PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SR
SITE DEVELOPMENT
SITE CONSTRUCTION
Earthwork on proposed structural built-up areas from part of the Note
Work pertaining to respective building or structure as measured
elsewhere.
PAVING AND SURFACING
01 Precast concrete pavers size 400 x400x40 mm gray color 27 M
shotblasted and dark gray or light beige color smooth finish,
including 20mm cement mortar bed, 100 mm thick concrete slab
with a 193WWF, polyethylene moisture barrier, compacted sub
grade as per detail 2 on drawing VL-GL-01 and specifications
section 2515
02 Precast concrete pavers size 400 x400x40 mm with 54 M
200x100x80mm thk. brick bands including sand leveling course
layer and cement mortar for tiles fixation, 100 mm thick concrete
slab with a 193WWF, polyethylene moisture barrier, compacted
sub grade as per detail 3 on drawing VL-GL-01 and specifications
section 2515
03 200x100x80mm thk. interlocking concrete pavers and concrete 17 M
edger including compacted sand leveling course, 20mm cement
mortar bed, cast in place concrete foundation and compacted
aggregate base course, subgrade as per detail 4 on drawing
VL-GL-01 and specifications section 2515
04 400X400X10mm thk.non slip ceramic tiles including 20mm cement 13 M
mortar bed, 100 mm thick concrete slab with a 193WWF,
polyethylene moisture barrier, compacted sub grade as per detail 5
on drawing VL-GL-01 and specifications section 2515
SUNDRIES
RAISED PLANTER
raised planter including plain concrete and 150mm tkick R.C 5 M
planter wall with granite cladding finish ,granite copping, gravel
surface, weep hole, moisture barrier, compacted sub grade as per
detail no. 6 on drawing VL-GL-01 and specifications section 3100,3200, 3300, and 2515
Steps
5 30mm thick flamed granite tread, 20mm thick polished granite riser 16 M
including expansion joint, 20mm cement mortar bedding as per
detail no. 10 on drawing VL-GL-01 and specifications
To Collection SR
ITEM D E S C R I P T I O N QTY UNIT RATE
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
1 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
2/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
PVC SHADE STRUCTURE
PVC structure shade comprising tent fabric, beams, column
(as per manufacture recommendation), earthworks,
foundations, water proofing, fixing, finishing and all related
works as per detail no. 7 on drawing VL-GL-01 and
specification section 13015, 2870 (area measured on plan)
01 PVC shade structure 18 M
TENSILE STRUCTURE
Tensile structure comprising of posts, canopy (as per
manufacture recommendation), earthworks, foundations,water proofing, fixing, finishing and all related works as per
detail no. 8 on drawing VL-GL-01 and specification section
05500, 2870 (area measured on plan)
02 Tensile structure canopy 16 M
CONCRETE FENCE
Boundary concrete fence comprising excavation, backfilling,
plain and reinforced concrete foundation, insulation, grade
beams, columns, precast concrete w/plaster and paint (Both
side), grooves, two aluminum doors tubular sections with
glass, parking door, expansion joints, decorating, finishingas per elevations A,B,C on drawing VL02-X-L02 and as per
specifications section 03300, 08120
03 Boundary concrete fence 2600mm height to suit required locations 69 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
2 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
3/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
WATER FOUNTAIN
Water Fountain comprising, reinforced concrete structure,
30mm thick cladding (sand stone , finish : natural/rought)
fixed on 20mm thick latex modified mortar bed,
200x200x30mm thick sand stone coping all exposed edges to
be pencil rounded finished sand blasted color to match
surrounding, water basin with 20x20x4mm thick vitreous tile
non slip glass mosaic, color mix laid on 15mm thick latex
modified mortar bed,20mm thick cut to size black slate with
natural finished to achieve wave/surge effect laid on 15mm
thick latex modified mortar bed, 50mm thick x varies width
hollow section marine grade stainless steel capping with
water supply for cascade. Fin. polished to water feature,water proofing membrane, supply and drainage pipework,
fountain pump, electrical power and lighting, required to
complete the work installation and all associated works as
per detail 9 on drawing VL-GL-01 and specification section
13150
01 To suit Fountain (approximate area 16 m2) 1 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
3 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
4/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
LANDSCAPING
Palms including pit, stakes and ties, soil planting mix,
mulching, filter membrane and drainage layer, concrete
screed and waterproofing membrane and all required as per
details P1 & P2 and planting schedule on drawing VL-GL-01
and specifications section 2900
PALMS
01 P/Re 1 No.
TREES
02 T/Aa 1 No.
Shrubs and ground cover including planting, , soil planting
mix, filter, 63mm thick expanded polystyrene water storage
and drainage element, 80 mm thick screed slope to drain,
3mm water proofing membrane and drainage layer all as
per detail P3 and planting schedule on drawing VL-GL-01 as
per specification section 2900
SHRUBS
03 S/Hs 9 No.
04 S/Ld 4 No.
GROUND COVER
05 G/Cgp 60 No.
06 G/Cm (p) 19 No.
07 G/Cm (y) 22 No.
08 G/Gr (y) 3 No.
LAWN
09 L/Cd 14 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
4 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
5/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Supply, install and test pipework, UPVC schedule 40, for
