March 19, 2019
Via Electronic Mail and USPS Mail
Columbia University - Facilities and Operations Department
New York, NY 10027
RE: Columbia Manhattanville Project/MWL Submissions
Dear ,
On behalf of Lendlease (US) Construction LMB Inc. ("Lendlease'), I confirm that the information in the schedule of the Minority/Women/Local-Owned Business Participation Utilization Plan is prepared based on documentation and information received from the trade contractors working on the Columbia University Manhattanville Project (the "Project").
Lendlease also confirms that it has, based on available information and representations from Columbia's trade contractors, provided to Columbia the required MWL documentation for Minority, Women-Owned and Locally-Based Business Enterprise participation as outlined in the EEO requirements in the Exhibit O - Notice to Bidders to Lendlease's Contract with Columbia for MWL compliance reporting. The documentation utilizes the Business Enterprise-Schedule of Minority/Women/Local-Owned Business Participation (Schedule M) as the primary source for MWL compliance reporting. The data generated from this source, which Lendlease submits quarterly to Columbia for analysis and approval, is used to produce quarterly summaries of spend. Lendlease distinguishes specialty and nonspecialty construction in accordance with the contractual definitions utilized for payment requisition assembly.
Lendlease additionally confirms that it has, based on available information and representations from Columbia's trade contractors, provided to Columbia the required MWL documentation for Minority, Female and Local Workforce participation as outlined in the EEO requirements in Exhibit O - Notice to Bidders to Lendlease's Contract with Columbia for MWL compliance reporting. Lendlease continues to review the certified payroll submissions for Columbia's trade contractors to verify compliance with Columbia's guidelines for proper completion of workforce employee information (such as: name, address, zip code, gender and ethnicity).
If you have any questions or require additional information, please do not hesitate to contact me directly.
Sincerely, Lendlease (US) Construction LMB Inc.
Ralph J. Esposito President
Lendlease (US) Construction LMB Inc.
200 Park Avenue, 9th Floor, New York, NY 10166 www.lendlease.com
T 212 592 6800 F 212 592 6988
SKANSKA
March 22, 2019
Columbia University
New York, NY 10027
RE: Columbia University Manhattanville MWL Certification The Forum Project Quarter Ending December 2018
Dear
Skanska USA Building Inc.
Columbia University
University Forum Project 659 West 131st Street
New York, NY 10027
On behalf of Skanska USA, I hereby certify that the information as noted in the schedules for the Minority/Women/Local-owned Business Participation Utilization Plan is generated from documents received from the contractors working on the Columbia University Manhattanville, Forum Project.
If you have any questions or require additional information, please let me know.
cc: C. Viola (Skanska); D. Licciardi (Skanska)
VELEZ ORGANIZATION
March 20, 2019
Columbia University Facilities and Operations
New York, NY 10027
RE: Columbia Manhattanville MWL Certification
Dear
The Velez Organization certifies that we have, to the best of our ability, provided to Columbia
and Skanska the required MWL documentation for Minority, Women-Owned and Locally-based
Business Enterprise participation as outlined in the EEO requirements in Exhibit P of the
Columbia Manhattanville notice to bidders/contract, for MWL compliance reporting.
The documentation utilizes the following primary source for MWL compliance
reporting: Business Enterprise-Schedule of Minority/Women/Local Owned Business
Participation (Schedule M). The data from this source is used to produce monthly reports which
Velez submits to Columbia and Skanska for analysis and approval. In these monthly reports,
Velez distinguishes specialty and non-specialty construction in accordance with the project
definitions utilized by Skanska for payment requisition assembly.
Velez additionally certifies that we have, to the best of our ability, provided to Columbia and
Skanska the required MWL documentation for Minority, Female and Local Workforce
participation as outlined in the EEO requirements in Exhibit P of the Columbia Manhattan ville
notice to bidders/contract, for MWL compliance reporting. Velez has reviewed the certified
no William Street - Suite 2402, New York, New York 10038
Phone: 212.684.5500 Fax: 212.684.5516
payroll submissions for on-site trade contractors, to verify compliance with Columbia guidelines
for proper completion of workforce employee information (such as: name, address, zip code,
gender and ethnicity).
President, The Velez Organization
no William Street - Suite 2402, New York, New York 10038
Phone: 212.684.5500 Fax: 212.684.5516
Turner
March 29, 2019
Columbia University - Facilities and Operations Department
New York, NY10027
RE: 4th Quarter 2018 Report for
Columbia Manhattanville Project/MWL Submissions
Dear ,
Turner Construction Company
375 Hudson Street, 6 1° Floor
New York, NY10014
On behalf ofTurner Construction Company, as the agent for the Owner, I confirm to the best of my
knowledge and information that the information in the schedule of the Minority/Women/Local Owned
Business ("MWLOB") Participation Utilization Plan is prepared based on documentation and information
received from the trade contractors working on the Columbia University Manhattanville Project.
Turner, as the Owner's agent, further confirms that it has, based on available information and
representations from Columbia's trade contractors, provided to Columbia the required MWL
documentation for Minority, Women-owned and locally-based Business Enterprise participation as
outlined in the EEO requirements in the Exhibit E. Notice to Bidders to Turner Construction contract with
Columbia for MWL compliance reporting. The documentation utilizes the business Enterprise Schedule of
Minority Women Local-Owned Business Participation (Schedule E) as the primary source for MWL
compliance reporting. The data generated from this source, which Turner Construction submits quarterly to
Columbia foranalysis and approval, is used to produce quarterly summaries ofspend.
Turner additionally confirms as the Owner's agent it has, based on available information and
representations from Columbia's trade contractors, provided to Columbia the required MWL
documentation for Minority, Female and Local Workforce participation as outlined in the EEO
requirements in Exh ibit E. Notice to bidders to Turner contract with Columbia for MWL compliance
reporting. Turner continues to review the certified payroll submissions for Columbia's trade contractors
to verify compliance with Columbia's guidelines for proper completion of workforce employee
information (such as: name, address, zip code, gender and ethnicity).
If you have any questions or require additional information, please do not hesitate to contact me directly.
Sincerely,
/�llano Vice President and Construction Executive
Building the future
PAR ENVIRONMENTAL CORPORATION 313 Spook Rock Road, Suffern, New York 109 01- 845-369-7500- Fax 845-369-6682
March 21, 2019
,
Columbia University
New York, NY 10027
RE: Columbia University Manhattanville MWL Certification PAR
Demolition Project - Quarter Ending December 2018
Dear
On behalf of PAR Environmental Corp., I confirm that the information in the
Minority/Women/Local-owned Business Participation Utilization Plan is prepared based on documentation and infonnation received from trade Contractors working on the Columbia
University Manhattan ville Project on behalf of PAR Environmental Corp. PAR Environmental Corp. also confirms that it has, based on available information and representations from its trade
contractors, provided to Columbia the required MWL documentation for Minority, Women-owned and Locally-Based Business Enterprise participation as outlined in the governing EEO requirements
in the in the Notice to Bidders exhibit of It's contract with Columbia for MWL compliance
reporting. PAR Environmental Corp. additionally confirms that is has, based on available infonnation and representations from its trade contractors, provide to Columbia the required MWL documentation for Minority, Female and Local Workforce participation as outlined in the governing EEO requirements in the Notice to Bidders exhibit of it's contract with Columbia for MWL compliance reporting. PAR Environmental Corp. continues to review the certified payroll
submissions for Columbia's trade contractors to verify compliance with Columbia guidelines for
proper completion of workforce employee information (such as: name, address, zip code, gender and ethnicity).
If you have any questions or require additional information, please let me know.
Regards,
�Ii. Patrick B. Mahoney President PAR Environmental Corp.
Cc:
Non-Specialty Construction
Date: 12/31/2018
Project Name Project Start Status Page #
Utilities Improvement 1/3/2008 In Progress 4-9
Abatement & Demolition Project 9/1/2009 In Progress 10-23
Jerome L. Greene Science Center 2/28/2011 In Progress 24-52
EPA Clean Diesel 5/1/2009 Project Completed 11/2011 53-54
Open Space 7/10/2013 In Progress 55-61
Lenfest 12/1/2013 In Progress 62-78
University Forum 12/1/2015 In Progress 79-93
Phase 2 Below Grade 10/1/2016 In Progress 94-104
Columbia Business School 1/1/2018 In Progress 105-113
Shared Services 2/4/2010 In Progress 114-116
• Schedule M3s are firms paid by a firm found on the preceding Schedule M2
Non-Specialty Project Reporting Periods
Reporting Period Summary Notes
Manhattanville Project Reporting Period: 8/1/2008 – 12/31/2018
During the reporting period there are currently ten projects comprising the Non-Specialty construction portion of the Manhattanville project. Nine out of the
ten projects are all in progress with starting periods as early as 1/3/2008, with payments starting in August 2008. The Shared Services spending is allocated
to each individual project.
The Non-Specialty report package has cumulative and quarterly summaries of workforce hours and spending (backed by Schedule Ms). There are three types
of Schedule Ms (indicated in the upper right corner of the forms):
• Schedule M1s are for firms paid directly by Columbia University
• Schedule M2s are for payments made by a firm directly paid by Columbia University (typically the Construction Manager)
1
Total Spend Total L
$ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ $
Utilities Improvement -$ 0% 21,944$ 0% 28,894,115$ 86% 585,271$ 2% -$ 0% -$ 0% 597,070$ 2% 30,098,400$ 89% 3,683,259$ 11% 33,781,659$ 29,491,185$
* Abatement & Demolition 2,048,663$ 8% 1,291,791$ 5% 214,614$ 1% 1,155,685$ 4% 2,350$ 0% 214,401$ 1% 617,158$ 2% 5,544,662$ 21% 20,615,874$ 79% 26,160,536$ 1,048,523$
* Jerome L. Greene Science Center 48,937,451$ 12% 45,160,310$ 11% 12,773,391$ 3% 2,668,892$ 1% -$ 0% 77,871$ 0% 6,625,281$ 2% 116,243,196$ 28% 303,397,181$ 72% 419,640,377$ 19,476,543$
EPA Clean Diesel -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% 613,907$ 100% 613,907$ -$
* Open Space 916,708$ 6% 576,798$ 4% 340,419$ 2% 54,195$ 0% -$ 0% -$ 0% 121,951$ 1% 2,010,071$ 12% 14,294,108$ 88% 16,304,179$ 462,370$
* Lenfest 3,217,815$ 4% 6,177,697$ 9% 1,656,673$ 2% 226,668$ 0% -$ 0% 23,092$ 0% 1,513,224$ 2% 12,815,169$ 18% 59,111,564$ 82% 71,926,733$ 3,192,989$
* University Forum 15,824,450$ 21% 4,774,633$ 6% 2,272,282$ 3% 1,246,502$ 2% -$ 0% -$ 0% 10,865$ 0% 24,128,732$ 32% 51,744,742$ 68% 75,873,474$ 2,283,147$
* Phase 2 Below Grade 4,993,931$ 3% 1,787,075$ 1% 95,149,345$ 57% 101,285$ 0% -$ 0% 5,621$ 0% 1,238,678$ 1% 103,275,935$ 62% 64,085,040$ 38% 167,360,975$ 96,393,644$
* Columbia Business School 208,057$ 1% 3,520,435$ 18% 24,196$ 0% 126,423$ 1% -$ 0% -$ 0% 14,191$ 0% 3,893,302$ 20% 15,311,327$ 80% 19,204,629$ 38,387$
Total 76,147,075$ 63,310,683$ 141,325,035$ 6,164,921$ 2,350$ 320,985$ 10,738,418$ 298,009,467$ 532,857,002$ 830,866,469$ 152,386,788$ % of Total Spending¹ 9% 8% 17% 1% 0% 0% 1% 36% 64% 100% 18%
Total Spend Total L$ $
Total $695,933,319 $146,484,416% of Total Spending¹ 100% 21%
MWL Spending # of Firms Total Spending% of Total MWL
Spending
% of Total
Spending
ESD Certified Firms 112 141,812,716$ 48% 17%
Local Firms 32 141,325,035$ 47% 17%
Firms With Other Certification 22 14,871,716$ 5% 2%
Total MWL 166 298,009,467$ 100% 36%
Total Hours Total L Total
Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs Hrs # %² # %² #
Utilities Improvement 15,126 16% 203 0% 0 0% 0 0% 8,053 8% 0 0% 0 0% 23,382 24% 72,083 76% 95,465 8,053 57 24% 182 76% 239
* Abatement & Demolition 75,355 58% 16 0% 122 0% 5,732 4% 10,011 8% 0 0% 0 0% 91,236 70% 38,796 30% 130,032 10,133 307 69% 141 31% 448
* Jerome L. Greene Science Center 502,503 32% 6,546 0% 10,389 1% 16,684 1% 47,382 3% 1,225 0% 8,280 1% 593,008 38% 973,230 62% 1,566,237 67,276 1,168 42% 1,593 58% 2,761
