    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SR

    SITE DEVELOPMENT

    SITE CONSTRUCTION

    Earthwork on proposed structural built-up areas from part of the Note

    Work pertaining to respective building or structure as measured

    elsewhere.

    PAVING AND SURFACING

    01 Precast concrete pavers size 400 x400x40 mm gray color 27 M

    shotblasted and dark gray or light beige color smooth finish,

    including 20mm cement mortar bed, 100 mm thick concrete slab

    with a 193WWF, polyethylene moisture barrier, compacted sub

    grade as per detail 2 on drawing VL-GL-01 and specifications

    section 2515

    02 Precast concrete pavers size 400 x400x40 mm with 54 M

    200x100x80mm thk. brick bands including sand leveling course

    layer and cement mortar for tiles fixation, 100 mm thick concrete

    slab with a 193WWF, polyethylene moisture barrier, compacted

    sub grade as per detail 3 on drawing VL-GL-01 and specifications

    section 2515

    03 200x100x80mm thk. interlocking concrete pavers and concrete 17 M

    edger including compacted sand leveling course, 20mm cement

    mortar bed, cast in place concrete foundation and compacted

    aggregate base course, subgrade as per detail 4 on drawing

    VL-GL-01 and specifications section 2515

    04 400X400X10mm thk.non slip ceramic tiles including 20mm cement 13 M

    mortar bed, 100 mm thick concrete slab with a 193WWF,

    polyethylene moisture barrier, compacted sub grade as per detail 5

    on drawing VL-GL-01 and specifications section 2515

    SUNDRIES

    RAISED PLANTER

    raised planter including plain concrete and 150mm tkick R.C 5 M

    planter wall with granite cladding finish ,granite copping, gravel

    surface, weep hole, moisture barrier, compacted sub grade as per

    detail no. 6 on drawing VL-GL-01 and specifications section 3100,3200, 3300, and 2515

    Steps

    5 30mm thick flamed granite tread, 20mm thick polished granite riser 16 M

    including expansion joint, 20mm cement mortar bedding as per

    detail no. 10 on drawing VL-GL-01 and specifications

    To Collection SR

    ITEM D E S C R I P T I O N QTY UNIT RATE

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    1 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    2/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    PVC SHADE STRUCTURE

    PVC structure shade comprising tent fabric, beams, column

    (as per manufacture recommendation), earthworks,

    foundations, water proofing, fixing, finishing and all related

    works as per detail no. 7 on drawing VL-GL-01 and

    specification section 13015, 2870 (area measured on plan)

    01 PVC shade structure 18 M

    TENSILE STRUCTURE

    Tensile structure comprising of posts, canopy (as per

    manufacture recommendation), earthworks, foundations,water proofing, fixing, finishing and all related works as per

    detail no. 8 on drawing VL-GL-01 and specification section

    05500, 2870 (area measured on plan)

    02 Tensile structure canopy 16 M

    CONCRETE FENCE

    Boundary concrete fence comprising excavation, backfilling,

    plain and reinforced concrete foundation, insulation, grade

    beams, columns, precast concrete w/plaster and paint (Both

    side), grooves, two aluminum doors tubular sections with

    glass, parking door, expansion joints, decorating, finishingas per elevations A,B,C on drawing VL02-X-L02 and as per

    specifications section 03300, 08120

    03 Boundary concrete fence 2600mm height to suit required locations 69 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    2 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    3/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    WATER FOUNTAIN

    Water Fountain comprising, reinforced concrete structure,

    30mm thick cladding (sand stone , finish : natural/rought)

    fixed on 20mm thick latex modified mortar bed,

    200x200x30mm thick sand stone coping all exposed edges to

    be pencil rounded finished sand blasted color to match

    surrounding, water basin with 20x20x4mm thick vitreous tile

    non slip glass mosaic, color mix laid on 15mm thick latex

    modified mortar bed,20mm thick cut to size black slate with

    natural finished to achieve wave/surge effect laid on 15mm

    thick latex modified mortar bed, 50mm thick x varies width

    hollow section marine grade stainless steel capping with

    water supply for cascade. Fin. polished to water feature,water proofing membrane, supply and drainage pipework,

    fountain pump, electrical power and lighting, required to

    complete the work installation and all associated works as

    per detail 9 on drawing VL-GL-01 and specification section

    13150

    01 To suit Fountain (approximate area 16 m2) 1 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    3 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    4/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    LANDSCAPING

    Palms including pit, stakes and ties, soil planting mix,

    mulching, filter membrane and drainage layer, concrete

    screed and waterproofing membrane and all required as per

    details P1 & P2 and planting schedule on drawing VL-GL-01

    and specifications section 2900

    PALMS

    01 P/Re 1 No.

    TREES

    02 T/Aa 1 No.

    Shrubs and ground cover including planting, , soil planting

    mix, filter, 63mm thick expanded polystyrene water storage

    and drainage element, 80 mm thick screed slope to drain,

    3mm water proofing membrane and drainage layer all as

    per detail P3 and planting schedule on drawing VL-GL-01 as

    per specification section 2900

    SHRUBS

    03 S/Hs 9 No.

    04 S/Ld 4 No.

    GROUND COVER

    05 G/Cgp 60 No.

    06 G/Cm (p) 19 No.

    07 G/Cm (y) 22 No.

    08 G/Gr (y) 3 No.

    LAWN

    09 L/Cd 14 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    4 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    5/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    PLUMBING INSTALLATIONS

    WASTE AND DRAINAGE INSTALLATION

    Supply, install and test pipework, UPVC schedule 40, for

    waste and drainage the work shall include but not limited to

    earthwork, fittings, supports, trenchwork and all materials

    and equipment required to complete and finish the work as

    shown on drawings and according to specifiactions

    section 2730

    01 50 mm dia 10 M

    02 100 mm dia 10 M

    03 150 mm dia 29 M

    Accessories

    04 Gully trap, ef. (GT) 1 No.

    Inspection chambers , including reinforced concrete, with

    aluminium cover and frame, including earthworks, and all

    materials and equipment required to complete the work as

    per drawings, and according to specifications section 2730

    05 Ref. (CTIC) 600 x 600 mm 3 No

    STORM DRAIN INSTALLATION

    Supply, install and test pipework, UPVC schedule 40, for

    storm drainage the work shall include but not limited to

    earthwork, fittings, supports, trenchwork and all materials

    and equipment required to complete and finish the work as

    per drawings and according to specifiactions, section 2720

    06 75 mm dia 16 M

    07 100 mm dia 22 M

    08 150 mm dia 24 M

    Accessories

    09 Ground cleanout 75mm dia., ref. (GCO) 1 No.

    10 Ground cleanout 100mm dia., ref. (GCO) 1 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    5 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    6/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    STORM DRAIN INSTALLATION

