Virtualization: Doing it right the first time to avoid costly repeat attempts.
Software Licensing, Storage Options, Power and Cooling and Management
vSphere 4 Product Licensing
Essentials includes support and Essentials Plus requires support.
vSphere 4 Product Licensing
Support is required and sold separately.
vSphere 4 Acceleration Kits/Promotions
Microsoft OS Licensing
Operating Systems will need to be licensed Microsoft O/S
Unlimited VM – licensed per CPUWindows Server Datacenter
4 VM per licenseWindows Server Enterprise
1 VM per licenseWindows Server Standard
Storage
Shared Storage Pools Centralized Management Cost and Simplicity
Storage Protocols
FC (Fibre Channel) FCoE (Fibre Channel over Ethernet) iSCSI NAS (NFS)
The answer is based on your environment and or application requirements.
http://www.vmware.com/resources/techresources/
What will it be with your VMware environment?
VMware Useful Resources
Product Information - http://www.vmware.com/products Events - http://www.vmware.com/events White Papers - http://www.vmware.com/solutions/whitepapers.html Compatibility Guides - http://www.vmware.com/resources/guides.html TCO Calculator - http://www.vmware.com/calculator Success Stories - http://www.vmware.com/customers/ SMB Portal- http://www.vmware.com/smb Product Downloads - http://www.vmware.com/download/ Solution Tracks Online - http://www.solutiontracks.com
Zophar SanteNexsan VP Product Marketing
Mike CirrincioneNexsan Sales Manager
8
MicroAge Presents
NexsanStorage Strategies forVMware
Agenda for TodayNew Storage TechnologyFor Aligning VMware
Server Cost Reduction Strategieswith Storage Cost Reduction Strategies• Reducing Storage Power• Reducing Storage Space• Reducing Storage Hardware • Reducing Storage Management
Storage Architectures for VMware• Single ESX Server• Multiple ESX Servers / VMotion• Multiple ESX Servers / VMotion / Disaster Recovery
9
New Technology to Reduce Storage POWER
Old MAID Reduces application
performance for energy savings
“On-or-off” approach to energy savings
Usually only supported on SATA drives
Minutes to spin up components to respond to IO requests
Slow response confines use to just a few applications
AutoMAIDBenefits of MAID without
the limitations!
Energy savings with application performance “Green with Speed”
Supported on SAS and SATA drives
Three levels of energy savings
– Level 1, up to 20%
– Level 2, up to 40% (SATA only)
– Level 3, up to 60%
Fast response to 1st I/O requests
– Level 1, sub-second
– Level 2, less than 15 seconds
– Level 3, less than 30 seconds
Fast and flexible response broadens use to include a wide range of applications
10
LEGACY NEW
T3 Year Power kWhs $17,382$17,382 $6996$6996
The results when you use New Technology to Reduce Storage POWER
Using LEGACY technology compared to NEW technology
$.15 Kilowatt hour cost3 year period84TB
Results - 60% less expense (includes CAPEX , OPEX)
New Technology to Reduce Storage SPACE
12
Drives are installed back to back to reduce vibration
Drive bottom
Drive bottom
DensitySingle 4U chassisUp to 84TB21TB per USAS and SATA4 FC ports4 iSCSI ports
Performance4 RAID Engines per chassis4 GB cache per chassis1100MBs and 40,000 IOPs
Cooling channel reduce drive heat.
