Vietcombank - Chiller Plant Sizing for Tender 1/04/2010 Plant total load 7860.5 kW * Plant total load with diversity 7074.5 kW apply further 10% diversity for people, lighting and equipment Data centers load 1230.6 kW allow for 350Tr; no diversity on data centres loads Data centers load 0.6153 kW/sqm Data center area 2000 sqm estimate Office average load 0.181 kW/sqm Office load@2000 sqm 362.2 kW Plant sizing revise =Plant total load with diversity-(Office load@2000sqm)+(Data center load@2000sqm ) Plant sizing revise = 7943 kW 3 main chillers = 2648 kW 756 Tr say 750 Tr 2 standby/low load chillers = 1324 kW 378 Tr say 375 Tr * Coincident air system cooling loads (includes solar/facade diversity) from E-20 Cal (R1)* * Facade glass U=1.6W/m2K; SC=0.5 P:\Projects\2009 MIS\bkk0906000 - Vietcombank, PCP\1 - Eng\02 - Calcs & Design Data\02 - AC\100326 Facade Glass Performance and Cooling Load Study.xls P:\Projects\2009 MIS\bkk0906000 - Vietcombank, PCP\1 - Eng\02 - Calcs & Design Data\02 - AC\100326 Facade Glass Performance and Cooling Load Study.xls

description

Vietcombank Chiller Plant Sizing Calcs

Transcript of Vietcombank Chiller Plant Sizing Calcs

Page 1: Vietcombank Chiller Plant Sizing Calcs

Vietcombank - Chiller Plant Sizing for Tender1/04/2010

Plant total load 7860.5 kW *

Plant total load with diversity 7074.5 kW apply further 10% diversity for people, lighting and equipment

Data centers load 1230.6 kW allow for 350Tr; no diversity on data centres loads

Data centers load 0.6153 kW/sqm

Data center area 2000 sqm estimate

Office average load 0.181 kW/sqm

Office load@2000 sqm 362.2 kW

Plant sizing revise =Plant total load with diversity-(Office load@2000sqm)+(Data center load@2000sqm )

Plant sizing revise = 7943 kW

3 main chillers = 2648 kW 756 Tr say 750 Tr

2 standby/low load chillers = 1324 kW 378 Tr say 375 Tr

* Coincident air system cooling loads (includes solar/facade diversity) from E-20 Cal (R1)*

* Facade glass U=1.6W/m2K; SC=0.5

P:\Projects\2009 MIS\bkk0906000 - Vietcombank, PCP\1 - Eng\02 - Calcs & Design Data\02 - AC\100326 Facade Glass Performance and Cooling Load Study.xlsP:\Projects\2009 MIS\bkk0906000 - Vietcombank, PCP\1 - Eng\02 - Calcs & Design Data\02 - AC\100326 Facade Glass Performance and Cooling Load Study.xls

Page 2: Vietcombank Chiller Plant Sizing Calcs

Cooling Plant Sizing Summary for VCB Plant(8.00-18.00) VietcomBank 03/25/2010 eec 04:09PM

Hourly Analysis Program v.4.2 Page 1 of 1

1. Plant Information: Plant Name .................................................................. VCB Plant(8.00-18.00) Plant Type .................................................................. Generic Chilled Water Design Weather ................................................... Ho Chi Minh City, Vietnam 2. Cooling Plant Sizing Data: Maximum Plant Load ............................................................................ 7860.5 kW Load occurs at ................................................................................. Mar 1500 m²/kW ......................................................................................................... 5.6 m²/kW Floor area served by plant .................................................................. 44042.1 m² 3. Coincident Air System Cooling Loads for Mar 1500

System

Cooling

Coil Load Air System Name Mult. ( kW )

00-B1-01 1 15.8

00-B1-02 1 8.5

00-G-A-01 1 33.9

00-G-A-02 1 17.9

00-G-A-03 1 150.4

00-M-A-01 1 142.0

00-M-A-02 1 173.8

L-01-A-01 1 134.6

L-01-A-02 1 125.1

L-02-A-01 1 133.5

L-02-A-02 1 114.5

L-03- A-01 1 133.5

L-03- A-02 1 133.1

L-04-A-01 1 133.0

L-04-A-02 1 128.9

L-05-A-01 1 131.5

L-05-A-02 1 135.7

L-07-A-01 1 65.2

L-07-A-02 1 64.6

L-08to11-A-01 4 98.9

L-08to11-A-02 4 96.8

L-12to20-A-01 9 98.9

L-12to20-A-02 9 97.4

L-21-A-01 1 98.9

L-21-A-02 1 96.1

L-22to23-A-01 2 97.6

L-22to23-A-02 2 95.5

L-24to25-A-01 2 85.4

L-24to25-A-02 2 86.5

L-26to28-A-01 3 86.3

L-26to28-A-02 3 86.3

L-29to30-A-01 2 85.9

L-29to30-A-02 2 86.7

L-31to32-A-01 2 80.3

L-31to32-A-02 2 79.6

L-33to34-A-01 2 80.3

L-33to34-A-02 2 79.6

00-B1-03 1 85.2

L8-L32 Tenant Server Room 25 29.1

00-B1-04 1 91.6

00-G-A-04 1 2.3

System loads are for coils whose cooling source is ' Chilled Water ' or ' Any ' .

Page 3: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-B1-01 Project Name: VietcomBank 03/26/2010 Prepared by: OO 09:29AM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name .......................................... 00-B1-01 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones ........................................................... 1 Floor Area .............................................................. 126.0 m? Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 13.4 kW Sensible coil load .................................................. 12.6 kW Coil L/s at Mar 1400 ............................................ 1000 L/s Max block L/s ...................................................... 1000 L/s Sum of peak zone L/s .......................................... 1000 L/s Sensible heat ratio .............................................. 0.942 m?/kW ................................................................... 9.4 W/m? .................................................................. 106.2 Water flow @ 7.0 ?K rise ...................................... 0.46 L/s

Load occurs at ................................................. Mar 1400 OA DB / WB ................................................... 34.9 / 25.1 ?C Entering DB / WB ........................................... 24.7 / 17.6 ?C Leaving DB / WB ............................................ 14.2 / 13.5 ?C Coil ADP .................................................................. 13.0 ?C Bypass Factor ........................................................ 0.100 Resulting RH ............................................................... 51 % Design supply temp. ................................................. 14.3 ?C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 ?K

Precool Coil Sizing Data

Total coil load ........................................................ 2.1 kW Sensible coil load ................................................... 1.2 kW Coil L/s at Mar 1500 ............................................... 49 L/s Max coil L/s ............................................................ 49 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 ?K rise ...................................... 0.07 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 ?C Entering DB / WB ........................................... 35.1 / 25.2 ?C Leaving DB / WB ............................................ 15.0 / 14.3 ?C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 1000 L/s Standard L/s ......................................................... 998 L/s Actual max L/(s-m?) ............................................. 7.94 L/(s-m?)

