Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village...

42
Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest District April 17, 2009 Barron, WI

Transcript of Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village...

Page 1: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Village of Turtle LakeCollaborative Digester

Feasibility StudyPresented at the

WWOA Northwest District

April 17, 2009

Barron, WI

Page 2: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

IntroductionsCory Davis, Director of Public Works

Village of Turtle Lake

Mark Broses, PE, Environmental EngineerPaul Gont, PE, Wastewater Engineer

Sheryl Claflin, PE, Civil EngineerShort Elliott Hendrickson, Inc.

Page 3: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

A copy of this presentation will be available at

www.villageofturtlelake.comand

www.sehinc.com

Page 4: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Outline

• General Drivers behind Anaerobic Digester Biogas to Energy projects

• History of the Turtle Lake Project

• Overview of the Feasibility Study

• General Considerations for Biogas to Energy projects

Page 5: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

General Drivers for Collaborative Digester Biogas Project

• Collaborative digesters focus on combining the organic waste streams from multiple operations (cheese factories, dairy farms, and egg layers, for example) into a central digester system (s)

• Waste Treatment

• Biogas Renewable Energy Opportunity

• Financing Options for Public / Private Systems

Page 6: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Federal Legislative Actions related to Biogas to Energy

• Energy Independence & Security Act ( 2007 )• Food and Energy Security Act of 2008 ( Farm Bill ) • American Recovery and Reinvestment Act Economic

Stimulus Act (2009) • Production and Incentive Tax Credits, ( electricity derived

from biomass extended to 2013 )

In the not too distant future …..• New Energy Bill? Renewable Feed-In-Tariffs?• Biogas tax credits $4/MMBTU ?• Bitter debate over Carbon Cap & Trade - When, If, How?• Increased emphasis on cogeneration• Renewable Biomass Facilitation Act (Biomass from Federal

Lands)

Page 7: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Why is a Digester Needed?

• The Turtle Lake WWTP is having difficulty meeting limits due to the industrial waste loads and slug discharges currently going to the treatment plant.

• The local industries are having difficulty meeting their DNR requirements to handle their high-strength waste (land application)

• Expansion

• A collaborative digester would address both the industrial and the Village current DNR regulation issues.

Page 8: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

History of the Project

• Initial studies conducted by Lake Country Dairy began in 2006

• Evaluated both single plant stream as well as additional waste streams from Kerry Foods and Northern Liquid Waste Management

• Ecovation Anaerobic Digester Mobilized Film Technology (MFT)

• Combined Heat and Power

• Project stalled due to short term finance issues

Page 9: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Current Study

The Village offered to take the lead on Public / Private approach

A Focus on Energy grant was securedto complete a Preliminary Feasibility study

to determine if a digester would be a feasible solution for the situation.

Core participants agreed to pay for a portion of the matching funds to complete

the study.

Page 10: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Is providing $10,000 grant toward Phase 1

Focus on Energy works with eligible Wisconsin residents and businesses to install cost effective energy efficiency and renewable energy projects.

Focus information, resources and financial incentives help to implement projects that otherwise would not be completed, or to complete projects

sooner than scheduled. Its efforts help Wisconsin residents and businesses manage rising energy costs, promote in-state economic

development, protect our environment and control the state's growing demand for electricity and natural gas.

http://www.focusonenergy.com/

Page 11: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Core (Paying) Participants for Phase 1

• Lake Country Dairy

• Kerry Foods

• Northern Liquid Waste Management

• Village of Turtle Lake

• Focus on Energy

Page 12: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Other Study Participants• Barron and Polk Counties

• UW Extension

• Turtle Lake School

• Other interested food industries and

• Large dairy farms – concentrated animal feed operations (CAFOS)

Page 13: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest
Page 14: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Lake Country DairyStudy Participant

Page 15: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Lake Country Dairy

• Lake Country Dairy started as a milk transfer station with 12 employees

• LC currently makes 70,000 lbs of cheese per day

• LC utilizes 800,000 lbs of milk per day• LC during the winter peak this year had 200

employees• LC land spread 11 million gallons of waste

per year• LC is hoping to double it’s size depending

on the economy.

