VILLAGE OF OSSINING

56
Historic Preservation Commission February 1, 2021 VILLAGE OF OSSINING Planning Department Video Conference Information Included in Agenda 101 Route 9A, Ossining, N.Y. 10562 Tel: (914)762-6232 www.villageofossining.org HISTORIC PRESERVATION COMMISSION AGENDA Monday, February 1, 2021 7:00 PM A meeting will be conducted by the Historic Preservation Commission via virtual technology in accordance with the Governor's Executive Order 202.1. The public can watch the live meeting online through Zoom. Please log on to https://Zoom.us, Webinar ID: 959-3818-3057 to view the meeting. If any interested members of the public would like to provide comments on an application, comments can be called in during the meeting at 1+ (929) 205-6099 or provided through the written chat section of the Zoom meeting. Comments can also be emailed before and during the meeting to the Village Planning Department at [email protected]. The meeting will be recorded. The video and a transcript of the meeting will be available on the Village website at a later date. Please check the Village website for updates. I. CONTINUING BUSINESS OF THE BOARD A. Restoration Efforts at the First Baptist Church B. Historic Markers II. NEW BUSINESS OF THE BOARD A. HPC 01-2021 54 Revolutionary Rd., 97.15-2-22, Anthony Corda, Owner, in an S-75 zoned district Applicant Request: Applicant is seeking a certificate of appropriateness in order to install solar panels on the roof. [270-25E] Comments: New Application 54 Revolutionary Rd. Referral Form 54 Revolutionary Rd. Vivint Solar Letter 54 Revolutionary Rd. Front Elevation Photo 54 Revolutionary Rd. Google Map Image I 54 Revolutionary Rd. Google Map Image II 54 Revolutionary Rd. Plans III. ADDITIONAL BUSINESS OF THE BOARD A. Approval of minutes and resolutions from the January 4, 2021 meeting. B. Pursuant to the Governor's Executive Order 202.1, the meeting transcript is attached. HPC Mtg. Transcript 2-1-21 Page 1 of 56

Transcript of VILLAGE OF OSSINING

Page 1: VILLAGE OF OSSINING

Historic Preservation Commission February 1, 2021

VILLAGE OF OSSINING

Planning Department

Video Conference Information Included in Agenda

101 Route 9A, Ossining, N.Y. 10562

Tel: (914)762-6232 www.villageofossining.org

HISTORIC PRESERVATION COMMISSION AGENDA

Monday, February 1, 2021

7:00 PM

A meeting will be conducted by the Historic Preservation Commission via virtual technology in

accordance with the Governor's Executive Order 202.1. The public can watch the live meeting online

through Zoom. Please log on to https://Zoom.us, Webinar ID: 959-3818-3057 to view the meeting. If any

interested members of the public would like to provide comments on an application, comments can be

called in during the meeting at 1+ (929) 205-6099 or provided through the written chat section of the

Zoom meeting. Comments can also be emailed before and during the meeting to the Village Planning

Department at [email protected]. The meeting will be recorded. The video and a

transcript of the meeting will be available on the Village website at a later date. Please check the Village

website for updates.

I. CONTINUING BUSINESS OF THE BOARD A. Restoration Efforts at the First Baptist Church B. Historic Markers II. NEW BUSINESS OF THE BOARD A. HPC 01-2021

54 Revolutionary Rd., 97.15-2-22, Anthony Corda, Owner, in an S-75 zoned district

Applicant Request: Applicant is seeking a certificate of appropriateness in order to

install solar panels on the roof. [270-25E]

Comments: New Application 54 Revolutionary Rd. Referral Form

54 Revolutionary Rd. Vivint Solar Letter

54 Revolutionary Rd. Front Elevation Photo

54 Revolutionary Rd. Google Map Image I

54 Revolutionary Rd. Google Map Image II

54 Revolutionary Rd. Plans III. ADDITIONAL BUSINESS OF THE BOARD A. Approval of minutes and resolutions from the January 4, 2021 meeting. B. Pursuant to the Governor's Executive Order 202.1, the meeting transcript is attached.

HPC Mtg. Transcript 2-1-21

Page 1 of 56

Page 2: VILLAGE OF OSSINING

VILLAGE OF OSSINING BUILDING DEPARTMENT Building Permit Referral Form

SECTION: 97.15 BLOCK: 2 LOT: 22 ADDRESS: 54 Revolutionary Rd. X Residential Commercial Institutional Other OWNER: Anthony & Katherine Corda ARCHITECT/ENGINEER: Paul Zacher / Vivant Solar BOARD APPROVAL REQUIRED: Area Variance: Use Variance: Site Plan Development: Conditional Use: Architectural Review: HPC: 270-25E Certificate of Appropriateness for the Proposed Installation of Solar Panels and Equipment. Signature: (Building Inspector) Date: January 24, 2021

Agenda Item #A.

Page 2 of 56

JAgostinelli
Signature
Page 3: VILLAGE OF OSSINING

J. Matthew Walsh, PE Kirk M. Nelson, SE Samuel Brown, PE - Civil Director of Engineering Structural Engineering Structural Engineering

[email protected] [email protected] [email protected]

Page 1 of 2

1800 W Ashton Blvd. Lehi, UT 84043

December 30, 2020 Re: Structural Engineering Services Corda Structure 54 Revolutionary Rd, Ossining, NY S-6520932; CAD Version: 3; NY-05 To Whom It May Concern: We have reviewed the following information regarding solar panel installation on the roof of the above referenced structure:

1. Site visit by a representative from our office under my supervision identifying specific interior and exterior site information including the condition of the existing roof system and the size, spacing, and condition of existing structural framing members. Information gathered during the site visit includes photographs, sketches, and verification forms.

2. Design drawings of the proposed PV System layout, including details to mount the new solar panels to the existing roof.

Based on the above information, we have evaluated the structural capacity of the existing roof system to support the additional loads imposed by the solar panels and have the following comments related to our review and evaluation: A. Description of Structure: The existing structure has typical wood framing construction with a maximum of two layers of composite shingle roofing. All wood material utilized for the roof system is assumed to be Douglas Fir-Larch #2 or better with standard construction components. The designed areas of the home consist of the following framing methods:

• Roof Section: Dimensional lumber - Sistered 2x4 at 24" on center and 2x4 collar ties at 48" on center. Survey photos indicate that there was free access to verify the framing size and spacing.

• Roof Section: Dimensional lumber - Sistered 2x4 at 24" on center and 2x4 collar ties at 48" on center. Survey photos indicate that there was free access to verify the framing size and spacing.

B. Loading Criteria 9.84 PSF = Dead Load (roofing/framing) 3.00 PSF = Dead Load (solar panels/mounting hardware) 12.84 PSF = Total Dead Load 20 PSF = Roof Live Load 30 PSF = Ground Snow Load (based on local requirements) Wind speed of 115 mph (based on Exposure Category B - the total area subject to wind uplift is calculated for the Interior, Edge, and Corner Zones of the dwelling.) C. Solar Panel Anchorage 1. Installation shall proceed in accordance with the applicable guidelines and recommendations indicated below.

If, during solar panel installation, the roof framing members appear unstable or deflect non-uniformly, our office should be notified before proceeding with the installation.

Agenda Item #A.

Page 3 of 56

JKane
Received
Page 4: VILLAGE OF OSSINING

Page 2 of 2

• Unirac, Inc. Installation Manual, which can be found on the Unirac, Inc. website (www.unirac.com). 2. The solar panels are 1½" thick. At no time will the panels be mounted higher than 10" above the existing

surface of the roof. 3. The following mounting types shall be used. Please refer to the mounting details for the associated mounting

method requirements. Based on our evaluation, the uplift demand is less than the maximum allowable per mount and therefore is adequate.

• SFM: (1) 5/16" lag screw. Pullout capacity based on National Design Specifications (NDS) of timber construction specifications for Douglas Fir-Larch is 235 lbs/inch penetration.

4. Fasteners are installed to meet industry standards and this document satisfies requirements in 2020 NYSBC 2303.4.5 verifying that the fasteners will not adversely affect the roof framing.

5. The maximum allowed spacing was calculated for the Wind Speed shown in paragraph B above, using the wind load uplift procedures of ASCE 7-16. These spacing requirements apply to all mount types indicated above. The following values have been verified by in-house testing and the mounting hardware manufacturers' data, which are available upon request. Panel support connections should be staggered, where possible, to distribute load to adjacent members.

Modules in Landscape Modules in Portrait

Roof Zone Interior Edge Corner Interior Edge Corner

Max Vertical Spacing (in) 40 40 40 66 66 66

Max Horizontal Spacing (in) 72 72 72 48 48 48

Cantilever (in) 24 24 24 16 16 16

D. Summary Based on the above evaluation, with appropriate panel anchors being utilized, the roof system designed on will adequately support the additional loading imposed by the solar panels, if installed correctly. This evaluation has been performed for the structural elements only and verifies that they are in conformance with the 2020 Residential Code of New York State, current industry standards and practice, and the information supplied to us at the time of this report. If there are any questions regarding the above, or if more information is required, please contact me.

Regards, NY License No. 12/30/2020

LICENSED PROFESSIONAL ENGINE

ER

PA

UL K. ZACHER

EXP. 07/31/202154 REVOLUTIONARYRD, OSSINING, NY

Paul Zacher, P.E. Professional Engineer T: 916.961.3960 x101 email: [email protected]

091365-1

Agenda Item #A.

Page 4 of 56

Page 5: VILLAGE OF OSSINING

Agenda Item

#A.

Page 5 of 56

Page 6: VILLAGE OF OSSINING

HHlIIaIlHHm-w w w‘

_

:'i:';'umummnmm<mi.“

.lmagecamuve May2UW ~37L)21Goog‘re U-medsuleu Terms Rewvlayro?vem

Agenda Item

#A.

Page 6 of 56

Page 7: VILLAGE OF OSSINING

% T|=|°I!I|i!I‘I

_-‘f‘r ‘.-\,+“~

it

‘ ::~ln\nqen:amu'lMlyN!§ eiuzxsmgne |)nned51:;o Yerma nqamapvnetem

Agenda Item

#A.

Page 7 of 56

Page 8: VILLAGE OF OSSINING

SYSTEM SIZE - 14.08KW DC | 11.4KW ACMODULE TYPE & AMOUNT - (44) JINKO SOLAR JKM320M-60HBL WITH SOLAREDGE P340 OPTIMIZERSMODULE DIMENSIONS: (L/W/H) 66.3 / 39.5 / 1.4INVERTER - (2) SOLAREDGE TECHNOLOGIES SE7600H-USS AND SE3800H-USSINTERCONNECTION METHOD (GRID-TIED): SUPPLY TAP

PHOTOVOLTAIC SYSTEM SPECIFICATIONS

1. ALL WIRING MUST BE PROPERLY SUPPORTED BY DEVICES OR MECHANICALMEANS DESIGNED AND LISTED FOR SUCH USE. FOR ROOF-MOUNTED SYSTEMS-WIRING MUST BE PERMANENTLY AND COMPLETELY HELD OFF OF THE ROOFSURFACE.2. ANY CODE VIOLATIONS EVIDENT IN THE INTERCONNECTION PANEL WILL BECORRECTED ON INSTALLATION.3. SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH ALL RELEVANT CODE4. RAPID SHUTDOWN INITIATION TAKES PLACE WITHIN THE FIRMWARE OF THEINVERTER. RAPID SHUTDOWN COMMENCES UPON LOSS OF UTILITY SOURCEVOLTAGE.5. SEE *E 1.0 AND *E 2.0 FOR DIAGRAMS- CALCULATIONS- SCHEDULE ANDSPECIFICATIONS

GENERAL ELECTRICAL NOTES1. THE SOLAR PANELS ARE TO BE MOUNTED TO THE ROOF FRAMING USING THESFM INFINITY RAIL-LESS SYSTEM BY UNIRAC. THE MOUNTING FEET ARE TO BESPACED AS SHOWN IN THE DETAILS- AND MUST BE STAGGERED TO ADJACENTFRAMING MEMBERS TO SPREAD OUT THE ADDITIONAL LOAD.2. UNLESS NOTED OTHERWISE SEE S 1.0 - MOUNTING ANCHORS SHALL BE 5/16" LAGSCREWS WITH A MINIMUM OF 2-1/2" MIN PENETRATION INTO ROOF FRAMING.3. THE PROPOSED PV SYSTEM ADDS 3.0 psf TO THE ROOF FRAMING SYSTEM4. ROOF LIVE LOAD = 20 psf TYPICAL- 0 psf UNDER NEW PV SYSTEM.5. GROUND SNOW LOAD = 30 psf6. WIND SPEED = 115 mph7. EXPOSURE CATEGORY = B

GENERAL STRUCTURAL NOTES

PV 0.0 - COVER SHEETPV 1.0 - SITE PLANS 1.0 - MOUNT DETAILSE 1.0 - ELECTRICAL DIAGRAME 2.0 - ELECTRICAL NOTESE 3.0 - WARNING LABELSE 4.0 - WARNING LABEL LOCATIONSE 5.0 - BONDING DETAILS

SHEET INDEX

2020 RESIDENTIAL CODE OF NEW YORK STATE2020 FIRE CODE OF NEW YORK STATE2017 NATIONAL ELECTRICAL CODE

GOVERNING CODESALL WORK SHALL CONFORM TO THE FOLLOWING CODES:

1800 ASHTON BLVD. LEHI, UT, 840431.877.404.4129

CORDA RESIDENCE54 REVOLUTIONARY RD

OSSINING, NY 10562-5941 UTILITY ACCOUNT: 58-8506-1555-0002-4

METER: 9343283

S# S-6520932 ROC: NY-05 DRAWN BY: DINDATE: 12/19/2020 REVISION: 0

NY LIC: 1906 | WC26664-H14

EDT(

12-1

7-20

20)v4

, CLA

2.34

PV 0.0

LICENSED PROFESSIONAL ENGINE

ER

PA

UL K. ZACHER

EXP. 07/31/202154 REVOLUTIONARYRD, OSSINING, NY

Agenda Item

#A.