EPA Clean Diesel (No Workforce - Equipment Supplies) 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Open Space 19,121 51% 0 0% 0 0% 0 0% 280 1% 0 0% 0 0% 19,401 51% 18,438 49% 37,839 280 99 52% 90 48% 189
* Lenfest 88,213 36% 1,418 1% 1,352 1% 2,235 1% 4,545 2% 0 0% 126 0% 97,889 40% 148,272 60% 246,160 6,023 306 40% 450 60% 756
* University Forum 105,740 60% 170 0% 121 0% 1,635 1% 6,441 4% 0 0% 310 0% 114,415 65% 61,723 35% 176,137 6,871 397 53% 356 47% 753
* Phase 2 Below Grade 127,942 34% 3,534 1% 368 0% 2,768 1% 3,938 1% 0 0% 44 0% 138,593 37% 240,299 63% 378,892 4,350 410 39% 653 61% 1,063
* Columbia Business School 1,314 26% 0 0% 0 0% 32 1% 72 1% 0 0% 0 0% 1,418 28% 3,569 72% 4,987 72 34 49% 36 51% 70
* Shared Services - Lend Lease US Construction LMB³ 92,640 32% 2,939 1% 13,996 5% 19,956 7% 49,345 17% 0 0% 2,537 1% 181,413 63% 107,940 37% 289,353 65,878 133 42% 182 58% 315
* Shared Services - Johnson Security³ 148,887 60% 0 0% 2,042 1% 30,793 12% 54,030 22% 0 0% 11,142 4% 246,894 99% 3,068 1% 249,962 67,214 298 97% 8 3% 306
* Shared Services - Eddington Security³ 110,679 76% 0 0% 0 0% 304 0% 35,032 24% 0 0% 0 0% 146,015 100% 8 0% 146,023 35,032 167 99% 1 1% 168
Total Hours 1,287,518 14,825 28,389 80,138 219,128 1,225 22,439 1,653,661 1,667,424 3,321,085 271,181 3,376 3,692 7,068% of Total Hours² 39% 0% 1% 2% 7% 0% 1% 50% 50% 100% 8% 48% 52% 100%
$ $
20%
2%
42%
$291,068,329 $404,864,990
0% 1% 42% 58%
$ $ $
$320,985 $4,836,046
11% 9% 20% 1% 0%
$75,686,501 $63,310,683 $141,325,035 $5,586,729 $2,350
ML WL MWL Total MWL Non-MWLNon-Specialty Projects
Excluding CM SpendM W L MW$ $ $ $
(Note: May include changes to prior periods)
1 Denotes percentages of the individual MWL designation to the total spending
Manhattanville MWL Workforce and Spending SummaryCumulative: Aug 1, 2008 to December 31, 2018
(Excluding Specialty Construction)
Construction Spending: CU Goal = 35%
Non-Specialty Projects M W L MW ML WL MWL Total MWL Non-MWL
Non-MWL Total MWL Non-MWL
1 Denotes percentages of the individual MWL designation to the total spending
* Denotes active project
Workforce Hours : CU Goal = 40%
Non-Specialty Projects
Headcount
M W L MW ML WL
% of Total Excluding CM
Spending
19%
2 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
3 Security workforce hours apply to all projects and reported by vendor in a shared services project
* Denotes active project
MWL Total MWL
2
Total Spend Total L
$ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ %¹ $ $
Utilities Improvement -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% 7,094$ 100% 7,094$ -$
* Abatement & Demolition 10,494$ 4% 69,111$ 29% -$ 0% 12,859$ 5% -$ 0% -$ 0% -$ 0% 92,464$ 39% 144,776$ 61% 237,240$ -$
* Jerome L. Greene Science Center 25,491$ 2% 43,224$ 4% 82,747$ 8% -$ 0% -$ 0% 19,836$ 2% -$ 0% 171,298$ 16% 923,171$ 84% 1,094,469$ 102,583$
EPA Clean Diesel -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ 0% -$ -$
* Open Space -$ 0% -$ 0% 7,922$ 3% -$ 0% -$ 0% -$ 0% -$ 0% 7,922$ 3% 223,803$ 97% 231,725$ 7,922$
* Lenfest 18,383$ 3% 9,751$ 2% 27,562$ 5% -$ 0% -$ 0% 23,092$ 4% -$ 0% 78,788$ 13% 509,473$ 87% 588,261$ 50,654$
* University Forum 2,508,051$ 31% 459,023$ 6% 118,545$ 1% 114,145$ 1% -$ 0% -$ 0% 2,770$ 0% 3,202,534$ 39% 4,998,846$ 61% 8,201,380$ 121,315$
* Phase 2 Below Grade 3,070,039$ 19% (7,548)$ 0% 5,093,296$ 32% -$ 0% -$ 0% -$ 0% 188,455$ 1% 8,344,242$ 53% 7,404,037$ 47% 15,748,279$ 5,281,751$
* Columbia Business School 208,057$ 3% 125,892$ 2% 17,896$ 0% 82,327$ 1% -$ 0% -$ 0% 14,191$ 0% 448,363$ 6% 7,432,252$ 94% 7,880,615$ 32,087$
Total 5,840,515$ 699,453$ 5,347,968$ 209,331$ -$ 42,928$ 205,416$ 12,345,611$ 21,643,452$ 33,989,063$ 5,596,312$ % of Total Spending¹ 17% 2% 16% 1% 0% 0% 1% 36% 64% 100% 16%
Total Hours Total L Total
Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs %² Hrs Hrs # %² # %² #
Utilities Improvement 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Abatement & Demolition 3,955 43% 0 0% 0 0% 8 0% 659 7% 0 0% 0 0% 4,622 51% 4,515 49% 9,137 659 45 57% 34 43% 79
* Jerome L. Greene Science Center 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 32 100% 32 0 0 0% 2 100% 2
EPA Clean Diesel (No Workforce - Equipment Supplies) 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Open Space 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Lenfest 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* University Forum 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Phase 2 Below Grade 13,886 33% 558 1% 0 0% 56 0% 310 1% 0 0% 0 0% 14,810 35% 27,832 65% 42,642 310 125 37% 209 63% 334
* Columbia Business School 1,314 31% 0 0% 0 0% 0 0% 72 2% 0 0% 0 0% 1,386 32% 2,918 68% 4,304 72 33 49% 34 51% 67
* Shared Services - Lend Lease US Construction LMB³ 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
* Shared Services - Johnson Security³ 4,479 76% 0 0% 0 0% 712 12% 680 11% 0 0% 0 0% 5,871 99% 56 1% 5,927 680 33 97% 1 3% 34
* Shared Services - Eddington Security³ 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0 0% 0 0% 0
Total Hours 23,634 558 0 776 1,720 0 0 26,688 35,353 62,041 1,720 236 280 516% of Total Hours² 38% 1% 0% 1% 3% 0% 0% 43% 57% 100% 3% 46% 54% 100%
Manhattanville MWL Workforce and Spending SummaryQuarter: October 1, 2018 to December 31, 2018
* Denotes active project
(Note: May include changes to prior periods)
3 Security workforce hours apply to all projects and reported by vendor in a shared services project
2 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
1 Denotes percentages of the individual MWL designation to the total spending
MW ML WL MWL Total MWL
Construction Spending: CU Goal = 35%
Non-Specialty Projects
(Excluding Specialty Construction)
Total MWL Non-MWL
Workforce Hours : CU Goal = 40%
Non-Specialty ProjectsHeadcount
M W L MW ML WL
Non-MWL
MWL Total MWL Non-MWL
M W L
3
Utilities Improvement
4
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 1/3/2008¹ Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 14,402
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W No Printing Service Yes $ - $ 13 $ 13
L No Plumbing Contractor Yes $ 12,812 $ 14,134 $ 14,134
NON No Locksmiths Yes $ - $ 255 $ 255
$ 12,812 $ 14,402 $ 14,402
$ 12,812 $ 14,147 $ 14,147
Non-MWL Direct Spend Total $ - $ 255 $ 255
¹ Billing begins on 8/1/2008 100% 98% 98%
Date: 12/31/2018
Abbey Locksmiths Inc
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL:
NON:
Titan Plumbing & Heating LLC
410 West 118th Street, NY, NY 10027
Name/Address/Phone # (if available) otherwise enter Trade
Name
Columbia University
Green Girl Printing and Messenger Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
Utilities Improvement
Owner
Trade
In Progress12/31/2018
Columbia University
5
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 1/3/2008¹ Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 33,767,257
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ 26,364,500 $ 34,501,633 $ 33,767,257
$ 26,364,500 $ 34,501,633 $ 33,767,257
$ - $ - $ -
Non-MWL Direct Spend Total $ 26,364,500 $ 34,501,633 $ 33,767,257
¹ Billing begins on 8/1/2008 0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Utilities Improvement
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
6
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 1/3/2008¹ Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 26,364,500 $ 34,501,633 $ 33,767,257
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
MW-ESD No Security Yes $ - $ 7,079 $ 7,079
W-ESD No Electrical Yes $ 21,931 $ 21,931 $ 21,931
L No Utilities Yes $ 13,205,245 $ 14,912,282 $ 14,912,281
L No Utilities Yes $ 13,150,000 $ 13,966,897 $ 13,966,896
L No Building Supplies Yes $ - $ 804 $ 804
MW-ESD No Construction Management Yes $ - $ 578,192 $ 578,192
MWL-ESD No Construction Management Yes $ - $ 385,484 $ 385,484
MWL-ESD No Construction Management Yes $ - $ 211,586 $ 211,586
NON:
NON No Fire Safety Yes $ 287,950 $ 287,950 $ 287,950
NON No Excavation Yes $ 434,950 $ 274,950 $ 274,950
NON No Dewatering Yes $ 5,603 $ 5,603 $ 5,603
$ 27,105,679 $ 30,652,758 $ 30,652,756
$ 26,377,176 $ 30,084,255 $ 30,084,253
Non-MWL Tier II Total $ 728,503 $ 568,503 $ 568,503
¹ Billing begins on 8/1/2008 100% 87% 89%
Date: 12/31/2018
Pearlgreen
The McKissack Group Inc
MFM Contracting Corp
The McKissack Group Inc
The McKissack Group Inc
Rael Automatic Sprinkler
Moretrench American Corp
Nicholson Construction
Name/Address/Phone # (if available) otherwise enter Trade
Trade
Felix Associates LLC
Lend Lease
MWL:
212-939-9580622 West 132nd, 2nd fl, New York, NY 10027
Egg Electric Inc
Construction Management
Eddington Security Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Utilities Improvement
In Progress
Construction Management
Lend Lease
Name
12/31/2018
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
7
GC/CM: Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 88 3% 0 0% 0 0% 88 3% 3,406 97% 3,494 2 50% 2 50% 4
Construction Management
* Tier II MFM Contracting Corp 5,706 16% 3 0% 0 0% 0 0% 3,694 10% 0 0% 0 0% 9,402 26% 26,540 74% 35,942 25 20% 97 80% 122
Utility Work
Felix Associates LLC 9,051 17% 200 0% 0 0% 0 0% 4,272 8% 0 0% 0 0% 13,522 25% 41,203 75% 54,725 21 24% 67 76% 88
Utility Work
Moretrench American Corp 370 28% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 370 28% 934 72% 1,304 9 36% 16 64% 25
Dewatering
15,126 203 0 0 8,053 0 0 23,382 72,083 95,465 57 182 239
16% 0% 0% 0% 8% 0% 0% 24% 76% 100% 24% 76% 100%
Contractor Start
MFM Contracting Corp 3/28/2011
Felix Associates LLC 9/28/2009
Moretrench American Corp 1/13/2008 10/25/2008
Total Hours
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In progress
5/29/2011
* Denotes active contractors
Overall % of Total
Utilities ImprovementSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
8
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Construction Management
* Tier II MFM Contracting Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Utility Work
Felix Associates LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Utility Work
Moretrench American Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Dewatering
0 0 0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
Utilities ImprovementSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
* Denotes active contractors
9
Abatement & Demolition
10
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 349,209
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Plumbing Yes $ - $ 4,483 $ 4,483
W-ESD No Pest Control Yes $ - $ 2,238 $ 2,238
W-ESD No Storage Yes $ - $ 48,245 $ 48,245
M-ESD No Mechanical Yes $ - $ 5,796 $ 5,796
MW-ESD No General Contractor Yes $ - $ 25,069 $ 25,069
WL-ESD No General Contractor Yes $ - $ 13,163 $ 13,163
L No Plumbing Contractor Yes $ - $ 1,295 $ 1,295
L No General Contractor Yes $ - $ 4,086 $ 4,086
L No Plumbing Contractor Yes $ - $ 18,130 $ 18,130
L No Electrical Contractor Yes $ - $ 31,423 $ 31,423
NON No Doors & Windows Yes $ - $ 4,308 $ 4,308
NON No Electrical Contractor Yes $ - $ 1,120 $ 1,120
NON No Environmental Services Yes $ - $ 1,950 $ 1,950
NON No Asbestos Removal Yes $ - $ 400 $ 400
NON No Uniforms Yes $ - $ 344 $ 344
NON No Contractor Yes $ - $ 46,640 $ 46,640
NON No Specialities Yes $ - $ 74,935 $ 74,935
NON No Moving Yes $ - $ 45,750 $ 45,750
NON No Mechanical Yes $ - $ 7,800 $ 7,800
NON No Air Quality Yes $ - $ 3,065 $ 3,065
NON No Doors & Windows Yes $ - $ 8,554 $ 8,554
NON No Specialities Yes $ - $ 415 $ 415
$ - $ 349,209 $ 349,209
$ - $ 153,928 $ 153,928
Non-MWL Direct Spend Total $ - $ 195,281 $ 195,281
0% 44% 44%
Date: 12/31/2018
In Progress
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
Abatement & Demolition
12/31/2018
Columbia University
Trade
410 West 118th Street, NY, NY 10027
Name/Address/Phone # (if available) otherwise enter Trade
Name
DIRECT SPEND VENDORS (Tier I)
SMR Contracting Corp
Innovative Building Solutions LLC
Izzo Construction Corp
Northstar Mechanical Inc
PSEC Plumbing & Heating Co Inc
Twins Electric Corp
NON:
MWL:
First Choice Mechanical Inc
Black Widow Termite & Pest Control Corp
Clancy Cullen Storage Co Inc
Absolute Plumbing & Heating Corp
William Hird & Co Inc
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Titan Plumbing & Heating LLC
Abbey Locksmiths Inc
Access Control Technologies Inc
Affiliated Environmental Serv. (AES)
Degmor Inc
Pro Roll Inc
G & K Services Co
Gotham Waterproofing
Inst Recycling Network
JC Duggan Inc
Omega Laboratories
11
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 24,923,779
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ 4,491,955 $ 25,730,418 $ 24,923,779
$ 4,491,955 $ 25,730,418 $ 24,923,779
$ - $ - $ -
Non-MWL Direct Spend Total $ 4,491,955 $ 25,730,418 $ 24,923,779
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Abatement & Demolition
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
12
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 4,679,500 $ 4,679,500 $ 887,548
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No General Contractor Yes $ - $ 887,548 $ 887,548
$ - $ 887,548 $ 887,548