Fan motor BHP ........................................................ 1.86 BHP Fan motor kW .......................................................... 1.39 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................... 49 L/s L/(s-m?) ................................................................ 0.39 L/(s-m?)

l/s/person ................................................................. 4.41 l/s/person

Page 4: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-B1-03 Project Name: VietcomBank 03/26/2010 Prepared by: OO 09:40AM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name .......................................... 00-B1-03 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones ........................................................... 1 Floor Area .............................................................. 723.0 m? Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 68.1 kW Sensible coil load .................................................. 63.3 kW Coil L/s at Mar 1500 ............................................ 6000 L/s Max block L/s ...................................................... 6000 L/s Sum of peak zone L/s .......................................... 6000 L/s Sensible heat ratio .............................................. 0.929 m?/kW .................................................................. 10.6 W/m? .................................................................... 94.2 Water flow @ 7.0 ?K rise ...................................... 2.33 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 ?C Entering DB / WB ........................................... 24.2 / 18.2 ?C Leaving DB / WB ............................................ 15.5 / 14.9 ?C Coil ADP .................................................................. 14.5 ?C Bypass Factor ........................................................ 0.100 Resulting RH ............................................................... 56 % Design supply temp. ................................................. 15.9 ?C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 ?K

Precool Coil Sizing Data

Total coil load ....................................................... 18.7 kW Sensible coil load .................................................. 10.6 kW Coil L/s at Mar 1500 ............................................. 439 L/s Max coil L/s .......................................................... 439 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 ?K rise ...................................... 0.64 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 ?C Entering DB / WB ........................................... 35.1 / 25.2 ?C Leaving DB / WB ............................................ 15.0 / 14.3 ?C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 6000 L/s Standard L/s ........................................................ 5987 L/s Actual max L/(s-m?) ............................................. 8.30 L/(s-m?)

Fan motor BHP ...................................................... 11.18 BHP Fan motor kW .......................................................... 8.33 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 439 L/s L/(s-m?) ................................................................ 0.61 L/(s-m?)

l/s/person ................................................................. 4.95 l/s/person

Page 5: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-B1-04 Project Name: VietcomBank 03/26/2010 Prepared by: OO 09:44AM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name .......................................... 00-B1-04 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones ........................................................... 1 Floor Area .............................................................. 780.0 m? Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 70.9 kW Sensible coil load .................................................. 65.5 kW Coil L/s at Mar 1200 ............................................ 6300 L/s Max block L/s ...................................................... 6300 L/s Sum of peak zone L/s .......................................... 6300 L/s Sensible heat ratio .............................................. 0.923 m?/kW .................................................................. 11.0 W/m? .................................................................... 90.9 Water flow @ 7.0 ?K rise ...................................... 2.42 L/s

Load occurs at ................................................. Mar 1200 OA DB / WB ................................................... 33.2 / 24.7 ?C Entering DB / WB ........................................... 24.1 / 18.2 ?C Leaving DB / WB ............................................ 15.5 / 14.9 ?C Coil ADP .................................................................. 14.6 ?C Bypass Factor ........................................................ 0.100 Resulting RH ............................................................... 56 % Design supply temp. ................................................. 15.8 ?C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 ?K

Precool Coil Sizing Data

Total coil load ....................................................... 20.4 kW Sensible coil load .................................................. 11.6 kW Coil L/s at Mar 1500 ............................................. 478 L/s Max coil L/s .......................................................... 478 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 ?K rise ...................................... 0.70 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 ?C Entering DB / WB ........................................... 35.1 / 25.2 ?C Leaving DB / WB ............................................ 15.0 / 14.3 ?C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 6300 L/s Standard L/s ........................................................ 6286 L/s Actual max L/(s-m?) ............................................. 8.08 L/(s-m?)

Fan motor BHP ...................................................... 11.73 BHP Fan motor kW .......................................................... 8.75 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 478 L/s L/(s-m?) ................................................................ 0.61 L/(s-m?)

l/s/person ................................................................. 4.90 l/s/person

Page 6: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-G-A-01 Project Name: VietcomBank 03/25/2010 Prepared by: eec 04:04PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ 00-G-A-01 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area .............................................................. 105.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 36.4 kW Sensible coil load .................................................. 32.8 kW Coil L/s at Jan 1500 ............................................. 2276 L/s Max block L/s ...................................................... 2276 L/s Sum of peak zone L/s .......................................... 2276 L/s Sensible heat ratio .............................................. 0.901 m²/kW .................................................................... 2.9 W/m² .................................................................. 346.4 Water flow @ 7.0 °K rise ....................................... 1.24 L/s

Load occurs at ................................................. Jan 1500 OA DB / WB ................................................... 33.4 / 24.6 °C Entering DB / WB ........................................... 25.5 / 17.7 °C Leaving DB / WB ........................................... 13.5 / 12.8 °C Coil ADP .................................................................. 12.2 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 48 % Design supply temp. ................................................ 13.0 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Supply Fan Sizing Data

Actual max L/s ..................................................... 2276 L/s Standard L/s ........................................................ 2271 L/s Actual max L/(s-m²) ............................................ 21.67 L/(s-m²)

Fan motor BHP ........................................................ 2.12 BHP Fan motor kW .......................................................... 1.58 kW Fan static .................................................................. 375 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 119 L/s L/(s-m²) ................................................................. 1.13 L/(s-m²)

l/s/person ................................................................. 4.25 l/s/person

Page 7: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-G-A-02 Project Name: VietcomBank 03/25/2010 Prepared by: eec 04:04PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ 00-G-A-02 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area ................................................................ 98.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 18.6 kW Sensible coil load .................................................. 17.7 kW Coil L/s at Dec 1500 ............................................ 1331 L/s Max block L/s ...................................................... 1331 L/s Sum of peak zone L/s .......................................... 1331 L/s Sensible heat ratio .............................................. 0.951 m²/kW .................................................................... 5.3 W/m² .................................................................. 189.4 Water flow @ 7.0 °K rise ....................................... 0.63 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.6 / 17.2 °C Leaving DB / WB ........................................... 13.6 / 12.9 °C Coil ADP .................................................................. 12.4 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 48 % Design supply temp. ................................................ 13.0 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ........................................................ 2.5 kW Sensible coil load ................................................... 1.4 kW Coil L/s at Mar 1500 ............................................... 59 L/s Max coil L/s ............................................................ 59 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.09 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 1331 L/s Standard L/s ........................................................ 1328 L/s Actual max L/(s-m²) ............................................ 13.58 L/(s-m²)