Page 8 of 56

JKane
Received
Page 9: VILLAGE OF OSSINING

1800 ASHTON BLVD. LEHI, UT, 840431.877.404.4129

CORDA RESIDENCE54 REVOLUTIONARY RD

OSSINING, NY 10562-5941 UTILITY ACCOUNT: 58-8506-1555-0002-4

METER: 9343283

S# S-6520932 ROC: NY-05 DRAWN BY: DINDATE: 12/19/2020 REVISION: 0

NY LIC: 1906 | WC26664-H14

EDT(

12-1

7-20

20)v4

, CLA

2.34

SYSTEM LEGEND

ROOF PLANE 1 SLOPE = 25°ROOF PLANE 1 AZIMUTH = 24°ROOF 1 MAT = COMPOSITION SHINGLE

ROOF PLANE 2 SLOPE = 25°ROOF PLANE 2 AZIMUTH = 204°ROOF 2 MAT = COMPOSITION SHINGLE

ROOF SECTIONS:

ROOF FIRE SUPPRESSION SPRINKLERSYSTEM: NOTOTAL ROOF AREA: 1839FT²TOTAL MODULE AREA: 792TOTAL AREA COVERED: 44%

PV STRING 1 = 15 MODULES

PV STRING 2 = 15 MODULES

PV STRING 3 = 14 MODULES

PV STRINGS:FIRE SETBACKSRIDGE: 18" | PATHWAYS: 36" *R324.6 EXCEPTIONS: ROOF SLOPES <9.5° DONOT REQUIRE FIRE SETBACKS

N

PV 1.0SITE PLANSCALE: 3/16" = 1'-0"

54 REVOLUTIONARY RDFRONT OF HOUSE.

MAC

1

2

CI

(N) 2 PV STRING INVERTERS:SE7600H-USS & SE3800H-USS

PV SYSTEM SIZE:(N) 14.080kW DC | 11.400kW AC

M

AC (N) PV SYSTEM AC DISCONNECT.

C (N) DEDICATED PV SYSTEM COMBINERPANEL.

POINT OF INTERCONNECTION INEXISTING INTERIOR MSP TIED TOUTILITY METER A72A9343283.

(N) JUNCTION BOX.(MOUNTED WITH SOLADECK)

I(N) 44 JINKO SOLAR JKM320M-60HBLMODULES WITH P340 OPTIMIZERSMOUNTED ON THE BACK OF EACHMODULE.

3'

3'

3'

3'

3'

ROOF ACCESS POINT

ROOF ACCESS POINTLICENSED PROFESSIONAL ENGI

NEER

PA

UL K. ZACHER

EXP. 07/31/202154 REVOLUTIONARYRD, OSSINING, NY

Agenda Item

#A.

Page 9 of 56

JKane
Received
Page 10: VILLAGE OF OSSINING

MOUNTING NOTES

S 1.0

1

SFM - ROOF ATTACHMENT

NOT TO SCALE

5/16"Ø LAG SCREWPER MFR.

FLASHING

S 1.0

2

SECTION VIEW

NOT TO SCALE

MODULE

S 1.0

4

SFM - 9" ATTACHED SPLICE

NOT TO SCALE

5/16"Ø SS LAG SCREWPER MFR.

S 1.0

5

SFM - 3" RAIL

NOT TO SCALE

S 1.0

3

ROOF ATTACHMENT

NOT TO SCALE

SFM - TRIMRAIL WITH

5/16"Ø SS LAG SCREWPER MFR.

2-1/2"

S 1.0

10

PV SYSTEM MOUNTING DETAIL

NOT TO SCALE

38"

38"

35mm PROFILE

40mm PROFILES 1.0

11

SFM - TRIMRAIL

NOT TO SCALE

3

5

COUPLING, TYPCLAMP + ATTACHMENT, TYP

COUPLING, TYPCLAMP + ATTACHMENT, TYP

MODULE, TYP

MODULE, TYP

FRAMING, TYP

FRAMING, TYP

S 1.0

9

MODULES IN PORTRAIT/LANDSPACE

NOT TO SCALE

S 1.0

7

ILSCO SGB-4 GROUNDING LUGS

NOT TO SCALE

S 1.0

8

SFM - 9" SPLICE

NOT TO SCALE

SFM 9" SPLICE

SFM 9" ATTACHED SPLICE

SFM 3"

TRIMRAIL

TRIMRAIL SPLICE

TRIMRAIL ROOF ATTACHMENT, SEETABLE

S 1.0

6

SFM LAYOUT

NOT TO SCALE

MODULE

COUPLING CLAMP

CANTILEVER L/3 OR LESS

6" MAX

S 1.0

12

CONDUIT MOUNTING DETAIL

NOT TO SCALE

CONDUITONE HOLE STEEL STRAP

CONDUIT MOUNT BRACKET

FLASHING OR TILE STRAP1 1/2"

LAG SCREWS: 5/16" DIA. STAINLESS STEEL W/ MIN 2.5" EMBED INTOFRAMING MEMBERS. TORQUE - 13 +/- 2 FT -LBS

FRAMING, TYP

LANDSCAPE=MAX 72" (6'-0")PORTRAIT=MAX 48" (4'-0")

1800 ASHTON BLVD. LEHI, UT, 840431.877.404.4129

CORDA RESIDENCE54 REVOLUTIONARY RD

OSSINING, NY 10562-5941 UTILITY ACCOUNT: 58-8506-1555-0002-4

METER: 9343283

S# S-6520932 ROC: NY-05 DRAWN BY: DINDATE: 12/19/2020 REVISION: 0

NY LIC: 1906 | WC26664-H14

EDT(

12-1

7-20

20)v4

, CLA

2.34

MOUNTING NOTES

S 1.0MOUNT DETAILSSCALE: NOT TO SCALE

LICENSED PROFESSIONAL ENGINE

ER

PA

UL K. ZACHER

EXP. 07/31/202154 REVOLUTIONARYRD, OSSINING, NY

Agenda Item

#A.

Page 10 of 56

JKane
Received
Page 11: VILLAGE OF OSSINING

Tag Description Wire Gauge # of Conductors/Color Conduit Type Conduit Size

1 DC-to-DC Converter Output (PV Wire) 10 AWG 2(V+, V-) B/R Free Air N/A

1 EGC (Bare) 6 AWG 1 BARE Free Air N/A

2 DC-to-DC Converter Output (THWN-2) 12 AWG 4(2V+, 2V-) B/R FMC 1/2"

2 EGC (THWN-2) 12 AWG 1(GRN) FMC 1/2"

3 DC-to-DC Converter Output (THWN-2) 12 AWG 2(V+, V-) B/R FMC 1/2"

3 EGC (THWN-2) 12 AWG 1(GRN) FMC 1/2"

4 DC-to-DC Converter Output (THWN-2) 12 AWG 4(2V+, 2V-) B/R EMT 1/2"

4 EGC (THWN-2) 12 AWG 1(GRN) EMT 1/2"

5 DC-to-DC Converter Output (THWN-2) 12 AWG 2(V+, V-) B/R EMT 1/2"

5 EGC (THWN-2) 12 AWG 1(GRN) EMT 1/2"

6 Inverter Output (THWN-2) 8 AWG 3(L1, L2, N) B/R/W EMT 3/4"

6 EGC (THWN-2) 10 AWG 1(GRN) EMT 3/4"

7 Inverter Output (THWN-2) 12 AWG 3(L1, L2, N) B/R/W EMT 1/2"

7 EGC (THWN-2) 12 AWG 1(GRN) EMT 1/2"

8 Inverter Output (THWN-2) 6 AWG 3(L1, L2, N) B/R/W EMT 3/4"

8 EGC (THWN-2) 10 AWG 1(GRN) EMT 3/4"

9 Service Feeder (THWN-2) 6 AWG 3(L1, L2, N) B/R/W EMT 3/4"

9 GEC (THWN-2) 8 AWG 1(GRN) EMT 3/4"

Photovoltaic System

DC System Size (Watts)

AC System Size (Watts)

Total Module Count

14080

11400

44

SHEET

NUMBER:

E.1

65

20

93

2

19

06

| W

C2

66

64

-H1

4

INS

TA

LLE

R N

UM

BE

R:

1.8

77

.40

4.4

12

9

INS

TA

LLE

R:

VIV

INT

SO

LAR

3-L

ine

Dra

win

g

SHEET

NAME:

Conduit Conductor Schedule (Unless Otherwise Specified Conductors Shall be Copper)

Cre

ate

d:

12

/19

/20

Co

rda

Re

sid

en

ce

54

RE

VO

LUT

ION

AR

Y R

D

Oss

inin

g,

NY

10

56

2

Uti

lity

Acc

ou

nt:

58

-85

06

-15

55

-00

02

-4

NEMA 3R Junction Box

StorEdge SE7600H-USS

*Conforms to ANSI

C12.1-2008

StorEdge SE3800H-USS

*Conforms to ANSI

C12.1-2008

8

40A

20A

15

15

14

30 PV MODULES PER INVERTER = 9600 WATTS

STC

14 PV MODULES PER INVERTER = 4480 WATTS

STC

STRING 1: 15 PV

MODULES

W/OPTIMIZERS

STRING 2: 15 PV

MODULES

W/OPTIMIZERS

STRING 3: 14 PV

MODULES

W/OPTIMIZERS

4

5

6

7

1

1

1

Combiner Panel 125A/240V,Square D

HOM48L125GRB

2

3

External Rapid Shutdown

Disconnect; Square D

D222NRB 240V/60A

FUSED NEMA3R

TERMINATIONS RATED 75°

C

Minimum GEC size 4

AWG copper

60A

Point of Interconnection, Supply Side

705.12(A)

200A

9

Existing Murray

240V/200A Service Panel,

Single Phase, with 200A

Main Disconnect

Visible/Lockable 'Knife' AC

Disconnect

Agenda Item

#A.

Page 11 of 56

JKane
Received
Page 12: VILLAGE OF OSSINING

Co

rda

Re

sid

en

ce

54

RE

VO

LUT

ION

AR

Y R

D

Oss

inin

g,

NY

10

56

2

Uti

lity

Acc

ou

nt:

58

-85

06

-15

55

-00

02

-4

SHEET

NAME:

Cre

ate

d:

12

/19

/20

INS

TA

LLE

R:

VIV

INT

SO

LAR

INS

TA

LLE

R N

UM

BE

R:

1.8

77

.40

4.4

12

9

19

06

| W

C2

66

64

-H1

4

No

tes

Pa

ge

SHEET

NUMBER:

E.2

65

20

93

2

Optimizer SolarEdge P340

DC Input Power 340 Watts

DC Max. Input Voltage 48 Volts

DC Max. Input Current 13.75 Amps

DC Max. Output Current 15 Amps

Max. string rating inverter dependent. See SE documents.

Inverter/Optimizer Specs

Inverter Make/Model StorEdge SE7600H-USS

CEC Efficiency 99 %

AC Operating Voltage 240 Volts

Cont. Max Output Current 32 Amps

DC Max Input Current 20 Amps

Input Short Circuit Current 45 Amps

Max Output Fault Current 40 A/20 ms

Inverter 2 Make/Model StorEdge SE3800H-USS

CEC Efficiency 99 %

AC Operating Voltage 240 Volts

Cont. Max Output Current 16 Amps

DC Max Input Current 10.5 Amps

Input Short Circuit Current 45 Amps

Max. Output Fault Current 17.5 A/20 ms

PV Module Rating @ STC

Module Make/Model Jinko Solar JKM320M-60HBL

Max. Power-Point Current (Imp) 9.59 Amps

Max. Power-Point Voltage (Vmp) 33.4 Volts

Open-Circuit Voltage (Voc) 40.9 Volts

Short-Circuit Current (Isc) 10.15 Amps

Max. Series Fuse (OCPD) 20 Amps

Nom. Max. Power at STC (Pmax) 320 Watts

Max. System Voltage 1000 VDC (UL/IEC)

Voc Temperature Coefficient -0.28 %/C

ASHRAE 2017 - WESTCHESTER COUNTY AP

Highest Monthly 2% D.B. Design Temp.: 32.4 °C

Lowest Min. Mean Extreme D.B.: -19.5 °C

Conductor Calculations

Current and OCPD Calculations (690.7, 690.9)

Other Notes

Power Source(s) Output Calc: 705.12(A)

PV Source Max Circuit Voltage: Module Voc × (1-(ΔT × Voc Coeff)) [art. 690.7(A)]

JKM320M-60HBL: 40.9 V × (1-((25 C – -19.5 C) × -0.28%)) = 46 V <= 48 V

Inverter Output Circuit(s): Listed Output Current × 1.25 [art. 690.9(B)]

Inverter 1: SE7600H-USS Max Output = 32 A × 1.25 = 40 A <= 40 A (OCPD)

Inverter 2: SE3800H-USS Max Output = 16 A × 1.25 = 20 A <= 20 A (OCPD)

System output current w/ continuous duty = 60 A <= 60 A (System OCPD)

Wire ampacity calculated from 310.15(B)(16) & (17) as appropriate with ambient temperature

calculations from 310.15(B)(2)(a) & 310.15(B)(3)(c) and raceway fill adjustments from 310.15(B)

(3)(a). Conduit on the roof shall be installed no less than 1” above the roof deck.

