Vigilance related issues in procurement of works

20
VIGILANCE RELATED ISSUES IN PROCUREMENT OF WORKS DR K M SONI, CHIEF ENGINEER, WZ-I, CPWD, MUMBAI

Transcript of Vigilance related issues in procurement of works

Page 1: Vigilance related issues in procurement of works

VIGILANCE RELATED ISSUES IN PROCUREMENT OF WORKS

DR K M SONI, CHIEF ENGINEER, WZ-I, CPWD, MUMBAI

Page 2: Vigilance related issues in procurement of works

APPOINTMENT OF CONSULTANTS-avoid conflict of interest

CONFLICT BETWEEN CONSULTANCY AND PROCUREMENT

CONFLICT BETWEEN CONSULTANCY AND CONTROLS/CONSULTANCY

CONFLICT BETWEEN CONSULTANT AND EMPLOYER’S STAFF

ONLY ONE PROPOSAL IN INDIVIDUAL’S CAPACITY OR JT VENTURE

Page 3: Vigilance related issues in procurement of works

RECOVERIES FROM observations of CTE/QA OBSERVATIONSTO BE MADE AS PER CONTRACTTO BE MADE BY ENGINEER IN

CHARGE WITHOUT QUOATING THIRD PARTY i.e. CTE OR QA TEAM

Page 4: Vigilance related issues in procurement of works

BANK GUARANTEEFROM SCHEDULED BANKOF REQUIRED AMOUNTOF REQUIRED PERIODVALIDITY EXTENSION AFTER ITS EXPIRY

VERIFICATION TO AVOID FORGE DOCUMENT

INDEPENDENT VERIFICATION DIRECTLY FROM THE BANK

Page 5: Vigilance related issues in procurement of works

MOBILIZATION ADVANCEBG OF 110% ADVANCE TO

RECOVER INTEREST IF ANY.NORMALLY SHOULD NOT BE

PAID IN LESS THAN TWO INSTALMENTS.

INTEREST FREE BUT IF THE CONTRACT IS TERMINATED DUE TO DEFAULT OF THE CONTRACT, INTEREST RATE TO BE MENTIONED

Page 6: Vigilance related issues in procurement of works

TRANSPARENCY IN TENDERING SYSTEM OF COMPLEX NATURE

INVITE EOIFINALISE TECHNICAL

SPECIFICATIONSTHEN CALL TECHNO

COMMERCIAL BIDS

Page 7: Vigilance related issues in procurement of works

MIX DESIGNMINIMUM CEMENT CONTENTMAXIMUM WATER CEMENT RATIOMINIMUM GRADE OF CONCRETEVALUE OF STANDARD DEVIATION TO

BE CHECKEDFOR ACCEPTANCE CRITERIA MEAN OF

A GROUP OF 4 NON OVERLAPPING CONSECUTIVE TEST RESULTS

SAMPLES HAVING +/- 15% VARIATIONS OF AVERGARE THREE SPECIMENS NOT BEING DECLARED INVALID

Page 8: Vigilance related issues in procurement of works

POST TENDER NEGOTIATIONSTHERE SHOULD BE NO POST TENDER

NEGOTIATIONS OTHER THAN WITH L-1 THAT TOO EXCEPT IN CERTAIN EXCEPTIONAL CIRCUMSTANCES

POST TENDER NEGOTIATION COULD OFTEN BE A SOURCE OF CORRUPTION

NO POST NEGOTIATION WITH OTHER THAN THE L-1

RECORD CIRCUMSTANCES OF ACCEPTING SINGLE BID (CONSIDER RATE JUSTIFICATION ALSO)

Page 9: Vigilance related issues in procurement of works

E - GOVERNANCENOT NECESSARY TO BE

SECUREDTO BE CERTIFIED FROM THE

DEPARTMENT OF INFORMATION TECHNOLOGY

Page 10: Vigilance related issues in procurement of works

PURCHASE PREFERENCE POLICY

DPE GUIDELINES 21.11.2007/18.07.2005 STAND TERMINATED WEF 31.3.2008.

Page 11: Vigilance related issues in procurement of works

TENDERING SYSTEMFAIR, TRANSPARENT AND

OPENSECURED

Page 12: Vigilance related issues in procurement of works

DELAY IN FINALISATION OF TENDERSEXTENSION OF VALIDITY TO

BE VIEWED SERIOUSLYTO BE RARE WITH VALID

REASONS

Page 13: Vigilance related issues in procurement of works

DELAYS IN MAKING PAYMENTSREVIEW BY CVOs

Page 14: Vigilance related issues in procurement of works

PQ CRITERIASHOULD NOT BE

DISCRIMINATORYSHOULD BE CLEARLY

SPECIFIEDSHOULD NOT BE TOO

STRINGENT

Page 15: Vigilance related issues in procurement of works

MANUAL NITsA SOURCE OF COMPLAINT

DURING E TENDERING SYSTEM

USED FOR SPECIALISED WORK

PRESS NOTICE SHOULD BE THROUGH WEB

Page 16: Vigilance related issues in procurement of works

ACCEPTANCE CRITERIA OF AWARD OF WORKSTRANSPARENTCONSISTENTWITH JUSTIFIED COST

Page 17: Vigilance related issues in procurement of works

DECISIONSSELF SPEAKINGWRITTEN

Page 18: Vigilance related issues in procurement of works

VIGILANCE ANGLE TO BE EXAMINED IN CASE OF IF ABNORMAL PROCUREMENTS

IF WORK AWARDED ON HIGH RATES

IF AWARD IS DELAYEDDISCRETIONS ARE FREQUENTLY RESORTED TO

FAVOURS ARE FOUNDBIASED AWARDS ETC.

Page 19: Vigilance related issues in procurement of works
Page 20: Vigilance related issues in procurement of works

THANKS