Fan motor BHP ........................................................ 1.24 BHP Fan motor kW .......................................................... 0.92 kW Fan static .................................................................. 375 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................... 59 L/s L/(s-m²) ................................................................. 0.60 L/(s-m²)

l/s/person ................................................................. 5.02 l/s/person

Page 8: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-G-A-03 Project Name: VietcomBank 03/25/2010 Prepared by: eec 04:04PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ 00-G-A-03 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area .............................................................. 800.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 131.5 kW Sensible coil load ................................................ 120.8 kW Coil L/s at May 1400 ............................................ 9213 L/s Max block L/s ...................................................... 9213 L/s Sum of peak zone L/s .......................................... 9213 L/s Sensible heat ratio .............................................. 0.919 m²/kW .................................................................... 6.1 W/m² .................................................................. 164.4 Water flow @ 5.6 °K rise ....................................... 5.66 L/s

Load occurs at ................................................ May 1400 OA DB / WB ................................................... 33.8 / 24.5 °C Entering DB / WB ........................................... 24.6 / 17.4 °C Leaving DB / WB ........................................... 13.7 / 13.0 °C Coil ADP .................................................................. 12.5 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 50 % Design supply temp. ................................................ 14.0 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 26.0 kW Sensible coil load .................................................. 14.8 kW Coil L/s at Mar 1500 ............................................. 610 L/s Max coil L/s .......................................................... 610 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 5.6 °K rise ....................................... 1.12 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 9213 L/s Standard L/s ........................................................ 9193 L/s Actual max L/(s-m²) ............................................ 11.52 L/(s-m²)

Fan motor BHP ...................................................... 17.16 BHP Fan motor kW ........................................................ 12.80 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 610 L/s L/(s-m²) ................................................................. 0.76 L/(s-m²)

l/s/person ................................................................. 4.12 l/s/person

Page 9: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-G-A-04 Project Name: VietcomBank 03/25/2010 Prepared by: eec 04:04PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ 00-G-A-04 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area ................................................................ 12.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ........................................................ 2.1 kW Sensible coil load ................................................... 2.0 kW Coil L/s at Mar 1400 ............................................. 157 L/s Max block L/s ....................................................... 157 L/s Sum of peak zone L/s ........................................... 157 L/s Sensible heat ratio .............................................. 0.946 m²/kW .................................................................... 5.8 W/m² .................................................................. 171.8 Water flow @ 7.0 °K rise ....................................... 0.07 L/s

Load occurs at ................................................. Mar 1400 OA DB / WB ................................................... 34.9 / 25.1 °C Entering DB / WB ........................................... 24.2 / 17.2 °C Leaving DB / WB ........................................... 13.8 / 13.2 °C Coil ADP .................................................................. 12.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 50 % Design supply temp. ................................................ 13.0 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ........................................................ 0.3 kW Sensible coil load ................................................... 0.2 kW Coil L/s at Mar 1500 ................................................. 7 L/s Max coil L/s .............................................................. 7 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.01 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ...................................................... 157 L/s Standard L/s ......................................................... 156 L/s Actual max L/(s-m²) ............................................ 13.05 L/(s-m²)

Fan motor BHP ........................................................ 0.15 BHP Fan motor kW .......................................................... 0.11 kW Fan static .................................................................. 375 Pa

Outdoor Ventilation Air Data Design airflow L/s ..................................................... 7 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 10: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-01-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-01-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 859.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 115.4 kW Sensible coil load ................................................ 106.8 kW Coil L/s at Feb 1600 ............................................ 7561 L/s Max block L/s at Jan 1600 ................................... 8581 L/s Sum of peak zone L/s .......................................... 8581 L/s Sensible heat ratio .............................................. 0.925 m²/kW .................................................................... 7.4 W/m² .................................................................. 134.4 Water flow @ 7.0 °K rise ....................................... 3.95 L/s

Load occurs at ................................................. Feb 1600 OA DB / WB ................................................... 34.3 / 25.1 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 22.3 kW Sensible coil load .................................................. 12.6 kW Coil L/s at Mar 1500 ............................................. 522 L/s Max coil L/s .......................................................... 522 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.76 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 8581 L/s Standard L/s ........................................................ 8562 L/s Actual max L/(s-m²) .............................................. 9.99 L/(s-m²)

Fan motor BHP ...................................................... 15.98 BHP Fan motor kW ........................................................ 11.92 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 522 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 11: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-01-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-01-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 743.3 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 107.3 kW Sensible coil load ................................................ 100.0 kW Coil L/s at Apr 1500 ............................................. 7050 L/s Max block L/s at Apr 1500 ................................... 7833 L/s Sum of peak zone L/s .......................................... 7833 L/s Sensible heat ratio .............................................. 0.933 m²/kW .................................................................... 6.9 W/m² .................................................................. 144.3 Water flow @ 7.0 °K rise ....................................... 3.67 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 19.1 kW Sensible coil load .................................................. 10.8 kW Coil L/s at Mar 1500 ............................................. 447 L/s Max coil L/s .......................................................... 447 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.65 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1500 .................................. 7833 L/s Standard L/s ........................................................ 7815 L/s Actual max L/(s-m²) ............................................ 10.54 L/(s-m²)

Fan motor BHP ...................................................... 14.59 BHP Fan motor kW ........................................................ 10.88 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 447 L/s L/(s-m²) ................................................................. 0.60 L/(s-m²)

l/s/person ................................................................. 4.99 l/s/person

Page 12: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-M-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ 00-M-A-01 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area .............................................................. 791.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 119.0 kW Sensible coil load ................................................ 105.9 kW Coil L/s at Apr 1600 ............................................. 7474 L/s Max block L/s ...................................................... 7474 L/s Sum of peak zone L/s .......................................... 7474 L/s Sensible heat ratio .............................................. 0.890 m²/kW .................................................................... 6.6 W/m² .................................................................. 150.4 Water flow @ 7.0 °K rise ....................................... 4.07 L/s

Load occurs at ................................................. Apr 1600 OA DB / WB ................................................... 34.9 / 25.1 °C Entering DB / WB ........................................... 24.8 / 17.3 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 48 % Design supply temp. ................................................ 12.8 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 24.4 kW Sensible coil load .................................................. 13.9 kW Coil L/s at Mar 1500 ............................................. 573 L/s Max coil L/s .......................................................... 573 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.84 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 7474 L/s Standard L/s ........................................................ 7458 L/s Actual max L/(s-m²) .............................................. 9.45 L/(s-m²)

Fan motor BHP ...................................................... 13.92 BHP Fan motor kW ........................................................ 10.38 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 573 L/s L/(s-m²) ................................................................. 0.72 L/(s-m²)

l/s/person ................................................................. 4.27 l/s/person