waste and drainage the work shall include but not limited to
earthwork, fittings, supports, trenchwork and all materials
and equipment required to complete and finish the work as
shown on drawings and according to specifiactions
section 2730
01 50 mm dia 10 M
02 100 mm dia 10 M
03 150 mm dia 29 M
Accessories
04 Gully trap, ef. (GT) 1 No.
Inspection chambers , including reinforced concrete, with
aluminium cover and frame, including earthworks, and all
materials and equipment required to complete the work as
per drawings, and according to specifications section 2730
05 Ref. (CTIC) 600 x 600 mm 3 No
STORM DRAIN INSTALLATION
Supply, install and test pipework, UPVC schedule 40, for
storm drainage the work shall include but not limited to
earthwork, fittings, supports, trenchwork and all materials
and equipment required to complete and finish the work as
per drawings and according to specifiactions, section 2720
06 75 mm dia 16 M
07 100 mm dia 22 M
08 150 mm dia 24 M
Accessories
09 Ground cleanout 75mm dia., ref. (GCO) 1 No.
10 Ground cleanout 100mm dia., ref. (GCO) 1 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
5 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
6/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
STORM DRAIN INSTALLATION
Inspection chambers , including reinforced concrete, with
aluminium cover and frame, including earthworks, and all
materials and equipment required to complete the work as
per drawings and specifications section 2720
01 Ref. (IC) 600 x 600 mm 1 No
Supply, installation and test pipework, UPVC schedule 80-
class V for water and CPVC schedule 80 class V for hot water
the work shall include but not limited to installation, fittings,
insulation for hot pipework, valves, supports and all
materials and equipment required to complete and finish thework as per drawings and according to specifications
section 2668
02 40 mm dia. 36 M
03 50 mm dia. 10 M
Accessories
04 Water meter assembly 40mm dia., ref. (WMA) 1 No
Irrigation water installation
Supply, installation and test pipework, UPVC schedule 80-
class V for Irrigation water the work shall include but not
limited to installation, fittings, valves, supports and all
materials and equipment required to complete and finish the
work as per draiwngs and according to specifications
section 2810
05 15 mm dia. 2 M
06 20 mm dia. 25 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
6 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
7/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
PLUMBING INSTALLATIONS
Irrigation water installation
Accessories
01 Water meter assembly 20mm dia., ref. (WMA) 1 No
02 Hose bib 15mm dia., ref. (HP) 2 No
POTABLE WATER SUPPLY
Reinforced concrete under ground water tank with
proprietary cast iron manhole covers and frames the workshall include but not limited to earthworks, concrete works,
internal lining and water proofing, access ladders, pipework
and valves, vent pipes, and all materials and equipments
required to complete and finish the work according to
drawings and specifications section 2668
03 Potable water tank capacity 10 m3 1 Item
POTABLE WATER SUPPLY SYSTEM
Supply, installation and test Packaged type constant
pressure booster potable water pumps, set of one duty and
one stand by pump, the work shall include but not limited topiping and valves complete with all controllers, accessories
for automatic operateion and all materials and equipments
required to complete and finish the work according to
drawings and specifications section 2668
04 Potable water pumps, power 1.32 KW 1 Set
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
7 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
8/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
ELECTRICAL UTILITIES
MAIN AND SUB-MAIN POWER
Sub-Main Circuit: supply , install , testing and commissioning
600/1000V XLPE multicore copper cable in conduit ,
including junction boxes, connection for feeders and various
power loads as shown on drawings and coordination &
integration with other systems shall be conducted during
work execution as per technical specifications, drawings and
by making arrangement with supervising engineer to
achieve the work to the best possible and specifications
section 16126
01 4C-120mm-CU/XLPE/PVC/ 110 mmd UPVC conduit in 20 M
ground
Supply, install ,test and commissioning panel boards
complete including circuit breakers, enclosures, fixings,
supports and associated lighting contactors where required
as shown on drawings and as described in specifications
section 16129 & 16442
02 Bus bar interface panel (IP54) 1 No
OUTDOOR HAND HOLE
Supply, install, testing and commissioning reinforced
concrete Hand Holes connected via UPVC conduit, complete
with hand hole bolted type metal cover, drain pipe outlet,
including trenching and backfilling for UPVC conduits for
power & telecommunication cables in UPVC conduit, tapes, ,
grounding, all as required to suit locations as shown on
drawings and as described in specifications section 16050
03 Hand Hole Ref.( HH) 1 No
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
8 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
9/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
ELECTRICAL WORKS
OUTDOOR POWER AND LIGHTING
Supply , install, test and commissioning power and sockets
accessories including all necessary boxes, faces(according
to the engineer approval ) comprising cables, conduits,
fittings, connections, from the outlets to Panel boards feeder
associated works as required to suit the locations shown on
drawings Coordination with other disciplines shall be
conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications section 16050
01 Wall mounted junction box for CCTV camera 5 No
02 Disconnect switch, non-fused with pilot light, 2 No
weatherproof , 20A, 1P, 230V for fountain pump & lift
pump
OUTDOOR LIGHTING INSTALLATION
Supply, install and testing of lighting fixture outlets and
including conduits, wires and all boxes belong to Lighting
Panel boards and associated works as required to suit the
locations shown on drawings .Coordination with other
disciplines shall be conducted during work execution as per
technical specifications, drawings and by making
arrangement with supervising engineer to achieve the work
to the best possible and specifications section 16500 & 16050
03 Lighting fixture outlets 25 No
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
9 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
10/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
ELECTRICAL WORKS
OUTDOOR LIGHTING INSTALLATION
Supply ,install, assembly, test and commissioning of lighting
fixture (furnished with lamp and electronic blast,
accessories and internal wires) mounting
accessories.(according to the engineer approval ) associated
works as required to suit the locations shown on drawings
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications section 16500 & 16050
01 Ref. WL2 17 No
02 Ref. WL3 8 No
DATA AND VOICE SYSTEM INSTALLATION
Supply and install a data and voice system ( apart including
fiber optic cable all UTP CAT 6A cable, switches , conduits,
connection/ extension and interfacing all as shown on
drawings, specifications section 16720 & 16770 and single
line diagram drawing all as complete consisting of, but not
limited to:
To suit system network equipped with:
03 Wall mounted telecommunication outlet, weatherproof 1 No
for intercom, ref. (TO) I
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
10 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
11/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
ELECTRICAL WORKS
OUTDOOR COMMUNICATION SYSTEMS
OUTDOOR INTEGRATED SECURITY SYSTEM
Supply, install, testing and commissioning of integrated