PV Circuit conductor ampacity is constrained using the 75°C column with the continuous duty

uprating or the 90°C column with the relevant ambient temperature and raceway fill adjustments

without the continuous duty uprating per 690.8(B), whichever results with a larger wire size.

Non-PV Circuit conductors use the ampacity in the 75°C column or the 90°C column with the

relevant ambient temperature and raceway fill adjustments, whichever is less (110.14(C) &

310.15(A)(2)). The rating of the conductor after adjustments shall be greater than, or equal to,

the continuous duty uprated current.

More information about conductor calculations can be provided upon request.

Calc. Ex: Wire Ampacity x Ambient Temp. Corr. Factor x Conduit Fill Adj. Factor >= Output Current

(Tag 1 Under Array):

DC-to-DC Converter Output: 10 AWG rated 30 A, 30 A >= 18.75 A

(Tag 2 Attic):

DC-to-DC Converter Output: 12 AWG rated 30 A, 30 A x 0.76 x 0.8 = 18.24 A >= 15 A

(Tag 3 Attic):

DC-to-DC Converter Output: 12 AWG rated 20 A, 20 A >= 18.75 A

(Tag 4 On Roof):

DC-to-DC Converter Output: 12 AWG rated 20 A, 20 A >= 18.75 A

(Tag 5 On Roof):

DC-to-DC Converter Output: 12 AWG rated 20 A, 20 A >= 18.75 A

(Tag 6 Exterior):

Inverter Output: 8 AWG rated 50 A, 50 A >= 40 A

(Tag 7 Exterior):

Inverter Output: 12 AWG rated 20 A, 20 A >= 20 A

(Tag 8 Exterior):

Inverter Output: 6 AWG rated 65 A, 65 A >= 60 A

(Tag 9 Exterior):

Service Feeder: 6 AWG rated 65 A, 65 A >= 60 A

Service Rating: 200 Amps

PV Breaker Rating: 60 Amps

60A <= 200A, OK

• Designed according to and all code citations are relevant to the 2017 National Electrical Code.

• All specified equipment grounding devices/components must be listed for use

• Inverters are equipped with rapid shut down.

• 690.11 DC Arcfault circuit protection. Enphase micro inverters are exempt because there are no DC strings.

Agenda Item

#A.

Page 12 of 56

JKane
Received
Page 13: VILLAGE OF OSSINING

SHEET

NAME:

65

20

93

2

Wa

rnin

g

Lab

els

Pa

ge

SHEET

NUMBER:

E.3

INS

TA

LLE

R:

VIV

INT

SO

LAR

INS

TA

LLE

R N

UM

BE

R:

1.8

77

.40

4.4

12

9

19

06

| W

C2

66

64

-H1

4

Co

rda

Re

sid

en

ce

54

RE

VO

LUT

ION

AR

Y R

D

Oss

inin

g,

NY

10

56

2

Uti

lity

Acc

ou

nt:

58

-85

06

-15

55

-00

02

-4C

rea

ted

: 1

2/1

9/2

0

• SIGNS/LABELS SHALL MEET THE REQUIREMENTS OF ARTICLES 690 AND 705, UNLESS OTHERWISE SPECIFIED PER

LOCAL AHJ REQUIREMENTS • SIGNS/LABELS SHALL MEET THE REQUIREMENTS OF SECTION 110.21(B) AS REQUIRED

PER ARTICLES 690 AND 705 AND SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS •

SIGNS/LABELS SHALL BE REFLECTIVE IF REQUIRED TO BE SO PER ARTICLE 690 • SIGNS/LABELS MEETING

REQUIREMENTS OF ARTICLE 690 SHALL HAVE NO SMALLER THAN 3/8" WHITE TEXT ON RED BACKGROUND UNLESS

OTHERWISE DEPICTED OR DESCRIBED • SIGNS/LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR

WIRING METHOD AND SHALL NOT BE HANDWRITTEN • SIGNS/LABELS SHALL BE OF SUFFICIENT DURABILITY TO

WITHSTAND THE ENVIRONMENT INVOLVED • SIGNS/LABELS SHALL NOT COVER EXISTING MANUFACTURER LABELS

Plaque / Directory at Service Disconnecting Means per 690.56(B), & 705.10

PV with Rapid Shutdown Switch, Installed within 3 ft of Service Disconnecting

Means with min. 3/8" black capitalized text on yellow background & 3/16"

black capitalized text on white background per 690.56(C)(1)(a)

Installed within 3 ft of Rapid Shutdown Switch, Reflective, and shall be

placed on both Panel Exterior & next to Main Disconnect per Conduit, Raceways, and J-Boxes (Labeled Every 10') and

Reflective per 690.31(G)(3) & (4)

PV System Disconnects per 690.13(B)

Inverter 2 DC Disconnect per 690.53

15 A

10.5 A

480 V

Inverter 1 DC Disconnect per 690.53

480 V

20 A

15 A

All AC Disconnecting Means - AC Disconnect(s),

Combiner Panels, and Load Centers per 690.54

48 A

240 V

Dual Power Sources in Main Service Panel

and Sub Panel(s) per 690.59 & 705.12(B)(3)

Power Source Output Connection, Adjacent

to Back-fed Breaker per 705.12(B)(2)(3)(b)

All Disconnecting Means - AC & DC

Disconnect(s), Load Centers, and Combiner

Panels per 690.13(B) & 690.15(D)

Agenda Item

#A.

Page 13 of 56

JKane
Received
Page 14: VILLAGE OF OSSINING

SHEET

NAME:

Wa

rnin

g

Lab

els

Pa

ge

SHEET

NUMBER:

E.4

INS

TA

LLE

R:

VIV

INT

SO

LAR

INS

TA

LLE

R N

UM

BE

R:

1.8

77

.40

4.4

12

9

19

06

| W

C2

66

64

-H1

4

65

20

93

2

Co

rda

Re

sid

en

ce

54

RE

VO

LUT

ION

AR

Y R

D

Oss

inin

g,

NY

10

56

2

Uti

lity

Acc

ou

nt:

58

-85

06

-15

55

-00

02

-4C

rea

ted

: 1

2/1

9/2

0

M

ROOFTOP

JUNCTION BOX

ROOFTOP ARRAY

MAIN SERVICE

DISCONNECT PANELSOLAR INVERTER

DC

DISCONNECT

INSIDE

INSIDE

PANEL

IF APPLICABLE

COMBINER PANEL

(WHEN USED)

VISIBLE/LOCKABLE A/C

DISCONNECT (WHERE

REQUIRED)

M

VIVINT SOLAR METER

(WHERE REQUIRED)

VISIBLE/LOCKABLE A/C

DISCONNECTSUB PANEL

(WHEN REQUIRED)

11

11

10

10

10

99

9

8

8

8888

8

7

7

66

666

6

5

5

4

4

3

3

2

2

2

2

1

1

MAIN BREAKER DE-RATED

DUE TO SOLAR CIRCUITS

***AMPS MAX ALLOWED

DO NOT UPGRADE

WARNING

DUAL POWER SOURCE

SOURCES: UTILITY GRID

AND PV SOLAR ELECTRIC SYSTEM

WARNING

POWER SOURCE OUTPUT CONNECTION

DO NOT RELOCATE

THIS OVERCURRENT PROTECTION DEVICE

WARNING

TERMINALS ON THE LINE AND

LOAD SIDES MAY BE ENERGIZED

IN THE OPEN POSITION

SITE PLACARD SHOWING ADDITIONAL POWER SOURCE

AND DISCONNECT LOCATIONS. PLACARD SHALL BE

MOUNTED ON EXTERIOR OF ELECTRICAL PANEL

PHOTOVOLTAIC AC DISCONNECT

MAXIMUM AC OUTPUT CURRENT: *** A

NOMINAL AC OPERATING VOLTAGE: *** V

SOLAR PV SYSTEM EQUIPPED

WITH RAPID SHUTDOWN

RAPID SHUTDOWN SWITCH

FOR SOLAR PV SYSTEM

PV SYSTEM DISCONNECT

WARNING: PHOTOVOLTAIC POWER SOURCE

MAXIMUM VOLTAGE ***V

MAXIMUM CIRCUIT CURRENT *** A

MAX RATED OUTPUT CURRENT OF

THE CHARGE CONTROLLER OR DC-TO-DC ***A

CONVERTER (IF INSTALLED)

EVERY 10' AND

WITHIN 1' OF ELBOWS

• SIGNS/LABELS SHALL MEET THE REQUIREMENTS OF ARTICLES 690 AND 705, UNLESS OTHERWISE SPECIFIED PER LOCAL AHJ REQUIREMENTS • SIGNS/LABELS SHALL MEET THE REQUIREMENTS OF SECTION 110.21(B) AS REQUIRED PER ARTICLES 690 AND 705 AND

SHALL COMPLY WITH ANSI Z535.4-2011, PRODUCT SAFETY SIGNS AND LABELS • SIGNS/LABELS SHALL BE REFLECTIVE IF REQUIRED TO BE SO PER ARTICLE 690 • SIGNS/LABELS MEETING REQUIREMENTS OF ARTICLE 690 SHALL HAVE NO SMALLER THAN 3/8" WHITE

TEXT ON RED BACKGROUND UNLESS OTHERWISE DEPICTED OR DESCRIBED • SIGNS/LABELS SHALL BE PERMANENTLY AFFIXED TO THE EQUIPMENT OR WIRING METHOD AND SHALL NOT BE HANDWRITTEN • SIGNS/LABELS SHALL BE OF SUFFICIENT DURABILITY TO

WITHSTAND THE ENVIRONMENT INVOLVED • SIGNS/LABELS SHALL NOT COVER EXISTING MANUFACTURER LABELS

*** - value calculated for each

account, for specific value see the

previous warning label pageTYPICAL SOLAR GENERATION INSTALLATION(NOT ALL DEVICES ARE REQUIRED IN EVERY JURISDICTION)

Agenda Item

#A.

Page 14 of 56

JKane
Received
Page 15: VILLAGE OF OSSINING

PV MODULE TO ACT AS AN ACTIVE GROUNDING COMPONENT

E-W MID-CLAMP BONDING.SEE DETAIL #1

P/N 008000UE/W BONDING CLAMP

P/N 008100UTRIM BONDING CLAMP

P/N 250100USFM TRIMRAIL UNIV PV MODULE

3/4"

6 1/2" 5/16"TRIMRAIL BONDING ALTERNATE METHOD:ATTACH A BONDING CLIP FROM THE TRIMRAILTO AN ADJACENT MODULE. FULLY SEAT BONDINGCLIP UNTIL RADIUS PORTION IS IN CONTACT WITHTRIMRAIL MATING SURFACE AND MODULE FLANGE.

N/S BONDING ALTERNATE METHOD:FULLY SEAT BONDING CLIP ON EACH MODULE

FLANGE TO PROVIDE BOND ACROSS N/SMODULE CAP.

GROUNDING LUG(SEE S1.0 DETAIL #2)

N-S WIRE BONDING CLIP.SEE DETAIL #2

UNDERSIDE OFPV MODULE

NOTE: E-W BONDING IS ACCOMPLISHED WITH 2 PRE-INSTALLEDBONDING PINS WITHIN THE MID-CLAMPS.