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 887,548 $ 887,548
0% 0% 0%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Par Environmental Corporation
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Abatement & Demolition
13
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 4,491,955 $ 25,730,418 $ 24,923,779
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
Work Completed:
W-ESD No Misc Concrete Yes $ - $ 79,000 $ 68,310
W-ESD No General Contractor Yes $ 455,000 $ 432,900 $ 432,900
MW-ESD No Security Yes $ 137,063 $ 345,763 $ 326,096
MW-ESD No General Contractor Yes $ - $ 163,000 $ 163,000
MWL-ESD No Security Yes $ - $ 583,968 $ 523,867
M-ESD No General Contractor Yes $ 186,000 $ 189,719 $ 189,719
MWL-ESD No Construction Management Yes $ - $ 29,256 $ 29,256
MWL-ESD No Suprintendent-Civil/Site Yes $ - $ 8,574 $ 8,574
Work Completed:
NON No Demolition & Abatement Contractor Yes $ 879,000 $ 819,596 $ 819,596
NON No Demolition & Abatement Contractor Yes $ 2,975,000 $ 2,975,000 $ 2,975,000
NON No Demolition & Abatement Contractor Yes $ 875,000 $ 735,000 $ 735,000
NON No Demolition & Abatement Contractor Yes $ - $ 336,337 $ 334,642
NON No Demolition & Abatement Contractor Yes $ 1,818,000 $ 1,818,183 $ 1,818,183
NON No Demolition & Abatement Contractor Yes $ 7,100,000 $ 7,100,000 $ 7,100,000
Work In Progress:
NON No Demolition & Abatement Contractor Yes $ - $ 1,300,000 $ 1,267,032
NON No Demolition & Abatement Contractor Yes $ - $ 593,259 $ 587,326
NON No Demolition & Abatement Contractor Yes $ 2,627,000 $ 2,571,570 $ 2,492,972
NON No Miscellaneous Metal Work Yes $ - $ 120,516 $ 119,310
$ 17,052,063 $ 20,201,641 $ 19,990,783
$ 778,063 $ 1,832,180 $ 1,741,722
Non-MWL Tier II Total $ 16,274,000 $ 18,369,461 $ 18,249,061
17% 7% 7%
Date: 12/31/2018
Par Environmental Corp - Areas 2, 4 & 5
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Par Environmental Corp - Area 9a
Par Environmental Corp - Areas 7 (Site 28) & 8
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Abatement & Demolition
Trade
Lend Lease
Construction Management
Construction Management
12/31/2018
622 West 132nd, 2nd fl, New York, NY 10027
Lend Lease
212-939-9580
Name/Address/Phone # (if available) otherwise enter Trade
In Progress
Commodore Construction Corporation
Breeze National Inc - Area 6
Name
Johnson Security Bureau Inc
Manhattan Business Interiors Inc (MBI)
NON:
Breeze National Inc - Area 3A
The McKissack Group Inc
MWL:
Eddington Security Inc
Deerpath Construction Corp
Innovative Building Solutions LLC
The McKissack Group Inc
Breeze National Inc - Areas 7 & 8
Par Environmental Corp - Area 7 (Site 22, 29, 30, 31)
Par Environmental Corp - Areas 1A & 1B
Post Road Iron Works
Par Environmental Corp - Area 0
14
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 4,679,500 $ 4,679,500 $ 887,548
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W No Supplies Yes $ 110,000 $ 100,000 $ 17,084
MW-ESD No Expediter / Permit Processing Yes $ 50,000 $ 50,000 $ 48,260
MW-ESD No Security Yes $ 196,374 $ 196,374 $ 10,884
M-ESD No Supplies Yes $ 50,000 $ 50,000 $ 10,494
MW-ESD No Vectoring Yes $ 15,000 $ 15,000 $ 4,470
W-ESD No Fuel Yes $ 35,000 $ 35,000 $ 3,729
W-ESD No Loss Control Yes $ 130,000 $ 130,000 $ 50,000
NON No Portable Lavatory Yes $ 5,500 $ 5,500 $ 1,713
NON No Scaffolding Services Yes $ 1,112,115 $ 1,112,115 $ 138,087
NON No Noise Control Yes $ 14,000 $ 14,000 $ 3,630
NON No Electrical Yes $ 54,800 $ 54,800 $ 54,800
$ 1,772,789 $ 1,762,789 $ 343,151
$ 586,374 $ 576,374 $ 144,921
Non-MWL Tier II Total $ 1,186,415 $ 1,186,415 $ 198,230
13% 12% 16%
Date: 12/31/2018
Pestrol Inc
Eagle Scaffolding Services Inc
Petroscan Ltd
NON:
Lewis S. Goodfriend & Associates
MSR Electrical Construction Corp
Call A Head
Safety & Quality Plus Inc
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
313 Spook Rock Road, Suffern, New York 10901 212-939-9580
12/31/2018 In Progress
COMPANY (Tier I)
Name Trade
Par Environmental Corporation General Contractor
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Active Systems Inc
Johnson Security Bureau Inc
Park Avenue Building & Roofing Supplies LLC
Expedite-Dem Inc
General Contractor Area 9B (Site 40)
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Par Environmental Corporation Abatement & Demolition
15
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 9/24/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 4,729,000 $ 4,529,596 $ 4,529,596
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
MWL-ESD No Extermination Yes $ 1,013 $ 3,099 $ 3,099
$ 1,013 $ 3,099 $ 3,099
$ 1,013 $ 3,099 $ 3,099
Non-MWL Tier III Total $ - $ - $ -
0% 0% 0%
Date: 12/31/2018
Breeze National Inc
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Pestrol Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & DemolitionBreeze National Inc
Trade
General Contracting
212-939-9580622 West 132nd, 2nd fl, New York, NY 10027
Lend Lease
General Contracting
3/22/201212/31/2018
Name
16
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 9/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,818,000 $ 1,818,183 $ 1,818,183
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
Expedite-Dem Inc MW-ESD No Sidewalk Bridge & Scaffold Yes $ - $ 126,400 $ 126,400
W-ESD No Expeditor Yes $ 50,000 $ 17,610 $ 17,610
L No Building Supplies Yes $ 30,000 $ 11,246 $ 11,246
M-ESD No Scaffolding Yes $ 163,000 $ 282,192 $ 282,192
L No Temporary Toilets Yes $ 8,000 $ 5,804 $ 5,804
W-ESD No Fuel/Diesel Yes $ - $ 870 $ 870
L No Equipment Supplier Yes $ - $ 10,234 $ 10,234
W-ESD No Safety Yes $ - $ 30,000 $ 30,000
MWL-ESD No Vectoring Yes $ - $ 15,000 $ 15,000
M-ESD No Recycle/Waster Removal Yes $ 100,000 $ 16,093 $ 16,093
L No Material Supplier Yes $ - $ 6,526 $ 6,526
MW-ESD No Material Supplier Yes $ - $ 6,892 $ 6,892
W-ESD No Utility Supplier Yes $ - $ 50,000 $ 50,000
$ 351,000 $ 578,867 $ 578,867
$ 351,000 $ 578,867 $ 578,867
Non-MWL Tier III Total $ - $ - $ -
19% 32% 32%
Date: 12/31/2018
12/31/2018
Lend Lease
Par Environmental Corp
A Royal Flush
Petroscan Ltd
Safety & Quality Plus Inc
Coral Management
Pestrol Inc
Metropolitan Enterprises Inc, DBA Target Scaffolding
General Contracting
622 West 132nd, 2nd fl, New York, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & Demolition
Areas 1A & 1B
Par Environmental Corp
Trade
General Contracting
212-939-9580
1/12/2011
Name
JEG Inc
Atlas Equipment Rentals
Adco Electrical Corp
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Pearlgreen
Sienna Environmental Technologies LLC
Marguerite Connelly Your Expediter Inc
MWL % of Tier II
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
17
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 7,100,000 $ 7,100,000 $ 7,100,000
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Carting Yes $ - $ 8,130 $ 8,130
MW-ESD No Expeditor Yes $ 180,000 $ 160,000 $ 160,000
M-ESD No Sidewalk Bridge & Scaffolding Yes $ - $ 249,768 $ 249,768
M No Scaffolding Yes $ - $ 669,089 $ 669,089
L No Temporary Toilets Yes $ 40,000 $ 11,295 $ 11,295
W-ESD No Fuel/Diesel Yes $ 65,000 $ 62,572 $ 62,572
L No Equipment Supplier Yes $ 120,000 $ 62,464 $ 62,464
MW-ESD No Material Supplier Yes $ 125,000 $ 120,644 $ 120,644
M-ESD No Material Supplier Yes $ - $ 33,182 $ 33,182
M-ESD No Vectoring Yes $ 185,000 $ 246,774 $ 246,774
M-ESD No General Conditions Yes $ - $ 68,968 $ 68,968
MWL-ESD No Vectoring Yes $ 35,000 $ 28,056 $ 28,056
W-ESD No Safety Yes $ 140,000 $ 107,315 $ 107,315
WL-ESD No ACM Disposal Yes $ - $ 95,734 $ 95,734
W-ESD No Expeditor Yes $ - $ 38,340 $ 38,340
M-ESD No Safety Yes $ - $ 13,537 $ 13,537
ML-ESD No Plumbing/Heating Yes $ - $ 2,350 $ 2,350
$ 890,000 $ 1,978,218 $ 1,978,218
$ 890,000 $ 1,978,218 $ 1,978,218
Non-MWL Tier III Total $ - $ - $ -
13% 28% 28%
Date: 12/31/2018
Expedite-Dem Inc
A Tech Electric Enterprise Inc
A Royal Flush
Petroscan Ltd
Metropolitan Enterprises Inc
JEG Inc
Atlas Equipment Rentals
Sienna Environmental Technologies LLC
Manhattan Business Interiors Inc (MBI)
Park Avenue Building & Roofing Supplies LLC
Blue Lake Crane LLC
Robert Parchment Plumbing & Heating Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & Demolition
Areas 2, 4 & 5
Par Environmental Corp
Trade
General Contracting
212-939-9580
12/31/2018
Par Environmental Corp
Lend Lease
10/1/2011
General Contracting
622 West 132nd, 2nd fl, New York, NY 10027
Tri State Transfer Associates Inc
Name
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Rizzo Environmental Services Corp
Pestrol Inc
Safety & Quality Plus Inc
Ann Hickey PE
MWL % of Tier II
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
18
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/11/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 2,627,000 $ 2,571,570 $ 2,492,972
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Electrical Yes $ 50,000 $ 26,594 $ 26,594
MW-ESD No Expeditor Yes $ 88,000 $ 54,960 $ 54,960
W-ESD No Expeditor Yes $ 18,000 $ 15,855 $ 15,855
M No Scaffolding Yes $ 500,000 $ 158,486 $ 158,486
WL-ESD No ACM Disposal Yes $ 30,000 $ 19,185 $ 19,185
W-ESD No Safety Yes $ 65,000 $ 91,245 $ 91,245
MWL-ESD No Vectoring Yes $ 20,000 $ 5,859 $ 5,859
L No Equipment Supplier Yes $ 100,000 $ 35,811 $ 35,811
M-ESD No Recycle/Waster Removal Yes $ 80,000 $ 2,009 $ 2,009
W-ESD No Fuel Supplier Yes $ 25,000 $ 11,654 $ 11,654
MW-ESD No Supplier Yes $ - $ 47,433 $ 47,433
M-ESD No Material Supplier Yes $ - $ 10,246 $ 10,246
W-ESD No Noise Control Yes $ 8,000 $ 8,050 $ 8,050
W No Scaffolding Yes $ - $ 20,686 $ 20,686
$ 984,000 $ 508,073 $ 508,073
$ 984,000 $ 508,073 $ 508,073
Non-MWL Tier III Total $ - $ - $ -
37% 20% 20%
Date: 12/31/2018
Pestrol Inc
Atlas Equipment Rentals
Contracting Supply Solutions
JEG Inc
Par Environmental Corp
Metropolitan Enterprises Inc
Expedite-Dem Inc
Ann Hickey PE
Tri State Transfer Associates Inc
Safety & Quality Plus Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Abatement & Demolition
Areas 7 (Site 28) & 8
Par Environmental Corp
Trade
General Contracting
212-939-9580
12/31/2018
Lend Lease
General Contracting
622 West 132nd, 2nd fl, New York, NY 10027
In Progress
Palace Hoisting & Scaffolding Corp of NY
Name
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
MSR Electrical Construction Corp
Park Avenue Building & Roofing Supplies LLC
Creative Environment Solutions Corp
Petroscan Ltd
MWL % of Tier II
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
19
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 11/30/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 560,750 $ 593,259 $ 587,326
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Electrical Yes $ 15,000 $ 4,590 $ 4,590
MW-ESD No Expeditor Yes $ 35,000 $ 32,850 $ 32,850
W-ESD No Expeditor Yes $ 10,000 $ - $ -
M No Scaffolding Yes $ 50,000 $ 44,093 $ 44,093
WL-ESD No ACM Disposal Yes $ 15,000 $ 30,491 $ 30,491
W-ESD No Safety Yes $ 20,000 $ 25,122 $ 25,122
MWL-ESD No Vectoring Yes $ 10,000 $ 997 $ 997
L No Equipment Supplier Yes $ 10,000 $ 11,817 $ 11,817
M-ESD No Recycle/Waster Removal Yes $ 25,000 $ 6,740 $ 6,740
W-ESD No Fuel Supplier Yes $ 5,000 $ - $ -
M-ESD No Material Supplier Yes $ - $ 5,727 $ 5,727
W-ESD No Temporary Toilets Yes $ 8,000 $ 5,450 $ 5,450
$ 203,000 $ 167,877 $ 167,877
$ 203,000 $ 167,877 $ 167,877
Non-MWL Tier III Total $ - $ - $ -
36% 28% 29%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Par Environmental Corp Abatement & Demolition
General Contracting Area 9A
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018 In Progress
COMPANY (Tier II)
Pestrol Inc
Par Environmental Corp General Contracting
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
MSR Electrical Construction Corp
Expedite-Dem Inc
Ann Hickey PE
Metropolitan Enterprises Inc
Tri State Transfer Associates Inc
Safety & Quality Plus Inc
Atlas Equipment Rentals
JEG Inc
Petroscan Ltd
Park Avenue Building & Roofing Supplies LLC
Creative Environment Solutions Corp
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
20
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 11/30/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,317,500 $ 1,300,000 $ 1,267,032
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Electrical Yes $ 25,000 $ 4,250 $ 4,250
MW-ESD No Expeditor Yes $ 30,000 $ 27,566 $ 27,566
W-ESD No Expeditor Yes $ 10,000 $ 11,285 $ 11,285
WL-ESD No ACM Disposal Yes $ 20,000 $ 55,828 $ 55,828
W-ESD No Safety Yes $ 30,000 $ 10,027 $ 10,027
MWL-ESD No Vectoring Yes $ 5,000 $ 2,450 $ 2,450
W-ESD No Fuel Supplier Yes $ 5,000 $ 1,308 $ 1,308
MW-ESD No Supplier Yes $ 20,000 $ 1,161 $ 1,161
W No Scaffolding Yes $ 150,000 $ 118,332 $ 118,332
M-ESD No Carting Yes $ 100,000 $ 35,750 $ 35,750
$ 395,000 $ 267,957 $ 267,957
$ 395,000 $ 267,957 $ 267,957
Non-MWL Tier III Total $ - $ - $ -
30% 21% 21%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Par Environmental Corp Abatement & Demolition
General Contracting Area 0
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018 In Progress
COMPANY (Tier II)
Petroscan Ltd
