Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater...
Transcript of Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater...
![Page 1: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/1.jpg)
7/8/2018
Virginia Beach Stormwater Master Plan Model
Model Content and Application Technical Guidance
![Page 2: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/2.jpg)
Meeting Outline
Introduction Overview Source data and datum
Methodology Hydrology Hydraulics Boundary conditions Model validation
Master plan model application Master plan model application Master plan model limitations Examples
2
![Page 3: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/3.jpg)
City Watersheds and Model Status
3
![Page 4: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/4.jpg)
City Watersheds and Model Status
4
![Page 5: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/5.jpg)
Model Software
5
Storm Water Management Model (SWMM)
Computational Hydraulics International
![Page 6: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/6.jpg)
Model Resolution
Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater Management Facilities (SWMF) Overland flow paths 2-D modeling where applicable Based on Public Works Stormwater Infrastructure GIS Models continue downstream to MS4 outfall and/or tidal
boundary condition North American Vertical Datum of 1988 (NAVD 88)
Included conversions from NGVD 1929 and NGVD 1929 with 1972 adjustment
6
![Page 7: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/7.jpg)
Methodology
![Page 8: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/8.jpg)
Hydrology
Subbasin Geometry Boundaries (DEM/contour lines/sewer network) Flow width (Area weighted) Slope Area Outlet
Outlet
SubcatchmentBoundary
8
![Page 9: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/9.jpg)
Hydrology
Lx: Flow path lengthSx: Flow path slopeWx: Flow path width
Flow Width (three-path approach)
9
![Page 10: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/10.jpg)
Hydrology
Subbasin Runoff Parameters (Landuse) Impervious area Surface runoff roughness (Manning’s
Roughness Coefficient) Initial abstraction (Depression storage) Subarea routing (Impervious pervious OR
pervious impervious) Percent routed between subareas Flow routing method (Kinematic/Dynamic
Wave)
10
![Page 11: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/11.jpg)
Hydrology (Rainfall Patterns and Inputs)
Historical rainfall (Rain gauge data) for model calibration
Design storm rainfall for master plan simulations NOAA Atlas 14 Type C One set of rainfall hyetographs for the entire City
Rainfall depth Based on values at the Centroid of the City (Watershed 6)
Temporal pattern Based on shape of 25-year rainfall hyetograph
11
![Page 12: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/12.jpg)
Hydrology (Rainfall Patterns and Inputs)
0.000
0.200
0.400
0.600
0.800
1.000
1.200
1.400
1.600
660 670 680 690 700 710 720 730 740 750 760 770 780
Inte
nsity
(in/
hour
)
Time (min)
25 Year
Type CAveraged
Type II
NOAA Atlas 14 Type C Hyetograph
12
![Page 13: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/13.jpg)
Hydrology (Rainfall Patterns and Inputs)
13
![Page 14: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/14.jpg)
Hydrology
Infiltration (Soil) Modified Green-Ampt infiltration
Suction Head Conductivity Initial Deficit
(Rainfall depth)
(Depression storage)
INFILTRATION (MODIFIED GREEN-AMPT)
14
![Page 15: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/15.jpg)
Hydraulics (View in PCSWMM)
15
Outfall
Subbasin load point (storage node)
Junction node
Overflow conduit
Irregular conduit (channel)
Conduit (pipe)
Subbasin
![Page 16: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/16.jpg)
Hydraulics (2-D Area)
16
2D Grid
![Page 17: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/17.jpg)
Hydraulics (2-D Area)
17
Dense 2D Grid along roads
![Page 18: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/18.jpg)
Hydraulics (Lake and SMF Example)
18
Lake Trashmore (storage)
Pipe Length: 147 ft
Model Schematic Length: 660 ft
![Page 19: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/19.jpg)
Hydraulics – Stage Area Relationships
Conveyance system storage: Stage-area-storage in open (irregular) conduits
Surface storage at storage nodes: stage-storage area relationships computed from topography (LiDAR and GIS)
Approach foundation: No double-counting surface area and conveyance system storage
19
![Page 20: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/20.jpg)
Hydraulics – Overland Flow
20
Overflow Link
Subbasin boundary
Irregular links used to equalize flood depths between neighboring subbasins
![Page 21: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/21.jpg)
Hydraulics – Overflow links
21
Link transect computed from topography (LiDAR and GIS)
Overflow Link
![Page 22: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/22.jpg)
Storage Node04520-460
Model Representation of Rim
22
Ground Elevation at 04520-460 : 7.1 ft NAVD 88 Model rim: 17.1 ft
![Page 23: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/23.jpg)
Model Validation
Historical rainfall events based on flood call history
Observed and field surveyed high water elevations from 2016
10-year event profile compared with VDOT hydraulic grade line calculation
23
![Page 24: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/24.jpg)
Coordination and References
Section 2 Model Approach
NEEDED: Pictures to Update the City’s Master Drainage Plans https://www.vbgov.com/government/departments/public-
works/storm-water/Pages/storm-pics-master-drain-plan-6-8-17.aspx
Comprehensive Sea Level Rise https://www.vbgov.com/government/departments/public-
works/storm-water/Pages/pw-slr-8-2015.aspx
24
![Page 25: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/25.jpg)
Master Plan Model Application
![Page 26: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/26.jpg)
Master Plan Model Application
Flows and water surface elevations in the PSMS
Locations with surcharging in the PSMS
Performance of storage facilities
Overland flow between subbasins
Surface flooding (storage node water surface elevations)
Influence of downstream tidal conditions
26
![Page 27: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/27.jpg)
Additional Master Plan Model Applications
1. Site specific evaluationsa. Tailwater to support site design b. System flow-routing understanding, “what-if” scenarios for
downstream impacts and improvements
2. Starting Point for refined site-specific evaluationsa. Site specific topography and critical elevationsb. Site specific drainage featuresc. System flow-routing refinements
3. Intent: Provide information and tools to assist with engineering evaluations and compliance with DPW Standards
27
![Page 28: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/28.jpg)
Model Application – Tailwater Conditions
28
Profile view through Thalia Creek
Thalia CreekThalia Creek
Thalia Creek OutfallTailwater during 100YR Event
I 264 Bonney Road
Overflow Conduits
6 barrel 8’ x 7’ RCB
Overflow Conduit
15” RCP
Constitution Drive Trib. VB Blvd
Overflow Conduit
Irregular Conduit (Trib.)