SEE DETAIL #3 FOR E-W BONDING PATH

SEE DETAIL #3FOR N-S BONDING PATH

P/N 008015SWIRE BONDING CLIP

END CLAMP MID CLAMP

2 MODULE JUMPER BONDING WITH UL2703NOT TO SCALE1 END/MID-CLAMP BONDING WITH UL2703

NOT TO SCALE

3 SYSTEM BONDING LAYOUT WITH UL2703NOT TO SCALE

4 OPTIMIZER BONDING DETAIL WITH UL2703NOT TO SCALE

MODULE FRAME

OPTIMIZER MOUNTEDTO MODULE FRAME

UL2703:2015 LISTEDBONDING CLIPBONDS SOLAR MODULEFRAME TO OPTIMIZEROR MICRO-INVERTER

MID/END CLAMP

1800 ASHTON BLVD. LEHI, UT, 840431.877.404.4129

CORDA RESIDENCE54 REVOLUTIONARY RD

OSSINING, NY 10562-5941 UTILITY ACCOUNT: 58-8506-1555-0002-4

METER: 9343283

S# S-6520932 ROC: NY-05 DRAWN BY: DINDATE: 12/19/2020 REVISION: 0

NY LIC: 1906 | WC26664-H14

EDT(

12-1

7-20

20)v4

, CLA

2.34

NOTES

E 5.0BONDING DETAILSSCALE: NOT TO SCALE

Agenda Item

#A.

Page 15 of 56

JKane
Received
Page 16: VILLAGE OF OSSINING

WEBVTT 1 00:00:28.560 --> 00:00:31.980 Jaime Martinez: Stuart your beard has never been more appropriate than on a day like today. 2 00:00:34.710 --> 00:00:35.730 Stuart Kahan: I yes. 3 00:00:37.980 --> 00:00:39.090 Adam Markovics: Stuart hi Jaime. 4 00:00:39.330 --> 00:00:40.440 How you doing at home. 5 00:00:42.000 --> 00:00:48.390 Adam Markovics: I hope that the village didn't expect you to travel into an office today. 6 00:00:49.170 --> 00:00:52.680 Stuart Kahan: I know in fact tomorrow, they are in fact closed. 7 00:00:53.130 --> 00:01:00.030 Stuart Kahan: Okay, we were, I think, really only the REC Center was open as a warming station. 8 00:01:00.900 --> 00:01:01.380 Adam Markovics: Okay. 9 00:01:02.190 --> 00:01:04.440 Jaime Martinez: yeah not a lot of value and going in today. 10 00:01:06.450 --> 00:01:13.110 Jaime Martinez: wow you know, honestly, we never in the planning department, we almost never see anybody show up physically and all. 11 00:01:14.010 --> 00:01:25.590 Jaime Martinez: The planning department everything's pretty much virtual but I got imagine a day like today, you know that even if one person came in, which was you know again very seldom it would not happen today. 12 00:01:31.380 --> 00:01:33.360

Agenda Item #B.

Page 16 of 56

JKane
Typewritten Text
HPC Meeting February 1, 2021
Page 17: VILLAGE OF OSSINING

Jaime Martinez: Council gets a lot of personal visits either. 13 00:01:34.140 --> 00:01:43.380 Stuart Kahan: I do not, and my paralegal I’ve actually had work from home, essentially for almost the entire period of the state of emergency know. 14 00:01:44.610 --> 00:01:48.270 Stuart Kahan: If anyone tries to come in and see me I go I’m sorry we oh yeah. 15 00:01:49.170 --> 00:01:52.830 Jaime Martinez: I imagine the veil I you know DPW of courses in and build support. 16 00:01:53.310 --> 00:01:58.110 Stuart Kahan: I mean Adam is they actually sort of it's unfortunate because. 17 00:01:59.220 --> 00:02:12.000 Stuart Kahan: taxes were due yesterday, and so they would get continued to today, and if you didn't pay it by today, even with the inclement weather, we cannot defer penalty. 18 00:02:12.900 --> 00:02:20.220 Stuart Kahan: So they actually open Saturday for three hours for both town and village taxes, apparently, they got a good number of people to come in. 19 00:02:20.610 --> 00:02:30.000 Stuart Kahan: I am sure there are people who attempted to pay today or would have paid today, but you know, hopefully they'll get it done and they'll just get it with a 20 00:02:30.450 --> 00:02:32.070 Stuart Kahan: sort of a minor penalty but. 21 00:02:33.450 --> 00:02:37.710 Stuart Kahan: Those just him do it the sort of the wrong time for them. 22 00:02:42.120 --> 00:02:43.020 Adam Markovics: To unfortunate. 23

Agenda Item #B.

Page 17 of 56

Page 18: VILLAGE OF OSSINING

00:02:45.420 --> 00:02:49.560 Adam Markovics: There hasn't been too much relief for Homeowners in this time. 24 00:02:49.830 --> 00:02:52.050 Stuart Kahan: Well, actually the governor just sign. 25 00:02:52.620 --> 00:02:54.180 Stuart Kahan: Legislation he. 26 00:02:55.140 --> 00:02:58.740 Stuart Kahan: will allow a 120 day deferral. 27 00:03:00.000 --> 00:03:01.980 Stuart Kahan: of property tax payments. 28 00:03:03.660 --> 00:03:09.630 Stuart Kahan: But most localities are not going to do that I said Well, no, because it will absolutely screw up their accounting. 29 00:03:10.050 --> 00:03:15.300 Stuart Kahan: Now the words what you'd have to do is you could you could differ for up to 120 days, and you can do. 30 00:03:16.200 --> 00:03:24.150 Stuart Kahan: Payment you know you can basically do a payment plan as many payment plans is the village whatever wants to do, I had spoken with village treasurer do. 31 00:03:24.750 --> 00:03:35.070 Stuart Kahan: offer the town's controller, the town is absolutely not inclined to do it I’m not sure what the villages position is Dale's position is not to do it, but the governor just sign that. 32 00:03:36.120 --> 00:03:36.810 Stuart Kahan: Like yesterday. 33 00:03:37.980 --> 00:03:44.700 Jaime Martinez: I mean you know I don't I don't I keep not speaking locally, I have no idea what's going on, but there are some municipalities that I don't think could. 34 00:03:46.140 --> 00:03:47.880

Agenda Item #B.

Page 18 of 56

Page 19: VILLAGE OF OSSINING

Jaime Martinez: survive 120 days without. 35 00:03:48.570 --> 00:03:49.410 Jaime Martinez: Their taxes. 36 00:03:51.330 --> 00:03:51.990 Jaime Martinez: You know what I mean. 37 00:03:53.880 --> 00:03:54.150 Adam Markovics: Thank you. 38 00:03:56.280 --> 00:03:57.960 Stuart Kahan: mean we're already giving folks. 39 00:03:59.790 --> 00:04:01.320 Stuart Kahan: The ability to defer. 40 00:04:02.850 --> 00:04:11.550 Stuart Kahan: Water payments, you know so we're not so that they can, I think we can give them, they can actually do payment plans and as a whole, set up a sign. 41 00:04:12.000 --> 00:04:21.570 Stuart Kahan: By as part of an executive order and then changes by the public service Commission but this one I’m just not sure what we did do is, we were able to get. 42 00:04:22.710 --> 00:04:32.610 Stuart Kahan: It dates for certain taxes in terms of initial tax date that we got changed by executive order of the Governor, this is to do it more on a statewide basis. 43 00:04:33.720 --> 00:04:49.620 Stuart Kahan: issue would see the executive order would include like the village of bail out on long island and you know you know and city of Potsdam up upstate you know they would get a deferral of payment under the real property tax law, but we, we shall see. 44 00:04:54.510 --> 00:04:59.520 Adam Markovics: I haven't heard from the other Members hi Catherine, good evening. 45 00:05:02.130 --> 00:05:08.400

Agenda Item #B.

Page 19 of 56

Page 20: VILLAGE OF OSSINING

Adam Markovics: So we'll wait we'll wait a few minutes hi I’m as there is the applicant waiting to be let in. 46 00:05:10.860 --> 00:05:11.940 Jaime Martinez: We have one attendee. 47 00:05:13.740 --> 00:05:15.570 Jaime Martinez: I don't know if that's the applicant but. 48 00:05:17.160 --> 00:05:19.200 Jaime Martinez: It might be a representative on the applicant. 49 00:05:20.700 --> 00:05:22.020 Jaime Martinez: it's not somebody that I spoke with. 50 00:05:24.720 --> 00:05:31.770 Jaime Martinez: it's kind of an interesting application it's a solar panel for an HPC you know property. 51 00:05:32.010 --> 00:05:34.650 Jaime Martinez: And so I don't really know how these have been handled in the past. 52 00:05:35.970 --> 00:05:37.170 Jaime Martinez: But you know. 53 00:05:38.280 --> 00:05:39.480 Jaime Martinez: I’m curious to see how it goes. 54 00:05:45.660 --> 00:05:49.350 Adam Markovics: Know unless we have some more people show up I don't think we can do anything. 55 00:05:51.570 --> 00:05:54.180 Jaime Martinez: That was only 7:02 on my end so. 56 00:05:55.680 --> 00:05:57.510 Jaime Martinez: yeah let's give it a couple minutes okay. 57 00:06:30.000 --> 00:06:32.160 Stuart Kahan: Tomorrow night's presentation is still on right.

Agenda Item #B.

Page 20 of 56

Page 21: VILLAGE OF OSSINING

58 00:06:34.590 --> 00:06:35.970 Jaime Martinez: Oh yeah I mean. 59 00:06:36.780 --> 00:06:39.210 Stuart Kahan: The advantages, the advantage of zoom in remote. 60 00:06:39.990 --> 00:06:51.150 Jaime Martinez: hey you know, the only thing I had to be worried about and we saw you know we survived did last time, so I just didn't bother thinking about it, but the only thing I’m worried about is like the Internet going down power going down stuff like that. 61 00:06:51.150 --> 00:06:53.370 Stuart Kahan: yeah I know, but by tomorrow night. 62 00:06:54.480 --> 00:06:57.150 Stuart Kahan: It should all be gone this I mean should be over so. 63 00:06:57.180 --> 00:06:59.700 Jaime Martinez: I mean yeah the store will be over by tomorrow and. 64 00:06:59.760 --> 00:07:07.200 Jaime Martinez: If people if there's a significant amount of like you know power outages and village, then I would say, you should cancel it but. 65 00:07:07.440 --> 00:07:07.830 Stuart Kahan: I haven't. 66 00:07:08.100 --> 00:07:08.520 Jaime Martinez: seen that. 67 00:07:08.910 --> 00:07:13.740 Stuart Kahan: At this point, I have not heard anything I haven't seen anything for Kevin indicating that there's any. 68 00:07:15.030 --> 00:07:16.020 Stuart Kahan: No serious problems. 69 00:07:16.650 --> 00:07:24.660

Agenda Item #B.

Page 21 of 56

Page 22: VILLAGE OF OSSINING

Jaime Martinez: yeah I mean yeah what's a recorded session I think there's a lot of value in like continuing them so unless we absolutely had to. 70 00:07:25.170 --> 00:07:26.820 Jaime Martinez: Get rid of them yeah there's six of them. 71 00:07:27.060 --> 00:07:30.210 Stuart Kahan: I don't know that's the whole point, as you said, they are recorded so. 72 00:07:30.810 --> 00:07:32.610 Stuart Kahan: that'll be good. 73 00:07:32.760 --> 00:07:44.340 Jaime Martinez: yeah and so that the topic tomorrow is like you know taxes violence stuff like that there's another session it's dedicated to the schools, which again, you know is might as well just beat the same topic. 74 00:07:46.500 --> 00:07:50.280 Jaime Martinez: Is when they talk about taxes they're usually not talking about whether there's enough money to. 75 00:07:51.030 --> 00:07:53.010 Stuart Kahan: And then usually not talking about village taxes. 76 00:07:53.880 --> 00:07:54.180 Never. 77 00:07:57.540 --> 00:07:59.100 Stuart Kahan: You know, I was reading the. 78 00:08:00.870 --> 00:08:01.380 Stuart Kahan: The. 79 00:08:08.460 --> 00:08:11.550 Stuart Kahan: Analysis report or the DPW site. 80 00:08:12.690 --> 00:08:13.800 Stuart Kahan: very interesting reading. 81

Agenda Item #B.

Page 22 of 56

Page 23: VILLAGE OF OSSINING

00:08:15.450 --> 00:08:21.300 Stuart Kahan: I mean what they propose to do you know and how much they think it's going to cost and how long they think it's going to take. 82 00:08:23.730 --> 00:08:37.530 Stuart Kahan: You that's a lot of digging and a lot of work that plan, but at least in our planning to take it least they're not proposing literally take all the dirt away just planning to solidify you know everything I guess from five to 34 feet so. 83 00:08:38.670 --> 00:08:39.390 Stuart Kahan: be interesting. 84 00:08:39.780 --> 00:08:46.860 Jaime Martinez: I mean you know yeah I I’m looking forward to the conversation next conversation with the developer to figure out what. 85 00:08:47.820 --> 00:08:51.360 Jaime Martinez: role they had and what they know about that I was funny I sent it. 86 00:08:51.810 --> 00:08:55.020 Stuart Kahan: I sent it to Walter and I never got to like an acknowledgement so it's like. 87 00:08:55.200 --> 00:09:02.670 Jaime Martinez: I mean I didn't get a response from bill to like 540 on the presentation so I’m gonna. 88 00:09:05.100 --> 00:09:08.190 Stuart Kahan: have three just you just need one more Hello Steven. 89 00:09:08.670 --> 00:09:09.450 Jaime Martinez: Hello close. 90 00:09:10.440 --> 00:09:13.770 Stuart Kahan: we're waiting for one more Member will have a quorum and we can start. 91 00:09:17.790 --> 00:09:19.290 Jaime Martinez: And then, Michael Velez waiting. 92 00:09:21.990 --> 00:09:30.300

Agenda Item #B.

