)As many new sites on air, so need decrease the old sites coverage to avoid too much interference, wbad EcIo, good RSCPSolution: after most of the new site on air, HW will start the cluster optimization with cluster driving tes

    2. Cell with high RTWP (plan)It may cause unbalance between uplink and downlink;Solution: The best solution is to find and clear the interference, but it is very difficult;If the interference can not solve in short time, the suggestion is decrease the cell downlink coverage aavoid the situation good signal but bad quality

    3. Neighbor optimization (troubleshooting)Bad the top worst cell to check neighborOptimize the missing neighbor base on CHR logfile

    4. Top worst cell optimization (daily)Base one KPI statistics to troubleshooting for top worst cell

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    15/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 15

    Optimization content

    5. Check user performance with CHR logfile (troubleshooting)Discover the top worst performance user in advance and solve the problem

    6. VIP user performance guarantee (daily)

    Get the call failure or drop record from CHR, to find and solve problem if any in time

    7. Alarm and transmission which affect service (daily)Base the performance to find and solve the problem in time,

    8. Monitor both CN and SRAN performance (daily)Monitor both CN and SRAN performance, as some kind of failure can not be found in SRAN, such as reject failure

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    16/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 16

    Optimization Plan for next week1. Start optimization for HDGAs most site is ready in HDG, we will prepare the optimization for HDG, and discuss with VMS5 togethoptimization:

    Confirm the parameter setting, DT plan and route, optimization schedule and target

    2. Improve coverage in Quay 153 Cho Sat Pham Hung Thoi HBAdjust the nearest site HPG_HBG_NGUYEN_THAI_HOC_1800, and recheck the result

    3. 3G to 2G handover performance improvementCurrently the inter-RAT performance increase a little, but still not catch the target, choose the worst ceanalysis the failure cause

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    17/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 17

    Support and help

    Weak indoor coverage, need on air new site ASAP

    Many complains these days, and most of them is about weak coverage, especially indoor

    Solution: On air the new site or expansion site ASAP (lack of transmission currently)

    Many new site still not yet no air as transmission not ready or special antenna not ready Add new site for the area with high traffic but no site nearby

    Some area high traffic, but no site nearby, need add new site (repeater can be the temporary solution, but iinterference and difficult to do troubleshooting later)

    ActualrequirementTarget Configuration Current 2G/3G Current 3G equipment

    Total Target Number Current BTS3900 BTS3900A DBS3900

    418

    266GSM/DCS/

    UMTS

    81 GSM 0 0 0

    17 DCS 0 0 0

    8 GSM/DCS 0 0 0

    2 UMTS 2 0 0

    99 GSM/UMTS 2 0 97

    16 DCS/UMTS 7 3 6

    45 GSM/DCS/UMTS 8 0 37

    152GSM/UMT

    S

    2 UMTS 2

    61 GSM 0 0 0

    89 GSM/UMTS 68 8 13

  • 8/2/2019 VMS5 Optimization Weekly Report Feb26 2012

    18/18

    HISILICON SEMICONDUCTORHUAWEI TECHNOLOGIES CO., LTD. Page 18

    Thank You