Page 13: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for 00-M-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ 00-M-A-02 Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area .............................................................. 782.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 153.9 kW Sensible coil load ................................................ 137.7 kW Coil L/s at Jan 1500 ............................................. 9526 L/s Max block L/s ...................................................... 9526 L/s Sum of peak zone L/s .......................................... 9526 L/s Sensible heat ratio .............................................. 0.895 m²/kW .................................................................... 5.1 W/m² .................................................................. 196.8 Water flow @ 7.0 °K rise ....................................... 5.26 L/s

Load occurs at ................................................. Jan 1500 OA DB / WB ................................................... 33.4 / 24.6 °C Entering DB / WB ........................................... 24.8 / 17.2 °C Leaving DB / WB ........................................... 12.8 / 12.1 °C Coil ADP .................................................................. 11.5 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 47 % Design supply temp. ................................................ 12.8 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 27.6 kW Sensible coil load .................................................. 15.7 kW Coil L/s at Mar 1500 ............................................. 647 L/s Max coil L/s .......................................................... 647 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.94 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s ..................................................... 9526 L/s Standard L/s ........................................................ 9505 L/s Actual max L/(s-m²) ............................................ 12.18 L/(s-m²)

Fan motor BHP ...................................................... 17.74 BHP Fan motor kW ........................................................ 13.23 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 647 L/s L/(s-m²) ................................................................. 0.83 L/(s-m²)

l/s/person ................................................................. 3.92 l/s/person

Page 14: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-02-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-02-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 851.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 113.7 kW Sensible coil load ................................................ 105.2 kW Coil L/s at Feb 1600 ............................................ 7445 L/s Max block L/s at Jan 1600 ................................... 8454 L/s Sum of peak zone L/s .......................................... 8454 L/s Sensible heat ratio .............................................. 0.925 m²/kW .................................................................... 7.5 W/m² .................................................................. 133.6 Water flow @ 7.0 °K rise ....................................... 3.89 L/s

Load occurs at ................................................. Feb 1600 OA DB / WB ................................................... 34.3 / 25.1 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 22.0 kW Sensible coil load .................................................. 12.5 kW Coil L/s at Mar 1500 ............................................. 517 L/s Max coil L/s .......................................................... 517 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.75 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 8454 L/s Standard L/s ........................................................ 8435 L/s Actual max L/(s-m²) .............................................. 9.93 L/(s-m²)

Fan motor BHP ...................................................... 15.75 BHP Fan motor kW ........................................................ 11.74 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 517 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 15: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-02-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-02-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 704.3 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 98.8 kW Sensible coil load .................................................. 92.0 kW Coil L/s at Apr 1500 ............................................. 6489 L/s Max block L/s at Apr 1600 ................................... 7214 L/s Sum of peak zone L/s .......................................... 7214 L/s Sensible heat ratio .............................................. 0.931 m²/kW .................................................................... 7.1 W/m² .................................................................. 140.3 Water flow @ 7.0 °K rise ....................................... 3.38 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 18.0 kW Sensible coil load .................................................. 10.2 kW Coil L/s at Mar 1500 ............................................. 423 L/s Max coil L/s .......................................................... 423 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.62 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 7214 L/s Standard L/s ........................................................ 7198 L/s Actual max L/(s-m²) ............................................ 10.24 L/(s-m²)

Fan motor BHP ...................................................... 13.44 BHP Fan motor kW ........................................................ 10.02 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 423 L/s L/(s-m²) ................................................................. 0.60 L/(s-m²)

l/s/person ................................................................. 5.00 l/s/person

Page 16: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-03- A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ....................................... L-03- A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 851.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 113.7 kW Sensible coil load ................................................ 105.2 kW Coil L/s at Feb 1600 ............................................ 7445 L/s Max block L/s at Jan 1600 ................................... 8454 L/s Sum of peak zone L/s .......................................... 8454 L/s Sensible heat ratio .............................................. 0.925 m²/kW .................................................................... 7.5 W/m² .................................................................. 133.6 Water flow @ 7.0 °K rise ....................................... 3.89 L/s

Load occurs at ................................................. Feb 1600 OA DB / WB ................................................... 34.3 / 25.1 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 22.0 kW Sensible coil load .................................................. 12.5 kW Coil L/s at Mar 1500 ............................................. 517 L/s Max coil L/s .......................................................... 517 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.75 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 8454 L/s Standard L/s ........................................................ 8435 L/s Actual max L/(s-m²) .............................................. 9.93 L/(s-m²)

Fan motor BHP ...................................................... 15.75 BHP Fan motor kW ........................................................ 11.74 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 517 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 17: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-03- A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ....................................... L-03- A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 801.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 113.5 kW Sensible coil load ................................................ 105.6 kW Coil L/s at Apr 1500 ............................................. 7450 L/s Max block L/s at Apr 1500 ................................... 8266 L/s Sum of peak zone L/s .......................................... 8266 L/s Sensible heat ratio .............................................. 0.930 m²/kW .................................................................... 7.1 W/m² .................................................................. 141.7 Water flow @ 7.0 °K rise ....................................... 3.88 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 20.7 kW Sensible coil load .................................................. 11.7 kW Coil L/s at Mar 1500 ............................................. 485 L/s Max coil L/s .......................................................... 485 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.71 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1500 .................................. 8266 L/s Standard L/s ........................................................ 8248 L/s Actual max L/(s-m²) ............................................ 10.32 L/(s-m²)

Fan motor BHP ...................................................... 15.40 BHP Fan motor kW ........................................................ 11.48 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 485 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.95 l/s/person

Page 18: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-04-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-04-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 847.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 113.3 kW Sensible coil load ................................................ 104.9 kW Coil L/s at Feb 1600 ............................................ 7405 L/s Max block L/s at Jan 1600 ................................... 8384 L/s Sum of peak zone L/s .......................................... 8384 L/s Sensible heat ratio .............................................. 0.926 m²/kW .................................................................... 7.5 W/m² .................................................................. 133.8 Water flow @ 7.0 °K rise ....................................... 3.87 L/s

Load occurs at ................................................. Feb 1600 OA DB / WB ................................................... 34.3 / 25.1 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 21.8 kW Sensible coil load .................................................. 12.4 kW Coil L/s at Mar 1500 ............................................. 512 L/s Max coil L/s .......................................................... 512 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.75 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 8384 L/s Standard L/s ........................................................ 8365 L/s Actual max L/(s-m²) .............................................. 9.90 L/(s-m²)

Fan motor BHP ...................................................... 15.62 BHP Fan motor kW ........................................................ 11.65 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 512 L/s L/(s-m²) ................................................................. 0.60 L/(s-m²)

l/s/person ................................................................. 4.96 l/s/person