Page 23 of 56

Page 24: VILLAGE OF OSSINING

Jaime Martinez: It would, I mean look up very nicely you get a full quarter today because, again, they want to know which way to go, and I hate to have them wait. 93 00:09:30.570 --> 00:09:33.690 Stuart Kahan: When I would do Jaime, let me tell you this if we don't have a quorum. 94 00:09:34.080 --> 00:09:46.290 Stuart Kahan: I would live to three Members here this discuss it and then they can report to the others, and then I think we can just my I’ve done it that way before with HPC because I don't I don't want to have to have the Member person come back. 95 00:09:47.490 --> 00:09:50.460 Stuart Kahan: You know, and I just think it's fair way to do it. 96 00:09:51.390 --> 00:09:51.780 Jaime Martinez: To green. 97 00:09:56.160 --> 00:09:57.060 We should be this. 98 00:10:06.960 --> 00:10:14.310 Stuart Kahan: And I did think it was a very interesting report with they want to, with their they do go through their whole analysis to come up with that alternative. 99 00:10:55.860 --> 00:11:03.270 Stuart Kahan: Does anyone want to send a text or an email to either choice or fill or any of our other Members, to see if. 100 00:11:04.350 --> 00:11:07.260 Stuart Kahan: We can get a fourth rich so speak. 101 00:11:10.230 --> 00:11:13.230 Adam Markovics: And I’m happy to Stuart I'll do that now. 102 00:11:13.590 --> 00:11:14.130 Thanks. 103 00:13:13.980 --> 00:13:27.000

Agenda Item #B.

Page 24 of 56

Page 25: VILLAGE OF OSSINING

Adam Markovics: Well, how about we start maybe talking about some of the other agenda items and maybe I don't know by 7:15 no one showed up will talk about the application. 104 00:13:27.480 --> 00:13:31.170 Stuart Kahan: I think that's fine if you want to, we can do it that way sure so. 105 00:13:31.350 --> 00:13:34.170 Stuart Kahan: Why don't you start we get ourselves started. 106 00:13:35.310 --> 00:13:44.370 Adam Markovics: Okay, good evening it's about 10 after seven on a very snowy February 1 2021 This is a regularly 107 00:13:45.480 --> 00:13:56.940 Adam Markovics: scheduled meeting of the Village of Ossining Historic Preservation Commission I’m Adam Markovics the chairperson would with the others independence, please state your name for director. 108 00:13:59.730 --> 00:14:00.780 Stephen Casey: Steve Casey. 109 00:14:02.700 --> 00:14:03.210 Catherine Wilson: Wilson. 110 00:14:08.580 --> 00:14:15.270 Adam Markovics: And corporation counsel Kahan is here, as well as planning director Jaime Martinez right. 111 00:14:18.510 --> 00:14:22.230 Adam Markovics: Okay, we have an APP with us here tonight. 112 00:14:23.700 --> 00:14:36.570 Adam Markovics: For the installation solar panels on 54 Revolutionary Road I figured what we would do, since we don't have a quorum as of now is talk for a few minutes about the other agenda items. 113 00:14:37.740 --> 00:14:41.190 Adam Markovics: or one or two miscellaneous items and if we don't have a quorum by. 114 00:14:42.840 --> 00:14:45.300

Agenda Item #B.

Page 25 of 56

Page 26: VILLAGE OF OSSINING

Adam Markovics: Will will begin the discussion, the application. 115 00:14:47.070 --> 00:14:55.920 Adam Markovics: I wanted to start with a miscellaneous item which is the high school essay contest, which again I think was a great success. 116 00:14:57.270 --> 00:15:06.300 Adam Markovics: I’ve confirmed with the contest winner Emily Wang and she's received her prize the essays posted on the HPC website. 117 00:15:07.590 --> 00:15:13.380 Adam Markovics: I thought it might be nice to forward the entry to the property owner. 118 00:15:15.030 --> 00:15:19.260 Adam Markovics: who may not be aware that 10th grade student at awesome in high school. 119 00:15:20.790 --> 00:15:25.140 Adam Markovics: wrote an essay about the old Crotonville School. 120 00:15:26.580 --> 00:15:39.900 Adam Markovics: I may have to follow with the Planning Department unless Stuart you have any other ideas, I was unable to find address information quickly for the owner of the. 121 00:15:41.520 --> 00:15:44.460 Adam Markovics: The old Crotonville School, which is now the American Legion. 122 00:15:45.780 --> 00:15:51.660 Adam Markovics: So I think it'd be nice to send the property owners, a copy of the essay. 123 00:15:52.980 --> 00:15:57.630 Adam Markovics: letting them know that that a student wrote a winning essay about their building. 124 00:15:58.410 --> 00:16:03.420 Stuart Kahan: Adam all I need is the property address I can look it up and get you that information ASAP. 125 00:16:04.260 --> 00:16:06.840

Agenda Item #B.

Page 26 of 56

Page 27: VILLAGE OF OSSINING

Adam Markovics: it's 11 old pot all the new post road. 126 00:16:08.280 --> 00:16:14.520 Stuart Kahan: Fine okay I'll look that up and I will get that for you have probably have a few by tomorrow morning. 127 00:16:15.270 --> 00:16:24.300 Adam Markovics: Okay, thanks, very much for another point worth noting, just as a side on this is that in my looking round. 128 00:16:25.710 --> 00:16:34.200 Adam Markovics: Online about this property, it appears not to be in the village of ossining from what I can tell appears to be in the town of Boston. 129 00:16:36.150 --> 00:16:45.840 Adam Markovics: Which is interesting to me only in as much as it appears in the village of ossining has you know significance for sites and structures guide. 130 00:16:47.280 --> 00:16:59.430 Adam Markovics: I don't know if the boundaries changed at some point between the village in town, since the guide was published in 2009 2010 but it's worth noting that, at least from my. 131 00:17:00.870 --> 00:17:08.820 Adam Markovics: Preliminary looking around the site appears to be in the town of ossining actually Stuart if you could confirm that I would appreciate that. 132 00:17:08.850 --> 00:17:11.430 Stuart Kahan: Absolutely yeah that that we can certainly do sure. 133 00:17:13.200 --> 00:17:15.690 Adam Markovics: Okay, we have been drawing by. 134 00:17:17.670 --> 00:17:19.440 Adam Markovics: Miranda, how are you doing Phil. 135 00:17:20.010 --> 00:17:24.090 Phil Faranda: snowed in and on my data plan, because we have no wi fi but I’m here. 136

Agenda Item #B.

Page 27 of 56

Page 28: VILLAGE OF OSSINING

00:17:25.980 --> 00:17:26.730 Adam Markovics: Very well. 137 00:17:28.500 --> 00:17:31.350 Adam Markovics: And I think I saw Member Cole. 138 00:17:31.650 --> 00:17:34.830 Adam Markovics: Yes, I draw is good evening how are you. 139 00:17:35.010 --> 00:17:35.700 Joyce Cole: Good how are you. 140 00:17:36.060 --> 00:17:44.490 Adam Markovics: Good and now we have a quorum and I think we should proceed to consider the application before us this evening. 141 00:17:45.690 --> 00:17:50.430 Adam Markovics: revolutionary road, so I may, if you could let the applicant or the representative in. 142 00:17:54.090 --> 00:17:54.570 Jaime Martinez: Sure thing. 143 00:18:03.780 --> 00:18:06.540 Jaime Martinez: hello, Michael is. 144 00:18:08.310 --> 00:18:11.640 Jaime Martinez: Are you with sunrise did solar Hello. 145 00:18:15.420 --> 00:18:16.350 Stuart Kahan: You start unmute. 146 00:18:16.650 --> 00:18:19.500 Michael Velez: yeah hey good evening, can you guys hear me. 147 00:18:19.950 --> 00:18:21.300 Stuart Kahan: Yes, Mr. Velez we can. 148 00:18:22.680 --> 00:18:24.810 Jaime Martinez: We can hear you but we can't see you so. 149

Agenda Item #B.

Page 28 of 56

Page 29: VILLAGE OF OSSINING

00:18:25.080 --> 00:18:27.000 Michael Velez: let's see, let me see if I can fix the. 150 00:18:30.570 --> 00:18:31.680 Michael Velez: Start video. 151 00:18:32.820 --> 00:18:33.000 Michael Velez: Oh. 152 00:18:41.670 --> 00:18:50.430 Adam Markovics: I’m Adam Markovics I’m Chair of the Historic Preservation Commission, thank you for taking the time to appear before us this evening. 153 00:18:51.900 --> 00:19:00.630 Adam Markovics: As you may know, 54 Revolutionary Road is in a historic and architectural design district, the Sparta District. 154 00:19:01.230 --> 00:19:11.850 Adam Markovics: 54 is a contributing property, so that when exterior changes are made to the property, the changes have to be approved by our Commission Historic Preservation Commission. 155 00:19:12.510 --> 00:19:28.050 Adam Markovics: I wonder if you could say a few things about the the application, the scope of work and what's what's involved and Jaime if there's any way, maybe you could share the. 156 00:19:29.190 --> 00:19:37.590 Adam Markovics: The site plan that was uploaded to the village website on if that's technically feasible wellness drivel as is present presenting. 157 00:19:40.110 --> 00:19:41.460 Adam Markovics: Perfect I see it. 158 00:19:42.090 --> 00:19:57.810 Michael Velez: For so a little bit about project it's 44 panels total total of 29 panels going on the South side of the roof, which should be the left side of the House from that picture that he had just had up. 159 00:19:58.920 --> 00:20:01.680 Michael Velez: And another 15 panels on the. 160

Agenda Item #B.

Page 29 of 56

Page 30: VILLAGE OF OSSINING

00:20:03.150 --> 00:20:23.370 Michael Velez: North side of the roof, which is the roof section number one as you see there they're going to be 320 Watt modules all connected to a solar edge island titan bit inverter located on the side of the House where the AC and I little boxes are located their. 161 00:20:24.840 --> 00:20:28.950 Michael Velez: project should take about one whole day to complete. 162 00:20:30.060 --> 00:20:31.800 Michael Velez: modules of black on black. 163 00:20:33.000 --> 00:20:34.080 Michael Velez: For aesthetics. 164 00:20:35.400 --> 00:20:43.650 Michael Velez: And let's see anything else that I’ve left out did say was solar edge solar edge optimizer. 165 00:20:46.350 --> 00:20:51.330 Michael Velez: And 325 modules are pretty much pretty much it. 166 00:20:55.140 --> 00:21:00.630 Adam Markovics: The modules that are being installed, are they all the same size. 167 00:21:01.350 --> 00:21:06.930 Michael Velez: Yes, they're all 320 months there about 553 and dimension. 168 00:21:08.520 --> 00:21:09.030 Adam Markovics: Okay. 169 00:21:11.400 --> 00:21:24.120 Adam Markovics: I don't know much about solar panels, the our our days are typical first and for solar panels, are they are they do, they look like most solar panels that are installed and residences. 170 00:21:24.450 --> 00:21:30.120 Michael Velez: These look like most like most with the minor difference of the aesthetics being. 171 00:21:30.810 --> 00:21:45.360

Agenda Item #B.

Page 30 of 56

Page 31: VILLAGE OF OSSINING

Michael Velez: The black trim with the black top where most would be a silver or blue or black or blue this is black and black just because we we know most H js or most Arabic meetings that we go to. 172 00:21:46.320 --> 00:21:52.140 Michael Velez: really care a lot about aesthetics so black on Black usually is there are go to for these kinds of things. 173 00:21:54.990 --> 00:22:03.060 Adam Markovics: It looks to me that really almost the entirety of the roof is going to be covered with solar panels is that right. 174 00:22:03.510 --> 00:22:04.050 Michael Velez: that's correct. 175 00:22:05.130 --> 00:22:06.300 Adam Markovics: And is there. 176 00:22:11.580 --> 00:22:24.960 Adam Markovics: Is there any way that the panel's can be grouped toward the rear of the structure or or rearrange that the bulk is toward the rear. 177 00:22:26.160 --> 00:22:41.700 Michael Velez: Sure, I would have to see if that plane, which will be the top left corner, which just blank I see if that's a viable roof section I’m pretty sure if that is, we can move as many panels, as we could to that section. 178 00:22:42.330 --> 00:22:44.190 Phil Faranda: Is that blank section, the north side. 179 00:22:45.060 --> 00:22:47.190 Michael Velez: That is the north you talking about. 180 00:22:47.820 --> 00:23:03.780 Phil Faranda: Adam that might be physically possible but that may detract from the efficiency of solar, because the southern exposure is what's necessary north is like the worst direction to face into if you if you want sunlight. 181 00:23:06.960 --> 00:23:07.350 Adam Markovics: Okay.

Agenda Item #B.

