View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed...
Transcript of View from Birds Nest - Redcliffe State High School › Supportandresources › ... · placed...
Redcliffe State High School
View from Birds Nest
K L I N G N E R R O A D
1:250
fall
1:250
fall
5
1
2
3
4
6
7
8
9
10
11
1215
1413
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
DESIGN DEVELOPMENT
Overall planning
The new administration building and assembly hall is located on Klingner Road and gives the school a new formal entry for students, staff and visitors. The project includes a new administration centre and assembly hall, the replacement of the basketball courts and two sheds, and the relocation of P Block and Q Block.
To allow the new administration building to places in the best location, the basketball courts that are being demolished will be relocated with the other sports courts and adjacent to the oval. P Block and Q Block will therefore need to be relocated and will be placed parallel to Red Studio with view over the oval. A walkway will be provided between the two buildings.
The new bus shed will be located on the eastern campus adjacent to the library and allow easy access to the workshop on the same campus. The new PE shed which replaces two sheds that need to be removed, will be located next to the oval behind the security fence to ensure equipment is secure after hours.
Safety and security
Redcliffe State High School has a medium security level and the visitors’ entry to the administration building is clearly visible from the street along the main pathway into the school. Legibility for visitors is important to ensure they can easily find the administration services before entering the school grounds. The student entry into the administration building is separate to public entry. Further detail has been provided around appropriate duress and locking systems, fencing and gates as well as general security considerations to protect the school and the safety of students and staff.
Construction
The large volume of the hall has a steel portal frame structure while the administration building, with more modest volumes, has a steel column and framed roof. Metal sheeting is used as the lightweight infill material for the hall and prefinished fibre cement for the administration building. Metal roof sheeting is used for the entire building. A mixture of commercial and industrial glazing systems are used throughout. All materials have been chosen to reduce ongoing maintenance and address the coastal location.
Interior design
The overall composition that the administration areas aim to provide is a clear and organised interior for the staff working in the space while providing a welcoming, sophisticated and professional area for visitors and students. Colour is applied in bold strokes and forms to bring attention to key zones assisting wayfinding and reinforcing clear routes.
The colour palette in both the administration areas and the hall combines shades of blue with warm tones and the texture of natural timber, offset with sharp whites to reinforce a strong school identity. The school colour of Deep Ocean Blue is a soothing colour stimulating clear thought, and the lighter softer blues calm the mind and aid concentration. The interior composition aims to simultaneously recall the school’s colours, and its nautical location. Simple interior elements and forms including accent paint, carpeting, bulkheads are used to encourage a directional flow towards gathering spots and to stimulate interaction creating a dynamic active space.
The interior and external colours of the new building reflect the school colours and the boldness, independence and decisiveness of the school’s emblem – the eagle.
Site Plan for Western Campus
Redcliffe State High School
Birds Nest
Gymnasium
Red Studio
Relocatables
New basketball courts
M Block
New PE shed
HallAdmin
RW-3
SETOUT
SETOUT
rt
RW-2
RW-1
RW-1
RW-2
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
col
dpdp
dp
dp
dp
dp
dp
dp
dpdp
dp
dp
dp
dp
dp
dp
dp
BRIDGE TOSTAGE DOOR
STAGE CURTAIN
FHR
hwu
1:14
RAM
P
1:14
RAM
P
1:250
fall
1:250
fall
hwu
FHR
FHR
BOLLARD
RENDEREDFINISH TOEXPOSEDFOOTING
REPLACE DOORWITH WINDOW
CJCJ
compactus
FIP
FOYER02.01
02.03
STAGE02.04
KITCHEN02.07
COLD ROOM02.09
BULK STORE02.08
AV02.05
CHAIR STORE02.06
WC MALE02.11
WC FEMALE02.10
WC PWD02.12
CLEANERS'02.13
PRINCIPAL01.12
DEPUTY01.13
DEPUTY01.14
CONFERENCE01.07
K'TTE01.08
B.S.M.01.16
DEPUTY01.15
STAFF ROOM01.21
K'TTE01.22
COMMS/DATA01.18
STAFF TCE.01.23
PLANT01.24
RESOURCE01.09
HEAD OF DEP.01.17 WC+SHW.
01.20
RESOURCE STORE01.10
SUPPORT/RECEPTION01.05
WAIT - VISITOR01.03
WAIT - STUDENT01.04
INTERVIEW01.06
C'DOR02.02
CORRIDOR01.02
CORRIDOR01.01
F
vp
vp
vp
vp
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
CPT-1
VNL-1
CPT-1
CPT-1
WL-1
CPT-1
VNL-1
VNL-1
VNL-1
WL-1
CPT-1
CPT-1
VNL-1
VNL-1
VNL-1
VNL-1
VNL-1
VNL-1
VNL-1
VNL-1
VNL-1 VNL-1
WL-1 WL-1
APL-3
VNL-1
VNL-1
MSB
CNC-1
VNL-1
APL-
2
APL-
2
APL-2
VNL-1
SECURE STORE01.11
WC PWD01.19
SETOUT
Floor Plan for Administration and Hall
Redcliffe State High School
CURRENT STATUS
The Schematic Design Project Proposal has been completed, forwarded to DET and approved.
The Department, school and the consultants have been working on the design and documentation of the new Administration and Hall building which includes the relocation of the school basketball courts. This has progressed well and documentation has reached 90% completion. Both the school and DET are enthusiastic about the layout and design of the new facilities.
The project will change the main entry to the school’s administration building and consideration has been given to the affect this may have on the day-to-day running of the school. The project’s consultants have taken care to incorporate the new main entry into the grounds so that the arrival and departure of personnel and visitors to the school can be monitored.
The design of the project incorporates a fire services upgrade.
Target Dates
• Department financial approval March 2017
• Tender documentation to be completed February 2017
• Community Infrastructure Designation March 2017
• Construction tender award May 2017
• Completion of the project to be ready for commencement of school year 2018.
KLINGNER ROAD
Hall
Fire booster Entry
Plaza
Public entry
Student entry
Fig tree
Tiered seating