Visit of dfid team on kusp roll programmes at BASIRHAT MUNICIPALITY North 24 Parganas
description
Transcript of Visit of dfid team on kusp roll programmes at BASIRHAT MUNICIPALITY North 24 Parganas
VISIT OF DFID TEAMVISIT OF DFID TEAMONON
KUSP ROLL PROGRAMMES KUSP ROLL PROGRAMMES
ATAT
BASIRHAT MUNICIPALITYBASIRHAT MUNICIPALITYNORTH 24 PARGANASNORTH 24 PARGANAS
CHAIRMAN
SRI NARAYAN MUKHERJEE SRI NARAYAN MUKHERJEE
Draft development plan Draft development plan
2008-09 to 2012-132008-09 to 2012-13
Basirhat municipalityBasirhat municipality
INITIATING THE DDP
DPG & DTGs were formed and they have provided policy guidance and technical support for the preparation of the DDP on regular basis. Board of Councillors, Municipal Employees and Ward Committees were sensitized on the importance of DDP. The following stakeholders were consulted:
Citizens of Basirhat Municipality Municipal Employees CDS Members Honorary Health Workers Local Trade Associations Formal and Informal sector workers
SURVEYS DONE
Baseline Survey and Digital Base Map preparation Socio-Economic Survey Survey of Health Facilities Survey of Educational Facilities Survey of Trade & Commerce Survey of Cultural Facilities Survey of Industrial Units
PROCESS FLOW OF DDP PREPARATION
THE PROCESS
Workshop Number of Workshops
Date
Launching Workshop 1 16/ 01/ 2007
Ward level orientation & sensitization workshops
22 02/ 03/ 2007 to 23/ 04/ 2007
Planning Workshop 1 23/04/2007
Ward Level Problem Identification
22 12/ 05/ 2007 to 21/ 01/ 2008
Workshop I of DPG & DTGs for finalization of projects
1 20/ 02/ 2008
Workshop II of DPG & DTGs for prioritization of projects
1 05/ 03/ 2008
DDP Quality Check and Public Validation
1 month 19/ 04/ 2008 to 19/ 05/ 2008
OBSTACLES
Basirhat is an old Sub-division town that has grown unplanned
Basirhat is attracting people from surrounding areas hence resulting in a population pressure
Traffic management is a big challenge of the Municipality
Supply of safe drinking water to the citizens is another major problem of the town.
SOLUTIONS
Proper planning is required.
Construction of a By-pass road will solve the problem of traffic congestion to a great extent.
Construction of a surface water treatment plant will provide safe drinking water to the citizens.
CONCLUSION
Implementation of DDP will:→ Improve the standard of living of the citizens of Basirhat. → Provide better infrastructure facilities to the citizens of Basirhat. → Help in poverty alleviation. → Help in delivering better health care services and primary education. → DDP will also enhance the cultural values
ACCOUNTING Reforms
STATUS OF OPENING BALANCE SHEET
Provisional Opening Balance Sheet as on 01.04.2007 has been completed
Provisional Opening Balance Sheet submitted to CMU, KUSP on 15.09.2008
Authentication process completed and submitted for approval to CMU on 09.04.2009 for final approval
ACCRUAL BASED DOUBLE ENTRY ACCOUNTING SYSTEM
Computerized Double Entry Accounting System introduced from March, 2008
Fully Migrated to Double Entry Accounting System
Citizens’ charterCitizens’ charter
Basirhat municipalityBasirhat municipality
CITIZENS’ CHARTER- PREPARATION PROCESS
Formation of a Core Committee
Preparation of Informal Citizens’ Charter in consultation with departmental heads
Ward Level consultation workshops to record the citizens’ expectation about the services
Preparation of the Draft Citizens’ Charter based on the norms and standards of services provided by each department
Workshops were conducted in every ward where the Draft Citizens’ Charter was approved by the citizens
Approval of final Citizens’ Charter by the Board of Councillors on 25th January, 2008
Approval of Citizens’ Charter by CMU on 21.02.2008
Approved Citizens’ Charter was displayed in all the major public places
A Grievance Redressal Cell was formed at Municipal Level for recording and managing complaints or grievances of the citizens.
SL. No.