Page 31 of 56

Page 32: VILLAGE OF OSSINING

182 00:23:08.550 --> 00:23:11.370 Adam Markovics: Mr. Velez do you have do you have a thought about that. 183 00:23:11.700 --> 00:23:29.400 Michael Velez: No he's absolutely correct, you know for this particular system, I believe we are offsetting almost 95% of their power So yes, moving significant amount of panels to that section would drop that offset. 184 00:23:30.540 --> 00:23:31.710 Michael Velez: You know significantly. 185 00:23:32.730 --> 00:23:39.540 Michael Velez: Then that's just another conversation we'll have to have with the homeowner and see if it's you know, a feasible. 186 00:23:41.280 --> 00:23:49.290 Michael Velez: system for them and we'll move forward from there, but you know as long as what you make you guys happy we'll we'll try to work, our best around it. 187 00:23:49.950 --> 00:23:54.120 Phil Faranda: I think the, the only other question I would have is if. 188 00:23:55.680 --> 00:24:01.290 Phil Faranda: The either side, well, the revolutionary road runs north, south yep is my recollection. 189 00:24:01.680 --> 00:24:04.290 Phil Faranda: yep, which means that the House. 190 00:24:05.610 --> 00:24:12.270 Phil Faranda: The roof neither side of the roof faces the curb, in other words, if I was looking at this House. 191 00:24:13.350 --> 00:24:18.960 Phil Faranda: I’m looking at technically the side of it I’m not going to see these panels unless I’m like really looking for him. 192 00:24:18.990 --> 00:24:34.440 Michael Velez: Know you're spending in directly in front of the House, you can physically you can't see on top of the roof, but this is, I

Agenda Item #B.

Page 32 of 56

Page 33: VILLAGE OF OSSINING

guess, this is the only direction if you're driving I guess North you would see the panels from here like in this picture here. 193 00:24:35.100 --> 00:24:38.460 Phil Faranda: Okay, but if I’m standing in front of the House on OK, I see that. 194 00:24:38.610 --> 00:24:42.270 Michael Velez: you're standing at the front of the House, he cannot see a thing. 195 00:24:43.650 --> 00:24:43.950 Okay. 196 00:24:47.340 --> 00:25:00.780 Adam Markovics: In my time on the HPC there haven't been any applications for the installation of solar panels, but I know that those applications have been made in the past and approved in the past. 197 00:25:01.200 --> 00:25:11.820 Adam Markovics: And I think the guiding principle in evaluating applications is to try to minimize to the greatest extent possible. 198 00:25:13.980 --> 00:25:17.460 Adam Markovics: So the visual impact of the placement of the solar panels. 199 00:25:18.510 --> 00:25:23.970 Adam Markovics: So uh you know other than my thought about placing some more of the solar panels. 200 00:25:24.990 --> 00:25:38.820 Adam Markovics: On the north side and they're obviously issues with that Mr. Velez do you have any other thoughts, given that, through the principle that we try to work with and in evaluating these applications about minimizing the visual impact. 201 00:25:39.360 --> 00:25:52.440 Michael Velez: So another solution would be to just remove the quantity of panels on that section and just upsize the wattage on the panel so, for example. 202 00:25:52.890 --> 00:26:02.550

Agenda Item #B.

Page 33 of 56

Page 34: VILLAGE OF OSSINING

Michael Velez: These particular panels are 320 we also have in stock 340 Watt panels, which are higher efficiency and we can just do away with. 203 00:26:02.880 --> 00:26:15.450 Michael Velez: Some of the modules and that low roof section that's visible to the street oncoming street and that way we can we don't lose any production and we you know it's kind of like a win, win scenario. 204 00:26:16.830 --> 00:26:19.740 Adam Markovics: How many panels could be eliminated that way. 205 00:26:20.520 --> 00:26:23.460 Michael Velez: On that particular roof section let's see. 206 00:26:25.590 --> 00:26:26.820 Michael Velez: We can. 207 00:26:28.020 --> 00:26:32.430 Michael Velez: At least get rid of 6789 1011. 208 00:26:35.340 --> 00:26:42.570 Adam Markovics: I think that would be a significant gain is there is there a cost differential for the property owner. 209 00:26:42.960 --> 00:26:54.960 Michael Velez: There, there would be but I would figure, it would balance out just the same so given them a higher wattage more efficiency panel, what would. 210 00:26:56.400 --> 00:26:58.500 Michael Velez: Typically, be speaking as. 211 00:26:59.970 --> 00:27:00.930 Michael Velez: The average about the same. 212 00:27:01.950 --> 00:27:02.880 Adam Markovics: Okay well. 213 00:27:03.120 --> 00:27:10.500 Stuart Kahan: Can I am is Chris I apologize, Mr. Velez I’m the Attorney for the village, I just want to understand what you just said. 214

Agenda Item #B.

Page 34 of 56

Page 35: VILLAGE OF OSSINING

00:27:11.580 --> 00:27:16.740 Stuart Kahan: The initial costs to the homeowner will be more if you use the. 215 00:27:19.200 --> 00:27:25.980 Michael Velez: don't blink significantly a little less if we use the higher Watt panels. 216 00:27:26.760 --> 00:27:37.080 Michael Velez: and remove a few of you know, so instead of making the entire system, all three parties will make the entire system 314 and just remove 10 or 11 panels. 217 00:27:37.770 --> 00:27:49.800 Michael Velez: And because those 340s are a little bit more premium panel, the cost would be significantly a little cheaper than what they are currently up with. 218 00:27:50.460 --> 00:27:52.380 Stuart Kahan: It would be less expensive because there. 219 00:27:52.410 --> 00:27:55.410 Stuart Kahan: Are fewer panels is that what I’m understanding. 220 00:27:55.410 --> 00:27:56.160 Michael Velez: that's correct yep. 221 00:27:56.400 --> 00:27:56.850 Stuart Kahan: Okay. 222 00:27:57.030 --> 00:27:58.830 Jaime Martinez: Good they look the same they look different. 223 00:27:59.280 --> 00:28:00.510 Michael Velez: They look exactly the same. 224 00:28:01.140 --> 00:28:05.940 Stuart Kahan: And you would they still manage their 95% efficiency that they're hoping for. 225 00:28:06.270 --> 00:28:21.570 Michael Velez: A well we'll try to balance that up just the same yeah we'll try to keep them with the same offset and efficiency that way

Agenda Item #B.

Page 35 of 56

Page 36: VILLAGE OF OSSINING

they're not losing any production or any power that they can potentially be slick saving money on. 226 00:28:24.690 --> 00:28:33.180 Stuart Kahan: Adam that's just really the concern I have is that you know I don't I don't want to put these folks in the position where they are trying to be energy efficient. 227 00:28:34.470 --> 00:28:36.810 Stuart Kahan: and effectively we're. 228 00:28:37.980 --> 00:28:44.700 Stuart Kahan: Putting them in a position where to do it, they might have to spend either more money or become or be less than energy efficient. 229 00:28:46.500 --> 00:29:02.670 Jaime Martinez: yeah I think in in in you know there I think there's a lot of stated goals here in the Community, one is obviously protecting history, the others is sort of supporting environmental sustainability in this instance, I think that if it may be worthwhile to consider whether or not. 230 00:29:04.020 --> 00:29:15.630 Jaime Martinez: These panels themselves actually detract from the historic nature of the roof now if this person had a copper roof or slate roof, then you might say that this is clearly different. 231 00:29:16.350 --> 00:29:28.890 Jaime Martinez: But the roof itself is an asphalt shingle roof, so if your concern is that some panels make the whole building look not historic or. 232 00:29:29.460 --> 00:29:41.460 Jaime Martinez: The concern is that some panels make the historic looking roof look not historic I think probably should be the basis of your sort of decision here, and you can go either way but. 233 00:29:42.600 --> 00:29:50.040 Jaime Martinez: It you know it's really up to the board, but the roof materials that it's going to be obscuring or they themselves not historically. 234 00:29:55.560 --> 00:29:56.040 Adam Markovics: Okay.

Agenda Item #B.

Page 36 of 56

Page 37: VILLAGE OF OSSINING

235 00:29:57.660 --> 00:30:02.610 Adam Markovics: All things being equal, from historic preservation standpoint, the fewer solar panels, the better. 236 00:30:04.680 --> 00:30:22.260 Adam Markovics: If we have a solution that can eliminate 11 solar panels, without any increased cost of the homeowner and without any loss of energy efficiency that was seemed to me to be what they call a win, win. 237 00:30:28.650 --> 00:30:34.500 Catherine Wilson: Adam, can I just can, is there a photograph of the panel like what it would look like. 238 00:30:43.740 --> 00:30:44.490 Stuart Kahan: I don't think so. 239 00:30:46.080 --> 00:30:46.440 Stuart Kahan: Okay. 240 00:30:48.420 --> 00:30:49.380 Jaime Martinez: Not a full color. 241 00:30:54.930 --> 00:30:58.110 Jaime Martinez: Do you have a can I go to your website, Mr. Velez. 242 00:30:58.230 --> 00:31:09.090 Michael Velez: um let's see, let me see if I can pull one up not in the office, right now, typically we have them and print outs, but let me see if I can find. 243 00:31:50.370 --> 00:31:53.400 Phil Faranda: faking it sort of looks like a black glass right. 244 00:31:53.940 --> 00:31:55.800 Phil Faranda: Absolutely lack of. 245 00:31:55.920 --> 00:31:57.120 Phil Faranda: The DM kind of glass. 246 00:31:57.690 --> 00:31:58.140 Jaime Martinez: like this.

Agenda Item #B.

Page 37 of 56

Page 38: VILLAGE OF OSSINING

247 00:32:00.240 --> 00:32:01.200 Here we go. 248 00:32:17.610 --> 00:32:25.290 Michael Velez: yeah typically like those so I what I did was Google Genco solar 320 Watt. 249 00:32:26.490 --> 00:32:27.480 Michael Velez: And I got. 250 00:32:28.830 --> 00:32:29.940 This picture here. 251 00:32:34.230 --> 00:32:37.620 Jaime Martinez: I’m going to enable your sharing okay. 252 00:32:42.870 --> 00:32:43.620 See. 253 00:32:48.870 --> 00:32:49.650 Jaime Martinez: All right, good. 254 00:32:54.780 --> 00:32:55.170 Phil Faranda: All right. 255 00:32:57.030 --> 00:32:58.860 Michael Velez: You guys see Can you see my screen. 256 00:33:02.670 --> 00:33:03.420 Adam Markovics: Yes, yes. 257 00:33:05.280 --> 00:33:16.740 Michael Velez: So this essentially is what the module looks like black trimmed and black on top that's what they all would look like. 258 00:33:33.270 --> 00:33:33.540 yeah. 259 00:33:37.080 --> 00:33:37.650 Adam Markovics: Any thoughts.

Agenda Item #B.

Page 38 of 56

Page 39: VILLAGE OF OSSINING

260 00:33:39.810 --> 00:33:41.370 Catherine Wilson: um yeah I. 261 00:33:43.080 --> 00:33:43.620 yeah it. 262 00:33:44.640 --> 00:33:47.460 might be fine on the black well the roof is black right. 263 00:33:57.690 --> 00:33:59.580 I think it's interesting that. 264 00:34:00.930 --> 00:34:11.040 Catherine Wilson: You know that the historic preservation, but there's the sustainability, the you know environmental side of it, so I don't think it would look bad. 265 00:34:17.670 --> 00:34:27.390 Adam Markovics: yeah Mr bell has sent me from my perspective, that's it's not a question of whether we're going to approve this it's whether any modifications made that. 266 00:34:29.460 --> 00:34:33.870 Adam Markovics: might reduce the visual impact and if you're if you're saying that. 267 00:34:35.340 --> 00:34:50.160 Adam Markovics: 11 panels could be eliminated, with no increased cost to the homeowner and no loss of energy efficiency, I would vote to approve the application with that modification being made. 268 00:34:51.420 --> 00:34:54.600 Stuart Kahan: At a mess now with Mr. Velez said we don't know about the efficiency. 269 00:34:56.310 --> 00:35:02.610 Michael Velez: Well, how about a get new design drawn up and then send it over I guess to Jamie. 270 00:35:04.680 --> 00:35:06.630 Michael Velez: And then we'll take it. 271

Agenda Item #B.