    Inspection chambers , including reinforced concrete, with

    aluminium cover and frame, including earthworks, and all

    materials and equipment required to complete the work as

    per drawings and specifications section 2720

    01 Ref. (IC) 600 x 600 mm 1 No

    Supply, installation and test pipework, UPVC schedule 80-

    class V for water and CPVC schedule 80 class V for hot water

    the work shall include but not limited to installation, fittings,

    insulation for hot pipework, valves, supports and all

    materials and equipment required to complete and finish thework as per drawings and according to specifications

    section 2668

    02 40 mm dia. 36 M

    03 50 mm dia. 10 M

    Accessories

    04 Water meter assembly 40mm dia., ref. (WMA) 1 No

    Irrigation water installation

    Supply, installation and test pipework, UPVC schedule 80-

    class V for Irrigation water the work shall include but not

    limited to installation, fittings, valves, supports and all

    materials and equipment required to complete and finish the

    work as per draiwngs and according to specifications

    section 2810

    05 15 mm dia. 2 M

    06 20 mm dia. 25 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    6 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    7/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    PLUMBING INSTALLATIONS

    Irrigation water installation

    Accessories

    01 Water meter assembly 20mm dia., ref. (WMA) 1 No

    02 Hose bib 15mm dia., ref. (HP) 2 No

    POTABLE WATER SUPPLY

    Reinforced concrete under ground water tank with

    proprietary cast iron manhole covers and frames the workshall include but not limited to earthworks, concrete works,

    internal lining and water proofing, access ladders, pipework

    and valves, vent pipes, and all materials and equipments

    required to complete and finish the work according to

    drawings and specifications section 2668

    03 Potable water tank capacity 10 m3 1 Item

    POTABLE WATER SUPPLY SYSTEM

    Supply, installation and test Packaged type constant

    pressure booster potable water pumps, set of one duty and

    one stand by pump, the work shall include but not limited topiping and valves complete with all controllers, accessories

    for automatic operateion and all materials and equipments

    required to complete and finish the work according to

    drawings and specifications section 2668

    04 Potable water pumps, power 1.32 KW 1 Set

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    7 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    8/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    ELECTRICAL UTILITIES

    MAIN AND SUB-MAIN POWER

    Sub-Main Circuit: supply , install , testing and commissioning

    600/1000V XLPE multicore copper cable in conduit ,

    including junction boxes, connection for feeders and various

    power loads as shown on drawings and coordination &

    integration with other systems shall be conducted during

    work execution as per technical specifications, drawings and

    by making arrangement with supervising engineer to

    achieve the work to the best possible and specifications

    section 16126

    01 4C-120mm-CU/XLPE/PVC/ 110 mmd UPVC conduit in 20 M

    ground

    Supply, install ,test and commissioning panel boards

    complete including circuit breakers, enclosures, fixings,

    supports and associated lighting contactors where required

    as shown on drawings and as described in specifications

    section 16129 & 16442

    02 Bus bar interface panel (IP54) 1 No

    OUTDOOR HAND HOLE

    Supply, install, testing and commissioning reinforced

    concrete Hand Holes connected via UPVC conduit, complete

    with hand hole bolted type metal cover, drain pipe outlet,

    including trenching and backfilling for UPVC conduits for

    power & telecommunication cables in UPVC conduit, tapes, ,

    grounding, all as required to suit locations as shown on

    drawings and as described in specifications section 16050

    03 Hand Hole Ref.( HH) 1 No

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    8 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    9/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    ELECTRICAL WORKS

    OUTDOOR POWER AND LIGHTING

    Supply , install, test and commissioning power and sockets

    accessories including all necessary boxes, faces(according

    to the engineer approval ) comprising cables, conduits,

    fittings, connections, from the outlets to Panel boards feeder

    associated works as required to suit the locations shown on

    drawings Coordination with other disciplines shall be

    conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best

    possible and specifications section 16050

    01 Wall mounted junction box for CCTV camera 5 No

    02 Disconnect switch, non-fused with pilot light, 2 No

    weatherproof , 20A, 1P, 230V for fountain pump & lift

    pump

    OUTDOOR LIGHTING INSTALLATION

    Supply, install and testing of lighting fixture outlets and

    including conduits, wires and all boxes belong to Lighting

    Panel boards and associated works as required to suit the

    locations shown on drawings .Coordination with other

    disciplines shall be conducted during work execution as per

    technical specifications, drawings and by making

    arrangement with supervising engineer to achieve the work

    to the best possible and specifications section 16500 & 16050

    03 Lighting fixture outlets 25 No

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    9 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    10/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    ELECTRICAL WORKS

    OUTDOOR LIGHTING INSTALLATION

    Supply ,install, assembly, test and commissioning of lighting

    fixture (furnished with lamp and electronic blast,

    accessories and internal wires) mounting

    accessories.(according to the engineer approval ) associated

    works as required to suit the locations shown on drawings

    .Coordination with other disciplines shall be conducted

    during work execution as per technical specifications,

    drawings and by making arrangement with supervising

    engineer to achieve the work to the best possible and

    specifications section 16500 & 16050

    01 Ref. WL2 17 No

    02 Ref. WL3 8 No

    DATA AND VOICE SYSTEM INSTALLATION

    Supply and install a data and voice system ( apart including

    fiber optic cable all UTP CAT 6A cable, switches , conduits,

    connection/ extension and interfacing all as shown on

    drawings, specifications section 16720 & 16770 and single

    line diagram drawing all as complete consisting of, but not

    limited to:

    To suit system network equipped with:

    03 Wall mounted telecommunication outlet, weatherproof 1 No

    for intercom, ref. (TO) I

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    10 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    11/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    ELECTRICAL WORKS

    OUTDOOR COMMUNICATION SYSTEMS

    OUTDOOR INTEGRATED SECURITY SYSTEM

    Supply, install, testing and commissioning of integrated

    security system ( included all feeders/conduits where

    required) for extension, connection & interfacing) complete

    to suit the locations shown on drawings, coordination,

    integration with other systems shall be conducted during

    work execution as per technical specifications, drawings

    and by making arrangement with supervising engineer to

    achieve the work to the best possible and specifications

    section 16783

    To suit a integrated security system consisting of, but not limited

    to:

    01 IP digital color fixed outdoor camera, wall mounted 4 No

    with advanced smart motion detection

    02 Reader interface module (ref. RIM) 1 No

    03 Door access system push button (ref. PB) 1 No

    04 Elec. door shutter 1 No

    05 Door contact with electric lock 1 No

    06 Garage contact 1 No

    07 Long range card reader 1 No

    08 Integrated security system network including 1 Item

    conduits, wiring, pull boxes, outlets, connections, and

    all required accessories to form a complete

    and fully operative system

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    11 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    12/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    SITE DEVELOPMENT

    Collection

    Sheet - 1

    Sheet - 2

    Sheet - 3

    Sheet - 4

    Sheet - 5

    Sheet - 6

    Sheet - 7

    Sheet - 8

    Sheet - 9

    Sheet - 10

    Sheet - 11

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    12 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    13/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 2 - SITE WORK