Par Environmental Corp General Contracting
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
MSR Electrical Construction Corp
Expedite-Dem Inc
Ann Hickey PE
Tri State Transfer Associates Inc
Safety & Quality Plus Inc
Pestrol Inc
Contracting Supply Solutions
Palace Hoisting & Scaffolding Corp of NY
Cuenca Coronel Trucking Co
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
21
GC/CM: Par Environmental / Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 185 3% 0 0% 0 0% 0 0% 2,628 43% 0 0% 0 0% 2,813 46% 3,309 54% 6,122 5 38% 8 62% 13
Construction Management
* Tier II A Tech Electric Enterprise 301 81% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 301 81% 70 19% 371 5 71% 2 29% 7
Sidewalk Bridge & Scaffolding
Breeze National Inc 11,338 56% 0 0% 122 1% 336 2% 2,817 14% 0 0% 0 0% 14,613 72% 5,774 28% 20,386 73 66% 38 34% 111
Demo & Abatement Contractor
* Current Fire Protection 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 72 100% 72 0 0% 2 100% 2
Fire Protection
Deerpath Construction Corp 232 12% 0 0% 0 0% 0 0% 265 14% 0 0% 0 0% 497 26% 1,446 74% 1,943 3 25% 9 75% 12
Demo & Abatement Contractor
* Eagle Scaffolding Services 499 25% 0 0% 0 0% 0 0% 340 17% 0 0% 0 0% 839 42% 1,139 58% 1,977 14 52% 13 48% 27
Scaffolding Services
* Johnson Security Bureau 711 70% 0 0% 0 0% 8 1% 303 30% 0 0% 0 0% 1,022 100% 0 0% 1,022 10 100% 0 0% 10
Security
* Par Environmental Corp 62,090 63% 16 0% 0 0% 5,388 5% 3,659 4% 0 0% 0 0% 71,153 73% 26,988 27% 98,140 197 74% 69 26% 266
Demo & Abatement Contractor
75,355 16 122 5,732 10,011 0 0 91,236 38,796 130,032 307 141 448
58% 0% 0% 4% 8% 0% 0% 70% 30% 100% 69% 31% 100%
Contractor Start
A Tech Electric Enterprise 11/28/2018
Breeze National Inc 9/17/2009
Current Fire Protection 12/4/2018
Deerpath Construction Corp 9/16/2009
Eagle Scaffolding Services 10/22/2018
Johnson Security Bureau 11/10/2018
Par Environmental Corp 10/5/2009
Total MWL Non-MWL Total MWL Non-MWL
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
Total Hours
Overall % of Total
3/28/2012
In Progress
7/13/2010
In Progress
In Progress
Abatement and DemolitionSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
22
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Construction Management
* Tier II A Tech Electric Enterprise 301 81% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 301 81% 70 19% 371 5 71% 2 29% 7
Sidewalk Bridge & Scaffolding
Breeze National Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Demo & Abatement Contractor
* Current Fire Protection 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 72 100% 72 0 0% 2 100% 2
Fire Protection
Deerpath Construction Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Demo & Abatement Contractor
* Eagle Scaffolding Services 499 25% 0 0% 0 0% 0 0% 340 17% 0 0% 0 0% 839 42% 1,139 58% 1,977 14 52% 13 48% 27
Scaffolding Services
* Johnson Security Bureau 711 70% 0 0% 0 0% 8 1% 303 30% 0 0% 0 0% 1,022 100% 0 0% 1,022 10 100% 0 0% 10
Security
* Par Environmental Corp 2,445 43% 0 0% 0 0% 0 0% 16 0% 0 0% 0 0% 2,461 43% 3,235 57% 5,695 16 48% 17 52% 33
Demo & Abatement Contractor
3,955 0 0 8 659 0 0 4,622 4,515 9,137 45 34 79
43% 0% 0% 0% 7% 0% 0% 51% 49% 100% 57% 43% 100%
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
Abatement and DemolitionSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
23
Jerome L. Greene Science Center
24
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 8,453,368
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Plumbing Yes $ - $ 10,896 $ 10,896
W-ESD No Pest Control Yes $ - $ 1,550 $ 1,550
M-ESD No General Contractor Yes $ - $ 290,392 $ 290,392
W No Moving & Relocation Yes $ - $ 1,214 $ 1,214
W-ESD No Signage Yes $ - $ 1,515 $ 1,515
L No Electrical Yes $ - $ 8,995 $ 8,995
MW-ESD No Cleaning Yes $ - $ 110,210 $ 110,210
W No Printing Service Yes $ - $ 99,182 $ 99,182
WL-ESD No General Contractor Yes $ - $ 35,945 $ 35,945
L No General Contractor Yes $ - $ 238,826 $ 238,826
WL-ESD No General Contractor Yes $ - $ 41,926 $ 41,926
L No Telecommunications Conduit Installation Yes $ - $ 41,938 $ 41,938
L No Electrical Yes $ - $ 3,067 $ 3,067
MWL-ESD No Cleaning Yes $ - $ 16,505 $ 16,505
L No Construction Management Yes $ - $ 1,846 $ 1,846
L No Plumbing Yes $ - $ 644 $ 644
NON No Safeway Fire - Monitoring Yes $ - $ 4,893 $ 4,893
NON No Doors & Windows Yes $ - $ 990 $ 990
NON No Debris Removal Yes $ - $ 1,047 $ 1,047
NON No General Contractor Yes $ - $ 509,686 $ 509,686
NON No Materials & Equipment Yes $ - $ 422 $ 422
NON No Mechanical Yes $ - $ 3,630 $ 3,630
NON No Materials & Equipment Yes $ - $ 19,923 $ 19,923
NON No AV/Cable/Telecom Yes $ - $ 68,605 $ 68,605
NON No Moving & Relocation Yes $ - $ 14,403 $ 14,403
NON No Materials & Equipment Yes $ - $ 151,998 $ 151,998
NON No Decontamination Services Yes $ - $ 137,314 $ 137,314
NON No Supplier Yes $ - $ 4,019,530 $ 4,019,530
Bruker Nano Inc NON No Moving & Relocation Yes $ - $ 136,450 $ 136,450
NON No Moving & Relocation Yes $ - $ 19,123 $ 19,123
NON No UWPA Suppliers Yes $ - $ 42,644 $ 42,644
NON No Supplier Yes $ - $ 26,000 $ 26,000
NON No Materials & Equipment Yes $ - $ 29,641 $ 29,641
NON No Scale Repair Yes $ - $ 674 $ 674
NON No Furniture Yes $ 62,809 $ 62,809 $ 62,809
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
Jerome L. Greene Science Center
Name Trade
12/31/2018
Columbia University
Owner
410 West 118th Street, NY, NY 10027
Columbia University
In Progress
Name/Address/Phone # (if available) otherwise enter Trade
Clancy Cullen Moving & Storage Co Inc
Carl Zeiss Microscopy LLC
MWL:
Action Carting Environmental Servic
Beckman Coulter Inc
Airgas E
MFM Contracting Corp
Platinum Electric Service Inc
Scrub Clean Maintenance Corp
Watsons Plumbing and Heating
275 Technology Solutions dba Safeway Fire & Protection
NON:
Airvel Airconditioning Coporation
Dancker Sellew & Douglas
Bioquell Inc
Advance Relocation & Storage
Abbey Locksmiths Inc
BH Inc
Aquaneering Inc
Bear Communications Inc
Coherent Inc
City of New York Parks and Recreation
Absolute Plumbing & Heating Corp
Black Widow Termite & Pest Control
CitiStructure
Gamma Cleaning Concepts Inc
Doumas Electric Inc
Green Girl Printing and Messenger Inc
Titan Plumbing & Heating LLC
Bruker Biospin Corp
King Rose of NY Inc
Crown Sign Systems Inc
Izzo Construction Corp
Mamais Contracting Corp
Central Moving & Storage Co
Cryostar Industries Inc
25
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 8,453,368
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
Jerome L. Greene Science Center
Name Trade
12/31/2018
Columbia University
Owner
410 West 118th Street, NY, NY 10027
Columbia University
In Progress
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
NON No Supplies Yes $ - $ 182 $ 182
NON No Flooring Resilient Tile Yes $ - $ 21,484 $ 21,484
NON No Materials & Equipment Yes $ - $ 600,192 $ 600,192
NON No Moving & Relocation Yes $ - $ 40,850 $ 40,850
NON No AV/Cable/Telecom Yes $ - $ 50,289 $ 50,289
NON No General Contractor Yes $ - $ 85,056 $ 85,056
NON No Cleaning Yes $ - $ 424 $ 424
NON No Supplier Yes $ - $ 73,170 $ 73,170
NON No Lab Furniture Yes $ - $ 66,353 $ 66,353
Leica Microsystems NON No Moving & Relocation Yes $ - $ 14,933 $ 14,933
NON No Supplier Yes $ - $ 155,487 $ 155,487
NON No Moving & Relocation Yes $ - $ 19,590 $ 19,590
NON No Equipment Yes $ - $ 84,747 $ 84,747
NON No Supplier Yes $ - $ 7,196 $ 7,196
NON No Materials & Equipment Yes $ - $ 49,132 $ 49,132
Olympus America Inc NON No Moving & Relocation Yes $ - $ 17,500 $ 17,500
NON No Appliances Yes $ - $ 307,485 $ 307,485
NON No Guard Service / Watchman Yes $ - $ 5,797 $ 5,797
NON No Cleaning Yes $ - $ 5,417 $ 5,417
NON No Moving & Relocation Yes $ - $ 6,680 $ 6,680
NON No Materials & Equipment Yes $ - $ 2,500 $ 2,500
NON No Materials & Equipment Yes $ - $ 29,707 $ 29,707
NON No Equipment Yes $ - $ 4,944 $ 4,944
NON No Moving & Relocation Yes $ - $ 13,250 $ 13,250
NON No HVAC Yes $ - $ 271,352 $ 271,352
NON No Doors & Windows Yes $ - $ 192,910 $ 192,910
NON No Telecommunication Yes $ - $ 7,642 $ 7,642
NON No Window Treatment Yes $ - $ 26,540 $ 26,540
NON No Supplier Yes $ - $ 71,426 $ 71,426
NON No Digital Services Yes $ - $ 180 $ 180
NON No Supplier Yes $ - $ 24,981 $ 24,981
NON No Signage Yes $ - $ 7,539 $ 7,539
NON No Furniture Yes $ 34,000 $ 34,000 $ 34,000
$ 96,809 $ 8,453,368 $ 8,453,368
$ - $ 904,651 $ 904,651
Non-MWL Direct Spend Total $ 96,809 $ 7,548,717 $ 7,548,717 Date: 12/31/2018 0% 11% 11%
Engineer Supply
NON:
Fibergrate Composite Structures Inc
Psychology Software Tools Inc
Scientific Equipment Product Service
Frames Animal Transportation
JWEISS LLC
LBG Enterprises LLC
Marathon Equipment Company (Delware)
Mortech Manufacturing
Pacific Bio-Material Management Inc
The Sign Works Inc
Tecniplast USA
Technical Digital Services
Steris Corp
MWL Direct Spend Total
MWL % of Total
HB Communications Inc
Star Draperies Inc
Newport Corp
Kewaunee Scientific Corporation
Long Island Scientific
StarCom Communications Service
SOS Locksmith Corp
Valley City MFG
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Hellman Construction Co Inc
Direct Spend Grand Total
Siemens Industry Inc
Par-Kut International Inc
I.H. Weiss Co Ltd (Town House Specialty Cleaning Co
Formulatrix Inc
Rise Vision USA LLC
PBM LLC
Pureaire Monitoring Systems Inc
Precision Micro Inc
26
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 410,797,383
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ 6,722,424 $ 445,313,393 $ 410,797,383
$ 6,722,424 $ 445,313,393 $ 410,797,383
$ - $ - $ -
Non-MWL Direct Spend Total $ 6,722,424 $ 445,313,393 $ 410,797,383
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Jerome L. Greene Science Center
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
27
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 389,626 $ 389,626
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No MBBI Synaptic Corridor Yes $ - $ 389,626 $ 389,626
$ - $ 389,626 $ 389,626
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 389,626 $ 389,626
0% 0% 0%
Date: 12/31/2018
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Jerome L. Greene Science Center Synapse
410 West 118th Street, NY, NY 10027
12/31/2018 In Progress
OWNER
Name Trade
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
28
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 6,722,424 $ 445,313,393 $ 410,797,383
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Plumbing Yes $ - $ 19,795,144 $ 19,795,144
W-ESD No Security Yes $ - $ 1,835 $ 1,835
W-ESD No HVAC-Sheetmetal Yes $ - $ 1,876,397 $ 1,003,878
M-ESD No Safety Equipment Yes $ - $ 2,936,757 $ 2,942,310
M-ESD No Drywall Yes $ - $ 74,045 $ 68,492
MW-ESD No Security Yes $ - $ 1,112,389 $ 1,112,389
W-ESD Yes Electrical Yes $ - $ 2,144,384 $ 2,144,044
W-ESD Yes Clear & Prep Site Yes $ - $ 23,614 $ 23,614
L No Drywall Yes $ - $ 10,637,272 $ 10,632,678
L No Resilient Flooring & Base Yes $ - $ 4,594 $ 4,594
M-ESD No Intumescent Painting Yes $ - $ 3,245,444 $ 3,213,922
M-ESD No Paint & Coatings Yes $ - $ 2,332,254 $ 2,295,315
L No Plumbing Yes $ - $ 20,887 $ 20,887
MWL-ESD No Security Yes $ - $ 1,349,760 $ 1,349,760
M No Scaffolding Yes $ - $ 600,239 $ 560,800
L No Utilities Yes $ - $ 86,311 $ 85,572
L No Electrical Yes $ - $ 2,977 $ 2,680
MWL-ESD No Spray Fireproofing Yes $ - $ 1,379,934 $ 1,379,934
W-ESD No Concrete Yes $ - $ 482,707 $ 482,707
MWL-ESD No Construction Management Yes $ - $ 3,879,082 $ 3,879,082
NON:
NON No Toilet Partitions Yes $ - $ 114,060 $ 114,060
NON No Electrical Yes $ - $ 46,147 $ 46,147
NON No Electrical Yes $ - $ 17,009,948 $ 17,009,428
NON No Millwork Yes $ - $ 5,418,876 $ 5,418,876
NON No Ornamental Metal Yes $ - $ 1,644,213 $ 1,644,213
NON No Glass & Glazing Yes $ - $ 1,006,114 $ 1,001,743
NON No Superstructure Steel Yes $ - $ 31,550,568 $ 31,550,568
NON No Roofing Yes $ - $ 2,776,430 $ 2,745,454
NON Yes Electrical Yes $ - $ 3,216,576 $ 3,216,067
NON Yes Clear & Prep Site Yes $ - $ 35,420 $ 35,420
NON No Resilient Flooring & Base Yes $ - $ 1,211,301 $ 1,211,301
NON No Electrical Yes $ - $ 20,801,178 $ 19,957,548
NON No Electrical Yes $ - $ 36,134,792 $ 35,677,671
NON No HVAC Systems Yes $ - $ 678,094 $ 671,369
Eagle One Roofing Contractors Inc
B&G Electrical Contractors of NY
ASR Electrical Contracting Inc
Celtic Sheetmetal Inc
Lend Lease
New York Concrete
Eddington Security Inc
EJ/Egg Electric JV - (EJ Electric)
Giachetti Plumbing
Forest Electric
Fresh Meadow Mechanical Corp
MFM Contracting Corp
Elite Floors Inc
Five Star Electric Corp
EJ/Egg Electric JV - (Egg Electric Inc)
Elite Interiors Systems Inc
Fine Painting & Decorating Company Inc
Fine Painting & Decorating Company Inc
Johnson Security Bureau Inc
MFM Contracting Corp
Bauerschmidt & Sons Inc
Champion Metal & Glass Inc
Champion Metal & Glass Inc
Cives Corp
The McKissack Group Inc
Morell Brown Corp
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Jerome L. Greene Science Center
Name
Lend Lease
Trade
Construction Management
12/31/2018