New 4X Enterprise RAID Engines Per Chassis
13
42TB in 4 U 42TB in 9 U
The results when you use New technology to Reduce Storage SPACE
LEGACY NEWTBs per U 4 10.5
U per TB .25 .095
Space Cost per TB x 3yr
$75$75 $28.5$28.5
Port Cost 12 x $300 = 12 x $300 = $3600 $3600
4 x $300 = 4 x $300 = $1200$1200
Using LEGACY technology compared to NEW technology
$100 per. U per. month
3 year period
FC Ports cost $300 each
84TB SATA (25TB of SAS)
Results - 62% less expense (OPEX) – 85% less expensive (Infrastructure CAPEX)
New Technology to Reduce Hardware Components
14
42TB Components LEGACY NEW
Power Supplies 6 2
Cooling Fans 18 7
Controllers 6 2
IO Ports 12 4
Enclosures 3 1
Total Hardware 4545 1616
RACK U 99 44The Results when you use New Technology
to Reduce Hardware Components
65% fewer componentsLess spaceLess powerFewer points of failureFew things to worry about
New Technology to Reduce Storage Management
LEGACY NEW
The Results when you use New Technology to Reduce Management
• 1 thing to manage NOT 3 things to manage• Less effort to scale• Less to worry about
Single ESX Server
ESX Virtual Server Host
Guests
New Storage Technology forA Single ESX Server
SAS (Speed) and SATA (Capacity)
3TB to 200TB
Dual / Redundant FC / iSCSI connections
Active / Active Data Paths
• Host Port Redundancy
• Network connection Redundancy
• Storage controller Redundancy
3TB to 200TB
16
New Storage Technology forSingle Site - Multiple ESX Servers with VMotion
VMotionESX
Virtual Server
Host
Guests Guests
ESX Virtual Server Host
Server Redundancy
SAS (Speed) and SATA (Capacity)
3TB to 200TB
Dual / Redundant FC / iSCSI connections
Active / Active Data Paths
• Host Port Redundancy
• Network connection Redundancy
• Storage controller Redundancy
3TB to 200TB17
New Storage Technology for
Multi-Site ESX Servers / VMotion / Disaster Recovery
VMotionESX Virtual Server
Host
Guests Guests
ESX Virtual Server
Host
Server Redundancy, Data Redundancy, Storage Redundancy, Site Redundancy
5 Nines = 99.999 HA
SAS (Speed) and SATA (Capacity)
3TB to 1000TB
Site A Site B
18
19
8 white papers 5 - 10 minute briefing papers Value Calculator
Here is some additional Nexsan information available from MicroAge
Conclusion
New Storage TechnologyFor Aligning VMware
Server Cost Reduction Strategieswith Storage Cost Reduction Strategies• Reducing Storage Power – 60%• Reducing Storage Space – 62%• Reducing Storage Hardware – 65%• Reducing Storage Management – 66%
Storage Architectures for VMware• Single ESX - YES• Multiple ESX / Vmotion YES• Multiple ESX / VMotion / Disaster Recovery YES
Contact MicroAge to Learn More
21
NexsanWho are We• Nexsan was founded in 1999• Over 24,000 storage systems sold into over 60 countries• We ship nearly 6000TB per month
What do we Do• Provide data storage solutions• SMB to Large Enterprise• All server environments
Confidential
Here are some Nexsan Customers
22
Common Mistake
Failure to adjust your power and cooling for your new infrastructure may
result in decreased efficiency
The percent of your input power that gets to the IT loadsThe percent of your input power that gets to the IT loads
=
The rest goes to power, cooling, and lighting equipment
Defining Data Center Infrastructure Efficiency
POW
ER
syst
em
COOL
ING
syst
em
The cooling system uses the most energy in the data center
Data Center Physical Infrastructure
IT
Go Go to latest online version of this tool
Click to resume presentation modeDone
EFFICIENCY POWER USEAlways goes down with virtualization
Always goes down, UNLESS power/cooling is downsized to match load
AFTER virtualization
ROOM cooling
Non-scalable
UPS
Unused rack space
ServersUnused POWER capacity
Unused COOLING capacity
ROOM cooling
Non-scalable
UPS
BEFORE virtualization
Power useDOWNDue to consolidated servers
Due to losses from excess
capacity
LOW
Due to losses from GREATER excess capacity
LOWER
Right-sizing improves power use AND efficiency
PLUS right-sized power and cooling
Power usedown MOREDue to RIGHT-SIZEDpower/cooling
Scalable ROW
cooling
Due to RIGHT-SIZED
power/cooling
HIGHER
Scalable UPS