VasilisKaragkounakisPortfolio of Experience
Areas of Expertise
Metro Stations – Switch Box – Stabling Yard
Stadiums - Multipurpose Hall Arenas
Hotels
Exhibition Centers
Multi storey car parks
Bridges Construction, onshore & offshore
Motorway with utility networks
Residential Buildings
Marine operations, Dredging – Reclamation,
Jetties and Quay-walls, Breakwaters, Cofferdams
Technical Office & Tendering
Preparation of Project strategy & Works schedule
Contract & Commercial management
Claim preparation & Negotiation
“Executive Projects Leader/ Senior Project Manager Qualified MEng
Civil Engineer with 22+ years of International diverse experience in
iconic and award winning high capital value Projects within blue chip
Corporations, able to adapt quickly, with excellent communication skills,
building teamwork spirit to integrate with colleagues and ability to grow
positive relationships with the Client team.
Over that last 16+ years I’ve gained an exclusive Middle East experience
from bidding to execution and successful leading in the demanding
growing industry of K.S.A., U.A.E., Kuwait and Qatar.
My constant self-motivated professional focus, leadership and hands-on
management experience in the construction industry include all functions
of Project Management including Tender bids, Technical, Commercial &
Contract Administration, Cost Management and proactive CM
Professional Practice. With a proven and measurable track record of
contributions, which have enhanced Organization’s annual revenue and
upgraded its position presence and opportunities in the Middle East
Region. A seasoned professional with thorough technical knowledge and
experience in the construction industry capable to add value in any
Organization.
While working with executive level decision makers over the past 8 years
I developed unique insights into stakeholder engagement, risks analysis,
conflict management and best approach to achieve successfully delivery
of fast track complex Building Projects such as Olympic specifications
Stadiums, Metro Stations, Switch box and rail Stabling Yard,
Multipurpose Halls, Hotels high-rise, as well as heavy Infrastructures like
Bridges, Highways, Oil Receiving Jetties and Breakwaters.
Extensive experience gained in International contract and commercial
management while working closely with International Consultancies for
the preparation of large scale complex claims. Highly capable of creating
accurate project cost estimate, and budget.”
Career Summary
Oct’16 – present Station Manager ALYSJ JV - AKTOR-Qatar
Jan’13 – Sep’16 Project Leader/ Senior Project manager AKTOR-Qatar
Sep’11 – Jan’13 Deputy Project Manager AKTOR-Qatar
May’10 – Sep’11 Construction Leader AKTOR- Kuwait & U.A.E.
May’08 – May’10 Deputy Project Manager AKTOR-U.A.E.
Feb’06 – May’08 Co-founder Real Estate – KMB
Jun’03 – Feb’06 Construction Manager ARCHIRODON U.A.E.
Jan’02 – Jun’03 Technical Office Manager ARCHIRODON U.A.E.
Mar’99 – Jan’02 Project Engineer ARCHIRODON K.S.A.
Sep’95 – Feb’99 Technical Office Engineer Private Sector Greece
RAS BU ABBOUD STATION
SWITCH BOX AND
STABLING YARD OF GOLD & BLUE LINE
OCT 2016 TO DATE
Goldline MetroAirport Station including Switchbox and Stabling yard for Gold & Blue lines
Doha Qatar, 2016 - to date
COMPANY POSITION
ALYSJ JV AKTOR S.A. STATION MANAGER
CONTRACT VALUE
(EUR) 340,000,000
RESPONSIBILITIES
• Function as a Project manager and manage all site activities associated with construction and project planning build strategy, coordination of engineering, preparation of value engineering proposals.
• Handle the commercial aspect and development of the project subcontract and supply agreements.
• Coordination of Electro Mechanical and Architectural fit-out works provisional packages.