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
In Progress
Construction Management
Name/Address/Phone # (if available) otherwise enter Trade
EJ/Egg Electric JV - (EJ Electric)
MWL:
EJ/Egg Electric JV - (Egg Electric Inc)
Cassone Leasing Inc
Creative Construction
Elite Interiors Systems Inc
Metropolitan Enterprises Inc
A Liss & Company Inc
Cardoza Plumbing
Creative Construction
29
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 6,722,424 $ 445,313,393 $ 410,797,383
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
Lend Lease
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier I)
SUBCONTRACTORS (Tier II)
Jerome L. Greene Science Center
Name
Lend Lease
Trade
Construction Management
12/31/2018
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
In Progress
Construction Management
Name/Address/Phone # (if available) otherwise enter Trade
MWL:NON:
NON No Elevators Yes $ - $ 122,863 $ 122,863
NON No Raised Access Flooring Yes $ - $ 786,302 $ 786,302
NON No Hoist / Bridges / Scaffold Yes $ - $ 19,259 $ 19,259
NON No Clear & Prep Site Yes $ - $ 36,948 $ 36,663
NON No Drywall Yes $ - $ 16,276,467 $ 16,015,474
NON No Fire Protection Systems Yes $ - $ 120,000 $ 98,349
NON No Ceramic Tile Yes $ - $ 2,269,407 $ 2,269,407
NON No Food Service Equipent Yes $ - $ 147,572 $ 147,572
NON No Overhead Doors Yes $ - $ 891,273 $ 891,273
NON No Glass and Glazing Yes $ - $ 4,975,517 $ 4,590,377
NON Yes Mechanical Yes $ - $ 61,135,336 $ 59,722,121
NON No Polished Concrete Yes $ - $ 360,842 $ 315,185
NON No Masonry Yes $ - $ 3,388,621 $ 3,190,168
NON No Safety Equipment Yes $ - $ 444,519 $ 444,519
NON No Elevators Yes $ - $ 4,131,223 $ 4,089,807
NON No Spray Fireproofing Yes $ - $ 691,497 $ 691,497
NON No Resilient Flooring & Base Yes $ - $ 4,027,552 $ 4,027,552
NON No Metal Work Yes $ - $ 4,093,049 $ 4,093,049
NON No Dewatering Yes $ - $ 6,617,522 $ 6,617,522
NON No Above Grade Concrete Yes $ - $ 10,064,686 $ 10,064,656
NON No HVAC Systems Yes $ - $ 14,460,998 $ 14,440,506
NON No Electrical Yes $ - $ 22,078 $ 20,491
NON No Clear & Prep Site Yes $ - $ 437,827 $ 437,827
NON No HVAC Systems Yes $ - $ 42,306 $ 42,306
NON No Clear & Prep Site Yes $ - $ 135,259 $ 95,608
NON No Hoist Yes $ - $ 2,589,742 $ 2,589,742
NON No Resilient Flooring & Base Yes $ - $ 511,499 $ 511,499
NON No Metal Stairs Yes $ - $ 6,071,083 $ 5,745,018
NON No HVAC Systems Yes $ - $ 29,160,593 $ 27,646,995
NON No Drywall Yes $ - $ 8,150 $ 6,634
NON No Plumbing Yes $ - $ 4,170 $ 3,127
NON No Window Washing Equipment Yes $ - $ 271,870 $ 271,870
$ - $ 347,945,773 $ 341,344,740
$ - $ 51,986,026 $ 50,999,637
Non-MWL Tier II Total $ - $ 295,959,747 $ 290,345,103
Date: 12/31/2018 0% 12% 12%
Navillus Tile Inc
WDF Inc
Universal Services Group
Trystate Mechanical Inc
Universal Builders Supply
United Drilling & Cutting Corp
RCC Concrete Corp
Siemens Industry Inc
Skanska
Modulo 3 Corporation DBA Unifor
M Tucker A Division of Singer NY LLC
Intricate Construction
Jantile Inc
H.S.E. System Inc (Metropolitan Enterprises Inc)
Handi-Lift Elevator LLC
Nets That Work
PAL Environmental Safety Corp
Otis Elevator Company
McKeon Door East
MW Mechanical Inc
Navillus Tile Inc
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
Siemens Industry Inc
WDF Inc
WDF Inc
Walters LLC
Winsafe Corp
Island Acoustics
Island Acoustics
Hi Tech Data Floors Inc
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Rael Automatic Sprinkler
Post Road Iron Works
Platinum Terrazzo
30
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 389,626 $ 389,626
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Electrical Corporation Yes $ - $ 148,488 $ 148,488
NON No Miscellaneous Metal Yes $ - $ 235,380 $ 235,380
$ - $ 383,868 $ 383,868
$ - $ - $ -
Non-MWL Tier II Total $ - $ 383,868 $ 383,868
0% 0% 0%
Date: 12/31/2018
Construction Management
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Jerome L. Greene Science Center Synapse
Name Trade
Lend Lease Construction Management
SUBCONTRACTORS (Tier II)
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018 In Progress
COMPANY (Tier I)
Forest Electric
Post Road Iron Works
NON:
Name/Address/Phone # (if available) otherwise enter Trade
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
31
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 28,270,835 $ 31,550,568 $ 31,550,568
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
Baco Enterprises Inc L No Field Bolts Yes $ 276,449 $ 230,714 $ 230,714
L No Safety/Slurry Yes $ 102,900 $ 130,340 $ 130,340
W-ESD No Structural Steel Material Yes $ 816,232 $ 862,145 $ 862,145
M-ESD No Installation of Deck & Studs Yes $ 1,573,600 $ 1,492,849 $ 1,492,849
W-ESD No Exterior Intumescent Columns Yes $ 400,000 $ 410,982 $ 410,982
W-ESD No Field Bolts Yes $ - $ 278,110 $ 278,110
Powell Steel Corp M-ESD No Structural Steel Beams Yes $ - $ 439,775 $ 439,775
$ 3,169,181 $ 3,844,915 $ 3,844,915
$ 3,169,181 $ 3,844,915 $ 3,844,915
Non-MWL Tier III Total $ - $ - $ -
11% 12% 12%
Date: 12/31/2018
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Lend Lease
Tier III Grand Total
MWL Tier III Total
Kiwi Steel Corp
Structural Steel
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
COMPANY (Tier II)
SUBCONTRACTORS (Tier III)
Jerome L. Greene Science CenterCives Corp
Trade
Structural Steel
315-287-22008 Church Street, Gouverneur, NY 13642
Name
In Progress
L&M Fabrication & Machine Inc
12/31/2018
Cives Corp
RKL Building Specialties Co Inc
Baco Enterprises Inc
Commonwealth Metal Co
32
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/10/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 6,643,000 $ 10,064,686 $ 10,064,656
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Concrete Ready Mix Supplier Yes $ - $ 774,257 $ 774,257
W-ESD No Construction Materials Yes $ - $ 33,231 $ 33,231
L No Rebar & Wire Mesh Supplier Yes $ 392,385 $ 492,283 $ 492,283
MW-ESD No Material Supplier Yes $ - $ 25,018 $ 25,018
M-ESD No Concrete Ready Mix Supplier Yes $ - $ 472,592 $ 472,592
W No Lumper (Metal Lathing) Yes $ - $ 591,395 $ 561,826
$ 392,385 $ 2,388,776 $ 2,359,207
$ 392,385 $ 2,388,776 $ 2,359,207
Non-MWL Tier III Total $ - $ - $ -
6% 24% 23%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
RCC Concrete Corp Jerome L. Greene Science Center
Cement & Concrete Construction
74 State Street, 2nd Floor Westbury, New York 11590 516-279-6787
12/31/2018 In Progress
COMPANY (Tier II)
RCC Concrete Corp Cement & Concrete Construction
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Elite Ready Mix
Sanzo Ltd Inc
NYCON Readimix
B.P. Precise Construction Corp
Wild Woman Co
CFS Steel Co
MWL % of Tier II
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
33
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/25/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON Yes $ 55,975,000 $ 61,135,336 $ 59,722,121
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No HVAC-Sheetmetal Yes $ 11,000,000 $ 12,560,561 $ 11,932,486
W-ESD No HVAC-Piping Yes $ 14,590,000 $ 16,682,126 $ 16,573,926
W-ESD No Insulation Yes $ 2,300,000 $ 2,623,213 $ 2,623,213
M-ESD No HVAC-Equipment & Rigging Yes $ 1,000,000 $ 1,534,239 $ 1,518,185
W-ESD No Equipment Rental & Leasing Yes $ - $ 10,000 $ 659
W-ESD No Safety Consultant Yes $ - $ 343,719 $ 343,719
M-ESD No Safety Consultant Yes $ - $ 124,160 $ 124,160
$ 28,890,000 $ 33,878,018 $ 33,116,348
$ 28,890,000 $ 33,878,018 $ 33,116,348
Non-MWL Tier III Total $ - $ - $ -
52% 55% 55%
Date: 12/31/2018
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
Safety & Environmental
MW Mechanical Inc HVAC
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Celtic Sheetmetal Inc
FW Sims Inc
Mate Matura & Sons Inc
Yuen Ling Enterprises Inc
Cassone Leasing Inc
Safety & Quality Plus Inc
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
MW Mechanical Inc Jerome L. Greene Science Center
HVAC
622 West 132nd Street, New York, NY 10027 718-961-6634
12/31/2018 In Progress
COMPANY (Tier II)
34
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 1/23/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 20,315,665 $ 20,801,178 $ 19,957,548
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Electrical Yes $ 7,110,483 $ 1,149,916 $ 1,149,916
MW No Electrical Yes $ - $ 1,221,698 $ 1,221,698
W No Electrical Yes $ - $ 816,981 $ 816,981
W-ESD No Supplier Yes $ - $ 443,752 $ 278,905
W-ESD No Supplier Yes $ - $ 95,777 $ 94,057
$ 7,110,483 $ 3,728,124 $ 3,561,557
$ 7,110,483 $ 3,728,124 $ 3,561,557
Non-MWL Tier III Total $ - $ - $ -
35% 18% 18%
Date: 12/31/2018
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
Five Star Electric Corp Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Eaton Electric Inc
Eastern Electric Corp of New York
G-Squared Electric LLC
LB Electric Supply Co.
Montana Datacom
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Five Star Electric Corp Jerome L. Greene Science Center
Electrical
101-32 101st Street, Ozone Park, NY 11416 718-641-5000
12/31/2018 In Progress
COMPANY (Tier II)
35
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 4/20/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 3,900,000 $ 4,131,223 $ 4,089,807
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Cab and Entrance Fabrication Yes $ 674,839 $ 739,014 $ 655,560
$ 674,839 $ 739,014 $ 655,560
$ 674,839 $ 739,014 $ 655,560
Non-MWL Tier III Total $ - $ - $ -
17% 18% 16%
Date: 12/31/2018
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
Otis Elevator Company Elevators
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Concept Elevator Group LLC
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Otis Elevator Company Jerome L. Greene Science Center
Elevators
One Odell Plaza, Suite 120, Yonkers, NY 10701 973-575-3107
12/31/2018 In Progress
COMPANY (Tier II)
36
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/25/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 25,166,020 $ 29,172,913 $ 27,656,756
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Insulation Yes $ 1,325,000 $ 1,507,415 $ 1,484,704
W No Material Supplier Yes $ - $ 71,073 $ 71,073
M-ESD No Material Supplier Yes $ 6,470 $ 98,656 $ 98,656
W No Water Treatment Yes $ - $ 2,547 $ 2,547
$ 1,331,470 $ 1,679,691 $ 1,656,980
$ 1,331,470 $ 1,679,691 $ 1,656,980
Non-MWL Tier III Total $ - $ - $ -
5% 6% 6%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
HVAC
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
Henry Quentzel Plumping Supply Co Inc
Hailey Insulation Corp
Purity Laboratories Inc
WDF Inc
NY Pl. Wholesale and Supply Inc
MWL:
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
WDF Inc Jerome L. Greene Science Center
HVAC
30 North Macquesten Parkway, Mount Vernon, NY 10550 914-776-8144
12/31/2018 In Progress
COMPANY (Tier II)
37
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 3/12/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 14,250,000 $ 16,396,467 $ 16,113,823
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Lathing Yes $ 478,896 $ 450,285 $ 450,285
W No Laser Curtains Yes $ - $ 197,164 $ 197,164
W-ESD No Materials Yes $ 3,049,535 $ 1,573,367 $ 1,573,367
MW-ESD No Manlifts Yes $ 93,600 $ 86,965 $ 86,965
W-ESD No Finishing Yes $ - $ 20,226 $ 20,226
W No Firestopping Yes $ - $ 97,976 $ 97,976
$ 3,622,031 $ 2,425,983 $ 2,425,983
$ 3,622,031 $ 2,425,983 $ 2,425,983
Non-MWL Tier III Total $ - $ - $ -
25% 15% 15%
Date: 12/31/2018
Beamstop'r
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
Firestop Solutions
Green Depot
AIW
Halmark
Carpentry
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
CenterSpan
Island Acoustics
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Island Acoustics Jerome L. Greene Science Center
Carpentry
518 Johnson Ave Bohemia, NY 11716 631-234-4500
12/31/2018 In Progress
COMPANY (Tier II)
38
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 5/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 31,000,000 $ 36,134,792 $ 35,677,671
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Lighting Material Supplier Yes $ 9,735,705 $ 10,481,341 $ 10,481,341
M-ESD No Electrical Material Supplier Yes $ 975 $ 975 $ 975
L No Electrical Material Supplier Yes $ 4,161 $ 146,703 $ 146,703
W-ESD No Electrical Material Supplier Yes $ 80,541 $ 853,947 $ 853,947
W-ESD No Electrical Material Supplier Yes $ - $ 80,114 $ 80,114
W-ESD No Electrical Material Supplier Yes $ - $ 170,758 $ 170,758
W No Electrical Material Supplier Yes $ - $ 600 $ 600
W-ESD No Electrical Material Supplier Yes $ - $ 28,338 $ 28,338
$ 9,821,382 $ 11,762,776 $ 11,762,776
$ 9,821,382 $ 11,762,776 $ 11,762,776
Non-MWL Tier III Total $ - $ - $ -
32% 33% 33%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Forest Electric Jerome L. Greene Science Center
Electrical
2 Penn Plaza New York, NY 10121 212-318-1500
12/31/2018 In Progress
COMPANY (Tier II)
Atlas Switch Co Inc
Forest Electric Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Belle Lighting
Dumont Electrical Inc
Smith EI-DIS Co, Inc
Turtle & Hughes
Act Electrical & Data
Montana Datacom
LB Electric Supply Co.