Page 16: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Kerry Foods

Page 17: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Kerry Foods• Separates soy flour and removed protein for human

consumption• Kerry sells the protein to international companies

such as Nestle and Kellogg• By-product of their process is soy fiber and soy

whey• Kerry land spreads 30 million gallons of waste per

year• In 2008 Kerry produced 7 million lbs of product• Kerry is estimating 10 million lbs of production in

2009• Kerry would like to double it’s capacity depending

on the market

Page 18: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Northern Liquid Waste Management

Manages (including collection and land application) of liquid wastes from several local food industries including cheese factories and dairies

Page 19: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Village of Turtle Lake

Page 20: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Village of Turtle Lake

• Continue to Serve existing Industrial and Residential Clients

• Support Expansion

• Attract New Businesses to Eco Industrial Park

Page 21: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Turtle Lake Wastewater Treatment Plant• WWTP Built in 2003

• Design flow of 546,000 gal/day

• Current flow to the WWTP is 514,000 gal/day

• Design BOD is 2,464 lbs/day

• As of March 2009, BOD loading was 2,958 lbs/day

• Suspended solid design is 2,407 lbs/day

• Current suspended solids is at 1,762 lbs/day

Page 22: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Overview of the Feasibility Study

• looking at waste from farms, industrial food processing businesses and municipalities within an approximate 100 mile radius, and then processing that material at a single or multiple locations to produce biogas and solids that can be utilized for a variety of purposes.

• The goal of this facility is produce enough biogas that if used for electrical generation, could produce up to 4 MW of energy.

Page 23: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

A brief word about

Confidentiality Agreements

Page 24: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Collaborative Anaerobic Digester Concept for Biogas Production

Page 25: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Scope of the Study

Page 26: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Phase 1

Page 27: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Phase 2

Page 28: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest
Page 29: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Biogas Usage options

• Heat production

• Combined Heat & Power

• Gas cleanup for CNG fueled vehicles

• Gas cleanup to NG pipeline quality

Page 30: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Combined Heat and Power

http://www.ge-energy.com/prod_serv/products/recip_engines/en/downloads/as_biogas_feb08.pdf

Page 31: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Cleaning up Landfill Gas to CNG for Vehicle Fueling in Ohio

http://www.firmgreen.com/tech_main.htm

Page 32: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Bio Gas Pipelines?Wednesday, February 25, 2009

Landfill gas may fuel dryers at Jones IslandFrom an article by Don Behm in the Milwaukee Journal Sentinel:

Building a 17-mile pipeline to carry landfill gas from Muskego to the Jones Island sewage treatment plant on Lake Michigan

will save the Milwaukee Metropolitan Sewerage District, its customers and property-tax payers at least $148 million in the

next two decades, Milwaukee Mayor Tom Barrett and sewerage district officials said Monday.

The landfill gas at Muskego is between 50% and 55% methane and will replace natural gas as the fuel for 12 sewage sludge

dryers inside the Milorganite fertilizer production facility at Jones Island, under the proposal. Cost of converting the dryers to burn landfill gas is included in the $22 million

construction estimate, Shafer said.

Page 33: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Considerations

• Logistical

• Administrative

• In-plant

• Hot Buttons

• Words of Caution

Page 34: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Logistical Issues

• Feedstock Delivery (& rejection)

• Storage (inputs and outputs)

• Odor, Noise, & Visual Aesthetics

• Truck Traffic Planning

• Health & Safety

Page 35: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Administrative Issues

• Long term fuel agreements

• Bio Fuel price variation may not be related to fossil fuel pricing

• Air permits (for variable fuels)

• Warranties (for fuel types)

• Public/private partnerships

• Power Purchase Agreements

• Carbon Credits

Page 36: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

In the Plant

• Fuel quality specifications

• Toxicity and shocking to bacteria

• Handling (sizing, fines, rocks, corrosiveness, stability, etc)

• Gas cleanup (H2S, siloxanes,…)

• Emissions

• Reliability (for example - anaerobic digestion to biogas can be a tricky business)

• Redundancy and Replacement

Page 37: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Hot Buttons

• Traffic, Traffic, Traffic

• Odor, Odor, Odor

• Noise

• Local participation

Page 38: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Words of Caution• Call a Ford dealer and ask him what kind of truck to

buy.

• If it looks to good to be true – it probably is.

• Stranded Assets

• Due Diligence on Emerging Companies (Developers, Technology, $)

• Long Term Stake?

Page 39: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Renewable Energy ServicesFeasibility and Resource Assessment Studies

Site Selection and Permitting ServicesAssistance with Funding Agencies

Public Involvement“Balance of Plant” Design

Bidding & Construction ManagementDesign/Build Capability

and…..Established teaming relationships with ME firms, legal counsel, and financial consultants to address all needs for Total Project Delivery

Page 40: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Questions – Now or Later

Cory Davis, DPW Turtle Lake [email protected]

Paul Gont, PE [email protected]

Sheryl Claflin, PE [email protected]

Roccy Raymond,PE [email protected]

Mark Broses, PE [email protected]

Page 41: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest

Thank You!

A copy of this presentation will be available at

www.villageofturtlelake.com

and

www.sehinc.com

Page 42: Village of Turtle Lake Collaborative Digester Feasibility ... Forms/WWOA TL Digeste… · Village of Turtle Lake Collaborative Digester Feasibility Study Presented at the WWOA Northwest