    SITE GRADING

    All additional excavation required for temporary works and spaces,

    shoring, dewatering, removal of surplus excavated materials,

    support, temporary spoil heaps and general compaction Note

    EXCAVATION AND EARTHWORK

    Necessary moving or transportation about the site excavation Note

    material including handling to temporary stockpile or ultimate

    disposal off site is to be included in the unit rate of excavation

    Excavation in natural land consisting of solid rock formation,

    cracked rocks, bolders and natural contoured soil, temporary

    earthwork supports, dewatering ( if any ) as per

    specifications sections 02200

    01 Excavation for foundations commencing from existing grade level 123 M

    Backfilling

    02 Approved selected imported fill material including compaction in 70 M

    making up levels around and over foundations, beds and the like as

    per spec. sections 02200

    03 Approved fill material selected from excavated material including M price only

    compaction as per specification section 02200

    Drainage layer

    04 100 mm thick compacted coarse gravel to underside of slabs on 185 Mgrade as per specification section 02200

    Soil treatment application for termite control

    05 To subgrades of slabs and along periphery of building 297 M

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    13 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    14/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    CONCRETE TYPES

    Include in Unit Rates for concrete of the following types and

    locations:

    20 Mpa

    a) Blinding concrete

    b) Catch basins and side walks Note

    40 Mpa

    a) Footings

    b) Columns and R.C. walls

    c) Floor and roof slabs, beams, girders, stairs

    d) Concrete topping or structural screed

    e) Slab on grade

    f) water tanks

    Plain insitu concrete, 20 Mpa, cement type V as per

    specifications section 03300

    01 Blinding beds, 100 mm thick 11 M

    Insitu reinforced concrete, 40 Mpa cement type V includingformwork and steel reinforcements conforming to

    ASTMA615and A185 as per specifications sections 03100,

    03200 & 03300

    02 Footing 21 M

    03 Grade and tie beams 13 M

    04 Strap beams 9 M

    05 Columns pedestals 2 M

    06 Slab on grade 125 mm thick with A193WWF mesh reinforcement 23 M

    including thickening

    07 Steps on grade including related concrete elements 2 M

    To Collection

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    14 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    15/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    Insitu reinforced concrete, 40 Mpa type I cement including

    formwork and steel reinforcements conforming to ASTM

    A615 and A185 as per specifications sections 03100, 03200 &

    03300

    01 Columns 14 M

    02 Beams 11 M

    03 Suspended flat slabs, 240mm thick 87 M

    04 Suspended flat slabs, 200mm thick 19 M

    05 Suspended flat slabs, 180mm thick 2 M

    06 Stairs 7 M

    Sundries

    07 R.C coping to suit parapet as per detail 7 on drawing VL-GA-04 63 M

    08 Allow for precast concrete splash block including grout and all 2 No.associated works as shown and detailed on drawings

    NOTES:

    Include in unit rates works associated to construction and control Note

    joints including joints surrounding equipment pads along with

    necessary caulk

    To Collection SR

    Collection

    Sheet - 14

    Sheet - 15

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    15 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    16/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 4 - MASONRY

    UNIT MASONRY

    Supply and fix concrete masonry blocks in courses with

    cement lime mortar including concrete lintels over

    openings , horizontal and vertical reinforcement, fixings,

    fillers, sealants and grout to complete the work according

    to specifications section 04200 and drawings

    01 100 mm thick wall 499 M

    02 200 mm thick wall 166 M

    03 Ditto, but one hour fire rated 116 M

    04 300 mm thick insulated wall 183 M

    05 400 mm thick insulated wall 12 M

    06 200 mm thick pre-insulated wall 37 M

    07 200 mm thick wall for parapet 77 M

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    16 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    17/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 5 - METALS

    HANDRAILS

    Supply and install twisted wrought iron hand rail with beech

    wood cap including fixing, wood handrail, finishing as per

    detail no.7 on drawing VL-GA-01 and as per specification

    section 05500

    01 Handrail to suit stairs 26 M

    Supply and install stainless steel handrail diameter 60 and

    30 mm, including fixing finishing as shown on drawing

    VL02-A02 and as per detail no. 13 on drawing VL-GA-04 andas per specification section 05500

    02 Handrail to suit faade 15 M

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    17 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    18/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISON 6 - WOOD AND PLASTIC

    External wooden tiles including fixing, finishgs and all

    associated work as shown on drawing and according to

    specifications section 6400

    01 External wooden tiles to suit faade 9 M2

    SUNDRIES

    Supply and install counter top lavatory, comprising counter

    top holed for lavatory (lavatory measured elsewhere) with

    backsplash, vanity unit , stainless steel bars, facia, sides, and

    metal framing including finishings, sealants and trims as perdetail 2,3 on drawing VL-GA-01 and specifications section

    6100

    02 Vanity top to suit required locations 11 M

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    18 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    19/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 7 - THERMAL AND MOISTURE PROTECTION

    Wall insulation

    01 Vapour retarder as per specifications section 07100 164 M

    Water proofing and moisture protection as per specification

    section 07100

    02 Membrane waterproofing to suit "wet room" areas including upturn 50 M

    to abutting walls or upstands concrete screed and all required

    material and equipments to complete the work as per details

    shown on drawing, according to specifications and code of practice

    Damp proofing

    03 Two coats of bituminous coatings on to surfaces of concrete in 175 M

    contact with soil as per specifications section 07150

    Vapour barrier

    04 Vapour barrier to underside of slabs, beds, and the like, 185 M

    specifications section 07100

    ROOFING SYSTEM

    Roofing system comprising gravel layer separation sheet,rigid insulation, waterproofing membrane and concrete

    screed to form slope to drain, including precast tiles where

    occur for maintenance walks, forming of cant strips, and

    waterproofing membrane base flashing, metal flashing,

    sealants and fixings, steel fabrications, all as per detail 1 on

    drawing VL-GA-04 and specifications section 07500

    05 To suit roof area 176 M

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    19 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    20/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 8 - DOORS AND WINDOWS

    DOOR SETS

    Supply and install all doors to suit masonry openings and approved Note

    samples including fixings, decorations, frames, architrave,

    hardwares and saddles and all required materials and equipments

    to complete and finish the work as detailed on drawing VL-GA-02

    and according to specifications sections 08210 and 08100

    44mm thick solid hard wood door including frames and

    decoration as per drawings and specifications

    01 Type A1, double leaves door, size 1300x2150mm 2 No.

    44mm thick paneled wood door. including frames and

    decoration as per drawings and specifications

    02 Type C1, single leaf door, size 900x2150mm 8 No.

    03 Type C2, single leaf door, size 800x2150mm 7 No.

    04 Type C3, single leaf door, size 700x2150mm 1 No.

    44mm thick paneled wood folded door. including frames and

    decoration as per drawings and specifications

    05 Type D1, four leaves door, size 1400x2150mm 1 No.

    44mm thick wrought iron door with laxan sheet backing

    including frames, finishes as shown on drawing and

    specification

    06 Type E1, single leaf door, size 900x2150mm 1 No.

    44mm thick painted hollow metal insulated door including

    frames and decortion as per drawings and specification

    07 Type F1, single leaf door, size 900x2150mm 1 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    20 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    21/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 8 - DOORS AND WINDOWS