Page 19: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-04-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-04-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 791.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 109.6 kW Sensible coil load ................................................ 101.8 kW Coil L/s at Apr 1500 ............................................. 7178 L/s Max block L/s at Apr 1500 ................................... 7964 L/s Sum of peak zone L/s .......................................... 7964 L/s Sensible heat ratio .............................................. 0.929 m²/kW .................................................................... 7.2 W/m² .................................................................. 138.5 Water flow @ 7.0 °K rise ....................................... 3.75 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.1 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 20.4 kW Sensible coil load .................................................. 11.6 kW Coil L/s at Mar 1500 ............................................. 479 L/s Max coil L/s .......................................................... 479 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.70 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1500 .................................. 7964 L/s Standard L/s ........................................................ 7946 L/s Actual max L/(s-m²) ............................................ 10.07 L/(s-m²)

Fan motor BHP ...................................................... 14.83 BHP Fan motor kW ........................................................ 11.06 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 479 L/s L/(s-m²) ................................................................. 0.60 L/(s-m²)

l/s/person ................................................................. 4.96 l/s/person

Page 20: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-05-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-05-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 817.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 113.7 kW Sensible coil load ................................................ 105.6 kW Coil L/s at Jan 1500 ............................................. 7453 L/s Max block L/s at Jan 1600 ................................... 8448 L/s Sum of peak zone L/s .......................................... 8448 L/s Sensible heat ratio .............................................. 0.928 m²/kW .................................................................... 7.2 W/m² .................................................................. 139.2 Water flow @ 7.0 °K rise ....................................... 3.89 L/s

Load occurs at ................................................. Jan 1500 OA DB / WB ................................................... 33.4 / 24.6 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 21.1 kW Sensible coil load .................................................. 12.0 kW Coil L/s at Mar 1500 ............................................. 494 L/s Max coil L/s .......................................................... 494 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.72 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 8448 L/s Standard L/s ........................................................ 8430 L/s Actual max L/(s-m²) ............................................ 10.34 L/(s-m²)

Fan motor BHP ...................................................... 15.74 BHP Fan motor kW ........................................................ 11.73 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 494 L/s L/(s-m²) ................................................................. 0.60 L/(s-m²)

l/s/person ................................................................. 4.96 l/s/person

Page 21: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-05-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-05-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 809.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ..................................................... 116.2 kW Sensible coil load ................................................ 108.2 kW Coil L/s at Apr 1500 ............................................. 7624 L/s Max block L/s at Apr 1600 ................................... 8457 L/s Sum of peak zone L/s .......................................... 8457 L/s Sensible heat ratio .............................................. 0.931 m²/kW .................................................................... 7.0 W/m² .................................................................. 143.6 Water flow @ 7.0 °K rise ....................................... 3.97 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 20.9 kW Sensible coil load .................................................. 11.9 kW Coil L/s at Mar 1500 ............................................. 490 L/s Max coil L/s .......................................................... 490 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.71 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 8457 L/s Standard L/s ........................................................ 8438 L/s Actual max L/(s-m²) ............................................ 10.45 L/(s-m²)

Fan motor BHP ...................................................... 15.75 BHP Fan motor kW ........................................................ 11.75 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 490 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.96 l/s/person

Page 22: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-07-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-07-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 397.5 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 57.3 kW Sensible coil load .................................................. 51.0 kW Coil L/s at Jan 1500 ............................................. 3517 L/s Max block L/s at Dec 1500 ................................... 3997 L/s Sum of peak zone L/s .......................................... 3997 L/s Sensible heat ratio .............................................. 0.889 m²/kW .................................................................... 6.9 W/m² .................................................................. 144.3 Water flow @ 7.0 °K rise ....................................... 1.96 L/s

Load occurs at ................................................. Jan 1500 OA DB / WB ................................................... 33.4 / 24.6 °C Entering DB / WB ........................................... 25.0 / 17.3 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.6 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 47 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ........................................................ 9.3 kW Sensible coil load ................................................... 5.3 kW Coil L/s at Mar 1500 ............................................. 219 L/s Max coil L/s .......................................................... 219 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.32 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 3997 L/s Standard L/s ........................................................ 3988 L/s Actual max L/(s-m²) ............................................ 10.06 L/(s-m²)

Fan motor BHP ........................................................ 7.45 BHP Fan motor kW .......................................................... 5.55 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 219 L/s L/(s-m²) ................................................................. 0.55 L/(s-m²)

l/s/person ................................................................. 5.50 l/s/person

Page 23: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-07-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-07-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 281.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 56.4 kW Sensible coil load .................................................. 45.7 kW Coil L/s at Mar 0900 ............................................ 3198 L/s Max block L/s at Jan 1500 ................................... 3465 L/s Sum of peak zone L/s .......................................... 3465 L/s Sensible heat ratio .............................................. 0.811 m²/kW .................................................................... 5.0 W/m² .................................................................. 200.6 Water flow @ 7.0 °K rise ....................................... 1.93 L/s

Load occurs at ................................................. Mar 0900 OA DB / WB ................................................... 29.3 / 23.7 °C Entering DB / WB ........................................... 24.9 / 17.8 °C Leaving DB / WB ........................................... 13.0 / 12.4 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 50 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 11.1 kW Sensible coil load ................................................... 6.3 kW Coil L/s at Mar 1500 ............................................. 260 L/s Max coil L/s .......................................................... 260 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.38 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1500 .................................. 3465 L/s Standard L/s ........................................................ 3458 L/s Actual max L/(s-m²) ............................................ 12.33 L/(s-m²)

Fan motor BHP ........................................................ 6.45 BHP Fan motor kW .......................................................... 4.81 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 260 L/s L/(s-m²) ................................................................. 0.93 L/(s-m²)

l/s/person ................................................................. 3.70 l/s/person

Page 24: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-08to11-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-08to11-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 577.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 89.4 kW Sensible coil load .................................................. 83.5 kW Coil L/s at Dec 1500 ............................................ 5893 L/s Max block L/s at Dec 1500 ................................... 6640 L/s Sum of peak zone L/s .......................................... 6640 L/s Sensible heat ratio .............................................. 0.934 m²/kW .................................................................... 6.5 W/m² .................................................................. 154.9 Water flow @ 7.0 °K rise ....................................... 3.06 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 15.1 kW Sensible coil load ................................................... 8.6 kW Coil L/s at Mar 1500 ............................................. 353 L/s Max coil L/s .......................................................... 353 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.52 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 6640 L/s Standard L/s ........................................................ 6625 L/s Actual max L/(s-m²) ............................................ 11.51 L/(s-m²)