CHALLENGES
• Fast track Project • All works for the Gold Line Underground Project are conducted,
following the highest standards.• high quality and safety standards are applied to every operation
Ras Bu Abboud Airport Station
PROJECT LIFECYCLE
Switchbox of Blue and Gold Line
Stabling Yard of Blue and Gold Line
Station Structure
Switchbox of Blue and Gold Line
AL SADD MULTIPURPOSE HALL
2013-2015
Al Sadd Stadium Multipurpose Hall
ArenaDoha Qatar, 2013-2014https://www.youtube.com/watch?v=cU6P4_U8OUY
COMPANY POSITION
AKTOR S.A. PROJECT LEADER
CONTRACT VALUE
(EUR) 152,500,000
RESPONSIBILITIES
• Tender bid preparation and submission• Project administration • Preparation of achievable and realistic work schedules• Project cost estimating, budgeting and control• Subcontractors procurement and management• Stakeholders management• Implementation of QC/HSE plans and procedures• Constructability programmes development
CHALLENGES
• Fast track Project, Completion in 23 months• Numerous Design changes, incomplete Design• Erection of Steel roof structure• QCDD Building sign off• Building Air tightness for the Ice Rink
PROJECT ACCOMPLISHMENT
• Completion of a fast track project while successfully incorporating Design changes and Additional works orders equal to the +18% of the original contract scope
• Venue successfully hosted 6 International events to date• Coordinated the preparation and Lead the negotiation-approval of at
least QAR 85 million of Variations to date
East view – Spectator entrance, Nov 2014 North View – VIP entrance, Nov 2014
Roof steel structure under construction, Jan 2014
Al Sadd Multipurpose Hall
2013 - 2014
Al Sadd Multipurpose Hall
PROJECT LIFECYCLE
December 2013February 2013
November 2014June 2014
Al Sadd Multipurpose Hall
PROJECT LIFECYCLE
February 2014
Asian Men's Handball Championship, November 2014
Al Sadd Multipurpose Hall
PROJECT LIFECYCLE
March 2014
November 2014
November 2013
September 2014
Roof steel structure – Secondary beams erection
Roof steel structure – Mega Truss Jacking up
Main Arena – Handball mode
Al Sadd Multipurpose Hall
2013 - 2014
24th Men's Handball World Championship, January 2015
Main Arena – Ice rink mode
VIP spectator room
Warm up Hall - Handball mode
Al Sadd Multipurpose Hall
2013 - 2014
Al Sadd Multipurpose Hall
Project Awards - Appreciations
• World Stadium Congress 2015, first runner Best Stadium Contractor of
the Year for Ali Bin Hamad Al Attiya Arena.
• MEED, Building Project of the Year 2015 for Ali Bin Hamad Al Attiya
Arena.
• World Stadium Congress 2015, second runner Stadium of the Year for
Ali Bin Hamad Al Attiya Arena.
• Construction Week Awards 2015, Sustainable Project of the Year for Ali
Bin Hamad Al Attiya Arena.
• GSAS, 4Stars Design Award 2014 for Ali Bin Hamad Al Attiya Arena.
• Qatar 2015, Certificate of Appreciation issued by H.E. Sheikh Joaan Bin
Hamad Al Thani.AL SADD MULTIPURPOSE HALL
2013-2014
DUBAI – FUJAIRAH FREEWAY
2011
Fujairah FreewayU.A.E. 2011
COMPANY POSITION
AKTOR S.A. CONSTRUCTION LEADER FOR BRIDGESManaging both Kuwait and Fujairah
CONTRACT VALUE (INITIAL)
(EUR) 104,000,000
RESPONSIBILITIES
• Preparation of achievable work schedules for the pre-stressed type Bridges.
• Identify Constructability issues and offer solutions to the Project Director for the on time Bridges completion.
• Administration of the Valley Bridge Project team .
CHALLENGES
• Isolated Project with Limited access.• Rough terrain restrictions.• Weather conditions, high temperature restrictions.
PROJECT ACCOMPLISHMENT
• Construction of a long span Valley Bridge using the Full Span Precast Beam Launching Gantry installation method.
Panoramic View – Rock blast Excavation Launching Gantry – Precast beam installation
Launching GantryValley Bridge
Dubai – Fujairah Freeway Contract #3
2011
1ST RING ROAD – PACKAGE #1
2010-2011
1st Ring Road Kuwait city, 2010-2011
COMPANY POSITION
AKTOR S.A. PROJECT MANAGER for BRIDGES
CONTRACT VALUE
(EUR) 85,000,000
RESPONSIBILITIES
• Administration of the Bridges Project team. • Preparation of achievable work schedule for all the Bridges (10 Nos)
of the Project.• Identified Constructability issues and offered solutions to the Project
Director for Underpasses completion.• Reporting directly to CEO and COO of AKTOR
CHALLENGES
• Limited construction period.• Extensive local networks, traffic restrains.• Weather conditions, high temperature restrictions.
PROJECT ACCOMPLISHMENT
• Managed the on time completion of Flyovers and Underpass Bridges along with the completion of Troughs.
Panoramic View Aerial View
Flyover View Underpass
1st Ring Road – Package #1
2010-2011
STARWOOD ALOFT HOTEL
2008-2010
Starwood Aloft Hotel &
ADNEC Wedding HallAbu Dhabi, 2008-2010 http://www.starwoodhotels.com/alofthotels/index.html
COMPANY POSITION
AKTOR S.A. DEPUTY PROJECT MANAGER
CONTRACT VALUE
(EUR) 88,000,000
RESPONSIBILITIES
• Managed the overall Project construction activities.• Planned and coordinated the subcontractors.• Planned and organized the fit out works with the End user.
CHALLENGES
• Solid completion date due to the first F1 Grand Prix in U.A.E. opening event.