    DOOR SETS

    GLAZED DOORS

    24 mm thick double glazed sliding door tinted outside clear

    inside on powder coated aluminum frames including saddels

    and hardware as shown on drawing VL-GA-02 and

    specifications section 08800

    01 Ref GD03, double leaves door, door size 1600x2200mm 1 No

    24 mm thick double glazed sliding door tinted ouside clear

    inside on powered coated aluminum frames with fixedupper panel including saddels and hardware as shown on

    drawing VL-GA-02 and specifications section 08800

    02 Ref GD08, double leaves door, door size 1920x3260mm 1 No

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    21 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    22/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 8 - DOORS AND WINDOWS

    WINDOWS

    Supply and install all windows to suit masonry opening

    including all hardware, fixtures, packing's, sealants, weather

    stripping and the like as described on drawing VL-GA-03 and

    according to specifications section 08520

    24mm thick double tempered glazed sliding window, tinted

    outside clear inside on powder coated aluminum frame

    01 Ref. W02, overall size 1500x1000mm 1 No

    24mm thick double tempered glazed sliding window tinted

    outside clear inside on powder coated aluminum frame with

    fixed upper, lower & side panels

    02 Ref. W06, overall size 4350x2860mm 1 No

    03 Ref. W24, overall size 4470x3160mm 1 No

    6mm thick sand plastid tempered glazed awning window on

    powder coated aluminum frame with fixed lower panel

    04 Ref. W08, overall size 600x1250mm 6 No

    24mm thick double tempered glazed fixed window, tinted

    outside clear inside on powder coated aluminum frame

    05 Ref. W13, overall size 1100x2860mm 2 No

    06 Ref. W20, overall size 1200x3260mm 1 No

    24mm thick double tempered glazed sliding window tinted

    outside clear inside on powder coated aluminum frame with

    fixed upper panels

    07 Ref. W21, overall size 2000 x 2860mm 2 No

    08 Ref. W22, overall size 2900 x 2260mm 1 No

    09 Ref. W23, overall size 1600 x 2860mm 1 No

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    22 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    23/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 8 - DOORS AND WINDOWS

    WINDOWS

    Supply and install all windows to suit masonry opening

    including all hardware, fixtures, packing's, sealants, weather

    stripping and the like as described on drawing VL-GA-03 and

    according to specifications section 08520

    24mm thick double tempered glazed sliding window, tinted

    outside clear inside on powder coated aluminum frame

    01 Ref. W17, overall size 1025x1200mm 1 No

    24mm thick double tempered glazed sliding window tinted

    outside clear inside on powder coated aluminum frame with

    fixed upper & middle panels

    02 Ref. W18, overall size 5320x2860mm 1 No

    To Collection SR

    Collection

    Sheet - 20

    Sheet - 21

    Sheet - 22

    Sheet - 23

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    23 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    24/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 9 - FINISHES

    INTERNAL FINISHES

    Flooring including respective types of bounding materials,

    concrete screed sub-floor of required thickness, (if any)

    accessories for complete installations as per ID drawing

    and specifications sections 9310, 9420, 9600, 9660, 9671, 9680 and 9685

    01 Ceramic floor tiles size 300x300 mm , ref. CR 26 M

    02 Porcelain floor tiles size 600x600mm , ref. PT1 38 M

    03 Porcelain floor tiles size 300x300mm , ref. PT2 23 M

    04 Vinyl sheet for sportage use, ref. VS 25 M

    05 600x600x20mm polished crema marfil marble, ref. M1 160 M

    06 Floor pattern comprising of 600x600x20mm polished crema marfil 88 M

    marble, ref. M1 with polished dark emprador marble stripes, ref. M2

    Ceramic tiles for wet area are anti-slip type Note

    Finishings : bases including sand-cement backing mortar

    and grout

    07 100 mm high Polished marble base, ref. B01 259 M

    08 100 mm high porcelain base, ref. B02 21 M

    09 100 mm high Ceramic tiles base , ref. B03 33 M

    10 100 mm high vinyl cove base , ref. B04 19 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    24 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    25/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 9 - FINISHES

    INTERNAL FINISHES

    Finishings : walls including metal angle beads and lathing at

    junctions of differing backgrounds according to

    specifications section 9200, 9310, 9900 and 6400

    01 Cement plaster 883 M

    02 Paint on cement plaster, ref. W01 628 M

    03 Decorative paint on cement plaster, ref. W02 255 M

    04 Ceramic wall tiles ,ref. W03 66 M

    05 Porcelain wall tiles, ref. W04 132 M

    Finishing: stair treads, risers and landings including bedding

    and pointing as per detail 6 shown on drawing VL-GA-01

    and according to specifications section 9600

    06 Polished marble 30mm thick for treads and 20mm thick for riser, 64 M

    ref. M3 to suit stair

    08 Polished marble to suit stair landings and floors, ref. M3 20 M

    Finishings : ceilings

    09 Cement plaster to suit ceiling 111 M

    10 Paint on cement plaster including , ref. C01 111 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    25 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    26/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 9 - FINISHES

    INTERNAL FINISHES

    Finishings: Suspended ceilings including suspension system

    as shown on ID drawing and according to specifications

    section 9250, 9510 & 9547 (Area measured on plan)

    01 Painted gypsum board, ref. C02 100 M

    02 Painted gypsum board with cove light , ref. C03 42 M

    03 Painted decorative gypsum board with cove light and cement 58 M

    plaster including paint to suit dining and living room ceilings space

    no. (G-06), (G-12)

    04 Moisture resistant painted gypsum board , ref. C04 27 M

    05 Cement plaster including paint, ref. C01 and painted gypsum board 44 M

    with cove light, ref. C03

    06 Moisture resistant painted gypsum board, ref. C04 and metal tiles 20 M

    600x600mm, ref. C05

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    26 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    27/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 9 - FINISHES

    EXTERNAL FINISHES

    Stone cladding mechanical fixation including fixings ,

    finishings and all associated work as per detail on drawings

    and specification section 9600

    01 Natural slatted brown stone cladding 179 M2

    02 Black marble cladding 26 M2

    Finishing : walls including metal angle beads and lathing at

    junctions of differing backgrounds according to

    specifications section 9200, 9600 and 9900

    03 Cement plaster to suit external surface 517 M2

    04 External Paint beige color on Cement plaster to suit external 227 M2

    surface

    05 Ditto, but light brown color 210 M2

    06 External paint on cement plaster to suit internal side of parapet 77 M2

    Finishing: stair treads, risers and landings including bedding

    and pointing as per detail 6 shown on drawing VL-GA-01

    and according to specifications section 9600

    07 Polished marble 30mm thick for treads and 20mm thick for riser,

    to suit external stair 6 M

    08 Polished marble to suit external entrances, ref. M3 3 M2

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    27 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    28/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 9 - FINISHES