security system ( included all feeders/conduits where
required) for extension, connection & interfacing) complete
to suit the locations shown on drawings, coordination,
integration with other systems shall be conducted during
work execution as per technical specifications, drawings
and by making arrangement with supervising engineer to
achieve the work to the best possible and specifications
section 16783
To suit a integrated security system consisting of, but not limited
to:
01 IP digital color fixed outdoor camera, wall mounted 4 No
with advanced smart motion detection
02 Reader interface module (ref. RIM) 1 No
03 Door access system push button (ref. PB) 1 No
04 Elec. door shutter 1 No
05 Door contact with electric lock 1 No
06 Garage contact 1 No
07 Long range card reader 1 No
08 Integrated security system network including 1 Item
conduits, wiring, pull boxes, outlets, connections, and
all required accessories to form a complete
and fully operative system
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
11 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
12/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
SITE DEVELOPMENT
Collection
Sheet - 1
Sheet - 2
Sheet - 3
Sheet - 4
Sheet - 5
Sheet - 6
Sheet - 7
Sheet - 8
Sheet - 9
Sheet - 10
Sheet - 11
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
12 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
13/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 2 - SITE WORK
SITE GRADING
All additional excavation required for temporary works and spaces,
shoring, dewatering, removal of surplus excavated materials,
support, temporary spoil heaps and general compaction Note
EXCAVATION AND EARTHWORK
Necessary moving or transportation about the site excavation Note
material including handling to temporary stockpile or ultimate
disposal off site is to be included in the unit rate of excavation
Excavation in natural land consisting of solid rock formation,
cracked rocks, bolders and natural contoured soil, temporary
earthwork supports, dewatering ( if any ) as per
specifications sections 02200
01 Excavation for foundations commencing from existing grade level 123 M
Backfilling
02 Approved selected imported fill material including compaction in 70 M
making up levels around and over foundations, beds and the like as
per spec. sections 02200
03 Approved fill material selected from excavated material including M price only
compaction as per specification section 02200
Drainage layer
04 100 mm thick compacted coarse gravel to underside of slabs on 185 Mgrade as per specification section 02200
Soil treatment application for termite control
05 To subgrades of slabs and along periphery of building 297 M
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
13 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
14/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 3 - CONCRETE
CONCRETE WORK
CONCRETE TYPES
Include in Unit Rates for concrete of the following types and
locations:
20 Mpa
a) Blinding concrete
b) Catch basins and side walks Note
40 Mpa
a) Footings
b) Columns and R.C. walls
c) Floor and roof slabs, beams, girders, stairs
d) Concrete topping or structural screed
e) Slab on grade
f) water tanks
Plain insitu concrete, 20 Mpa, cement type V as per
specifications section 03300
01 Blinding beds, 100 mm thick 11 M
Insitu reinforced concrete, 40 Mpa cement type V includingformwork and steel reinforcements conforming to
ASTMA615and A185 as per specifications sections 03100,
03200 & 03300
02 Footing 21 M
03 Grade and tie beams 13 M
04 Strap beams 9 M
05 Columns pedestals 2 M
06 Slab on grade 125 mm thick with A193WWF mesh reinforcement 23 M
including thickening
07 Steps on grade including related concrete elements 2 M
To Collection
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
14 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
15/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 3 - CONCRETE
CONCRETE WORK
Insitu reinforced concrete, 40 Mpa type I cement including
formwork and steel reinforcements conforming to ASTM
A615 and A185 as per specifications sections 03100, 03200 &
03300
01 Columns 14 M
02 Beams 11 M
03 Suspended flat slabs, 240mm thick 87 M
04 Suspended flat slabs, 200mm thick 19 M
05 Suspended flat slabs, 180mm thick 2 M
06 Stairs 7 M
Sundries
07 R.C coping to suit parapet as per detail 7 on drawing VL-GA-04 63 M
08 Allow for precast concrete splash block including grout and all 2 No.associated works as shown and detailed on drawings
NOTES:
Include in unit rates works associated to construction and control Note
joints including joints surrounding equipment pads along with
necessary caulk
To Collection SR
Collection
Sheet - 14
Sheet - 15
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
15 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
16/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 4 - MASONRY
UNIT MASONRY
Supply and fix concrete masonry blocks in courses with
cement lime mortar including concrete lintels over
openings , horizontal and vertical reinforcement, fixings,
fillers, sealants and grout to complete the work according
to specifications section 04200 and drawings
01 100 mm thick wall 499 M
02 200 mm thick wall 166 M
03 Ditto, but one hour fire rated 116 M
04 300 mm thick insulated wall 183 M
05 400 mm thick insulated wall 12 M
06 200 mm thick pre-insulated wall 37 M
07 200 mm thick wall for parapet 77 M
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
16 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
17/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 5 - METALS
HANDRAILS
Supply and install twisted wrought iron hand rail with beech
wood cap including fixing, wood handrail, finishing as per
detail no.7 on drawing VL-GA-01 and as per specification
section 05500
01 Handrail to suit stairs 26 M
Supply and install stainless steel handrail diameter 60 and
30 mm, including fixing finishing as shown on drawing
VL02-A02 and as per detail no. 13 on drawing VL-GA-04 andas per specification section 05500
02 Handrail to suit faade 15 M
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
17 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
18/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISON 6 - WOOD AND PLASTIC
External wooden tiles including fixing, finishgs and all
associated work as shown on drawing and according to
specifications section 6400
01 External wooden tiles to suit faade 9 M2
SUNDRIES
Supply and install counter top lavatory, comprising counter
top holed for lavatory (lavatory measured elsewhere) with
backsplash, vanity unit , stainless steel bars, facia, sides, and
metal framing including finishings, sealants and trims as perdetail 2,3 on drawing VL-GA-01 and specifications section
6100
02 Vanity top to suit required locations 11 M
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
18 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
19/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
Wall insulation
01 Vapour retarder as per specifications section 07100 164 M
Water proofing and moisture protection as per specification
section 07100
02 Membrane waterproofing to suit "wet room" areas including upturn 50 M
to abutting walls or upstands concrete screed and all required
material and equipments to complete the work as per details
shown on drawing, according to specifications and code of practice
Damp proofing
03 Two coats of bituminous coatings on to surfaces of concrete in 175 M
contact with soil as per specifications section 07150
Vapour barrier
04 Vapour barrier to underside of slabs, beds, and the like, 185 M
specifications section 07100
ROOFING SYSTEM
Roofing system comprising gravel layer separation sheet,rigid insulation, waterproofing membrane and concrete