Page 39 of 56

Page 40: VILLAGE OF OSSINING

00:35:08.730 --> 00:35:15.450 Michael Velez: Because, overall, the homeowner would have to approve of it and sign a new contract or whatnot. 272 00:35:17.430 --> 00:35:22.050 Jaime Martinez: And then from there anyhow, so I just have a quick question um. 273 00:35:24.180 --> 00:35:35.370 Jaime Martinez: So you so there was because I, this is where my confusion is so you have an ability to have less solar panels and the same level of efficiency. 274 00:35:35.970 --> 00:35:47.070 Jaime Martinez: And the same level of course actually less cost, so why why wasn't that presented to the applicant and why is it being presented now It just seems a little odd. 275 00:35:47.670 --> 00:35:50.070 Jaime Martinez: Right I’m assuming there's some information that I’m missing. 276 00:35:50.070 --> 00:35:50.520 Jaime Martinez: that's why. 277 00:35:50.760 --> 00:35:59.190 Michael Velez: Sure, so these 320 Watt panels is what we generally design from default. 278 00:36:00.300 --> 00:36:13.350 Michael Velez: Which is our main stock so in order for us to get a 340 Watt module I would have to reach out to my supply chain, they would have to ship them to us things like that, especially for this particular project. 279 00:36:21.810 --> 00:36:21.990 Adam Markovics: well. 280 00:36:22.800 --> 00:36:27.210 Adam Markovics: Does that mean there'd be some kind of delay entailed and going with these panels. 281 00:36:27.600 --> 00:36:35.010

Agenda Item #B.

Page 40 of 56

Page 41: VILLAGE OF OSSINING

Michael Velez: No, not at all we generally stock them in most places across the country so it's just one office shipping to the next. 282 00:36:38.460 --> 00:36:54.990 Catherine Wilson: Adam yeah wondering if I mean, even if you reduce the number of the panels are still there, so I’m just wondering it's not as though it's going to eliminate it entirely from the side of the roof, that you can see, the most prominently so would it be. 283 00:36:56.430 --> 00:36:59.670 Adam Markovics: worth it, is it worth it, I don't know I’m you know I’m thinking. 284 00:37:00.210 --> 00:37:09.720 Catherine Wilson: it's not that they are the black with the black trim is really as much as we could get from it being you know less. 285 00:37:10.830 --> 00:37:23.190 Adam Markovics: obtrusive in in like a physical an aesthetic way I don't know if there's anything beyond that, like except for moving entirely from one side which isn't possible and in a way, you know. 286 00:37:24.150 --> 00:37:33.450 Adam Markovics: It might sound like a win for historic preservation if if the total number is reduced on one side, but that may introduce a cemetery might look better. 287 00:37:34.530 --> 00:37:37.290 Adam Markovics: If more of the roof is covered rather than less. 288 00:37:38.010 --> 00:37:39.660 Catherine Wilson: yeah it might just blend. 289 00:37:41.610 --> 00:37:49.140 Phil Faranda: that's a good point it's probably worth bringing up to that these are not permanent the way regular roof shingles are. 290 00:37:50.910 --> 00:38:03.750 Phil Faranda: I mean it is conceivable that the Court is could sell this House and the next people could say we want geothermal or you know, whatever and take the solar panels off, they can be removed. 291 00:38:06.000 --> 00:38:12.090

Agenda Item #B.

Page 41 of 56

Page 42: VILLAGE OF OSSINING

Jaime Martinez: Actually, you know it's funny you mentioned that Phil the the gentleman that I spoke with when he was making the application. 292 00:38:12.750 --> 00:38:24.870 Jaime Martinez: stated that the lifespan of these is not is less than an actual roof, that they are just temporary they can be they can be put up and they can be taken down so they're not temporary just like a satellite dishes. 293 00:38:25.170 --> 00:38:26.190 Phil Faranda: yeah yeah. 294 00:38:27.600 --> 00:38:45.960 Adam Markovics: Well, does anyone I said I certainly you know I stated position strongly to test it out, so you know I I don't know if there's much to be gained by you know, eliminating 11 panels from the south side of the roof does anyone have a strong opinion about that. 295 00:38:49.290 --> 00:38:52.230 Phil Faranda: I don't see any I’m with Catherine on this. 296 00:38:53.250 --> 00:38:55.110 Phil Faranda: It might lose look better just having. 297 00:38:56.310 --> 00:38:58.170 Phil Faranda: It as presented. 298 00:39:00.720 --> 00:39:01.170 Phil Faranda: um. 299 00:39:02.400 --> 00:39:12.930 Phil Faranda: You know if somebody's driving North on Revolutionary Road and they look over and they saw solar panels I don't think they're going to county you know they'll either see one roof. 300 00:39:14.460 --> 00:39:18.060 Phil Faranda: or they'll see kind of something overlapped over the old roof. 301 00:39:19.320 --> 00:39:24.150 Phil Faranda: And I’m not so sure that there is a win in having it broken up. 302

Agenda Item #B.

Page 42 of 56

Page 43: VILLAGE OF OSSINING

00:39:28.320 --> 00:39:29.070 Adam Markovics: well. 303 00:39:29.340 --> 00:39:37.440 Michael Velez: Just for just to throw in there, literally like three houses down four houses down on the right side if you're driving north. 304 00:39:38.820 --> 00:39:41.310 Michael Velez: There is a house completely covered in solar panels. 305 00:39:46.050 --> 00:39:48.420 Catherine Wilson: Are those the black on Black with a black term. 306 00:39:49.170 --> 00:39:52.950 Michael Velez: Those are black on Black I’m not sure who built that system, but they are also black. 307 00:39:56.280 --> 00:40:01.680 Phil Faranda: Is that in the district is that is that, in the same I’m asking the committee is that the. 308 00:40:02.130 --> 00:40:04.260 Adam Markovics: might be just over the border film. 309 00:40:07.530 --> 00:40:07.800 Okay. 310 00:40:09.570 --> 00:40:11.370 Phil Faranda: Well, I mean if it's a few houses down by. 311 00:40:14.370 --> 00:40:17.250 Phil Faranda: I understand that there's a border, but right 312 00:40:18.270 --> 00:40:20.340 Phil Faranda: To the average guy driving up the street I. 313 00:40:21.810 --> 00:40:22.920 Phil Faranda: don't think would make a difference. 314 00:40:27.030 --> 00:40:30.330 Adam Markovics: So one last question, Mr. Velez in terms of.

Agenda Item #B.

Page 43 of 56

Page 44: VILLAGE OF OSSINING

315 00:40:32.340 --> 00:40:34.950 Adam Markovics: installation or D installation. 316 00:40:36.690 --> 00:40:46.560 Adam Markovics: You know, is it is it just the shingles and the sheathing that potentially will be impacted by the you know the. 317 00:40:47.700 --> 00:40:52.380 Adam Markovics: The installation mechanism us to fix these panels. 318 00:40:52.530 --> 00:41:12.330 Michael Velez: Sure, so potentially it's the shingles the sheathing and the rafters so the solar panels, they have mounts and those mounts get drilled into the rafters and that's what holds them in place, you know for strong when load snow loads things like that engineering purposes is what it is. 319 00:41:19.740 --> 00:41:22.230 Catherine Wilson: Adam is that house is like historic. 320 00:41:24.330 --> 00:41:32.250 Adam Markovics: To the district it's contributing to you know what I mean what years built a craftsman house circa 20s but. 321 00:41:34.410 --> 00:41:48.180 Catherine Wilson: it's a tricky one because Personally, I have solar panels on a purely I think they're wonderful what they do, but like do I want to own my house, not necessarily so I don't know if you can take that option away from someone. 322 00:41:49.470 --> 00:41:57.690 Catherine Wilson: Because the implications was doing for the environment, but I think my opinion is that if it's going to be done. 323 00:41:58.830 --> 00:42:01.230 The black with a black trim is probably. 324 00:42:08.670 --> 00:42:15.360 Adam Markovics: yeah Mr. Velez is just a quick question and I think we're going to take a vote in a moment. 325 00:42:16.500 --> 00:42:24.090

Agenda Item #B.

Page 44 of 56

Page 45: VILLAGE OF OSSINING

Adam Markovics: what's the status of these alternatives to the panels I’ve heard about shingles that themselves can. 326 00:42:25.620 --> 00:42:26.220 Adam Markovics: You know. 327 00:42:26.550 --> 00:42:34.830 Michael Velez: conduct solar power and, like the tesla shingles yeah those are great but super super expensive. 328 00:42:36.270 --> 00:42:49.170 Michael Velez: Which are probably four or five times the cost of this system okay and, and for that there is no option to remove them like once you put them on there you're stuck for life right. 329 00:42:51.060 --> 00:42:54.420 Adam Markovics: you're essentially roofing a house with with these. 330 00:42:54.450 --> 00:42:54.630 With. 331 00:42:55.740 --> 00:42:56.070 Michael Velez: Okay. 332 00:42:56.370 --> 00:43:10.710 Adam Markovics: Interesting well, thank you yeah I mean, I think, all things considered, the you know from a historic preservation perspective it'd be wonderful if the tesla shingles were you know cost effective for the average consumer, because they have little to no visual impact. 333 00:43:13.500 --> 00:43:15.660 Adam Markovics: But yeah I mean. 334 00:43:16.860 --> 00:43:20.340 Adam Markovics: I don't think that we can. 335 00:43:22.500 --> 00:43:34.590 Adam Markovics: I’m not inclined to stand in the way of an owner adding solar panels to their house and we haven't done it in the past, so, given our track record my own inclination on this issue. 336 00:43:36.180 --> 00:43:42.750

Agenda Item #B.

Page 45 of 56

Page 46: VILLAGE OF OSSINING

Adam Markovics: I would like to move to approve the application as it's been presented with no modifications. 337 00:43:46.530 --> 00:43:50.430 Adam Markovics: Would anyone like to second that motion for a vote. 338 00:43:51.240 --> 00:43:53.430 Phil Faranda: I'll second it out of this is Phil. 339 00:43:55.470 --> 00:43:58.050 Adam Markovics: All in favor of approving the. 340 00:43:59.400 --> 00:43:59.670 Phil Faranda: hi. 341 00:44:00.180 --> 00:44:02.400 Catherine Wilson: hi hi hi. 342 00:44:03.990 --> 00:44:04.350 Adam Markovics: hi. 343 00:44:06.420 --> 00:44:09.660 Adam Markovics: Mr bell as I believe that Tina and Ms. 344 00:44:12.750 --> 00:44:14.340 Adam Markovics: Did I hear Mr Casey. 345 00:44:14.760 --> 00:44:17.160 Stephen Casey: Yes, I I’m in favor. 346 00:44:19.830 --> 00:44:27.060 Adam Markovics: Okay, so indeed unanimous all five of us have voted to prove the application is presented. 347 00:44:29.430 --> 00:44:31.950 Michael Velez: Perfect Thank you guys have a good night. 348 00:44:32.370 --> 00:44:34.170 Stuart Kahan: You too, Mr. Velez Thank you very much. 349 00:44:38.880 --> 00:44:39.570

Agenda Item #B.

Page 46 of 56

Page 47: VILLAGE OF OSSINING

Adam Markovics: Okay. 350 00:44:42.120 --> 00:44:56.250 Adam Markovics: Jason Phil you joined a few minutes late, I had a few thoughts about the essay contest, which again thought was great success and again thank you phil and Jay film real estate for underwriting. 351 00:44:56.700 --> 00:45:06.630 Adam Markovics: The contest and made a big difference in the student's life and I’m optimistic that the word about the contest will be spreading and. 352 00:45:08.040 --> 00:45:17.100 Adam Markovics: To the end of further spreading the word I wanted to send a copy of the essay to the property owner, the owner of the American Legion the owner of the old Crotonville School. 353 00:45:17.550 --> 00:45:30.930 Adam Markovics: And Stuart Kahan is going to confirm the contact information for the owner, and let me know whether in fact the property is in the village or the town of Ossining. 354 00:45:32.460 --> 00:45:42.000 Adam Markovics: That was not an agenda item formally, but I wanted to raise that a two other items are on the agenda, the first of which is the first Baptist church. 355 00:45:42.660 --> 00:45:59.400 Adam Markovics: I let the group know that I have a new contact at the first Baptist church and I had a conversation with her last week her name is Hazel freight I don't have her last name with me. 356 00:46:01.830 --> 00:46:07.230 Adam Markovics: I spoke about the challenges that the Church has faced raising funds to. 357 00:46:08.460 --> 00:46:10.290 Adam Markovics: To preserve the exterior. 358 00:46:11.490 --> 00:46:22.080 Adam Markovics: And again, I talked about available grants for conducting like a technical assessment or a condition survey. 359 00:46:23.250 --> 00:46:28.410

Agenda Item #B.

Page 47 of 56

Page 48: VILLAGE OF OSSINING

Adam Markovics: And I did some further research into the available grants I believe there's just one. 360 00:46:29.550 --> 00:46:43.380 Adam Markovics: And that's a grant through the New York landmarks conservancy it's a it's under program called sacred sites, I had thought there was another program through New York preservation, but it turns out. 361 00:46:44.490 --> 00:46:44.700 Adam Markovics: it's. 362 00:46:45.900 --> 00:46:59.280 Adam Markovics: available to religious institutions, so this one program one grand program the sacred sites program for the New York landmarks conservancy has got an application deadline in June. 363 00:47:00.390 --> 00:47:13.620 Adam Markovics: The application would be for a grant to obtain monies toward a condition survey essentially the church would have to chip in some money. 364 00:47:14.220 --> 00:47:27.450 Adam Markovics: I’m not sure if it's a an exact you know 5050 match, or what the contribution is so I my plan is to discuss this one program further with my contact hazel and. 365 00:47:28.410 --> 00:47:44.070 Adam Markovics: Perhaps work with her on submitting an application by the June deadline and I may reach out to the group for assistance with the application if if it looks like it's going to be involved. 366 00:47:47.370 --> 00:48:06.390 Adam Markovics: So that's what I’ve got on the first Baptist church, the other agenda item is historic markers I don't have anything further to add about that subject at this point in time Joyce cold spot spoke about this topic at the last meeting Joyce do you have anything to add. 367 00:48:07.380 --> 00:48:19.260 Joyce Cole: Yes, I did forget one request from Miguel Hernandez with his interest in getting a marker at the location, the former location of the brandreth pill factory. 368 00:48:20.550 --> 00:48:20.940 Adam Markovics: Okay.