    Collection

    Sheet - 24

    Sheet - 25

    Sheet - 26

    Sheet - 27

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    28 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    29/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 10 -SPECIALTIES

    TOILET AND BATH ACCESSORIES

    Supply and installation of following toilet and bath

    accessories as per schedule including fixings and trims as

    shown on drawings and specification section 10800 to suit

    locations as required

    01 Ref. FM1, Clear glass counter wide mirror on 20 mm thick plywood 11 Mbacking, 900mm high

    02 Ref. FM2, Clear glass mirror size 400x600mm with stainless steel 1 No.frame

    03 Ref. RH, single robe hook 10 No.

    04 Ref. SDH, wall mounted soap dish and holder 8 No.

    05 Ref. TPH, Toilet paper holder 5 No.

    06 Ref. TR, towel ring 2 No.

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    29 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    30/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    SANITARY FIXTURES

    Supply and install sanitary fixtures, water mixers and

    accessories, as selection schedule, the work shall include

    but not limited to necessary fittings, trims, valves, traps,

    spouts and all materials and equipment required to

    complete and finish the work according to specifiactions

    section 15440 and drawings

    01 Floor mounted water closet with flush tank, ref. (WC) 5 No

    02 Conuter top lavatory, ref. (LAV1) 2 No

    03 Surface-mounted wash basin over vanity unit, ref. (LAV2) 5 No

    04 Lavatory without pedistal, ref. (LAV3) 1 No

    05 Bath tub 70x160cm, ref. (BT) 2 No

    06 Counter top one bowel sink, ref. (03) 1 No

    07 One bowel sink with side drain, ref. (04) 1 No

    WASTE AND DRAINAGE INSTALLATION

    Supply, installation and test drainage pipe work UPVC

    schedule 40 the work shall include but not limited to fittings,

    supports hangers, excavation, backfilling, cast iron pipes on

    roof for vent with caps and all materials and equipment

    required to complete and finish the work according to

    specifiactions section 15050, 15100, 15125, 15140 & 1540 and

    drawings

    08 32 mm dia 28 M

    09 40 mm dia 52 M

    10 50 mm dia 111 M

    11 75 mm dia 56 M

    12 100 mm dia 55 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    30 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    31/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    WASTE AND DRAINAGE INSTALLATION

    Accessories

    01 Floor drain, 50 mm dia., ref. (FD) 10 No.

    02 Area drain 75mm dia., (AD) 2 No.

    03 Roof drain , 75 mm dia., ref. (RD) 1 No.

    04 Scupper roof drain 75mm dia., ref. (SRD) 2 No.

    05 Cleanout, 100 mm dia., ref. (CO) 1 No.

    06 Floor cleanout 75mm dia., ref. (FCO) 2 No.

    07 Floor cleanout 100mm dia., ref. (FCO) 2 No.

    08 Splash to roof deck 75mm dia., 2 No.

    Packaged duplex type discharge pressure system potable

    water booster lift pumps, one duty & one stand-by, the work

    shall include but not limited to piping, valves, fittings,

    support, controllers, accessories for automatic operation

    and all materials and equipment required to complete and

    finish the work according to specifications, section 15453 and

    drawings

    09 Potable water booster lift pump, power 0.88 kw each 1 Set

    Supply, install, test and commissioning fiber glass

    elevated water tank for potable water, the work shall include

    but not limited to related piping fitting, valves and all

    materials and equipment required to complete and finish the

    work according to specifications section 15411 and drawings

    10 Elevated water tank cap 1000 liters 2 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    31 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    32/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    COLD WATER INSTALLATION

    Supply, installation and test pipework, plypropylene for

    cold water the work shall include but not limited to

    installation, fittings, insulation for hot pipework, valves,

    supports and all materials and equipment required to

    complete and finish the work according to specifications

    section 15411 and drawings

    01 15 mm dia. 28 M

    02 20 mm dia. 42 M

    03 25 mm dia. 27 M

    04 40 mm dia. 30 M

    05 50 mm dia., 28 M

    HOT WATER INSTALLATION

    Supply, installation and test pipework, plypropylene for

    hot water the work shall include but not limited to

    installation, fittings, insulation for pipework, valves,

    supports and all materials and equipment required to

    complete and finish the work according to specifications

    section 15411 and drawings

    06 15 mm dia. 36 M

    07 20 mm dia. 7 M

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    32 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    33/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15 - MECHANICAL

    HOT AND COLD WATER INSTALLATION

    Accessories

    01 Isolating valve, 25 mm dia, ref. (IV) 5 No.

    02 Hand spray with flexible hose and wall hook, ref. (HS) 5 No.

    03 Wall mounted shower head, ref. (SH) 1 No.

    Supply, install, testing and commissioning

    electrical water heaters the work shall include but

    not limited to short length pipework, valves,

    supports, controls, fixings, accessories and allassociate works and all materials and equipments

    required to complete and finish the work according

    to drawings, specification section 15860

    04 Ref. EWH- 1, capacity 20 liters, 3 KW 2 No

    05 Ref. EWH- 2, capacity 10 liters, 1.5 KW 1 No

    06 Ref. EWH- 3, capacity 40 liters, 3 KW 2 No

    FIRE PROTECTION SYSTEM

    Supply and install portable fire extinguisher, multipurposeincluding fixing and all materials and equipments required

    to complete and finish the work according to drawings,

    specification section 15320

    07 Ref. PFE 3 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    33 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    34/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15A - MECHANICAL

    Collection

    Sheet - 30

    Sheet - 31

    Sheet - 32

    Sheet - 33

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    34 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    35/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    CHILLED WATER SYSTEM

    Supply, install and test black steel pipework including

    fittings thermal insulation, valves, gagues, strainers,

    flexible connections and accessories as per required

    drawings and spec. sections15050 to 15140 ,15510

    01 15 mm dia. 35 M

    02 20 mm dia. 45 M

    03 25 mm dia. 10 M

    04 32 mm dia. 35 M

    05 40 mm dia. 20 M

    06 Flush mounted cabinet including 40mm dia., BTU meter and 40mm 1 No.

    dia., two isolating valves and 40mm dia., check valve as detailed

    on drawings

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    35 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    36/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install, test and commission, Fan coil units ducted