Fan motor BHP ...................................................... 12.37 BHP Fan motor kW .......................................................... 9.22 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 353 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 25: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-08to11-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-08to11-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 616.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 83.4 kW Sensible coil load .................................................. 77.3 kW Coil L/s at Apr 1500 ............................................. 5470 L/s Max block L/s at Apr 1600 ................................... 6146 L/s Sum of peak zone L/s .......................................... 6146 L/s Sensible heat ratio .............................................. 0.927 m²/kW .................................................................... 7.4 W/m² .................................................................. 135.4 Water flow @ 7.0 °K rise ....................................... 2.85 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 16.0 kW Sensible coil load ................................................... 9.1 kW Coil L/s at Mar 1500 ............................................. 375 L/s Max coil L/s .......................................................... 375 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.55 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 6146 L/s Standard L/s ........................................................ 6132 L/s Actual max L/(s-m²) .............................................. 9.98 L/(s-m²)

Fan motor BHP ...................................................... 11.45 BHP Fan motor kW .......................................................... 8.54 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 375 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.93 l/s/person

Page 26: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-12to20-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-12to20-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 577.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 89.4 kW Sensible coil load .................................................. 83.5 kW Coil L/s at Dec 1500 ............................................ 5893 L/s Max block L/s at Dec 1500 ................................... 6640 L/s Sum of peak zone L/s .......................................... 6640 L/s Sensible heat ratio .............................................. 0.934 m²/kW .................................................................... 6.5 W/m² .................................................................. 154.9 Water flow @ 7.0 °K rise ....................................... 3.06 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 15.1 kW Sensible coil load ................................................... 8.6 kW Coil L/s at Mar 1500 ............................................. 353 L/s Max coil L/s .......................................................... 353 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.52 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 6640 L/s Standard L/s ........................................................ 6625 L/s Actual max L/(s-m²) ............................................ 11.51 L/(s-m²)

Fan motor BHP ...................................................... 12.37 BHP Fan motor kW .......................................................... 9.22 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 353 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 27: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-12to20-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-12to20-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 621.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 83.9 kW Sensible coil load .................................................. 77.7 kW Coil L/s at Apr 1500 ............................................. 5501 L/s Max block L/s at Apr 1600 ................................... 6181 L/s Sum of peak zone L/s .......................................... 6181 L/s Sensible heat ratio .............................................. 0.927 m²/kW .................................................................... 7.4 W/m² .................................................................. 135.0 Water flow @ 7.0 °K rise ....................................... 2.87 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 16.1 kW Sensible coil load ................................................... 9.1 kW Coil L/s at Mar 1500 ............................................. 378 L/s Max coil L/s .......................................................... 378 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.55 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 6181 L/s Standard L/s ........................................................ 6167 L/s Actual max L/(s-m²) .............................................. 9.95 L/(s-m²)

Fan motor BHP ...................................................... 11.51 BHP Fan motor kW .......................................................... 8.58 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 378 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.93 l/s/person

Page 28: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-21-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-21-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 577.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 89.4 kW Sensible coil load .................................................. 83.5 kW Coil L/s at Dec 1500 ............................................ 5893 L/s Max block L/s at Dec 1500 ................................... 6640 L/s Sum of peak zone L/s .......................................... 6640 L/s Sensible heat ratio .............................................. 0.934 m²/kW .................................................................... 6.5 W/m² .................................................................. 154.9 Water flow @ 7.0 °K rise ....................................... 3.06 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 15.1 kW Sensible coil load ................................................... 8.6 kW Coil L/s at Mar 1500 ............................................. 353 L/s Max coil L/s .......................................................... 353 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.52 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 6640 L/s Standard L/s ........................................................ 6625 L/s Actual max L/(s-m²) ............................................ 11.51 L/(s-m²)

Fan motor BHP ...................................................... 12.37 BHP Fan motor kW .......................................................... 9.22 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 353 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 29: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-21-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ........................................ L-21-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 609.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 82.8 kW Sensible coil load .................................................. 76.7 kW Coil L/s at Apr 1500 ............................................. 5433 L/s Max block L/s at Apr 1600 ................................... 6106 L/s Sum of peak zone L/s .......................................... 6106 L/s Sensible heat ratio .............................................. 0.927 m²/kW .................................................................... 7.4 W/m² .................................................................. 135.9 Water flow @ 7.0 °K rise ....................................... 2.83 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 15.8 kW Sensible coil load ................................................... 9.0 kW Coil L/s at Mar 1500 ............................................. 371 L/s Max coil L/s .......................................................... 371 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.54 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 6106 L/s Standard L/s ........................................................ 6092 L/s Actual max L/(s-m²) ............................................ 10.03 L/(s-m²)

Fan motor BHP ...................................................... 11.37 BHP Fan motor kW .......................................................... 8.48 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 371 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.93 l/s/person

Page 30: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-22to23-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-22to23-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 572.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 91.1 kW Sensible coil load .................................................. 85.2 kW Coil L/s at Dec 1500 ............................................ 6006 L/s Max block L/s at Dec 1500 ................................... 6754 L/s Sum of peak zone L/s .......................................... 6754 L/s Sensible heat ratio .............................................. 0.936 m²/kW .................................................................... 6.3 W/m² .................................................................. 159.2 Water flow @ 7.0 °K rise ....................................... 3.11 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 14.9 kW Sensible coil load ................................................... 8.5 kW Coil L/s at Mar 1500 ............................................. 350 L/s Max coil L/s .......................................................... 350 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.51 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 6754 L/s Standard L/s ........................................................ 6739 L/s Actual max L/(s-m²) ............................................ 11.81 L/(s-m²)

Fan motor BHP ...................................................... 12.58 BHP Fan motor kW .......................................................... 9.38 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 350 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 31: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-22to23-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-22to23-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 616.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 82.2 kW Sensible coil load .................................................. 76.1 kW Coil L/s at Apr 1400 ............................................. 5386 L/s Max block L/s at May 1500 .................................. 6031 L/s Sum of peak zone L/s .......................................... 6031 L/s Sensible heat ratio .............................................. 0.926 m²/kW .................................................................... 7.5 W/m² .................................................................. 133.4 Water flow @ 7.0 °K rise ....................................... 2.81 L/s

Load occurs at ................................................. Apr 1400 OA DB / WB ................................................... 34.9 / 25.1 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 16.0 kW Sensible coil load ................................................... 9.1 kW Coil L/s at Mar 1500 ............................................. 375 L/s Max coil L/s .......................................................... 375 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.55 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at May 1500 ................................. 6031 L/s Standard L/s ........................................................ 6017 L/s Actual max L/(s-m²) .............................................. 9.79 L/(s-m²)

Fan motor BHP ...................................................... 11.23 BHP Fan motor kW .......................................................... 8.38 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 375 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.93 l/s/person