Agenda Item #B.

Page 48 of 56

Page 49: VILLAGE OF OSSINING

369 00:48:23.850 --> 00:48:30.840 Adam Markovics: yeah I mean I certainly a worthwhile endeavor and we can talk more about. 370 00:48:31.890 --> 00:48:32.910 Adam Markovics: Whether. 371 00:48:33.930 --> 00:48:39.690 Adam Markovics: This would be worth pursuing as an expansion of the Museum in the streets. 372 00:48:41.100 --> 00:48:55.860 Adam Markovics: or under a different program like the Pomeroy Foundation signs, there were two are actually three then we're now talking about three sign proposals, the Red pill factory. 373 00:48:56.910 --> 00:49:02.490 Adam Markovics: residents were Sojourner Truth apparently stayed for a period of time in Ossining. 374 00:49:03.810 --> 00:49:08.280 Adam Markovics: And the Benjamin Franklin mile marker at Nelson Park. 375 00:49:11.130 --> 00:49:19.230 Adam Markovics: I think you know Joyce has been somewhat involved in these, and I can continue talking offline with Joyce about. 376 00:49:21.480 --> 00:49:25.110 Adam Markovics: You know, ways to approach these different projects. 377 00:49:27.120 --> 00:49:33.450 Adam Markovics: Unless anyone has anything further to add about this topic for now I think that's all I’ve gone. 378 00:49:39.960 --> 00:49:40.470 Adam Markovics: Okay. 379 00:49:41.610 --> 00:49:46.170 Adam Markovics: Is there anything else anyone wanted to bring up tonight. 380 00:49:49.050 --> 00:50:04.980

Agenda Item #B.

Page 49 of 56

Page 50: VILLAGE OF OSSINING

I have just one quick thing I was wondering how much we can work with people in the Community, who have a large some sort of social media presence to bring attention to things like the First Baptist Church. 381 00:50:06.360 --> 00:50:24.630 I don't know where that falls in terms of people are you know I haven't said anything anyone, but I do have some friends that definitely can get the word out about things happiness Nina historic things and I just see an opportunity there that I just wondered if that something. 382 00:50:26.610 --> 00:50:28.290 Stuart Kahan: aspirin we have a. 383 00:50:29.910 --> 00:50:31.590 Stuart Kahan: We do a weekly web blast. 384 00:50:32.670 --> 00:50:44.760 Stuart Kahan: yeah and if you have something you'd like to put in there, on behalf of HPC to sort of get interest in this, what I would suggest you do is contact Jaimie Hoffman. 385 00:50:45.360 --> 00:51:01.800 Stuart Kahan: At the village she's Project Manager she works out of the Manager’s office and it's her first initial Jay and then last name Hoffman at village of Ossining dot org and she can arrange to get that in there, she can also put something directly on the web page. 386 00:51:02.820 --> 00:51:09.000 Stuart Kahan: So that it can sort of you know, go out that particular way you know, through the villages various. 387 00:51:10.110 --> 00:51:16.170 Stuart Kahan: Social medias gets a little dicey or when we start putting stuff on other social medias you know that. 388 00:51:16.440 --> 00:51:24.330 Stuart Kahan: that's really your, but if you wanted to have something that goes out that way it certainly can because you know. 389 00:51:25.170 --> 00:51:40.170 Stuart Kahan: That goes, I think, through a constant contact I think it's 6000 maybe more pto goes out weekly so there's a lot of people who are see that so and then from that I guess it can get you know republished you know, wherever.

Agenda Item #B.

Page 50 of 56

Page 51: VILLAGE OF OSSINING

390 00:51:40.500 --> 00:51:42.930 Stuart Kahan: So it's just a thought, if you have any interest. 391 00:51:42.930 --> 00:51:43.590 Stuart Kahan: In doing it yeah. 392 00:51:43.680 --> 00:51:51.810 Catherine Wilson: I definitely yeah I could see how that would work to even can hop on social media for read posts and work. 393 00:51:52.830 --> 00:51:55.590 Thank you sure, yes, we can talk about that. 394 00:51:56.760 --> 00:52:12.030 Adam Markovics: yeah I mean I think I'd like to have a follow up conversation with my contact and then you know, maybe at this juncture we won't even need to do outreach it'll just be a matter of getting this application together for the technical assistance grant. 395 00:52:14.100 --> 00:52:20.250 Adam Markovics: And again, the purpose behind getting this technical assistance grant or condition survey is to get. 396 00:52:21.840 --> 00:52:32.850 Adam Markovics: An idea of sort of the most important areas that need to be addressed in the exterior and an idea of what these things will cost. 397 00:52:34.410 --> 00:52:43.380 Adam Markovics: And my thinking was let's get an idea of what needs to be done and how much it'll cost and then from there, think about other grants, like the. 398 00:52:44.940 --> 00:52:45.780 Adam Markovics: New York State. 399 00:52:47.460 --> 00:52:50.190 Adam Markovics: Parks and Recreation and Historic Preservation. 400 00:52:51.660 --> 00:52:56.220 Adam Markovics: grant I think it's called an environmental services grants something like that. 401

Agenda Item #B.

Page 51 of 56

Page 52: VILLAGE OF OSSINING

00:53:00.060 --> 00:53:01.830 Adam Markovics: and raising money from the public. 402 00:53:02.850 --> 00:53:08.580 Adam Markovics: Right, I think, firstly, we need to have a clear sense of what needs to be done and how much it'll cost. 403 00:53:13.530 --> 00:53:29.430 Adam Markovics: And finally Joyce I saw an email maybe it's a village blast as Stuart just mentioned about some interesting black history month events wonder if you could say a word or two about that. 404 00:53:29.820 --> 00:53:48.120 Joyce Cole: I’m sure it's a black history and culture exhibit for the for a month it's starting the Saturday and it's running through March 5 I’m taking a local approach to black history has been learning about you know the big names we're going to celebrate the big names in our Community. 405 00:53:49.290 --> 00:53:58.170 Joyce Cole: past and present, but spending a lot of time in the past about things that people don't know the first black fire men and COP and different issues that they faced in. 406 00:53:59.190 --> 00:54:06.210 Joyce Cole: The resilience of the Community, despite some obstacles they had and just looking at black life over two centuries. 407 00:54:08.100 --> 00:54:20.310 Joyce Cole: And now there's five I believe five live events in every week there's something there is a jazz concert and we talked to the artists had Daniel about his life growing up an awesome name, we have kj dinner. 408 00:54:21.630 --> 00:54:27.210 Joyce Cole: We have a young local artists that are showing their paintings it's just a celebration of. 409 00:54:28.440 --> 00:54:40.500 Joyce Cole: Black life on a lot of hands, that I didn't know where so super talented in this Community their paintings and their drawings in their photography and just at a time for them to amplify their voices and share with their community. 410 00:54:41.850 --> 00:54:45.840 Joyce Cole: So it's gonna it's gonna be very nice um it's seven rooms of history.

Agenda Item #B.

Page 52 of 56

Page 53: VILLAGE OF OSSINING

411 00:54:46.950 --> 00:54:48.270 Joyce Cole: Black history in the Community. 412 00:54:49.170 --> 00:54:49.710 Adam Markovics: Was this. 413 00:54:51.960 --> 00:54:56.400 Adam Markovics: Was this you're doing or it was a collective involved in launching this. 414 00:54:56.490 --> 00:55:06.360 Joyce Cole: Well, this it was kind of my doing, but it was a Community effort, so I do a lot of digging around, obviously, and I would find facts, and I was trying to figure out. 415 00:55:06.840 --> 00:55:15.240 Joyce Cole: What happened and I had to start going to elders and have people digging in closets and boxes I probably got a lot of people to do some spring cleaning. 416 00:55:15.900 --> 00:55:29.220 Joyce Cole: But I got a lot of stuff from people looking into there's their history piecing it together, because there was no record of a lot of the things that did happen so we're creating the record basically. 417 00:55:29.850 --> 00:55:35.730 Joyce Cole: By reaching out to the Community and compiling this information so it's really interesting. 418 00:55:36.180 --> 00:55:43.890 Joyce Cole: When you're going to someone's house and you're telling them about their ancestor that's their great grandfather they had no idea about, but they had all the information in their basement. 419 00:55:44.520 --> 00:55:51.420 Joyce Cole: So it was a learning experience for them, for me, and it will be for the Community, because it's black history month but it's Ossining and history. 420 00:55:52.650 --> 00:56:03.240 Adam Markovics: yeah this is such a worthwhile project and I’m really, really interested in it, I hope these events will be recorded if if people can't make it live.

Agenda Item #B.

Page 53 of 56

Page 54: VILLAGE OF OSSINING

421 00:56:03.690 --> 00:56:14.790 Joyce Cole: yeah there's going to be a virtual I’m it's at Bethany Arts Community is going to be a virtual component and then you can go inside the live events are streaming live and it'll be on Facebook as well okay. 422 00:56:15.660 --> 00:56:24.570 Adam Markovics: Very good bye I hope everyone will have an opportunity to tune into at least a little bit at us congrats this is exciting. 423 00:56:25.020 --> 00:56:25.470 Joyce Cole: Thank you. 424 00:56:26.970 --> 00:56:31.140 Adam Markovics: Okay, any anything else anyone would like to bring up. 425 00:56:33.360 --> 00:56:38.790 Phil Faranda: This is not historic preservation, but I have to state for the record that Stuart looks great with a beard. 426 00:56:39.780 --> 00:56:42.210 Joyce Cole: He looks like Sean Connery I was just thinking. 427 00:56:45.270 --> 00:56:47.850 Jaime Martinez: keeps getting flooded Sean Connery thing I. 428 00:56:48.270 --> 00:56:50.340 Stuart Kahan: Probably the fifth person Joyce. 429 00:56:51.210 --> 00:56:53.220 Joyce Cole: Well, we all can't be wrong Stuart. 430 00:56:53.310 --> 00:56:54.390 Stuart Kahan: yeah you know what. 431 00:56:55.410 --> 00:56:58.500 Stuart Kahan: My wife's favorite actors, so I think we're doing okay. 432 00:57:00.750 --> 00:57:02.610 Phil Faranda: Things are looking up in that household. 433

Agenda Item #B.

Page 54 of 56

Page 55: VILLAGE OF OSSINING

00:57:03.210 --> 00:57:05.130 Stuart Kahan: Exactly I you bet. 434 00:57:05.310 --> 00:57:13.830 Stuart Kahan: What can I say I won't make fun of the fact that she's already gotten her vaccination because she's 11 months older than Sean. 435 00:57:16.230 --> 00:57:21.030 Stuart Kahan: But my daughter has now had heard her is delayed twice because of the weather. 436 00:57:21.630 --> 00:57:34.980 Stuart Kahan: So hopefully she'll get it, you know they reschedule it very quickly, I must say, if any of you have had it, yet the County Center was a dream literally she went in injected out, it was like unbelievable. 437 00:57:36.690 --> 00:57:38.040 Joyce Cole: That we were running that. 438 00:57:38.940 --> 00:57:47.370 Stuart Kahan: They did great I want you to know that just really and that she was told she can come back in three weeks for at eight o'clock in the morning and just get she was like ecstatic. 439 00:57:47.850 --> 00:57:49.770 Stuart Kahan: It was really, really went well. 440 00:57:49.830 --> 00:57:53.790 Stuart Kahan: My daughter's doing it out of Jones beach so she's waiting to see how that works out. 441 00:57:56.580 --> 00:57:56.940 yeah. 442 00:57:58.830 --> 00:58:00.540 Adam Markovics: Well, on that note. 443 00:58:03.120 --> 00:58:09.150 Adam Markovics: I would like to make a motion to adjourn tonight's meeting would anyone care to second that emotion. 444 00:58:10.470 --> 00:58:11.160

Agenda Item #B.

Page 55 of 56

Page 56: VILLAGE OF OSSINING

Stephen Casey: I second. 445 00:58:12.360 --> 00:58:13.410 Adam Markovics: All in favor. 446 00:58:14.340 --> 00:58:15.300 Stephen Casey: Aye right. 447 00:58:16.830 --> 00:58:18.570 Stuart Kahan: Thank you folks see in March. 448 00:58:19.020 --> 00:58:20.310 Phil Faranda: so warm stay dry. 449 00:58:20.760 --> 00:58:22.440 Adam Markovics: You day bye.

Agenda Item #B.

Page 56 of 56