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
39
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 11/20/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 6,200,000 $ 3,749,463 $ 3,505,353
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Masonry Supply Yes $ 500,000 $ 350,000 $ 322,323
L No Rebar Supplier Yes $ 40,000 $ 40,000 $ 32,855
M-ESD No Drafting Yes $ 10,000 $ 11,000 $ 10,438
L No Concrete Yes $ 10,000 $ 10,000 $ 5,769
$ 560,000 $ 411,000 $ 371,385
$ 560,000 $ 411,000 $ 371,385
Non-MWL Tier III Total $ - $ - $ -
9% 11% 11%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Navillus Tile Inc Jerome L. Greene Science Center
Masonry
575 5th Ave 29th Floor, New York, NY 10017 212-750-1808
12/31/2018 In Progress
COMPANY (Tier II)
Navillus Tile Inc Masonry
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
CD Construction & Design
CFS Steel Co
Blue Works Inc
Casa Redimix
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
40
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 9/13/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 12,625,000 $ 17,009,948 $ 17,009,428
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Relay Racks, Ladder Rack and Assoc Hardware Yes $ 340,000 $ 7,594 $ 7,594
W-ESD No Innerduct, Firestop, J-Hooks & Consumables Yes $ - $ 175,497 $ 175,497
W-ESD No Conduit & Support Hardware Yes $ 500,000 $ 967,729 $ 967,729
L No Relay Racks, Ladder Rack and Assoc Hardware Yes $ - $ 4,178 $ 4,178
NON No Noise Control & Mitigation Yes $ 5,700 $ 8,100 $ 8,100
$ 845,700 $ 1,163,098 $ 1,163,098
$ 840,000 $ 1,154,998 $ 1,154,998
Non-MWL Tier III Total $ 5,700 $ 8,100 $ 8,100
7% 7% 7%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
B&G Electrical Contractors of NY Jerome L. Greene Science Center
Electrical
7100 New Horizons Blvd. N. Amityville, NY 11701 631-669-6000
12/31/2018 In Progress
COMPANY (Tier II)
Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
G & G Electrical Supply
B&G Electrical Contractors of NY
Turtle & Hughes
Benfield
NON:
Montana Datacom
Geocomp Consulting
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
41
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/19/2012 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 6,940,000 $ 6,617,522 $ 6,617,522
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Subcontractor Yes $ 902,200 $ 74,750 $ 74,750
L No Supply Yes $ - $ 598,000 $ 289,723
NON No Supply Yes $ 138,000 $ 74,750 $ 1,436
$ 1,040,200 $ 747,500 $ 365,909
$ 902,200 $ 672,750 $ 364,473
Non-MWL Tier III Total $ 138,000 $ 74,750 $ 1,436
13% 10% 6%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Rael Automatic Sprinkler Jerome L. Greene Science Center
Fire Protection
1750 Plaza Avenue New Hyde, NY 11040 516-593-2000
12/31/2018 In Progress
COMPANY (Tier II)
Rael Automatic Sprinkler Fire Protection
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
First Women's Fire Systems
Ferguson Fire
NON:
Ascon
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
42
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 5,955,000 $ 14,483,076 $ 14,460,997
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Electrical Material Supplier Yes $ 125,000 $ 125,000 $ 99,502
MW-ESD No Electrical Material Yes $ 80,000 $ 80,000 $ 80,000
M-ESD No Electrician Yes $ 1,320,128 $ 1,483,222 $ 1,483,222
NON No Electrician Yes $ 2,811,000 $ 3,123,628 $ 3,123,628
NON No Electrician Yes $ 1,618,000 $ 1,626,878 $ 1,626,878
$ 5,954,128 $ 6,438,728 $ 6,413,230
$ 1,525,128 $ 1,688,222 $ 1,662,724
Non-MWL Tier III Total $ 4,429,000 $ 4,750,506 $ 4,750,506
26% 12% 11%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Siemens Industry Inc Jerome L. Greene Science Center
BMS
8 Fernwood Road, Florham Park, NJ 07392 973-575-6300
12/31/2018 In Progress
COMPANY (Tier II)
BCI Electrical
Siemens Industry Inc BMS
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Turtle & Hughes
Manna Supply
JM Electric
NON:
Ricotta Electrical
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
43
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 4,550,000 $ 5,418,876 $ 5,418,876
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Plywood/Core Material Supplier Yes $ - $ 153,553 $ 153,553
W-ESD No Doors, Frames & Finish Hardware Yes $ - $ 46,795 $ 46,795
L No Decorative Surfacing, Doors, and Millwork Yes $ - $ 102,121 $ 102,121
NON No Distributor of Laminate, Woodworking
Products & Hardwood Supplies
Yes $ - $ 229,628 $ 229,628
$ - $ 532,097 $ 532,097
$ - $ 302,469 $ 302,469
Non-MWL Tier III Total $ - $ 229,628 $ 229,628
0% 6% 6%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Bauerschmidt & Sons Inc Jerome L. Greene Science Center
Architectural Woodworking
11920 Merrick Blvd, Jamaica, NY 11434 718-528-3500
12/31/2018 In Progress
COMPANY (Tier II)
Architectural Woodworking
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Park Avenue Building & Roofing Supplies LLC
Bauerschmidt & Sons Inc
JC Ryan EBCO/H&G LLC
Rugby Architectural Building
NON:
Manhattan Laminates
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
44
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 2,230,000 $ 2,269,407 $ 2,269,407
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Plywood/Core Material Supplier Yes $ 8,798 $ 8,351 $ 8,351
MW-ESD No Supplier Yes $ - $ 57,630 $ 57,630
$ 8,798 $ 65,981 $ 65,981
$ 8,798 $ 65,981 $ 65,981
Non-MWL Tier III Total $ - $ - $ -
0% 3% 3%
Date: 12/31/2018
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
Jantile Inc Ceramic Tile
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Park Avenue Building & Roofing Supplies LLC
J and BB Tiles Corporation
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Jantile Inc Jerome L. Greene Science Center
Ceramic Tile
3960 Merritt Avenue, Bronx, NY 10466 718-655-5450
12/31/2018 In Progress
COMPANY (Tier II)
45
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No $ 9,400,000 $ 10,641,866 $ 10,637,272
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Acoustic Plaster Yes $ - $ 268,661 $ 268,661
NON No Salisbury Lockers - Installation Yes $ - $ 17,000 $ 17,000
NON No Black Iron Installation Yes $ 173,491 $ 210,108 $ 210,108
$ 173,491 $ 495,769 $ 495,769
$ - $ - $ -
Non-MWL Tier III Total $ 173,491 $ 495,769 $ 495,769
0% 0% 0%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
Elite Interiors Systems Inc
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Direct Service Installers
Evergreen Architectural Arts
Capital Construction Systems Inc
Carpentry / Drywall
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Elite Interiors Systems Inc Jerome L. Greene Science Center
Carpentry / Drywall
79 Alexander Ave Bronx, NY 10454 718-401-3706
12/31/2018 In Progress
COMPANY (Tier II)
46
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 3,550,000 $ 2,776,430 $ 2,745,454
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Supplier Yes $ 200,000 $ 140,000 $ 124,616
$ 200,000 $ 140,000 $ 124,616
$ 200,000 $ 140,000 $ 124,616
Non-MWL Tier III Total $ - $ - $ -
6% 5% 5%
Date: 12/31/2018
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
Eagle One Roofing Contractors Inc Roofing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Center Sheet Metal
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Eagle One Roofing Contractors Inc Jerome L. Greene Science Center
Roofing
18-60 45th Street Astoria, New York 11105 718-626-2108
12/31/2018 In Progress
COMPANY (Tier II)
47
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,200,000 $ 1,644,213 $ 1,644,213
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Supplier of SS Products Yes $ 1,685 $ 1,685 $ 1,685
$ 1,685 $ 1,685 $ 1,685
$ 1,685 $ 1,685 $ 1,685
Non-MWL Tier III Total $ - $ - $ -
0% 0% 0%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Champion Metal & Glass Inc Jerome L. Greene Science Center
Ornamental Metal
130 Motor Parkway, Hauppauge, NY 11788 631-254-2560
12/31/2018 In Progress
COMPANY (Tier II)
Champion Metal & Glass Inc Ornamental Metal
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
The Steel Supply Co Inc
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
48
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,275,000 $ 1,006,114 $ 1,001,743
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Steel Partitions & Doors Yes $ 54,800 $ 43,840 $ 43,840
M No Sandblast Glass Yes $ 1,648 $ 1,648 $ 1,648
M-ESD No Supply Silglaze Yes $ 463 $ 463 $ 463
NON No Automatic Doors Yes $ 56,000 $ 58,000 $ 58,000
NON No Touch ups on Powder coated bollards Yes $ 1,600 $ 1,600 $ 1,400
$ 114,511 $ 105,551 $ 105,351
$ 56,911 $ 45,951 $ 45,951
Non-MWL Tier III Total $ 57,600 $ 59,600 $ 59,400
4% 5% 5%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Champion Metal & Glass Inc Jerome L. Greene Science Center
Glazing
130 Motor Parkway, Hauppauge, NY 11788 631-254-2560
12/31/2018 In Progress
COMPANY (Tier II)
F&O Finishing
Champion Metal & Glass Inc Glazing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Superior Steel Door & Trim Co
GMD Industries
Park Avenue Building & Roofing Supplies LLC
NON:
AES Architectural Entrance Systems
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
49
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 2/28/2011 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 5,167,874 $ 4,975,517 $ 4,590,377
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M No Delivery and Installation Yes $ 875,000 $ 1,357,069 $ 1,357,069
NON No Delivery and Installation Yes $ 138,260 $ 138,260 $ 138,260
NON No Delivery and Installation Yes $ 54,958 $ 54,958 $ 38,192
$ 1,068,218 $ 1,550,287 $ 1,533,521
$ 875,000 $ 1,357,069 $ 1,357,069
Non-MWL Tier III Total $ 193,218 $ 193,218 $ 176,452
17% 27% 30%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
NON:
Workplace Installation Group
TGI Installation
Glass and Glazing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
All State Office Furniture Technicians
Modulo 3 Corporation DBA Unifor
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Modulo 3 Corporation DBA Unifor Jerome L. Greene Science Center
Glass and Glazing
149 Fifth Avenue, New York NY 10010 212-673-3434
12/31/2018 In Progress
COMPANY (Tier II)
50
GC/CM: Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 3,540 16% 808 4% 100 0% 48 0% 2,457 11% 0 0% 10 0% 6,962 32% 14,963 68% 21,925 32 53% 28 47% 60
Construction Management
* Tier II Bauerschmidt & Sons 1,851 12% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,851 12% 13,802 88% 15,653 1 4% 25 96% 26
Millwork
* B&G Electric 19,117 18% 1,942 2% 966 1% 1,946 2% 4,914 5% 0 0% 0 0% 28,884 27% 79,287 73% 108,171 45 33% 91 67% 136
Electrical
* Cardoza Plumbing Corp 32,654 26% 0 0% 1,649 1% 5,264 4% 5,733 5% 1,225 1% 0 0% 46,525 37% 77,589 63% 124,113 31 37% 52 63% 83
Plumbing
* Champion Metal and Glass 1,671 22% 0 0% 0 0% 0 0% 327 4% 0 0% 0 0% 1,998 26% 5,723 74% 7,721 17 36% 30 64% 47
Ornamental Metal, Glass & Glazing
* Cives Corp 47,566 29% 56 0% 1,821 1% 0 0% 2,626 2% 0 0% 0 0% 52,068 32% 111,885 68% 163,953 99 33% 204 67% 303
Superstructure Steel
* Creative Construction Services 9,838 48% 96 0% 0 0% 3,323 16% 499 2% 0 0% 767 4% 14,522 71% 5,997 29% 20,519 37 90% 4 10% 41
Safety Equipment
* Eagle One Roofing Contractors Inc 8,674 36% 81 0% 0 0% 2,120 9% 3,244 13% 0 0% 0 0% 14,118 58% 10,173 42% 24,291 56 60% 38 40% 94
Roofing
* Elite Interiors Inc 53 21% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 53 21% 199 79% 252 2 25% 6 75% 8
Drywall, Resillient Flooring & Base
* Fine Painting & Decorating Company Inc 27,238 72% 0 0% 0 0% 8 0% 444 1% 0 0% 0 0% 27,690 73% 10,094 27% 37,784 48 77% 14 23% 62
Painting & Instrumentation
* Five Star Electrical 12,305 8% 198 0% 152 0% 384 0% 3,453 2% 0 0% 1,684 1% 18,175 12% 136,379 88% 154,554 38 21% 145 79% 183
Electrical
* Forest Electric 46,104 25% 0 0% 0 0% 312 0% 2,335 1% 0 0% 0 0% 48,750 26% 137,606 74% 186,356 49 34% 97 66% 146
Electrical
* Fresh Meadow 1,352 46% 0 0% 0 0% 0 0% 136 5% 0 0% 0 0% 1,488 50% 1,460 50% 2,948 12 44% 15 56% 27
HVAC Systems
* Hi Tech Data 297 10% 1,002 33% 0 0% 0 0% 25 1% 0 0% 0 0% 1,324 43% 1,726 57% 3,050 7 64% 4 36% 11
Raised Access Flooring
* Island Acoustics 58,183 52% 8 0% 2,294 2% 1,732 2% 4,017 4% 0 0% 4,956 4% 71,189 64% 40,705 36% 111,894 74 54% 62 46% 136
Acoustics
* Jantile Inc 8,147 59% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8,147 59% 5,729 41% 13,876 11 52% 10 48% 21
Ceramic Tile
* Metropolitan Enterprises 1,346 54% 0 0% 0 0% 0 0% 14 1% 0 0% 0 0% 1,360 55% 1,126 45% 2,485 33 69% 15 31% 48
Scaffolding
* Morell Brown Corp 9,614 91% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 9,614 91% 1,008 9% 10,622 13 100% 0 0% 13
Fireproofing
* Navillus Contracting 42,824 50% 0 0% 0 0% 797 1% 12,199 14% 0 0% 0 0% 55,820 65% 29,456 35% 85,275 170 55% 137 45% 307
Masonry
* Nets That Work 1,252 52% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,252 52% 1,177 48% 2,429 4 33% 8 67% 12
Safety Equipment
* Otis Elevators 6,203 30% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 6,203 30% 14,734 70% 20,937 15 25% 46 75% 61
Elevators
* Platinum Terrazzo Inc 10,781 55% 0 0% 0 0% 0 0% 79 0% 0 0% 0 0% 10,860 56% 8,666 44% 19,526 17 59% 12 41% 29
Ceramic Tile
* Rael Automatic Sprinkler 1,148 3% 0 0% 0 0% 0 0% 49 0% 0 0% 0 0% 1,197 3% 43,466 97% 44,663 8 12% 60 88% 68
Dewatering
* RCC Concrete Corp 22,640 46% 107 0% 73 0% 243 0% 542 1% 0 0% 0 0% 23,604 48% 25,591 52% 49,194 83 34% 163 66% 246
Above Grade Concrete
* Siemens 8,770 18% 701 1% 0 0% 208 0% 0 0% 0 0% 0 0% 9,678 20% 39,699 80% 49,376 14 24% 45 76% 59
HVAC Systems
* Unifor 16,168 98% 0 0% 208 1% 0 0% 0 0% 0 0% 0 0% 16,376 99% 139 1% 16,515 28 97% 1 3% 29
Glass and Glazing
* Universal Builders Supply 4,569 52% 16 0% 0 0% 0 0% 0 0% 0 0% 0 0% 4,585 52% 4,162 48% 8,747 55 59% 39 41% 94
Hoist
* Walters LLC 27,344 60% 0 0% 0 0% 0 0% 270 1% 0 0% 0 0% 27,614 60% 18,246 40% 45,860 30 65% 16 35% 46
Metal Stairs* WDF 71,259 33% 1,533 1% 3,127 1% 301 0% 4,022 2% 0 0% 864 0% 81,106 38% 132,448 62% 213,553 139 38% 226 62% 365
Piping/Sheetmetal502,503 6,546 10,389 16,684 47,382 1,225 8,280 593,008 973,230 1,566,237 1,168 1,593 2,761
32% 0% 1% 1% 3% 0% 1% 38% 62% 100% 42% 58% 100%
Contractor Start
Bauerschmidt & Sons 10/17/2015
B&G Electric 3/27/2014
Cardoza Plumbing Corp 2/27/2013
Champion Metal and Glass 11/11/2015
Cives Corp 6/30/2012
Creative Construction Services 4/21/2013
Eagle One Roofing Contractors Inc 4/30/2013
Elite Interiors Inc 6/9/2017
Fine Painting & Decorating Company Inc 8/12/2013
Five Star Electrical 3/7/2013
Forest Electric 7/18/2013
Fresh Meadow 5/2/2017
Hi Tech Data 7/12/2015
Island Acoustics 9/11/2013
Jantile Inc 2/8/2015
Metropolitan Enterprises 3/11/2013
Morell Brown Corp 8/3/2013
Navillus Contracting 9/25/2013
Nets That Work 9/3/2013
Otis Elevators 9/6/2013
Platinum Terrazzo Inc 2/28/2015
Rael Automatic Sprinkler 5/1/2013
RCC Concrete Corp 1/30/2013
Siemens 4/3/2014
Unifor 9/30/2015
Universal Builders Supply 4/29/2013
Walters LLC 5/12/2013
WDF 7/24/2013
Total Hours
Overall % of Total
In Progress
In Progress
In Progress
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
In Progress
In Progress
Jerome L. Greene Science CenterSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
In Progress
Total MWL Non-MWL Total MWL Non-MWL
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
51
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Construction Management
* Tier II Bauerschmidt & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Millwork
* B&G Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Electrical
* Cardoza Plumbing Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Plumbing
* Champion Metal and Glass 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 32 100% 32 0 0% 2 100% 2
Ornamental Metal, Glass & Glazing
* Cives Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Superstructure Steel