Page 32: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-24to25-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-24to25-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 522.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 74.9 kW Sensible coil load .................................................. 69.5 kW Coil L/s at Jan 1600 ............................................. 4898 L/s Max block L/s at Jan 1600 ................................... 5577 L/s Sum of peak zone L/s .......................................... 5577 L/s Sensible heat ratio .............................................. 0.929 m²/kW .................................................................... 7.0 W/m² .................................................................. 143.4 Water flow @ 7.0 °K rise ....................................... 2.56 L/s

Load occurs at ................................................. Jan 1600 OA DB / WB ................................................... 33.2 / 24.5 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 13.6 kW Sensible coil load ................................................... 7.7 kW Coil L/s at Mar 1500 ............................................. 320 L/s Max coil L/s .......................................................... 320 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.47 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 5577 L/s Standard L/s ........................................................ 5564 L/s Actual max L/(s-m²) ............................................ 10.68 L/(s-m²)

Fan motor BHP ...................................................... 10.39 BHP Fan motor kW .......................................................... 7.75 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 320 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 33: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-24to25-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-24to25-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 566.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 73.8 kW Sensible coil load .................................................. 68.2 kW Coil L/s at Apr 1500 ............................................. 4825 L/s Max block L/s at Apr 1600 ................................... 5462 L/s Sum of peak zone L/s .......................................... 5462 L/s Sensible heat ratio .............................................. 0.924 m²/kW .................................................................... 7.7 W/m² .................................................................. 130.4 Water flow @ 7.0 °K rise ....................................... 2.52 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 14.7 kW Sensible coil load ................................................... 8.3 kW Coil L/s at Mar 1500 ............................................. 344 L/s Max coil L/s .......................................................... 344 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.50 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 5462 L/s Standard L/s ........................................................ 5450 L/s Actual max L/(s-m²) .............................................. 9.65 L/(s-m²)

Fan motor BHP ...................................................... 10.17 BHP Fan motor kW .......................................................... 7.59 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 344 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 34: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-26to28-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-26to28-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 566.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 73.6 kW Sensible coil load .................................................. 68.0 kW Coil L/s at Apr 1500 ............................................. 4810 L/s Max block L/s at Apr 1600 ................................... 5447 L/s Sum of peak zone L/s .......................................... 5447 L/s Sensible heat ratio .............................................. 0.924 m²/kW .................................................................... 7.7 W/m² .................................................................. 130.0 Water flow @ 7.0 °K rise ....................................... 2.51 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 14.7 kW Sensible coil load ................................................... 8.3 kW Coil L/s at Mar 1500 ............................................. 344 L/s Max coil L/s .......................................................... 344 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.50 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 5447 L/s Standard L/s ........................................................ 5435 L/s Actual max L/(s-m²) .............................................. 9.62 L/(s-m²)

Fan motor BHP ...................................................... 10.15 BHP Fan motor kW .......................................................... 7.57 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 344 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 35: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-26to28-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-26to28-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 566.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 73.6 kW Sensible coil load .................................................. 68.0 kW Coil L/s at Apr 1500 ............................................. 4810 L/s Max block L/s at Apr 1600 ................................... 5447 L/s Sum of peak zone L/s .......................................... 5447 L/s Sensible heat ratio .............................................. 0.924 m²/kW .................................................................... 7.7 W/m² .................................................................. 130.0 Water flow @ 7.0 °K rise ....................................... 2.51 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 14.7 kW Sensible coil load ................................................... 8.3 kW Coil L/s at Mar 1500 ............................................. 344 L/s Max coil L/s .......................................................... 344 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.50 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 5447 L/s Standard L/s ........................................................ 5435 L/s Actual max L/(s-m²) .............................................. 9.62 L/(s-m²)

Fan motor BHP ...................................................... 10.15 BHP Fan motor kW .......................................................... 7.57 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 344 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 36: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-29to30-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-29to30-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 518.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 75.5 kW Sensible coil load .................................................. 70.2 kW Coil L/s at Jan 1600 ............................................. 4942 L/s Max block L/s at Jan 1600 ................................... 5625 L/s Sum of peak zone L/s .......................................... 5625 L/s Sensible heat ratio .............................................. 0.930 m²/kW .................................................................... 6.9 W/m² .................................................................. 145.7 Water flow @ 7.0 °K rise ....................................... 2.58 L/s

Load occurs at ................................................. Jan 1600 OA DB / WB ................................................... 33.2 / 24.5 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 13.5 kW Sensible coil load ................................................... 7.7 kW Coil L/s at Mar 1500 ............................................. 317 L/s Max coil L/s .......................................................... 317 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.46 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Jan 1600 .................................. 5625 L/s Standard L/s ........................................................ 5612 L/s Actual max L/(s-m²) ............................................ 10.86 L/(s-m²)

Fan motor BHP ...................................................... 10.48 BHP Fan motor kW .......................................................... 7.81 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 317 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 37: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-29to30-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-29to30-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 562.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 74.2 kW Sensible coil load .................................................. 68.7 kW Coil L/s at Apr 1500 ............................................. 4858 L/s Max block L/s at Apr 1600 ................................... 5502 L/s Sum of peak zone L/s .......................................... 5502 L/s Sensible heat ratio .............................................. 0.925 m²/kW .................................................................... 7.6 W/m² .................................................................. 132.1 Water flow @ 7.0 °K rise ....................................... 2.54 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.7 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 14.6 kW Sensible coil load ................................................... 8.3 kW Coil L/s at Mar 1500 ............................................. 341 L/s Max coil L/s .......................................................... 341 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.50 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Apr 1600 .................................. 5502 L/s Standard L/s ........................................................ 5489 L/s Actual max L/(s-m²) .............................................. 9.79 L/(s-m²)

Fan motor BHP ...................................................... 10.25 BHP Fan motor kW .......................................................... 7.64 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 341 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.94 l/s/person

Page 38: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-31to32-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-31to32-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 434.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 74.4 kW Sensible coil load .................................................. 69.9 kW Coil L/s at Dec 1500 ............................................ 4922 L/s Max block L/s at Dec 1500 ................................... 5541 L/s Sum of peak zone L/s .......................................... 5541 L/s Sensible heat ratio .............................................. 0.940 m²/kW .................................................................... 5.8 W/m² .................................................................. 171.4 Water flow @ 7.0 °K rise ....................................... 2.54 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 45 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 11.3 kW Sensible coil load ................................................... 6.4 kW Coil L/s at Mar 1500 ............................................. 266 L/s Max coil L/s .......................................................... 266 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.39 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 5541 L/s Standard L/s ........................................................ 5528 L/s Actual max L/(s-m²) ............................................ 12.77 L/(s-m²)