![Page 29: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/29.jpg)
Model Application – Subbasin Conditions
29
Subbasin
Peak storage junction HGL: 11.46 ft NAVD
Peak pipe flow: 16.8 cfs
Peak overland flow: 72.7 cfs
Peak manhole HGL: 11.37 ft NAVD
![Page 30: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/30.jpg)
Master Plan Model Limitations
Results based on available data: GIS stormwater infrastructure GIS invert elevations LiDAR topography data City impervious area City land use City soils data (from NRCS)
Areas upstream of the modeled PSMS
Overland flow within a single subbasin located upstream of the subbasin storage node
30
![Page 31: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/31.jpg)
Example Application for Site of Interest
31
![Page 32: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/32.jpg)
Example Application for Site of Interest
32
![Page 33: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/33.jpg)
Master Plan Model Content
33
Steep gradient from edge of catchment to storage node
Desired boundary conditions: 10-year and 100-year HGL Ground elevation 8 feet 10-year HGL = 9.3 feet and 100-year HGL = 10.1 feet
![Page 34: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/34.jpg)
Application for Site of Interest
Overflow at ground level added from node of concern (04520-494) to the storage node downstream in subbasin
34
Model 1: Before adding overland flow conduit
Storage Node
![Page 35: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/35.jpg)
Additional Overland Flow Path
35
Overflow Link
![Page 36: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/36.jpg)
Refined Model Results
36
Model 1 – no overflow link
Model 2 –overflow link added
![Page 37: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/37.jpg)
Refined Model Results
37
Desired boundary conditions: 10-year and 100-year HGL Ground elevation 8 feet 10-year HGL = 8.5 feet and 100-year HGL = 8.7 feet
![Page 38: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/38.jpg)
Example Model Refinement
38
Master Plan Model
Watershed 10Veteran Care Center
Master Plan Model Refinement to Reflect Existing Conditions
Site Specific Refinement
![Page 39: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/39.jpg)
Example Model Refinement
39
Step 1: Delete all the
nodes and links that will be updated/replaced with refined data
![Page 40: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/40.jpg)
Example Model Refinement
40
Step 2: Update the
delineation and runoff parameters of the subbasins to represent the new development.
In this example, it involves splitting two subbasins into six subbasins
![Page 41: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/41.jpg)
Example Model Refinement
41
Step 3: Add storage nodes
to represent surface storage and detention facilities.
Storage nodes for surface storage are assigned to the subbasin “Outlet”
Add junctions along the hydraulic system
![Page 42: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/42.jpg)
Example Model Refinement
42
Step 4: Add links to
represent the hydraulic system: Open channels Stormwater pipes
![Page 43: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/43.jpg)
Example Model Refinement
43
Step 5: Add overland flow
paths connecting adjacent subbasins and the hydraulic system
![Page 44: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/44.jpg)
Example Model Refinement
44
Step 6a: Build and assign a
stage-storage curve for each storage node
![Page 45: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/45.jpg)
Example Model Refinement
45
Step 6b: Assign a transect
for each open channel, ditch and overland flow path
![Page 46: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/46.jpg)
Example Model Refinement: Storage Assignment
46
![Page 47: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/47.jpg)
Example Model Refinement: Storage Assignment
47
Ditch
Overbank
Critical to not double count storage Define ditch storage and overbank storage separately
![Page 48: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/48.jpg)
Example Model Refinement: Storage Assignment
48
Ditch Storage: Transect
![Page 49: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/49.jpg)
49
Example Model Refinement: Storage Assignment
Subbasin (Overbank) Storage Node
![Page 50: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/50.jpg)
Example Model Refinement
Overview of model refinement elements Design drawings or “As-Built” drawings GIS refinements (additional pipes and nodes) Additional control structures (not in GIS) Import new GIS Refine subbasins and process parameters Storage curves New open channels New overland flow links Initial depths
50
![Page 51: Virginia Beach Stormwater Master Plan Model · 2019-09-12 · Model Resolution Primary stormwater management system (PSMS): Open channels and pipes 24-inch diameter and larger Stormwater](https://reader033.fdocuments.net/reader033/viewer/2022042013/5e732ba465db332a5134c412/html5/thumbnails/51.jpg)
51