screed to form slope to drain, including precast tiles where
occur for maintenance walks, forming of cant strips, and
waterproofing membrane base flashing, metal flashing,
sealants and fixings, steel fabrications, all as per detail 1 on
drawing VL-GA-04 and specifications section 07500
05 To suit roof area 176 M
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
19 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
20/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 8 - DOORS AND WINDOWS
DOOR SETS
Supply and install all doors to suit masonry openings and approved Note
samples including fixings, decorations, frames, architrave,
hardwares and saddles and all required materials and equipments
to complete and finish the work as detailed on drawing VL-GA-02
and according to specifications sections 08210 and 08100
44mm thick solid hard wood door including frames and
decoration as per drawings and specifications
01 Type A1, double leaves door, size 1300x2150mm 2 No.
44mm thick paneled wood door. including frames and
decoration as per drawings and specifications
02 Type C1, single leaf door, size 900x2150mm 8 No.
03 Type C2, single leaf door, size 800x2150mm 7 No.
04 Type C3, single leaf door, size 700x2150mm 1 No.
44mm thick paneled wood folded door. including frames and
decoration as per drawings and specifications
05 Type D1, four leaves door, size 1400x2150mm 1 No.
44mm thick wrought iron door with laxan sheet backing
including frames, finishes as shown on drawing and
specification
06 Type E1, single leaf door, size 900x2150mm 1 No.
44mm thick painted hollow metal insulated door including
frames and decortion as per drawings and specification
07 Type F1, single leaf door, size 900x2150mm 1 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
20 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
21/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 8 - DOORS AND WINDOWS
DOOR SETS
GLAZED DOORS
24 mm thick double glazed sliding door tinted outside clear
inside on powder coated aluminum frames including saddels
and hardware as shown on drawing VL-GA-02 and
specifications section 08800
01 Ref GD03, double leaves door, door size 1600x2200mm 1 No
24 mm thick double glazed sliding door tinted ouside clear
inside on powered coated aluminum frames with fixedupper panel including saddels and hardware as shown on
drawing VL-GA-02 and specifications section 08800
02 Ref GD08, double leaves door, door size 1920x3260mm 1 No
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
21 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
22/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 8 - DOORS AND WINDOWS
WINDOWS
Supply and install all windows to suit masonry opening
including all hardware, fixtures, packing's, sealants, weather
stripping and the like as described on drawing VL-GA-03 and
according to specifications section 08520
24mm thick double tempered glazed sliding window, tinted
outside clear inside on powder coated aluminum frame
01 Ref. W02, overall size 1500x1000mm 1 No
24mm thick double tempered glazed sliding window tinted
outside clear inside on powder coated aluminum frame with
fixed upper, lower & side panels
02 Ref. W06, overall size 4350x2860mm 1 No
03 Ref. W24, overall size 4470x3160mm 1 No
6mm thick sand plastid tempered glazed awning window on
powder coated aluminum frame with fixed lower panel
04 Ref. W08, overall size 600x1250mm 6 No
24mm thick double tempered glazed fixed window, tinted
outside clear inside on powder coated aluminum frame
05 Ref. W13, overall size 1100x2860mm 2 No
06 Ref. W20, overall size 1200x3260mm 1 No
24mm thick double tempered glazed sliding window tinted
outside clear inside on powder coated aluminum frame with
fixed upper panels
07 Ref. W21, overall size 2000 x 2860mm 2 No
08 Ref. W22, overall size 2900 x 2260mm 1 No
09 Ref. W23, overall size 1600 x 2860mm 1 No
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
22 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
23/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 8 - DOORS AND WINDOWS
WINDOWS
Supply and install all windows to suit masonry opening
including all hardware, fixtures, packing's, sealants, weather
stripping and the like as described on drawing VL-GA-03 and
according to specifications section 08520
24mm thick double tempered glazed sliding window, tinted
outside clear inside on powder coated aluminum frame
01 Ref. W17, overall size 1025x1200mm 1 No
24mm thick double tempered glazed sliding window tinted
outside clear inside on powder coated aluminum frame with
fixed upper & middle panels
02 Ref. W18, overall size 5320x2860mm 1 No
To Collection SR
Collection
Sheet - 20
Sheet - 21
Sheet - 22
Sheet - 23
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
23 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
24/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 9 - FINISHES
INTERNAL FINISHES
Flooring including respective types of bounding materials,
concrete screed sub-floor of required thickness, (if any)
accessories for complete installations as per ID drawing
and specifications sections 9310, 9420, 9600, 9660, 9671, 9680 and 9685
01 Ceramic floor tiles size 300x300 mm , ref. CR 26 M
02 Porcelain floor tiles size 600x600mm , ref. PT1 38 M
03 Porcelain floor tiles size 300x300mm , ref. PT2 23 M
04 Vinyl sheet for sportage use, ref. VS 25 M
05 600x600x20mm polished crema marfil marble, ref. M1 160 M
06 Floor pattern comprising of 600x600x20mm polished crema marfil 88 M
marble, ref. M1 with polished dark emprador marble stripes, ref. M2
Ceramic tiles for wet area are anti-slip type Note
Finishings : bases including sand-cement backing mortar
and grout
07 100 mm high Polished marble base, ref. B01 259 M
08 100 mm high porcelain base, ref. B02 21 M
09 100 mm high Ceramic tiles base , ref. B03 33 M
10 100 mm high vinyl cove base , ref. B04 19 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
24 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
25/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 9 - FINISHES
INTERNAL FINISHES
Finishings : walls including metal angle beads and lathing at
junctions of differing backgrounds according to
specifications section 9200, 9310, 9900 and 6400
01 Cement plaster 883 M
02 Paint on cement plaster, ref. W01 628 M
03 Decorative paint on cement plaster, ref. W02 255 M
04 Ceramic wall tiles ,ref. W03 66 M
05 Porcelain wall tiles, ref. W04 132 M
Finishing: stair treads, risers and landings including bedding
and pointing as per detail 6 shown on drawing VL-GA-01
and according to specifications section 9600
06 Polished marble 30mm thick for treads and 20mm thick for riser, 64 M
ref. M3 to suit stair
08 Polished marble to suit stair landings and floors, ref. M3 20 M
Finishings : ceilings
09 Cement plaster to suit ceiling 111 M
10 Paint on cement plaster including , ref. C01 111 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
25 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
26/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 9 - FINISHES
INTERNAL FINISHES
Finishings: Suspended ceilings including suspension system
as shown on ID drawing and according to specifications
section 9250, 9510 & 9547 (Area measured on plan)
01 Painted gypsum board, ref. C02 100 M
02 Painted gypsum board with cove light , ref. C03 42 M
03 Painted decorative gypsum board with cove light and cement 58 M
plaster including paint to suit dining and living room ceilings space
no. (G-06), (G-12)