    type including control valves, pressure & temperature,

    gauge, Y-strainer mounting and fixing as per drawings and

    specifications section 15781

    01 Ref. FCU-01, 6.3 KW cooling capacity, 2 kw heating capacity 1 No.

    02 Ref. FCU-02, 4.7 KW cooling capacity, 2 kw heating capacity 1 No.

    03 Ref. FCU-03, 8 KW cooling capacity, 3 kw heating capacity 1 No.

    04 Ref. FCU-04, 6.4 KW cooling capacity, 1 No.

    05 Ref. FCU-05, 4 KW cooling capacity, 1.5 kw heating capacity 1 No.

    06 Ref. FCU-06, 7.1 KW cooling capacity, 2 kw heating capacity 1 No.

    07 Ref. FCU-07, 2.7 KW cooling capacity, 2 kw heating capacity 1 No.

    08 Ref. FCU-08, 3.5 KW cooling capacity, 1.5 kw heating capacity 1 No.

    09 Ref. FCU-09, 2.9 KW cooling capacity, 1.5 kw heating capacity 1 No.

    10 Ref. FCU-10, 1.9 KW cooling capacity, 1.5 kw heating capacity 1 No.

    11 Ref. FCU-11, 5.5 KW cooling capacity, 2 kw heating capacity 1 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    36 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    37/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install, test and commission, Ventilating fans as

    details on drawings and specifications, section 15860

    01 Ref. EF- 01, 35 LPS capacity 1 No.

    02 Ref. EF- 02, 35 LPS capacity 1 No.

    03 Ref. EF- 03, 30 LPS capacity 1 No.

    04 Ref. EF- 04, 30 LPS capacity 1 No.

    05 Ref. EF- 05, 30 LPS capacity 1 No.

    06 Ref. EF- 06, 30 LPS capacity 1 No.

    07 Ref. EF- 07, 30 LPS capacity 1 No.

    08 Ref. EF- 08, 30 LPS capacity 1 No.

    09 Ref. EF- 09, 30 LPS capacity 1 No.

    10 Ref. FAF- 01, 310 LPS capacity 1 No.

    Supply, install, test and commission, Supply air square

    ceiling diffusers with opposed blade volume damper

    including frame trims & insulated plenum box as detailed on

    drawing and specification, section 15860

    11 Ref. SD6A, B, C, D & E 2 No.

    Supply, install and test Supply air slot linear

    diffusers as detaild on drawings and spec. section 15891

    12 Ref. SLD3 9 No.

    13 Ref. SLD5 7 No.

    14 Ref. SLD7 3 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    37 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    38/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install and test Supply air round

    ceiling diffusers with opposed blade volume damper

    including frame trims & insulated plenum box as detailed on

    drawing and specification, section 15860

    01 Ref. SD1 2 No.

    02 Ref. SD2 2 No.

    Supply, install, test and commission, Supply return air slot

    linear diffuser as detailed on drawings and spec. section

    15891

    03 Ref. RLD3 9 No.

    04 Ref. RLD5 7 No.

    05 Ref. RLD7 3 No.

    Supply, install, test and commission, Return square louver

    face ceiling diffusers as detailed on drawing and

    specification, sections 15860 & 15891

    06 Ref. RD6A, B, C, D & E 2 No.

    Supply and install exhaust register as detailed on

    drawing and specification, section 15891

    07 Ref. ER1 13 No.

    Supply and install Galvanized steel sheet rectangular

    ductwork, including supports and volume damper ,

    and bill mouth opening as per drawings and

    specification, section 15891

    08 Various gauges 550 Kg

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    38 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    39/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install, test and commission door grille as detailed

    on drawing and specification

    01 Ref. DG 1 8 No.

    Supply and install Duct insulation

    02 Thermal semi-rigid insulation to rectangular ductwork 145 M

    Supply, install and test return air round ceiling diffusersas detailed on drawing and specification, section 15860

    03 Ref. RD1 2 No.

    04 Ref. RD2 2 No.

    To Collection SR

    Collection

    Sheet - 35

    Sheet - 36

    Sheet - 37

    Sheet - 38

    Sheet - 39

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    39 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    40/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    PRIMARY POWER SUPPLY

    Smart Metering System

    Supply, installation , testing and commissioning of Smart

    Metering System comprising of M-bus master controller

    ,M-bus IP router, complete with soft ware, including

    electronic KWH meter, interface with water meter& digital

    BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each

    meter, and the necessary connection to TCP/IP net work and

    all associated works required as shown on drawing and as

    described in specifications section 1621

    To suit Building Smart Metering System as required to form a Note

    complete and fully operative system to link all project buildings

    with the existing data center at phase (1)

    01 Electronic KWH meters 1 No

    02 M-bus master controller complete with software 1 No

    03 M-bus IP router 1 No

    MAIN AND SUB-MAIN POWER

    Sub-Main Circuit: supply , install , testing and commissioning

    600/1000V PVC multicore copper cable in conduit , including

    junction boxes, connection for feeders and various power

    loads as shown on drawings and coordination & integration

    with other systems shall be conducted during work

    execution as per technical specifications, drawings and by

    making arrangement with supervising engineer to achieve

    the work to the best possible and specifications section 16126

    04 2C-10mm-CU/PVC/PVC+10mmG/32mmd PVC conduit in 3 M

    masonry

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    40 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    41/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Sub-Main Circuit: supply , install , testing and commissioning

    600/1000V XLPE multicore copper cable in conduit ,

    including junction boxes, connection for feeders and various

    power loads as shown on drawings and coordination &

    integration with other systems shall be conducted during

    work execution as per technical specifications, drawings and

    by making arrangement with supervising engineer to

    achieve the work to the best possible and specifications

    section 16126

    01 4C-10mm-CU/XLPE/PVC+10mmG/32mmd PVC conduit in 22 Mmasonry

    02 4C-16mm-CU/XLPE/PVC+16mmG/38mmd PVC conduit in 13 M

    masonry

    Supply , install , testing and commissioning of panel boards

    including grounding, circuit breakers, grounding, fixings,

    markers and SAC switching actuator , DAC dimming

    actuators , other functional units and all associated works as

    required and shown on drawings and coordination &

    integration with other systems shall be conducted during

    work execution as per technical specifications, drawings and

    by making arrangement with supervising engineer toachieve the work to the best possible and specifications

    section 16442

    03 Ref. DP-VL03 1 No

    04 Ref. LPG 1 No

    05 Ref. LPF 1 No

    06 Ref. LPR 1 No

    07 Ref. UPG 1 No

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    41 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    42/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply , install , testing and commissioning of an emergency

    Uninterruptible Power Supply (UPS) unit including supports,

    battery rack, accessories and all associated works to suit the

    location shown on drawings and coordination & integration

    with other systems shall be conducted during work

    execution as per technical specifications, drawings and by

    making arrangement with supervising engineer to achieve

    the work to the best possible and specifications section 16610

    01 Ref. UPS (6 KVA , with 15 min.) 1 No.

    POWER INSTALLATION

    The contractor is to insure that all power outlets mounted in Note

    wet areas and all service outlets for kitchens, bathrooms,

    laundry and water heaters are to be protected by central

    ground fault circuit interrupter (GFCI)

