Footings & Foundations
Video lectures for MBA
By:
video.edhole.com
Footings & Foundations
Foundation Components
Footing
video.edhole.com
Footings & Foundations
Foundation Components
(to attach wood stud sill plate)
(to keep water off of foundation wall)
(separates slab from foundation wall)
(to keep water off of slab)
(to keep water off of slab & moisture barrier)(moves water away from building)
(moves water away from building)
video.edhole.com
Footings & Foundations
Foundation Types
video.edhole.com
Footings & Foundations
Site Preparation
•Remove trees and any debris
•Remove top soil (4-6” below surface)
video.edhole.com
Footings & Foundations
Site Layout
•Ensure lot lines are known & setbacks are complete
•Layout building perimeter
•Use batter boards
•Establish building corners & building perimeter
•Use surveying instruments
video.edhole.com
Footings & Foundations
Excavation
•Excavate foundation along line created by batter boards
•Excavate remainder of soil inside perimeter
•Don’t excavate inside soil if slab on grade
•If deep foundation, taper edges to prevent collapse
•If soil unstable, or very deep - use shoring
video.edhole.com
Footings & Foundations
Pour Footings
•Construct formwork (if required)
•Install reinforcement (rebar) for footings
•(protrudes above footing to tie-into foundation wall)
•Pour concrete footings
•Smooth / finish surface
video.edhole.com
Footings & Foundations
Pour Slab on Grade
•Install gravel base (to keep water off of slab)
•Install moisture barrier (to keep water off of slab)
•Install reinforcement (welded wire fabric)
•Pour concrete slab
•Finish slab surface
video.edhole.com
Footings & Foundations
Pour Concrete Foundation Walls
•Construct formwork (include sleeves / doors / windows)
•Install reinforcement into formwork
•Pour concrete foundation wall
•Install anchor bolts into semi-cured concrete
video.edhole.com
Footings & Foundations
Pour Concrete Foundation Walls
•Allow concrete to cure adequately (7-10 days)
•Strip forms
•Apply waterproofing
•Install perimeter drain tile
•Backfill
video.edhole.com
Footings & Foundations
Install Concrete Block Foundation Walls
•Allow concrete footing to properly cure
•Install first course of concrete block on bed of mortar
•Continue to lay block on top of first course until desired height reached
•Install horizontal reinforcement as courses proceed
video.edhole.com
Footings & Foundations
Install Concrete Block Foundation Walls
•Install vertical reinforcement at significant heights
•Install grout into cells with vertical reinforcement
•Tool joints and clean masonry
•Install waterproofing
video.edhole.com
Footings & Foundations
Rules of Thumb
•Footing shall be below frost line
•Footing width usually 2x height
•Typical size (24” wide x 12” tall)
•Rebar is usually 3” from edge of concrete
•Crawl spaces should have rigid insulation along the interior face of the foundation wall