04 Moisture resistant painted gypsum board , ref. C04 27 M
05 Cement plaster including paint, ref. C01 and painted gypsum board 44 M
with cove light, ref. C03
06 Moisture resistant painted gypsum board, ref. C04 and metal tiles 20 M
600x600mm, ref. C05
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
26 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
27/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 9 - FINISHES
EXTERNAL FINISHES
Stone cladding mechanical fixation including fixings ,
finishings and all associated work as per detail on drawings
and specification section 9600
01 Natural slatted brown stone cladding 179 M2
02 Black marble cladding 26 M2
Finishing : walls including metal angle beads and lathing at
junctions of differing backgrounds according to
specifications section 9200, 9600 and 9900
03 Cement plaster to suit external surface 517 M2
04 External Paint beige color on Cement plaster to suit external 227 M2
surface
05 Ditto, but light brown color 210 M2
06 External paint on cement plaster to suit internal side of parapet 77 M2
Finishing: stair treads, risers and landings including bedding
and pointing as per detail 6 shown on drawing VL-GA-01
and according to specifications section 9600
07 Polished marble 30mm thick for treads and 20mm thick for riser,
to suit external stair 6 M
08 Polished marble to suit external entrances, ref. M3 3 M2
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
27 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
28/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 9 - FINISHES
Collection
Sheet - 24
Sheet - 25
Sheet - 26
Sheet - 27
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
28 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
29/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 10 -SPECIALTIES
TOILET AND BATH ACCESSORIES
Supply and installation of following toilet and bath
accessories as per schedule including fixings and trims as
shown on drawings and specification section 10800 to suit
locations as required
01 Ref. FM1, Clear glass counter wide mirror on 20 mm thick plywood 11 Mbacking, 900mm high
02 Ref. FM2, Clear glass mirror size 400x600mm with stainless steel 1 No.frame
03 Ref. RH, single robe hook 10 No.
04 Ref. SDH, wall mounted soap dish and holder 8 No.
05 Ref. TPH, Toilet paper holder 5 No.
06 Ref. TR, towel ring 2 No.
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
29 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
30/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
SANITARY FIXTURES
Supply and install sanitary fixtures, water mixers and
accessories, as selection schedule, the work shall include
but not limited to necessary fittings, trims, valves, traps,
spouts and all materials and equipment required to
complete and finish the work according to specifiactions
section 15440 and drawings
01 Floor mounted water closet with flush tank, ref. (WC) 5 No
02 Conuter top lavatory, ref. (LAV1) 2 No
03 Surface-mounted wash basin over vanity unit, ref. (LAV2) 5 No
04 Lavatory without pedistal, ref. (LAV3) 1 No
05 Bath tub 70x160cm, ref. (BT) 2 No
06 Counter top one bowel sink, ref. (03) 1 No
07 One bowel sink with side drain, ref. (04) 1 No
WASTE AND DRAINAGE INSTALLATION
Supply, installation and test drainage pipe work UPVC
schedule 40 the work shall include but not limited to fittings,
supports hangers, excavation, backfilling, cast iron pipes on
roof for vent with caps and all materials and equipment
required to complete and finish the work according to
specifiactions section 15050, 15100, 15125, 15140 & 1540 and
drawings
08 32 mm dia 28 M
09 40 mm dia 52 M
10 50 mm dia 111 M
11 75 mm dia 56 M
12 100 mm dia 55 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
30 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
31/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
WASTE AND DRAINAGE INSTALLATION
Accessories
01 Floor drain, 50 mm dia., ref. (FD) 10 No.
02 Area drain 75mm dia., (AD) 2 No.
03 Roof drain , 75 mm dia., ref. (RD) 1 No.
04 Scupper roof drain 75mm dia., ref. (SRD) 2 No.
05 Cleanout, 100 mm dia., ref. (CO) 1 No.
06 Floor cleanout 75mm dia., ref. (FCO) 2 No.
07 Floor cleanout 100mm dia., ref. (FCO) 2 No.
08 Splash to roof deck 75mm dia., 2 No.
Packaged duplex type discharge pressure system potable
water booster lift pumps, one duty & one stand-by, the work
shall include but not limited to piping, valves, fittings,
support, controllers, accessories for automatic operation
and all materials and equipment required to complete and
finish the work according to specifications, section 15453 and
drawings
09 Potable water booster lift pump, power 0.88 kw each 1 Set
Supply, install, test and commissioning fiber glass
elevated water tank for potable water, the work shall include
but not limited to related piping fitting, valves and all
materials and equipment required to complete and finish the
work according to specifications section 15411 and drawings
10 Elevated water tank cap 1000 liters 2 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
31 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
32/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
PLUMBING INSTALLATIONS
COLD WATER INSTALLATION
Supply, installation and test pipework, plypropylene for
cold water the work shall include but not limited to
installation, fittings, insulation for hot pipework, valves,
supports and all materials and equipment required to
complete and finish the work according to specifications
section 15411 and drawings
01 15 mm dia. 28 M
02 20 mm dia. 42 M
03 25 mm dia. 27 M
04 40 mm dia. 30 M
05 50 mm dia., 28 M
HOT WATER INSTALLATION
Supply, installation and test pipework, plypropylene for
hot water the work shall include but not limited to
installation, fittings, insulation for pipework, valves,
supports and all materials and equipment required to
complete and finish the work according to specifications
section 15411 and drawings
06 15 mm dia. 36 M
07 20 mm dia. 7 M
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
32 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
33/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15 - MECHANICAL
HOT AND COLD WATER INSTALLATION
Accessories
01 Isolating valve, 25 mm dia, ref. (IV) 5 No.
02 Hand spray with flexible hose and wall hook, ref. (HS) 5 No.
03 Wall mounted shower head, ref. (SH) 1 No.
Supply, install, testing and commissioning
electrical water heaters the work shall include but
not limited to short length pipework, valves,
supports, controls, fixings, accessories and allassociate works and all materials and equipments
required to complete and finish the work according
to drawings, specification section 15860
04 Ref. EWH- 1, capacity 20 liters, 3 KW 2 No
05 Ref. EWH- 2, capacity 10 liters, 1.5 KW 1 No
06 Ref. EWH- 3, capacity 40 liters, 3 KW 2 No
FIRE PROTECTION SYSTEM
Supply and install portable fire extinguisher, multipurposeincluding fixing and all materials and equipments required
to complete and finish the work according to drawings,
specification section 15320
07 Ref. PFE 3 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
33 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
34/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15A - MECHANICAL
Collection
Sheet - 30
Sheet - 31
Sheet - 32
Sheet - 33
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
34 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
35/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
CHILLED WATER SYSTEM
Supply, install and test black steel pipework including
fittings thermal insulation, valves, gagues, strainers,
flexible connections and accessories as per required
drawings and spec. sections15050 to 15140 ,15510
01 15 mm dia. 35 M
02 20 mm dia. 45 M
03 25 mm dia. 10 M
04 32 mm dia. 35 M
05 40 mm dia. 20 M
06 Flush mounted cabinet including 40mm dia., BTU meter and 40mm 1 No.
dia., two isolating valves and 40mm dia., check valve as detailed
on drawings
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
35 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
36/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission, Fan coil units ducted