    Supply , install, testing and commissioning of power and

    sockets accessories including all necessary boxes,

    faces(according to the engineer approval ) comprising

    cables, conduits, fittings, connections, from the outlets to

    Panel boards feeder associated works as required to suit the

    locations shown on drawings Coordination with other

    disciplines shall be conducted during work execution as pertechnical specifications, drawings and by making

    arrangement with supervising engineer to achieve the work

    to the best possible and specifications section 16050

    02 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 7 No

    1P, 230V for booster pump control panel, EWH-01,02,03 &

    washing M/C

    03 Disconnect switch, non-fused with pilot light, weatherproof, 32A, 1 No

    1P, 230V for drying tumbler

    04 Disconnect switch, non-fused with pilot light, 45A, 1P, 230V, 1 No

    weatherproof for Elec. Rang

    05 Disconnect switch, non-fused with pilot light, 32A, 3P, 400V for 1 No

    UPS

    06 Disconnect switch, fused with pilot light, 20A, 1P, 230V for 11 No

    FCU-01,02,03,04,05,06,07,08,09 ,10 ,11

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    42 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    43/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    POWER INSTALLATION

    Supply , install, testing and commissioning of power and

    sockets accessories including all necessary boxes, faces

    (according to the engineer approval ) comprising cables,

    conduits, fittings, connections, from the outlets to Panel

    boards feeder associated works as required to suit the

    locations shown on drawings Coordination with other

    disciplines shall be conducted during work execution as per

    technical specifications, drawings and by making

    arrangement with supervising engineer to achieve the work

    to the best possible and specifications section 16050

    01 Wall mounted junction box 13 No

    02 Single socket outlet, 15A, 230V, grounding type 39 No.

    03 Single socket outlet, weatherproof , 15A, 230V, grounding type 6 No.

    04 Single socket outlet, weatherproof , 15A, 230V, with ground fault 6 No.

    circuit interrupter ,ref. GF

    05 Single phase, single socket outlet, 16A, 230V,grounding type for 16 No.

    emergency portable lighting fixture , mounted at 2200mm AFFL ,ref.

    (EPL )

    06 Duplex socket outlet,15A,230V, grounding type 26 No.

    07 Duplex socket outlet,15A,230V , with ground fault circuit interrupter 3 No.

    ,ref. GF

    08 Duplex socket outlet,15A,230V, grounding type (2400 mm height 3 No.

    mounted) ref.WAP

    09 Single phase power socket outlet 20A\230V, grounding type 3 No.

    10 Floor mounted duplex socket outlet, 15A,230V, grounding type 1 No.

    11 Door electric bell 1 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    43 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    44/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply, install , testing and commissioning of switches

    lighting accessories including all necessary boxes, switches,

    faces, conduits, wires (according to the engineer approval )

    associated works as required to suit the locations shown on

    drawings .Coordination with other disciplines shall be

    conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best

    possible and specifications section 16050 & 16500

    01 Single pole one-way switch (13A) 8 No.

    02 Single pole ,two gang, switch (13A) 1 No.

    03 Push button switch for door electric bell 1 No.

    04 Motor switch with built-in overload protection (tumbler switch) 9 No.

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    44 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    45/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply, install , testing and commissioning of lighting

    fixture outlets and including conduits, wires and all boxes

    belong to Lighting Panel boards and associated works as

    required to suit the locations shown on drawings

    .Coordination with other disciplines shall be conducted

    during work execution as per technical specifications,

    drawings and by making arrangement with supervising

    engineer to achieve the work to the best possible and

    specifications section 16050 and 16500

    01 Ref.Chandelier (480W) 4 No

    02 Lighting fixture outlets 149 No

    03 Lighting fixture outlets type FT (cove light ) 34 No

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    45 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    46/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    LIGHTING INSTALLATION

    Supply ,install, testing and commissioning of lighting

    fixture (furnished with lamp and electronic blast,

    accessories and internal wires) mounting accessories.

    (according to the engineer approval ) associated works as

    required to suit the locations shown on drawings

    .Coordination with other disciplines shall be conducted

    during work execution as per technical specifications,

    drawings and by making arrangement with supervising

    engineer to achieve the work to the best possible and

    specifications section 16050 & 16500

    01 Ref. F1 32 No

    02 Ref. F2 10 No

    03 Ref. F3 4 No

    04 Ref. F4 24 No

    05 Ref. F5 7 No

    06 Ref. F6 2 No

    07 Ref. F7 6 No

    08 Ref. FT 212 M.

    09 Ref. WL1 9 No

    10 Ref. I1 38 No

    11 Ref. EPL 17 No

    To Collection

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    46 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    47/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    COMMUNICATION SYSTEMS

    DATA AND VOICE SYSTEM INSTALLATION

    Supply ,install, testing and commissioning of integrated

    data and voice system with inter-link with CCTV camera,

    comprising equipment rack consisting of building data

    distribution, outlets, patch panels, patch cords including

    cabling (including fiber optic cable all UTP CAT 6A cable,

    switches) , in conduits, connection/ extension and

    interfacing all as shown on drawings .Coordination,

    integration with other disciplines shall be conducted duringwork execution as per technical specifications, drawings and

    by making arrangement with supervising engineer to

    achieve the work to the best possible and specifications

    section 16720, 16770 & 16715

    To suit system network equipped with:

    01 Wall mounted telecommunication outlet ( one data ) , 300mm 1 No

    A.F.F.L.) ref. (T0 )

    02 Wall mounted telecommunication outlet ( one tel ) , 300mm 7 No

    A.F.F.L. Ref. (T01)

    03 Wall mounted telecommunication outlet ( one tel ) ,1500mm 2 No

    A.F.F.L. Ref. (T01)w

    04 Wall mounted telecommunication outlet, 2 ports (one data, one tel) 8 No

    Ref.( T02 )

    05 Wall mounted telecommunication outlet ( one TV ) Ref. ( T03) 1 No

    06 Wall mounted telecommunication outlet, ports (one TV, one MRM) 5 No

    Ref.( T04)

    07 Wall mounted telecommunication outlet, ports ( one data, one TV, 4 No

    one MRM ) Ref. T05

    08 Wireless access points (ref. WAP) 3 No

    09 Wall mounted telecommunication outlet for intercom system 7 No

    ref. (TO) I

    To Collection

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    47 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    48/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    COMMUNICATION SYSTEMS

    DATA AND VOICE SYSTEM INSTALLATION

    Supply ,install, testing and commissioning of integrated

    data and voice system with inter-link with CCTV camera,

    comprising equipment rack consisting of building data

    distribution, outlets, patch panel, patch cords including

    cabling (including fiber optic cable all UTP CAT 6A cable,

    switches) , in conduits, connection/ extension and

    interfacing all as shown on drawings .Coordination,

    integration with other disciplines shall be conducted duringwork execution as per technical specifications, drawings and

    by making arrangement with supervising engineer to

    achieve the work to the best possible and specifications

    section 16720, 16770 & 16715

    01 Floor Distributor includes :19", 30U telecom rack, Home 1 No

    automation gateway ( by others ) ,Fast Ethernet switch 2x48 port,

    Fast Ethernet switch 2x 24 port ,UTP P.P. CAT6 a 5x 24 port .