Type of Services Present Time Frame After Publication of Charter
1 Assessment & Tax Department1.i. Mutation (New) Within 7 days Within 3 days1.ii. Mutation (Holding) Within 3 months Within 1 month1.iii. Amalgamation Within 3 months Within 1 month1.iv. Interim Assessment Depends on Valuation
BoardDepends on Valuation Board
1.v. Review As per quarter As per quarter1.vi. Certified copy of Assessment
RegisterWithin 3 days Within 2 days
1.vii. Correction of description of Assessment Register
Within 3 months Within 1 month
1.viii. Collection of Tax from Holding Daily Daily1.ix. Collection of Tax at Municipal
OfficeDaily Daily
1.x. Issue of Demand Notice Quarterly Quarterly
2 P.W.D. (Land & Building)2.i. Sanction of Building Plan2.i.a. Approval of Building Plan (up to 8
meters height)Within 7 days Within 4 days
2.i.b. Sanction or Refusal of Building plan including multi storied building
Within 7 days Within 4 days
2.i.c. Renewal of Building plan Within 3 days Within 2 days
2. ii. Action against complaint received
2.ii.a Regarding illegal construction Within 3 days Within 24 hours2.ii.b Regarding filling of water bodies Within 3 days Within 24 hours2.ii.c All type of complaints Within 3 days Within 24 hours
CITIZENS’ CHARTERCITIZENS’ CHARTER
SL. No.
Type of Services Present Time Frame After Publication of Charter
3. Water Supply3.i Domestic/ Commercial Water Supply
ConnectionWithin 10 days Within 7 days
3.ii Ferrule Change Within 2 days Within 1 day3.iii Ferrule Shifting Within 3 days Within 2 days
4. Birth & Death Registration4.i Issue of Birth Certificate Within 7 days Within 5 days4.ii Issue of Death Certificate Within 7 days Within 5 days4.iii Correction of records Within 5 days Within 3 days4.iv Cremation Certificate Within 3 days Within 2 days4.v Birth Certificate (in case of Domestic
Birth)Within 15 days Within 10 days
5. Electric DepartmentStreet Lighting
5.i Replacement of Lamp Within 3 days Within 2 days
6. License6.i. Enlistment Certificate Within 2 days Within 1 day6.ii License u/s 201, W.B. Municipal Act. Within 2 days Within 1 day6.iii Food License Within 9 days Within 7 days6.iv License for Rickshaws Within 2 days Within 1 day6.v. Hoarding Tax Within 2 days Within 1 day
7. Sanitation Department7.i. Garbage Collection Within 7 days Within 3 days
Display of Display of Citizens’ Charter Citizens’ Charter at major public at major public locationslocations
INNOVATIVE/ CHALLENGE FUNDINNOVATIVE/ CHALLENGE FUND
KOLKATA URBAN SERVICES FOR THE POORKOLKATA URBAN SERVICES FOR THE POOR
ANDAND
COMMUNITY DEVELOPMENT SOCIETY NO. 1 & 2 COMMUNITY DEVELOPMENT SOCIETY NO. 1 & 2
BASIRHAT BASIRHAT
Basirhat Community Development Society No. 1Basirhat Community Development Society No. 1
Project Title: Geriatrics Programme at Basirhat Municipality
Aim: This project mainly aims at improving the old age care and services through equipping 22 CDS women members through para-nurse technical training on old age medical care and support and setting up of a call center on old age care at the Municipality level.Objectives: Socio-economic empowerment of 22 CDS women; Better old age care and service delivery within the
specified wards ; Setting up of a call center on old age care at the
Municipality level to cater to the 60+ old age people.
Training sessions: Training sessions:
CDS Members are CDS Members are receiving training receiving training from from Dr. Alok Mukherjee, Dr. Alok Mukherjee, Founder-Director, Founder-Director, Believers’ of God Believers’ of God MissionMission
Training module:Training module:
The CDS Members received training on the following The CDS Members received training on the following
Sl. No. Training Module Duration
1 First aid 45 days
2 Home Nursing 45 days
3Blood pressure
checkup5 days
4 Injection 5 days
5 Blood collection 5 days
6 Dietetics and nutrition 15 days
Valediction programmeValediction programme
A valediction programme was organized on completion of A valediction programme was organized on completion of training on 22training on 22ndnd May 2009. May 2009.
Certificate Certificate Distribution Distribution
A short play A short play A short play was organized by the CDS members on the training received by them
Basirhat Community Development Society No. 2Basirhat Community Development Society No. 2
Project Title: Functional Literacy Programme of the T&CG Members
Aim: Primary level literacy program for illiterate TCG members from 1-22 wards under Basirhat Municipality. The project also seeks to educate them till the primary level through bridge camps and further mainstream the TCG women members to the Rabindra Mukto Vidyalaya to pursue further education.
Objectives: Identification of the number of illiterate TCG women, majority
belonging to the minorities, from wards no. 1-22 wards of Basirhat Municipality. Education of the identified women up to the primary levels,
through bridge camps, upon completion of which the women would be mainstreamed into the Rabindra/Netaji Mukto Vidyalaya in the local vicinity. Training of the 22 CDS members on ‘Bridge Education’
Methodology to act as Master Trainers in the Project.
Training of the trainersTraining of the trainers
A 7 days ‘training of the trainers’ program was conducted. Smt. Manjushree Mukherjee of TRCC trained the CDS members on adult education techniques using TLMs.
ClassroomsClassrooms
Thank youThank you