• Design changes.• Delivery of customized materials.• Stakeholder – End user management.
PROJECT ACCOMPLISHMENT
• Construction on time of a fast track complex project having high-end finishes used for hosting visitors for the 1st Formula 1 Grand Prix in Abu Dhabi.
• Coordinated successfully both Civil and MEP construction teams along with the fit out subcontractors.
9th Floor Swimming pool
Aloft 4 Stars 17 stories Hotel 9th Floor Events terrace
ADNEC Exhibition Concourse
Starwood Aloft Hotel, Abu Dhabi Exhibition Centre
2008-2010
SHEIKH ZAYED BRIDGE
2003-2006
Sheikh Zayed BridgeAbu Dhabi, 2003-2006https://en.wikipedia.org/wiki/Sheikh_Zayed_Bridge
COMPANY POSITION
ARCHIRODON CO. S.A. CONSTRUCTION MANAGER
CONTRACT VALUE
(EUR) 156,000,000
RESPONSIBILITIES
• Administration of the Marine and Substructures Project team. • Supervise and Coordinate the construction works of the four
Cofferdams and Pile caps.• Implementation of the project execution plans.
CHALLENGES
• Soil conditions.• Environmental limitations. • Large size concrete pours.
PROJECT ACCOMPLISHMENT
• Effectively organized the works ensuring the expeditious and within budget completion of the works scope.
• Ensured the implementation of QC/HSE plans and procedures.
Central Pier
Sheet piles Cofferdam construction Central and Marina Pier Cofferdams
Night shot perspective
Sheikh Zayed Bridge – Contract #3
2003-2006
PALM ISLAND I – CRESCENT BREAKWATER
2002-2003
Palm Island I (Jumeirah)
Dubai, 2002-2003https://en.wikipedia.org/wiki/Palm_Jumeirah
COMPANY POSITION
ARCHIRODON CO. S.A. TECHNICAL OFFICE MANAGER
CONTRACT VALUE
(EUR) 165,000,000
RESPONSIBILITIES
• Organized and oversaw the shop drawings.• Oversaw the reclamation works carried out by the dredging
subcontractor M/s. Royal Boskalis (34 million cub. meters.).• Prepared and follow up the payment certificates.• Prepared the project report and claims for the corporate tender
department.
CHALLENGES
• Accuracy on the quantities estimation for procurement and take off for invoicing purposes.
PROJECT ACCOMPLISHMENT
• Scheduled the rock supply (of around 40,000 tones daily during the peak period) and the logistics of the marine equipment.
• Managed the final handing over of the revetment to the Client meeting strict completion timelines and within budget.
Aerial View – Breakwater construction
Reclamation works
Satellite View
Palm Island I – Crescent Breakwater
2002-2003
JETTY AT SHOIABA DESALINATION PLANT
2001-2002
Jetty Oil Receiving terminal at
Desalination PlantShoiaba K.S.A. 2001-2002
COMPANY POSITION
ARCHIRODON CO. S.A. HEAD CIVIL ENGINEER
CONTRACT VALUE
(EUR) 29,000,000
RESPONSIBILITIES
• Organized and oversaw the offshore concreting activities.• Supervised the erection of temporary supports and formworks for
the unloading platform and dolphins.• Installation of precast slabs and beams.• Arranged the delivery and pouring of concrete.
CHALLENGES
• Rough Sea adverse conditions.
PROJECT ACCOMPLISHMENT
• Managed the completion of the Civil works as per the project schedule of works.
Access bridge on steel piles Unloading platform
Jetty Oil Receiving terminal at Shoiaba Desalination Plant
2001-2002
JETTY AT SHOIABA POWER PLANT
1999-2001
Jetty Oil Receiving terminal at
Power PlantShoiaba K.S.A. 1999-2001
COMPANY POSITION
ARCHIRODON CO. S.A. HEAD CIVIL ENGINEER
CONTRACT VALUE
(EUR) 39,000,000
RESPONSIBILITIES
• Head Engineer of Jetty Technical Office, upon completion of the shop drawings moved to construction.
• Organized and oversaw the causeway construction.• Preparation and erection of temporary supports and formworks for
the unloading platform and dolphins.• Organized and oversaw the offshore concreting activities.• Installation of precast slabs and beams.
CHALLENGES
• Rough Sea adverse conditions.
PROJECT ACCOMPLISHMENT
• Managed the completion of the Civil works as per the project schedule of works.
Aerial View – Dolphins construction Precast beam – walkway installation
Panoramic view – Causeway and Jetty First tanker – mooring in progress
Jetty Oil Receiving terminal at Shoiaba Power Plant
1999-2001
Contact details
+974 66011076
https://qa.linkedin.com/in/vkaragkounakisprojectmanager