Fan motor BHP ...................................................... 10.32 BHP Fan motor kW .......................................................... 7.70 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 266 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 39: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-31to32-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-31to32-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 478.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 69.5 kW Sensible coil load .................................................. 64.7 kW Coil L/s at Apr 1500 ............................................. 4568 L/s Max block L/s at May 1500 .................................. 5137 L/s Sum of peak zone L/s .......................................... 5137 L/s Sensible heat ratio .............................................. 0.932 m²/kW .................................................................... 6.9 W/m² .................................................................. 145.3 Water flow @ 7.0 °K rise ....................................... 2.37 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 12.4 kW Sensible coil load ................................................... 7.0 kW Coil L/s at Mar 1500 ............................................. 290 L/s Max coil L/s .......................................................... 290 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.42 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at May 1500 ................................. 5137 L/s Standard L/s ........................................................ 5125 L/s Actual max L/(s-m²) ............................................ 10.75 L/(s-m²)

Fan motor BHP ........................................................ 9.57 BHP Fan motor kW .......................................................... 7.13 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 290 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.95 l/s/person

Page 40: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-33to34-A-01 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-33to34-A-01 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 434.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 74.4 kW Sensible coil load .................................................. 69.9 kW Coil L/s at Dec 1500 ............................................ 4922 L/s Max block L/s at Dec 1500 ................................... 5541 L/s Sum of peak zone L/s .......................................... 5541 L/s Sensible heat ratio .............................................. 0.940 m²/kW .................................................................... 5.8 W/m² .................................................................. 171.4 Water flow @ 7.0 °K rise ....................................... 2.54 L/s

Load occurs at ................................................. Dec 1500 OA DB / WB ................................................... 32.9 / 24.1 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 45 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 11.3 kW Sensible coil load ................................................... 6.4 kW Coil L/s at Mar 1500 ............................................. 266 L/s Max coil L/s .......................................................... 266 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.39 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at Dec 1500 ................................. 5541 L/s Standard L/s ........................................................ 5528 L/s Actual max L/(s-m²) ............................................ 12.77 L/(s-m²)

Fan motor BHP ...................................................... 10.32 BHP Fan motor kW .......................................................... 7.70 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 266 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.90 l/s/person

Page 41: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L-33to34-A-02 Project Name: VietcomBank 03/17/2010 Prepared by: eec 04:45PM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name ................................. L-33to34-A-02 Equipment Class .......................................... CW AHU Air System Type .................................................. VAV

Number of zones .......................................................... 1 Floor Area .............................................................. 478.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ............................. Peak zone sensible load Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 69.5 kW Sensible coil load .................................................. 64.7 kW Coil L/s at Apr 1500 ............................................. 4568 L/s Max block L/s at May 1500 .................................. 5137 L/s Sum of peak zone L/s .......................................... 5137 L/s Sensible heat ratio .............................................. 0.932 m²/kW .................................................................... 6.9 W/m² .................................................................. 145.3 Water flow @ 7.0 °K rise ....................................... 2.37 L/s

Load occurs at ................................................. Apr 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 24.8 / 17.0 °C Leaving DB / WB ........................................... 13.0 / 12.3 °C Coil ADP .................................................................. 11.7 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 46 % Design supply temp. ................................................ 14.3 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Precool Coil Sizing Data

Total coil load ....................................................... 12.4 kW Sensible coil load ................................................... 7.0 kW Coil L/s at Mar 1500 ............................................. 290 L/s Max coil L/s .......................................................... 290 L/s Sensible heat ratio .............................................. 0.568 Water flow @ 7.0 °K rise ....................................... 0.42 L/s

Load occurs at ................................................. Mar 1500 OA DB / WB ................................................... 35.1 / 25.2 °C Entering DB / WB ........................................... 35.1 / 25.2 °C Leaving DB / WB ........................................... 15.0 / 14.3 °C Bypass Factor ........................................................ 0.100

Supply Fan Sizing Data

Actual max L/s at May 1500 ................................. 5137 L/s Standard L/s ........................................................ 5125 L/s Actual max L/(s-m²) ............................................ 10.75 L/(s-m²)

Fan motor BHP ........................................................ 9.57 BHP Fan motor kW .......................................................... 7.13 kW Fan static .................................................................. 750 Pa

Outdoor Ventilation Air Data Design airflow L/s ................................................. 290 L/s L/(s-m²) ................................................................. 0.61 L/(s-m²)

l/s/person ................................................................. 4.95 l/s/person

Page 42: Vietcombank Chiller Plant Sizing Calcs

Air System Sizing Summary for L8-L32 Tenant Server Room Project Name: VietcomBank 03/24/2010 Prepared by: eec 10:47AM

Hourly Analysis Program v.4.2 Page 1 of 1

Air System Information Air System Name .......... L8-L32 Tenant Server Room Equipment Class .......................................... CW AHU Air System Type ............................................. SZCAV

Number of zones .......................................................... 1 Floor Area ................................................................ 20.0 m² Location .............................. Ho Chi Minh City, Vietnam

Sizing Calculation Information Zone and Space Sizing Method:

Zone L/s ......................... Sum of space airflow rates Space L/s ..................... Individual peak space loads

Calculation Months ....................................... Jan to Dec Sizing Data ................................................... Calculated

Central Cooling Coil Sizing Data

Total coil load ....................................................... 29.2 kW Sensible coil load .................................................. 29.1 kW Coil L/s at Mar 1300 ............................................ 2329 L/s Max block L/s ...................................................... 2329 L/s Sum of peak zone L/s .......................................... 2329 L/s Sensible heat ratio .............................................. 0.997 m²/kW .................................................................... 0.7 W/m² ................................................................ 1458.3 Water flow @ 7.0 °K rise ....................................... 1.00 L/s

Load occurs at ................................................. Mar 1300 OA DB / WB ................................................... 34.2 / 25.0 °C Entering DB / WB ........................................... 24.7 / 17.4 °C Leaving DB / WB ........................................... 14.3 / 13.6 °C Coil ADP .................................................................. 13.2 °C Bypass Factor ........................................................ 0.100 Resulting RH .............................................................. 50 % Design supply temp. ................................................ 13.0 °C Zone T-stat Check ................................................. 1 of 1 OK Max zone temperature deviation ................................ 0.0 °K

Supply Fan Sizing Data

Actual max L/s ..................................................... 2329 L/s Standard L/s ........................................................ 2324 L/s Actual max L/(s-m²) .......................................... 116.46 L/(s-m²)

Fan motor BHP ........................................................ 1.45 BHP Fan motor kW .......................................................... 1.08 kW Fan static .................................................................. 250 Pa

Outdoor Ventilation Air Data Design airflow L/s ..................................................... 0 L/s L/(s-m²) ................................................................. 0.00 L/(s-m²)