    with fans ,UPS ,home controller and all accessories to complete

    the work as per drawings and specifications according to latest

    technology Ref (FD )

    02 Data and voice system network including conduits, wiring, pull1 Itemboxes, connections, and all required accessories to form a

    complete and fully operative system

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    48 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    49/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    FIRE ALARM SYSTEM

    Supply, install , testing and commissioning of fire detection

    /alarm system comprising of analogue addressable fire

    alarm panel , detectors, alarm bell, break glass, modules

    including associated cable wires, earthling for equipment

    and conducting, interfacing with other systems as shown on

    drawings and .Coordination, integration with other

    disciplines shall be conducted during work execution as per

    technical specifications, drawings and by making

    arrangement with supervising engineer to achieve the work

    to the best possible and specifications section 16721

    To suit fire alarm system network equipped with:

    01 Analogue addressable fire alarm control panel- (ref. FACP '2 1 No

    Loops) and power supply unit

    02 Ceiling mounted optical smoke detector, 20 No

    03 Ceiling mounted heat detector 2 No

    04 Fire alarm bell 4 No

    05 Fire alarm manual call station 4 No

    06 Fire alarm system network including conduits, wiring, pull boxes, 1 Item

    connections, and all required accessories to form a complete

    and fully operative system

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    49 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    50/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    AUDIO / VIDEO IP INTERCOM SYSTEM

    Supply , installation testing and commissioning of audio /

    video IP intercom system comprising of outdoor station unit

    with built-in color camera, indoor station units with built -in

    monitors, electrical door lock , AC power supply, cables and

    conduits and associated works as required to suit the

    locations shown on drawings and coordination & integration

    & communication kit with other systems shall be conducted

    during work execution as per technical specifications,

    drawings and by making arrangement with supervising

    engineer to achieve the work to the best possible and

    specifications section 16760

    To suit audio /video phone IP intercom system network equipped

    with:

    01 Waterproof outdoor station (6 line) unit including but not limited to 1 No

    color camera, mic, speaker, push buttons, power supply, etc.

    02 Indoor station unit including but not limited color LCD, head set, 7 No

    push buttons, door release push button, etc.

    03 Electric door lock 1 No

    04 Network controller with power supply 1 No

    05 Distributor 1 No

    06 Exit push button 1 No

    07 Audio / video IP intercom system network including conduits, 1 Item

    wiring, pull boxes, connections, and all required accessories

    to form a complete and fully operative system

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    50 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    51/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    SMART HOME SYSTEM

    Supply, installation , testing and commissioning of smart

    home system comprising of motion sensor, interactive LCD

    touch screen intelligent switches including all necessary

    cables, conduits, fittings, connections and associated works

    as required to suit the locations shown on drawings,

    coordination, integration with other systems shall be

    conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best

    possible and specifications section 16783

    To suit system network equipped with:

    01 7" interactive wireless portable LCD touch screen (LCD) 1 No

    02 7.5 " interactive LCD touch screen (LCD1) 2 No

    03 Intelligent switch Type (LCD2) 22 No

    04 Presence sensor (Indoor type) 10 No

    05 Motion sensor (Indoor type) 10 No

    06 Motion sensor (Outdoor type) 2 No

    07 Smart home system network including conduits, wiring, pull boxes, 1 Item

    connections, and all required accessories to form a complete and

    fully operative system

    To Collection SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    51 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    52/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    DIVISION 16 - ELECTRICAL

    ACCESS CONTROL SYSTEM (VILLA DOOR LOCK )

    Supply, installation , testing and commissioning of access

    control system (villa door lock ) comprising of Intelligent

    system controller ,double reader interface module , access

    system touch screen ,door access system push button ,

    electro magnetic lock ,Magnetic door contact , including all

    necessary cables, conduits, fittings, connections and

    associated works as required to suit the locations shown on

    drawings, coordination, integration with other systems shall

    be conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best

    possible and specifications section 16783

    To suit system network equipped with:

    01 Intelligent system controller (ref. ISC) 1 No

    02 Double reader interface module (ref. DRIM) 1 No

    03 Door access system touch screen ref. (CR) 2 No.

    04 Door access system push button (ref. PB) 2 No

    05 Electro magnetic lock 2 No.

    06 Magnetic door contact(ref. DC) 2 No

    07 Security alarm bell ref. (SEC) 1 No

    08 Security alarm bell outdoor ref. (SEC) 2 No

    09 Access control system network including conduits, wiring, pull 1 Item

    boxes, connections, and all required accessories to

    form a complete and fully operative system

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    52 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    53/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    IP TV SYSTEM

    Supply, install, test and commissioning of television system

    connected to TCP/IP (LAN) comprising of RJ45 TV outlets

    (measured elsewhere) set top box , power supply , and

    associated work as shown on drawings and .Coordination,

    integration with other systems disciplines shall be conducted

    during work execution as per technical specifications,

    drawings and by making arrangement with supervising

    engineer to achieve the work to the best possible and

    specifications section 16787

    To suit IPTV system network equipped with:

    01 Set top box 10 No

    02 IP TV system network including coaxial cable and all required 1 Item

    accessories to form a complete and fully operative system

    To Collection SR

    DIVISION 16 - ELECTRICAL

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    53 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    54/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    AMOUNT

    SRITEM D E S C R I P T I O N QTY UNIT RATE

    Collection

    Sheet - 40

    Sheet - 41

    Sheet - 42

    Sheet - 43

    Sheet - 44

    Sheet - 45

    Sheet - 46

    Sheet - 47

    Sheet - 48

    Sheet - 49

    Sheet - 50

    Sheet - 51

    Sheet - 52

    Sheet - 53

    To Bill Summary SR

    Project No.: J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    54 / 55

    REVISED PAGE Date: MAY 2012

  • 7/28/2019 Villa Vb1 (MAY 2012)

    55/55

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR Villa Type (Vb 1)

    Bldg. no. VL03

    Bill no. 1

    ITEM DESCRIPTION AMOUNT S.R.

    BILL SUMMARY

    Sheet - 12 SITE DEVELOPMENT 0.0

    Sheet - 13 - SITEWORK 0.0

    Sheet - 15 - CONCRETE 0.0

    Sheet - 16 - MASONRY 0.0

    Sheet - 17 - METALS 0.0

    Sheet - 18 - WOOD AND PLASTIC 0.0

    Sheet - 19 - THERMAL AND MOISTURE PROTECTION 0.0

    Sheet - 23 - DOORS AND WINDOWS 0.0

    Sheet - 28 - FINISHES 0.0

    Sheet - 29 - SPECIALTIES 0.0

    Sheet - 34 - PLUMBING 0.0

    Sheet - 39 - HVAC 0.0

    Sheet - 54 - ELECTRICAL 0.0