VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard...

15
VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production, astrometric and photometric calibration further processing: generate well sampled PSF, PSF and Sersic profile fitting advanced pipeline: database driven, deep stacking and mosaicing, merging catalogues, list driven photometry, overlap calibration
  • date post

    30-Jan-2016
  • Category

    Documents

  • view

    217
  • download

    0

Transcript of VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard...

Page 1: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

VISTA/WFCAM pipelines

summit pipeline: real time DQC verified raw product to Garching

standard pipeline: instrumental signature removal, catalogue production, astrometric and photometric calibration

further processing: generate well sampled PSF, PSF and Sersic profile fitting

advanced pipeline: database driven, deep stacking and mosaicing, merging catalogues, list driven photometry, overlap calibration

Page 2: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 3: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 4: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

WFAU

tapes disks internet

Page 5: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

Technical challenges

non-linearity calibration and measurement

cross-talk between channels and detectors

image persistence from frame-to-frame

sky level variations on short timescales

rapid variability of OH fringing

seeing variations on short timescales

possible time varying flatfield characteristics

calibration and extinction monitoring

data volume and throughput

robust automatic DQC measures

Page 6: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

Progress

work package spreadsheets and timelines

instigated regular minuted meetings with actions

provisional ICDs with JAC and WFAU agreed

FITS header definition and test MEF data processed

automated DQC monitoring developed

pipeline monitoring tools with web interface

programming completed for all basic modules

ORAC-DR test routines for UFTI delivered and installed

software module development for standard pipeline on target

good progress with VDFS documentation for PDR

Page 7: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

user manuals written for development pipeline/toolkits

Bad pixel monitoring, mask generating, confidence maps

difference imaging software developed

simulations and completeness tests done

prototype list-driven photometry package written and tested

devised general purpose stacking/mosaicing framework

NN stacking algorithm with simple rejection completed

large area mosaicing algorithm developed

automated astrometric and photometric calibration

astrometric and photometric distortion for WFCAM and VISTA quantified

Page 8: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

Processing tools/pipelines

INT Wide Field Camera (4 x 2k x 4k)

ESO WFI on 2.2m at La Silla (8 x 2k x4k)

KPNO and CTIO Mosaic1,2 4m (8 x 2k x 4k)

WFI on AAT (8 x 2k x 4k)

CFHT 12k imager (12 x 2k x 4k)

CIRSI mosaic on INT/DuPont (4 x 1k x 1k)

INGRID on WHT (1k x 1k)

UFTI on UKIRT (1k x 1k)

ISAAC on VLT (1k x 1k) ****

Page 9: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 10: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 11: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 12: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 13: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 14: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,
Page 15: VISTA/WFCAM pipelines summit pipeline: real time DQC verified raw product to Garching standard pipeline: instrumental signature removal, catalogue production,

CASU technical expertise

real time analysis and discovery

photometry and photometric system calibration

astrometry and astrometric system calibration

data modelling and simulations

archiving and DB management Sybase, PostgresQL, SQL-Server

data management and processing