type including control valves, pressure & temperature,
gauge, Y-strainer mounting and fixing as per drawings and
specifications section 15781
01 Ref. FCU-01, 6.3 KW cooling capacity, 2 kw heating capacity 1 No.
02 Ref. FCU-02, 4.7 KW cooling capacity, 2 kw heating capacity 1 No.
03 Ref. FCU-03, 8 KW cooling capacity, 3 kw heating capacity 1 No.
04 Ref. FCU-04, 6.4 KW cooling capacity, 1 No.
05 Ref. FCU-05, 4 KW cooling capacity, 1.5 kw heating capacity 1 No.
06 Ref. FCU-06, 7.1 KW cooling capacity, 2 kw heating capacity 1 No.
07 Ref. FCU-07, 2.7 KW cooling capacity, 2 kw heating capacity 1 No.
08 Ref. FCU-08, 3.5 KW cooling capacity, 1.5 kw heating capacity 1 No.
09 Ref. FCU-09, 2.9 KW cooling capacity, 1.5 kw heating capacity 1 No.
10 Ref. FCU-10, 1.9 KW cooling capacity, 1.5 kw heating capacity 1 No.
11 Ref. FCU-11, 5.5 KW cooling capacity, 2 kw heating capacity 1 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
36 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
37/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission, Ventilating fans as
details on drawings and specifications, section 15860
01 Ref. EF- 01, 35 LPS capacity 1 No.
02 Ref. EF- 02, 35 LPS capacity 1 No.
03 Ref. EF- 03, 30 LPS capacity 1 No.
04 Ref. EF- 04, 30 LPS capacity 1 No.
05 Ref. EF- 05, 30 LPS capacity 1 No.
06 Ref. EF- 06, 30 LPS capacity 1 No.
07 Ref. EF- 07, 30 LPS capacity 1 No.
08 Ref. EF- 08, 30 LPS capacity 1 No.
09 Ref. EF- 09, 30 LPS capacity 1 No.
10 Ref. FAF- 01, 310 LPS capacity 1 No.
Supply, install, test and commission, Supply air square
ceiling diffusers with opposed blade volume damper
including frame trims & insulated plenum box as detailed on
drawing and specification, section 15860
11 Ref. SD6A, B, C, D & E 2 No.
Supply, install and test Supply air slot linear
diffusers as detaild on drawings and spec. section 15891
12 Ref. SLD3 9 No.
13 Ref. SLD5 7 No.
14 Ref. SLD7 3 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
37 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
38/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install and test Supply air round
ceiling diffusers with opposed blade volume damper
including frame trims & insulated plenum box as detailed on
drawing and specification, section 15860
01 Ref. SD1 2 No.
02 Ref. SD2 2 No.
Supply, install, test and commission, Supply return air slot
linear diffuser as detailed on drawings and spec. section
15891
03 Ref. RLD3 9 No.
04 Ref. RLD5 7 No.
05 Ref. RLD7 3 No.
Supply, install, test and commission, Return square louver
face ceiling diffusers as detailed on drawing and
specification, sections 15860 & 15891
06 Ref. RD6A, B, C, D & E 2 No.
Supply and install exhaust register as detailed on
drawing and specification, section 15891
07 Ref. ER1 13 No.
Supply and install Galvanized steel sheet rectangular
ductwork, including supports and volume damper ,
and bill mouth opening as per drawings and
specification, section 15891
08 Various gauges 550 Kg
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
38 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
39/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 15B - MECHANICAL
HVAC INSTALLATIONS
Supply, install, test and commission door grille as detailed
on drawing and specification
01 Ref. DG 1 8 No.
Supply and install Duct insulation
02 Thermal semi-rigid insulation to rectangular ductwork 145 M
Supply, install and test return air round ceiling diffusersas detailed on drawing and specification, section 15860
03 Ref. RD1 2 No.
04 Ref. RD2 2 No.
To Collection SR
Collection
Sheet - 35
Sheet - 36
Sheet - 37
Sheet - 38
Sheet - 39
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
39 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
40/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
PRIMARY POWER SUPPLY
Smart Metering System
Supply, installation , testing and commissioning of Smart
Metering System comprising of M-bus master controller
,M-bus IP router, complete with soft ware, including
electronic KWH meter, interface with water meter& digital
BTU meter, M-bus & 1 pair twisted cable # 22 AWG for each
meter, and the necessary connection to TCP/IP net work and
all associated works required as shown on drawing and as
described in specifications section 1621
To suit Building Smart Metering System as required to form a Note
complete and fully operative system to link all project buildings
with the existing data center at phase (1)
01 Electronic KWH meters 1 No
02 M-bus master controller complete with software 1 No
03 M-bus IP router 1 No
MAIN AND SUB-MAIN POWER
Sub-Main Circuit: supply , install , testing and commissioning
600/1000V PVC multicore copper cable in conduit , including
junction boxes, connection for feeders and various power
loads as shown on drawings and coordination & integration
with other systems shall be conducted during work
execution as per technical specifications, drawings and by
making arrangement with supervising engineer to achieve
the work to the best possible and specifications section 16126
04 2C-10mm-CU/PVC/PVC+10mmG/32mmd PVC conduit in 3 M
masonry
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
40 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
41/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Sub-Main Circuit: supply , install , testing and commissioning
600/1000V XLPE multicore copper cable in conduit ,
including junction boxes, connection for feeders and various
power loads as shown on drawings and coordination &
integration with other systems shall be conducted during
work execution as per technical specifications, drawings and
by making arrangement with supervising engineer to
achieve the work to the best possible and specifications
section 16126
01 4C-10mm-CU/XLPE/PVC+10mmG/32mmd PVC conduit in 22 Mmasonry
02 4C-16mm-CU/XLPE/PVC+16mmG/38mmd PVC conduit in 13 M
masonry
Supply , install , testing and commissioning of panel boards
including grounding, circuit breakers, grounding, fixings,
markers and SAC switching actuator , DAC dimming
actuators , other functional units and all associated works as
required and shown on drawings and coordination &
integration with other systems shall be conducted during
work execution as per technical specifications, drawings and
by making arrangement with supervising engineer toachieve the work to the best possible and specifications