* Creative Construction Services 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Safety Equipment
* Eagle One Roofing Contractors Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Roofing
* Elite Interiors Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Drywall, Resillient Flooring & Base
* Fine Painting & Decorating Company Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Painting & Instrumentation
* Five Star Electrical 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Electrical
* Forest Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Electrical
* Fresh Meadow 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
HVAC Systems
* Hi Tech Data 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Raised Access Flooring
* Island Acoustics 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Acoustics
* Jantile Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Ceramic Tile
* Metropolitan Enterprises 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Scaffolding
* Morell Brown Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Fireproofing
* Navillus Contracting 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Masonry
* Nets That Work 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Safety Equipment
* Otis Elevators 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Elevators
* Platinum Terrazzo Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Ceramic Tile
* Rael Automatic Sprinkler 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Dewatering
* RCC Concrete Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Above Grade Concrete
* Siemens 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
HVAC Systems
* Unifor 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Hoist
* Universal Builders Supply 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Hoist
* Walters LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Metal Stairs
* WDF 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Piping/Sheetmetal
0 0 0 0 0 0 0 0 32 32 0 2 2
0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 0% 100% 100%
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
Jerome L. Greene Science CenterSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
52
EPA Clean Diesel
53
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 5/1/2009 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 613,907
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON:
NON No Equipment Supplier Yes $ 35,355 $ 35,355 $ 35,355
NON No Equipment Supplier Yes $ - $ 71,294 $ 71,294
NON No Equipment Supplier Yes $ 73,733 $ 93,733 $ 93,733
NON No Equipment Supplier Yes $ 75,160 $ 105,202 $ 105,202
NON No Equipment Supplier Yes $ 478,462 $ 308,323 $ 308,323
$ 662,710 $ 613,907 $ 613,907
$ - $ - $ -
Non-MWL Direct Spend Total $ 662,710 $ 613,907 $ 613,907
0% 0% 0%
Date: 12/31/2018
Edward Ehrbar
12/31/2018
Name/Address/Phone # (if available) otherwise enter Trade
Arpielle Equipment
Foley
H O Penn Machinery
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
OWNER
DIRECT SPEND VENDORS (Tier I)
EPA Clean Diesel
Trade Name
Columbia University
Work Completed 11/2011
410 West 118th Street, NY, NY 10027
Columbia University Owner
Kalbro
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
54
Open Space
55
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 52,276
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Ornamental Metals Yes $ - $ 22,900 $ 22,900
Crown Sign Systems W-ESD No Signage Yes $ - $ 11,675 $ 11,675
L No Electrical Yes $ - $ 34 $ 34
W No Printing Service Yes $ - $ 14,838 $ 14,838
L No Telecommunications Conduit Installation Yes $ - $ 1,365 $ 1,365
MWL-ESD No Cleaning Yes $ - $ 621 $ 621
W No Signage Yes $ - $ 16 $ 16
L No Plumbing Yes $ - $ 63 $ 63
NON No Doors & Windows Yes $ - $ 13 $ 13
NON No Telecommunication Yes $ - $ 751 $ 751
$ - $ 52,276 $ 52,276
$ - $ 51,512 $ 51,512
Non-MWL Direct Spend Total $ - $ 764 $ 764
0% 99% 99%
Date: 12/31/2018
Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
12/31/2018 In Progress
OWNER
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Open Space
MFM Contracting Corp
Scrub Clean Maintenance Corp
Watsons Plumbing and Heating
Clark & Wilkins Industries Inc
410 West 118th Street, NY, NY 10027
Columbia University
Name Trade
SOS Locksmith Corp
NON:
StarCom Communications Service
The Sign Works Inc
Doumas Electric Inc
Green Girl Printing and Messenger Inc
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
56
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 16,251,903
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ 1,047,159 $ 16,251,903 $ 16,251,903
$ 1,047,159 $ 16,251,903 $ 16,251,903
$ - $ - $ -
Non-MWL Direct Spend Total $ 1,047,159 $ 16,251,903 $ 16,251,903
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Open Space
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
57
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,047,159 $ 16,251,903 $ 16,251,903
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Security Yes $ - $ 15 $ 15
M-ESD No Drywall Yes $ - $ 2,412 $ 2,412
MW-ESD No Security Yes $ - $ 54,195 $ 54,195
W-ESD Yes Electrical Yes $ - $ 1,821 $ 1,821
W-ESD Yes Street Structures Yes $ - $ 342 $ 342
L No Resilient Flooring & Base Yes $ - $ 161 $ 161
L No Drywall Yes $ - $ 63 $ 63
M-ESD No Paint & Coatings Yes $ - $ 166 $ 149
MWL-ESD No Security Yes $ - $ 60,531 $ 60,531
L No Sitework Yes $ - $ 17,813 $ 17,813
L No Foundation Concrete Yes $ - $ 11,016 $ 10,820
MWL-ESD No Construction Management Yes $ - $ 60,799 $ 60,799
NON No Electrical Yes $ - $ 1,116,585 $ 1,116,585
NON No Roofing Yes $ 1,007,250 $ 1,169,639 $ 1,147,603
NON Yes Electrical Yes $ - $ 2,731 $ 2,731
NON Yes Street Structures Yes $ - $ 513 $ 513
NON No Resilient Flooring & Base Yes $ - $ 695 $ 695
NON No Sitework Yes $ - $ 8,673,762 $ 8,499,402
NON No Drywall Yes $ - $ 2,195 $ 2,195
NON No Above Grade Concrete Yes $ - $ 992,502 $ 989,137
NON No HVAC Systems Yes $ - $ 939 $ 939
NON No Sitework Yes $ - $ 91,219 $ 91,219
NON No Street Structures Yes $ - $ 57,137 $ 57,137
NON No Lawns & Planting Yes $ - $ 1,448,920 $ 1,427,551
NON No HVAC Systems Yes $ - $ 6,727 $ 6,593
$ 1,007,250 $ 13,772,898 $ 13,551,421
$ - $ 209,334 $ 209,121
Non-MWL Tier II Total $ 1,007,250 $ 13,563,564 $ 13,342,300
0% 1% 1%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
Intricate Construction
Island Acoustics
RCC Concrete Corp
Skanska
Skanska
Steven Dubner Landscaping Inc
WDF Inc
Siemens Industry Inc
Elite Floors Inc
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Cassone Leasing Inc
Creative Construction
Eddington Security Inc
EJ/Egg Electric JV - (Egg Electric Inc)
NON:
ASR Electrical Contracting Inc
Eagle One Roofing Contractors Inc
EJ/Egg Electric JV - (EJ Electric)
The McKissack Group Inc
MFM Contracting Corp
EJ/Egg Electric JV - (EJ Electric)
MFM Contracting Corp
In Progress
Lend Lease US Construction LMB Construction Management
Fine Painting & Decorating Company Inc
Elite Interiors Systems Inc
Johnson Security Bureau Inc
EJ/Egg Electric JV - (Egg Electric Inc)
Elite Interiors Systems Inc
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Open Space
Construction Management
COMPANY (Tier I)
Name Trade
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018
58
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 7/10/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 7,650,000 $ 8,673,762 $ 8,499,402
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Demolition Yes $ 100,000 $ 160,000 $ 159,797
W-ESD No Containers Yes $ 50,000 $ 19,125 $ 19,125
M-ESD No Trucking Yes $ 50,000 $ 50,000 $ 40,398
M-ESD No Plumbing Yes $ 680,000 $ 750,000 $ 713,952
W-ESD No F&I Natural Stone Yes $ 225,000 $ 241,332 $ 219,601
L No Concrete Yes $ 200,000 $ 287,200 $ 287,200
W No F&I Metal Deck Fence Yes $ 220,000 $ 310,000 $ 309,365
$ 1,525,000 $ 1,817,657 $ 1,749,438
$ 1,525,000 $ 1,817,657 $ 1,749,438
Non-MWL Tier III Total $ - $ - $ -
20% 21% 21%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Intricate Construction Open Space
Site Work
450 Commerce St, Hawthorne, NY 10532 914-769-1200
12/31/2018 In Progress
COMPANY (Tier II)
Westchester Metal Works Inc
Intricate Construction Site Work
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Gateway Demo/Civil Corp
Rizzo Environmental Services Corp
Blackridge Construction LLC
Cardoza Plumbing
Miller Druck Specialty Contracting
Casa Redimix
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
59
GC/CM: Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II Intricate Construction 15,339 47% 0 0% 0 0% 0 0% 280 1% 0 0% 0 0% 15,619 48% 16,939 52% 32,557 67 47% 77 53% 144
Sitework
* MFM Contracting Corp 2,195 59% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,195 59% 1,500 41% 3,695 10 43% 13 57% 23
Utilities
* Steven Dubner 1,587 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,587 100% 0 0% 1,587 22 100% 0 0% 22
Lawns & Planting
19,121 0 0 0 280 0 0 19,401 18,438 37,839 99 90 189
51% 0% 0% 0% 1% 0% 0% 51% 49% 100% 52% 48% 100%
Contractor Start
Intricate Construction 7/11/2010
MFM Contraction Corp 2/4/2010
Steven Dubner 8/2/2016
Total MWL Non-MWL Total MWL Non-MWL
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
Total Hours
Overall % of Total
In Progress
Open SpaceSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
60
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II Intricate Construction 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Sitework
* MFM Contracting Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Utilities
* Steven Dubner 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Lawns & Planting
0 0 0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
* Denotes active contractors
Open SpaceSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
61
Lenfest
62
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 852,495
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No General Contractor Yes $ - $ 60,085 $ 60,085
L No Electrical Yes $ - $ 123 $ 123
W No Printing Service Yes $ - $ 59,662 $ 59,662
Izzo Construction WL-ESD No General Contractor Yes $ - $ 23,092 $ 23,092
L No Telecommunications Conduit Installation Yes $ - $ 7,971 $ 7,971
MWL-ESD No Cleaning Yes $ - $ 2,221 $ 2,221
W No Signage Yes $ - $ 57 $ 57
L No Plumbing Yes $ - $ 226 $ 226
NON No General Contractor Yes $ - $ 8,858 $ 8,858
NON No Safeway Fire - Monitoring Yes $ - $ 2,526 $ 2,526
NON No Materials & Equipment Yes $ - $ 277,566 $ 277,566
Bear Communications NON No AV/Cable/Telecom Yes $ - $ 25,188 $ 25,188
From the Source NON No Furniture Yes $ - $ 8,410 $ 8,410
NON No Doors & Windows Yes $ - $ 46 $ 46
NON No Materials & Equipment Yes $ - $ 138,907 $ 138,907
NON No Telecommunication Yes $ - $ 2,682 $ 2,682
NON No Materials & Equipment Yes $ - $ 199,756 $ 199,756
NON No Materials & Equipment Yes $ - $ 35,119 $ 35,119
$ - $ 852,495 $ 852,495
$ - $ 153,437 $ 153,437
Non-MWL Direct Spend Total $ - $ 699,058 $ 699,058
0% 18% 18%
Date: 12/31/2018
The Sign Works Inc
Staging Concepts Acquisition
Watsons Plumbing and Heating
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
Scrub Clean Maintenance Corp
SOS Locksmith Corp
275 Technology Solutions dba Safeway Fire & Protection
Company
Barbizon Elec Co Inc
StarCom Communications Service
Temporary Walls Incorporated
United Rentals North America Inc
NON:
Advance Relocation & Storage
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Lenfest
MFM Contracting Corp
410 West 118th Street, NY, NY 10027
Green Girl Printing and Messenger Inc
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
CitiStructure
Doumas Electric Inc
63
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 71,074,238
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ - $ 81,965,260 $ 71,074,238
$ - $ 81,965,260 $ 71,074,238
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 81,965,260 $ 71,074,238
0% 0% 0%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Lenfest
64
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 81,965,260 $ 71,074,238
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Ceramic Tile Yes $ - $ 183,880 $ 183,880
W-ESD No Masonry Yes $ - $ 162,261 $ 162,261
M-ESD No Safety Equipment Yes $ - $ 349,861 $ 349,861
M-ESD No Drywall Yes $ - $ 14,074 $ 14,074
M-ESD No Drywall Yes $ - $ 50,000 $ 50,000
W-ESD No Identifying Devices Yes $ - $ 105,688 $ 105,688
MW-ESD No Security Yes $ - $ 226,668 $ 226,668
W-ESD Yes Electrical Yes $ - $ 241,806 $ 238,098
W-ESD Yes Electrical Yes $ - $ 2,737 $ 2,737
W-ESD Yes Street Structures Yes $ - $ 1,223 $ 1,223
L No Resilient Flooring & Base Yes $ - $ 941 $ 941
L No Drywall Yes $ - $ 369 $ 369
M-ESD No Painting & Instrumentation Yes $ - $ 701,939 $ 701,939
M-ESD No Paint & Coatings Yes $ - $ 402,380 $ 402,283
L No Plumbing Yes $ - $ 1,161,884 $ 1,161,884
MWL-ESD No Security Yes $ - $ 279,886 $ 279,886
M No Scaffolding Yes $ - $ 229,918 $ 229,918
L No Utilities Yes $ - $ 322,007 $ 310,600
L No Electrical Yes $ - $ 8,820 $ 5,650
M-ESD No Fire Protection Systems Yes $ - $ 787,911 $ 787,911
MWL-ESD No Construction Management Yes $ - $ 1,231,117 $ 1,231,117
W No Metal Stairs Yes $ - $ 703,000 $ 703,000
W No Miscellaneous Metal Yes $ - $ 1,848,673 $ 1,848,673
NON No Toilet Partitions & Screens Yes $ - $ 38,780 $ 38,780
NON No Electrical Yes $ - $ 11,338,958 $ 11,338,958
NON No Glass & Glazing Yes $ - $ 459,760 $ 459,760
NON No Snorkel Yes $ - $ 90,000 $ 90,000
NON No Millwork Yes $ - $ 45,924 $ 45,924
NON No Superstructure Steel Yes $ - $ 11,334,322 $ 11,334,322
NON No Masonry Yes $ - $ 1,639 $ 1,639
NON No Waterproofing & Roofing Yes $ - $ 452,211 $ 452,211
NON No Scaffolding Yes $ - $ 181,323 $ 181,303
NON Yes Electrical Yes $ - $ 362,708 $ 357,148
NON Yes Electrical Yes $ - $ 4,106 $ 4,106
Commodore Construction Corporation
Sirina Fire Protection Corp
Westchester Metal Works Inc
Champion Metal & Glass Inc
ASR Electrical Contracting Inc
Eagle One Roofing Contractors Inc
Eagle Scaffolding Services Inc
Champion Metal & Glass Inc
Cives Corp
EJ/Egg Electric JV - (Egg Electric Inc)
EJ/Egg Electric JV - (Egg Electric Inc)
MFM Contracting Corp
Westchester Metal Works Inc
COMPANY (Tier I)
Construction Management
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018 In Progress
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Lenfest
Trade
Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Lend Lease US Construction LMB
Name
EJ/Egg Electric JV - (Egg Electric Inc)
Elite Interiors Systems Inc
MFM Contracting Corp
EJ/Egg Electric JV - (Egg Electric Inc)
Giachetti Plumbing
EJ/Egg Electric JV - (Egg Electric Inc)
Fine Painting & Decorating Company Inc
3L & Company Inc
Commodore Construction Corporation
Creative Construction
Creative Construction
Creative Construction
Crown Sign Systems Inc
Johnson Security Bureau Inc
Champion Metal & Glass Inc
Eddington Security Inc
Fine Painting & Decorating Company Inc
A Liss & Company Inc
NON:
The McKissack Group Inc
Elite Interiors Systems Inc
Metropolitan Enterprises Inc
65
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 81,965,260 $ 71,074,238
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
COMPANY (Tier I)
Construction Management
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018 In Progress
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Lenfest
Trade
Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Lend Lease US Construction LMB
Name
NON Yes Street Structures Yes $ - $ 1,834 $ 1,834
NON No Resilient Flooring & Base Yes $ - $ 4,059 $ 4,059
NON No Electrical Yes $ - $ 289,895 $ 275,400
NON No Electrical Yes $ - $ 5,304 $ 5,250
NON No HVAC Systems Yes $ - $ 1,565,586 $ 1,451,251
NON No Hoist / Bridges / Scaffold Yes $ - $ 134,000 $ 134,000
NON No Raised Access Flooring Yes $ - $ 177,727 $ 177,727
NON No Street Structures Yes $ - $ 26,374 $ 26,374
NON No Drywall Yes $ - $ 84,064 $ 84,064