section 16442
03 Ref. DP-VL03 1 No
04 Ref. LPG 1 No
05 Ref. LPF 1 No
06 Ref. LPR 1 No
07 Ref. UPG 1 No
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
41 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
42/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
MAIN AND SUB-MAIN POWER
Supply , install , testing and commissioning of an emergency
Uninterruptible Power Supply (UPS) unit including supports,
battery rack, accessories and all associated works to suit the
location shown on drawings and coordination & integration
with other systems shall be conducted during work
execution as per technical specifications, drawings and by
making arrangement with supervising engineer to achieve
the work to the best possible and specifications section 16610
01 Ref. UPS (6 KVA , with 15 min.) 1 No.
POWER INSTALLATION
The contractor is to insure that all power outlets mounted in Note
wet areas and all service outlets for kitchens, bathrooms,
laundry and water heaters are to be protected by central
ground fault circuit interrupter (GFCI)
Supply , install, testing and commissioning of power and
sockets accessories including all necessary boxes,
faces(according to the engineer approval ) comprising
cables, conduits, fittings, connections, from the outlets to
Panel boards feeder associated works as required to suit the
locations shown on drawings Coordination with other
disciplines shall be conducted during work execution as pertechnical specifications, drawings and by making
arrangement with supervising engineer to achieve the work
to the best possible and specifications section 16050
02 Disconnect switch, non-fused with pilot light, weatherproof, 20A, 7 No
1P, 230V for booster pump control panel, EWH-01,02,03 &
washing M/C
03 Disconnect switch, non-fused with pilot light, weatherproof, 32A, 1 No
1P, 230V for drying tumbler
04 Disconnect switch, non-fused with pilot light, 45A, 1P, 230V, 1 No
weatherproof for Elec. Rang
05 Disconnect switch, non-fused with pilot light, 32A, 3P, 400V for 1 No
UPS
06 Disconnect switch, fused with pilot light, 20A, 1P, 230V for 11 No
FCU-01,02,03,04,05,06,07,08,09 ,10 ,11
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
42 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
43/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
POWER INSTALLATION
Supply , install, testing and commissioning of power and
sockets accessories including all necessary boxes, faces
(according to the engineer approval ) comprising cables,
conduits, fittings, connections, from the outlets to Panel
boards feeder associated works as required to suit the
locations shown on drawings Coordination with other
disciplines shall be conducted during work execution as per
technical specifications, drawings and by making
arrangement with supervising engineer to achieve the work
to the best possible and specifications section 16050
01 Wall mounted junction box 13 No
02 Single socket outlet, 15A, 230V, grounding type 39 No.
03 Single socket outlet, weatherproof , 15A, 230V, grounding type 6 No.
04 Single socket outlet, weatherproof , 15A, 230V, with ground fault 6 No.
circuit interrupter ,ref. GF
05 Single phase, single socket outlet, 16A, 230V,grounding type for 16 No.
emergency portable lighting fixture , mounted at 2200mm AFFL ,ref.
(EPL )
06 Duplex socket outlet,15A,230V, grounding type 26 No.
07 Duplex socket outlet,15A,230V , with ground fault circuit interrupter 3 No.
,ref. GF
08 Duplex socket outlet,15A,230V, grounding type (2400 mm height 3 No.
mounted) ref.WAP
09 Single phase power socket outlet 20A\230V, grounding type 3 No.
10 Floor mounted duplex socket outlet, 15A,230V, grounding type 1 No.
11 Door electric bell 1 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
43 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
44/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply, install , testing and commissioning of switches
lighting accessories including all necessary boxes, switches,
faces, conduits, wires (according to the engineer approval )
associated works as required to suit the locations shown on
drawings .Coordination with other disciplines shall be
conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications section 16050 & 16500
01 Single pole one-way switch (13A) 8 No.
02 Single pole ,two gang, switch (13A) 1 No.
03 Push button switch for door electric bell 1 No.
04 Motor switch with built-in overload protection (tumbler switch) 9 No.
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
44 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
45/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply, install , testing and commissioning of lighting
fixture outlets and including conduits, wires and all boxes
belong to Lighting Panel boards and associated works as
required to suit the locations shown on drawings
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications section 16050 and 16500
01 Ref.Chandelier (480W) 4 No
02 Lighting fixture outlets 149 No
03 Lighting fixture outlets type FT (cove light ) 34 No
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
45 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
46/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
LIGHTING INSTALLATION
Supply ,install, testing and commissioning of lighting
fixture (furnished with lamp and electronic blast,
accessories and internal wires) mounting accessories.
(according to the engineer approval ) associated works as
required to suit the locations shown on drawings
.Coordination with other disciplines shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications section 16050 & 16500
01 Ref. F1 32 No
02 Ref. F2 10 No
03 Ref. F3 4 No
04 Ref. F4 24 No
05 Ref. F5 7 No
06 Ref. F6 2 No
07 Ref. F7 6 No
08 Ref. FT 212 M.
09 Ref. WL1 9 No
10 Ref. I1 38 No
11 Ref. EPL 17 No
To Collection
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
46 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
47/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
COMMUNICATION SYSTEMS
DATA AND VOICE SYSTEM INSTALLATION
Supply ,install, testing and commissioning of integrated
data and voice system with inter-link with CCTV camera,
comprising equipment rack consisting of building data
distribution, outlets, patch panels, patch cords including
cabling (including fiber optic cable all UTP CAT 6A cable,
switches) , in conduits, connection/ extension and
interfacing all as shown on drawings .Coordination,
integration with other disciplines shall be conducted duringwork execution as per technical specifications, drawings and
by making arrangement with supervising engineer to
achieve the work to the best possible and specifications
section 16720, 16770 & 16715
To suit system network equipped with:
01 Wall mounted telecommunication outlet ( one data ) , 300mm 1 No
A.F.F.L.) ref. (T0 )
02 Wall mounted telecommunication outlet ( one tel ) , 300mm 7 No
A.F.F.L. Ref. (T01)
03 Wall mounted telecommunication outlet ( one tel ) ,1500mm 2 No
A.F.F.L. Ref. (T01)w
04 Wall mounted telecommunication outlet, 2 ports (one data, one tel) 8 No
Ref.( T02 )
05 Wall mounted telecommunication outlet ( one TV ) Ref. ( T03) 1 No
06 Wall mounted telecommunication outlet, ports (one TV, one MRM) 5 No
Ref.( T04)
07 Wall mounted telecommunication outlet, ports ( one data, one TV, 4 No
one MRM ) Ref. T05
08 Wireless access points (ref. WAP) 3 No
09 Wall mounted telecommunication outlet for intercom system 7 No
ref. (TO) I
To Collection
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
47 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
48/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
COMMUNICATION SYSTEMS
DATA AND VOICE SYSTEM INSTALLATION
Supply ,install, testing and commissioning of integrated
data and voice system with inter-link with CCTV camera,
comprising equipment rack consisting of building data
distribution, outlets, patch panel, patch cords including
cabling (including fiber optic cable all UTP CAT 6A cable,
switches) , in conduits, connection/ extension and
interfacing all as shown on drawings .Coordination,
integration with other disciplines shall be conducted duringwork execution as per technical specifications, drawings and
by making arrangement with supervising engineer to
achieve the work to the best possible and specifications
section 16720, 16770 & 16715
01 Floor Distributor includes :19", 30U telecom rack, Home 1 No
automation gateway ( by others ) ,Fast Ethernet switch 2x48 port,
Fast Ethernet switch 2x 24 port ,UTP P.P. CAT6 a 5x 24 port .
with fans ,UPS ,home controller and all accessories to complete
the work as per drawings and specifications according to latest
technology Ref (FD )
02 Data and voice system network including conduits, wiring, pull1 Itemboxes, connections, and all required accessories to form a
complete and fully operative system
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
48 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
49/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
FIRE ALARM SYSTEM
Supply, install , testing and commissioning of fire detection
/alarm system comprising of analogue addressable fire
alarm panel , detectors, alarm bell, break glass, modules
including associated cable wires, earthling for equipment
and conducting, interfacing with other systems as shown on
drawings and .Coordination, integration with other
disciplines shall be conducted during work execution as per
technical specifications, drawings and by making
arrangement with supervising engineer to achieve the work
to the best possible and specifications section 16721
To suit fire alarm system network equipped with:
01 Analogue addressable fire alarm control panel- (ref. FACP '2 1 No
Loops) and power supply unit
02 Ceiling mounted optical smoke detector, 20 No
03 Ceiling mounted heat detector 2 No
04 Fire alarm bell 4 No
05 Fire alarm manual call station 4 No
06 Fire alarm system network including conduits, wiring, pull boxes, 1 Item
connections, and all required accessories to form a complete
and fully operative system
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
49 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
50/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
AUDIO / VIDEO IP INTERCOM SYSTEM
Supply , installation testing and commissioning of audio /
video IP intercom system comprising of outdoor station unit
with built-in color camera, indoor station units with built -in
monitors, electrical door lock , AC power supply, cables and
conduits and associated works as required to suit the
locations shown on drawings and coordination & integration
& communication kit with other systems shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications section 16760
To suit audio /video phone IP intercom system network equipped
with:
01 Waterproof outdoor station (6 line) unit including but not limited to 1 No
color camera, mic, speaker, push buttons, power supply, etc.
02 Indoor station unit including but not limited color LCD, head set, 7 No
push buttons, door release push button, etc.
03 Electric door lock 1 No
04 Network controller with power supply 1 No
05 Distributor 1 No
06 Exit push button 1 No
07 Audio / video IP intercom system network including conduits, 1 Item
wiring, pull boxes, connections, and all required accessories
to form a complete and fully operative system
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
50 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
51/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
SMART HOME SYSTEM
Supply, installation , testing and commissioning of smart
home system comprising of motion sensor, interactive LCD
touch screen intelligent switches including all necessary
cables, conduits, fittings, connections and associated works
as required to suit the locations shown on drawings,
coordination, integration with other systems shall be
conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications section 16783
To suit system network equipped with:
01 7" interactive wireless portable LCD touch screen (LCD) 1 No
02 7.5 " interactive LCD touch screen (LCD1) 2 No
03 Intelligent switch Type (LCD2) 22 No
04 Presence sensor (Indoor type) 10 No
05 Motion sensor (Indoor type) 10 No
06 Motion sensor (Outdoor type) 2 No
07 Smart home system network including conduits, wiring, pull boxes, 1 Item
connections, and all required accessories to form a complete and
fully operative system
To Collection SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
51 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
52/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
DIVISION 16 - ELECTRICAL
ACCESS CONTROL SYSTEM (VILLA DOOR LOCK )
Supply, installation , testing and commissioning of access
control system (villa door lock ) comprising of Intelligent
system controller ,double reader interface module , access
system touch screen ,door access system push button ,
electro magnetic lock ,Magnetic door contact , including all
necessary cables, conduits, fittings, connections and
associated works as required to suit the locations shown on
drawings, coordination, integration with other systems shall
be conducted during work execution as per technical
specifications, drawings and by making arrangement with
supervising engineer to achieve the work to the best
possible and specifications section 16783
To suit system network equipped with:
01 Intelligent system controller (ref. ISC) 1 No
02 Double reader interface module (ref. DRIM) 1 No
03 Door access system touch screen ref. (CR) 2 No.
04 Door access system push button (ref. PB) 2 No
05 Electro magnetic lock 2 No.
06 Magnetic door contact(ref. DC) 2 No
07 Security alarm bell ref. (SEC) 1 No
08 Security alarm bell outdoor ref. (SEC) 2 No
09 Access control system network including conduits, wiring, pull 1 Item
boxes, connections, and all required accessories to
form a complete and fully operative system
To Collection SR
DIVISION 16 - ELECTRICAL
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
52 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
53/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
IP TV SYSTEM
Supply, install, test and commissioning of television system
connected to TCP/IP (LAN) comprising of RJ45 TV outlets
(measured elsewhere) set top box , power supply , and
associated work as shown on drawings and .Coordination,
integration with other systems disciplines shall be conducted
during work execution as per technical specifications,
drawings and by making arrangement with supervising
engineer to achieve the work to the best possible and
specifications section 16787
To suit IPTV system network equipped with:
01 Set top box 10 No
02 IP TV system network including coaxial cable and all required 1 Item
accessories to form a complete and fully operative system
To Collection SR
DIVISION 16 - ELECTRICAL
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
53 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
54/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
AMOUNT
SRITEM D E S C R I P T I O N QTY UNIT RATE
Collection
Sheet - 40
Sheet - 41
Sheet - 42
Sheet - 43
Sheet - 44
Sheet - 45
Sheet - 46
Sheet - 47
Sheet - 48
Sheet - 49
Sheet - 50
Sheet - 51
Sheet - 52
Sheet - 53
To Bill Summary SR
Project No.: J10-13300
ZUHAIR FAYEZ PARTNERSHIP
54 / 55
REVISED PAGE Date: MAY 2012
-
7/28/2019 Villa Vb1 (MAY 2012)
55/55
PROJECT: Infrastructure buildings of the residential complex (phase 2)
of ITCC complex - RIYADH
REVISED BOQ FOR Villa Type (Vb 1)
Bldg. no. VL03
Bill no. 1
ITEM DESCRIPTION AMOUNT S.R.
BILL SUMMARY
Sheet - 12 SITE DEVELOPMENT 0.0
Sheet - 13 - SITEWORK 0.0
Sheet - 15 - CONCRETE 0.0
Sheet - 16 - MASONRY 0.0
Sheet - 17 - METALS 0.0
Sheet - 18 - WOOD AND PLASTIC 0.0
Sheet - 19 - THERMAL AND MOISTURE PROTECTION 0.0
Sheet - 23 - DOORS AND WINDOWS 0.0
Sheet - 28 - FINISHES 0.0
Sheet - 29 - SPECIALTIES 0.0
Sheet - 34 - PLUMBING 0.0
Sheet - 39 - HVAC 0.0
Sheet - 54 - ELECTRICAL 0.0