NON No Window Treatment / Blinds Yes $ - $ 249,760 $ 249,760
NON No Safety Equipment Yes $ - $ 188,000 $ 188,000
NON No Elevators Yes $ - $ 1,281,830 $ 1,281,830
NON No Spray Fireproofing Yes $ - $ 666,750 $ 666,750
NON No Millwork Yes $ - $ 1,220,222 $ 1,220,222
NON No Fluid-Applied Flooring Yes $ - $ 183,945 $ 183,945
NON No Above Grade Concrete Yes $ - $ 2,030,298 $ 2,030,298
NON No Resilient Flooring & Base Yes $ - $ 755,165 $ 755,165
NON No Rough Carpentry Yes $ - $ 4,176 $ 4,176
NON No HVAC Systems Yes $ - $ 5,485 $ 5,485
NON No Street Structures Yes $ - $ 841,207 $ 841,207
NON No HVAC Systems Yes $ - $ 11,267,648 $ 11,267,648
NON No Structural Modifications Yes $ - $ 111,573 $ 111,573
NON No Demolition Yes $ - $ 18,487 $ 18,487
NON No Hoist Yes $ - $ 203,592 $ 203,592
NON No HVAC Systems Yes $ - $ 39,245 $ 38,460
NON No Theater & Stage Equipment Yes $ - $ 167,678 $ 167,678
NON No Drywall Yes $ - $ 5,708,942 $ 5,708,942
$ - $ 60,559,620 $ 60,405,989
$ - $ 9,017,043 $ 8,998,661
Non-MWL Tier II Total $ - $ 51,542,577 $ 51,407,328
0% 11% 13%
Date: 12/31/2018
NON:
Platinum Terrazzo
Re:Source New Jersey
PAL Environmental Safety Corp
Elite Floors Inc
Five Star Electric Corp
H.S.E. System Inc
Forest Electric
Hi Tech Data Floors Inc
Nets That Work
Otis Elevator Company
Fresh Meadow Mechanical Corp
Intricate Construction
Island Acoustics
EJ/Egg Electric JV - (Egg Electric Inc)
Re:Source New Jersey
Skanska
RCC Concrete Corp
Siemens Industry Inc
PGS Millwork Inc
LVC Interiors Inc
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier I
Tier II Grand Total
MWL Tier II Total
Whalen Berez Group
Woodworks Construction Co Inc
Trystate Mechanical Inc
United Drilling & Cutting Corp
United Drilling & Cutting Corp
Universal Builders Supply
WDF Inc
66
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 11,150,000 $ 11,334,322 $ 11,334,322
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Field Bolts Yes $ 387,460 $ 140,709 $ 140,709
$ 387,460 $ 140,709 $ 140,709
$ 387,460 $ 140,709 $ 140,709
Non-MWL Tier III Total $ - $ - $ -
3% 1% 1%
Date: 12/31/2018
Structural Steel
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Cives Corp Lenfest
8 Church Street, Gouverneur, NY 13642 315-287-2200
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Cives Corp Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Baco Enterprises Inc
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
67
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,837,000 $ 2,030,298 $ 2,030,298
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Concrete Ready Mix Supplier Yes $ 153,600 $ 136,969 $ 136,969
L No Rebar & Wire Mesh Supplier Yes $ 40,000 $ 28,200 $ 28,200
W No Lumper (Metal Lathing) Yes $ - $ 76,100 $ 68,490
NON No Rebar & Wire Mesh Supplier Yes $ 30,000 $ 34,578 $ 34,116
$ 223,600 $ 275,847 $ 267,775
$ 193,600 $ 241,269 $ 233,659
Non-MWL Tier III Total $ 30,000 $ 34,578 $ 34,116
11% 12% 12%
Date: 12/31/2018
Concrete Construction
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
RCC Concrete Corp Lenfest
NYCON Readimix
74 State Street - 2nd Floor Westbury, NY 11590 516-279-6787
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
RCC Concrete Corp Concrete Construction
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
CFS Steel Co
B.P. Precise Construction Corp
NON:
Reinforcing Supply
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
68
Schedule M3
CM Name:
Company Name: Giachetti Plumbing Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No $ 1,090,000 $ 1,161,884 $ 1,161,884
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Insulation Yes $ 43,400 $ 43,400 $ 43,400
$ 43,400 $ 43,400 $ 43,400
$ 43,400 $ 43,400 $ 43,400
Non-MWL Tier III Total $ - $ - $ -
4% 4% 4%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
County Insulation
58 Tiemann Place New York, NY 10027 646-532-3696
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Giachetti Plumbing Plumbing
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Plumbing
69
Schedule M3
CM Name:
Company Name: PGS Millwork Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,155,797 $ 1,220,222 $ 1,220,222
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Fabric Wrapped Acoustical Panels Yes $ 20,000 $ 11,215 $ 11,215
NON No Veneered Acoustical Planks Yes $ 90,000 $ 72,980 $ 72,980
NON No Installation Yes $ 155,000 $ 146,250 $ 146,250
NON No Door Yes $ 350 $ 689 $ 689
NON No Metalwork Yes $ 6,000 $ 6,810 $ 6,810
NON No Corian Countertops Yes $ 13,000 $ 34,700 $ 34,700
NON No Steel in Wall Supports Yes $ 6,000 $ 6,605 $ 6,605
NON No Plastic Laminate Millwork Yes $ 63,000 $ 73,392 $ 73,392
NON No Prime Base and Solid Oak Base Yes $ 4,000 $ 4,302 $ 4,302
NON No Bamboo Millwork Yes $ 15,000 $ 13,647 $ 13,647
$ 372,350 $ 370,590 $ 370,590
$ - $ - $ -
Non-MWL Tier III Total $ 372,350 $ 370,590 $ 370,590
0% 0% 0%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Architectural Millwork
32 Hickory Lane, Hudson, NY 12534 518-828-2608
12/31/2018 In Progress
COMPANY (Tier II)
Phoenix Cabinetry
PGS Millwork Inc Architectural Millwork
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Conwed/Wall Techonology
Decoustics
Supreme Woodwork Installation
VT Industries
Universal Metalcraftsman
Solid Surface Craftsman
Lewis Lumber
Wright Architectural Millwork
VM Choppy
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
70
Schedule M3
CM Name:
Company Name: Champion Metal & Glass Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 501,410 $ 595,684 $ 595,684
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Supply Silicone Yes $ 153 $ 153 $ 153
$ 153 $ 153 $ 153
$ 153 $ 153 $ 153
Non-MWL Tier III Total $ - $ - $ -
0% 0% 0%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Architectual Ornamental Metal & Glass
130 Motor Parkway, Hauppauge, NY 11788 631-254-2560
12/31/2018 In Progress
COMPANY (Tier II)
Champion Metal & Glass Inc Architectual Ornamental Metal & Glass
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Park Avenue Building & Roofing Supplies LLC
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
71
Schedule M3
CM Name:
Company Name: Woodworks Construction Co Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 5,708,942 $ 5,708,942 $ 5,708,942
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Doors, Frames & Hardware Supplier Yes $ 274,000 $ 293,375 $ 293,375
M-ESD No Material Supplier of Drywall, Insulation, &
Metal Studs
Yes $ 1,000,000 $ 484,622 $ 484,622
$ 1,274,000 $ 777,997 $ 777,997
$ 1,274,000 $ 777,997 $ 777,997
Non-MWL Tier III Total $ - $ - $ -
22% 14% 14%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
Park Avenue Building & Roofing Supplies LLC
JC Ryan EBCO/H&G LLC
322 8th Ave, Suite 701 New York, NY 10001 212-888-7311
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Woodworks Construction Co Inc Carpentry / Drywall
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Carpentry / Drywall
72
Schedule M3
CM Name:
Company Name: LVC Interiors Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 249,760 $ 249,760 $ 249,760
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Shade Manufacturer Yes $ 178,927 $ 178,927 $ 178,927
NON No Shade Manufacturer Yes $ 2,881 $ 2,881 $ 2,881
$ 181,808 $ 181,808 $ 181,808
$ - $ - $ -
Non-MWL Tier III Total $ 181,808 $ 181,808 $ 181,808
0% 0% 0%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
WT Shades
Mecho Shade Systems
345 Harrison Avenue, Garfield NJ 07026 201-525-0222
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
LVC Interiors Inc Window Treatment / Blinds
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Window Treatment / Blinds
73
Schedule M3
CM Name:
Company Name: Trystate Mechanical Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 10,226,340 $ 11,267,648 $ 11,267,648
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Sheetmetal Yes $ 2,420,000 $ 2,585,000 $ 2,462,871
W No Rigging Yes $ 93,500 $ 93,500 $ 93,500
NON No Insulation Yes $ 240,000 $ 385,000 $ 369,054
NON No Testing Balancing Yes $ 56,000 $ 85,000 $ 85,000
NON No Testing Balancing Yes $ 39,550 $ 39,550 $ 37,595
NON No ATC Yes $ 1,800,000 $ 1,736,543 $ 1,736,543
NON No Ductcleaning Yes $ 15,000 $ 2,156 $ 2,156
$ 4,664,050 $ 4,926,749 $ 4,786,719
$ 2,513,500 $ 2,678,500 $ 2,556,371
Non-MWL Tier III Total $ 2,150,550 $ 2,248,249 $ 2,230,348
25% 24% 23%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
Shadow Transport
NON:
Atlantic Contracting
Ht Lyons Contractors
Independent Testing Balancing
Siemens Industry Inc
Techclean
Celtic Sheetmetal Inc
241-02 Northern Blvd, 2nd Floor, Douglaston, NY 11362 718-819-8844
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Trystate Mechanical Inc HVAC Systems
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
HVAC Systems
74
Schedule M3
CM Name:
Company Name: 3L & Company Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W No $ 183,880 $ 183,880 $ 183,880
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Ceramic Installation Yes $ 75,000 $ 75,000 $ 75,000
$ 75,000 $ 75,000 $ 75,000
$ - $ - $ -
Non-MWL Tier III Total $ 75,000 $ 75,000 $ 75,000
0% 0% 0%
Date: 12/31/2018
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Ceramic Tile
VAL Floors
241-02 Northern Blvd, 2nd Floor, Douglaston, NY 11362 718-819-8844
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
3L & Company Inc Ceramic Tile
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
75
Schedule M3
CM Name:
Company Name: ASR Electrical Contracting Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2013 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 11,338,958 $ 11,338,958 $ 11,338,958
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Electrical Material Yes $ 30,000 $ 29,182 $ 29,182
$ 30,000 $ 29,182 $ 29,182
$ 30,000 $ 29,182 $ 29,182
Non-MWL Tier III Total $ - $ - $ -
0% 0% 0%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
Turtle & Hughes
207 Newton Rd, Plainview, NY 11803 516-420-0101
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
ASR Electrical Contracting Inc Electrical
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Lenfest
Electrical
76
GC/CM: Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II 3L & Company Inc 85 8% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 85 8% 997 92% 1,082 1 17% 5 83% 6
Ceramic Tile
* ASR Electric 20,476 30% 0 0% 0 0% 1,157 2% 0 0% 0 0% 0 0% 21,633 31% 47,738 69% 69,371 26 33% 54 68% 80
Electrical
* Champion Metal 232 14% 0 0% 0 0% 0 0% 8 0% 0 0% 0 0% 240 15% 1,415 85% 1,655 3 20% 12 80% 15
Glass & Glazing, Snorkel, Millwork
* Cives 9,239 25% 1,034 3% 0 0% 0 0% 0 0% 0 0% 0 0% 10,273 27% 27,165 73% 37,437 23 26% 66 74% 89
Structural Metals
* Commodore 608 46% 0 0% 0 0% 0 0% 80 6% 0 0% 0 0% 688 52% 635 48% 1,323 5 56% 4 44% 9
Masonry
* Creative Construction Services 606 21% 0 0% 0 0% 682 24% 282 10% 0 0% 126 4% 1,695 60% 1,123 40% 2,818 16 89% 2 11% 18
Safety Equipment
* Eagle Scaffolding 752 57% 0 0% 0 0% 0 0% 3 0% 0 0% 0 0% 755 57% 569 43% 1,324 15 65% 8 35% 23
Scaffolding, Waterproofing & Roofing
* Fine Painting & Decorating Company Inc 4,225 72% 0 0% 0 0% 0 0% 214 4% 0 0% 0 0% 4,439 75% 1,453 25% 5,892 23 79% 6 21% 29
Painting & Instrumentation
* Giachetti Plumbing & Heating Corp. 1,807 21% 88 1% 0 0% 0 0% 0 0% 0 0% 0 0% 1,895 22% 6,822 78% 8,717 5 16% 27 84% 32
Plumbing
* LVC Interiors Inc 14 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 14 100% 0 0% 14 1 100% 0 0% 1
Window Treatment / Blinds
* Metropolitan Enterprises 1,193 51% 0 0% 0 0% 0 0% 135 6% 0 0% 0 0% 1,328 57% 1,017 43% 2,345 37 76% 12 24% 49
Hoist/Bridges/Scaffold
* Nets That Work 183 46% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 183 46% 211 54% 394 3 30% 7 70% 10
Safety Equipment
* Otis Elevators 2,323 27% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,323 27% 6,153 73% 8,476 4 15% 23 85% 27
Elevators
* PAL Environmental 780 39% 0 0% 0 0% 0 0% 24 1% 0 0% 0 0% 804 40% 1,208 60% 2,012 11 42% 15 58% 26
Spray Fireproofing
* PGS Millwork 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 17 100% 17 0 0% 1 100% 1
Millwork
* Platinum Terrazzo, Inc. 263 52% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 263 52% 247 48% 510 4 57% 3 43% 7
Fluid-Applied Flooring
* RCC Concrete Corp 4,057 43% 24 0% 24 0% 0 0% 0 0% 0 0% 0 0% 4,105 44% 5,244 56% 9,348 39 30% 90 70% 129
Above Grade Concrete
* Re:Source New Jersey 341 16% 0 0% 0 0% 281 13% 0 0% 0 0% 0 0% 622 29% 1,501 71% 2,123 4 27% 11 73% 15
Resilient Flooring & Base
* Sirina Fire Protection Corp 2,990 79% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 2,990 79% 810 21% 3,800 7 30% 16 70% 23
Fire Protection Systems
* Trystate Burns Mechanical 6,230 15% 272 1% 48 0% 80 0% 40 0% 0 0% 0 0% 6,670 16% 35,062 84% 41,732 26 29% 64 71% 90
HVAC Systems
* United Drilling 972 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 972 100% 0 0% 972 3 100% 0 0% 3
Drilling
* Westchester Metal Works 5,426 62% 0 0% 0 0% 35 0% 1,990 23% 0 0% 0 0% 7,451 85% 1,352 15% 8,803 20 63% 12 38% 32
Metal Stairs
* Woodworks Construction 25,413 71% 0 0% 1,280 4% 0 0% 1,770 5% 0 0% 0 0% 28,463 79% 7,536 21% 35,998 30 71% 12 29% 42
Drywall
Total Hours 88,213 1,418 1,352 2,235 4,545 0 126 97,889 148,272 246,160 306 450 756
Overall % of Total 36% 1% 1% 1% 2% 0% 0% 40% 60% 100% 40% 60% 100%
Contractor Start
3L & Company Inc 8/7/2016
ASR Electric 6/24/2015
Champion Metal 12/7/2016
Cives 5/2/2014
Commodore 2/2/2016
Creative Construction Services 10/11/2014
Eagle Scaffolding 5/30/2016
Fine Painting & Decorating Company Inc 6/7/2015
Giachetti Plumbing & Heating Corp. 12/23/2014
LVC Interiors Inc 7/22/2017
Metropolitan Enterprises 7/20/2014
Nets That Work 10/14/2014
Otis Elevators 8/28/2015
PAL Environmental 1/18/2015
PGS Millwork 7/1/2017
Platinum Terrazzo, Inc. 9/3/2016
RCC Concrete Corp 9/2/2014
Re:Source New Jersey 8/28/2016
Sirina Fire Protection Corp 8/19/2014
Trystate Burns Mechanical 6/2/2015
United Drilling 4/3/2014
Westchester Metal Works 7/25/2014
Woodworks Construction 5/19/2015
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
* Denotes active contractors
LenfestSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
77
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II 3L & Company Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Ceramic Tile
* ASR Electric 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Electrical
* Champion Metal 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Glass & Glazing, Snorkel, Millwork
* Cives 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Structural Metals
* Commodore 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Masonry
* Creative Construction Services 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Safety Equipment
* Eagle Scaffolding 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Scaffolding, Waterproofing & Roofing
* Fine Painting & Decorating Company Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Painting & Instrumentation
* Giachetti Plumbing & Heating Corp. 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Plumbing
* LVC Interiors Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Window Treatment / Blinds
* Metropolitan Enterprises 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Hoist/Bridges/Scaffold
* Nets That Work 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Safety Equipment
* Otis Elevators 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Elevators
* PAL Environmental 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Spray Fireproofing
* PGS Millwork 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Millwork
* Platinum Terrazzo, Inc. 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Fluid-Applied Flooring
* RCC Concrete Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Above Grade Concrete
* Re:Source New Jersey 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Resilient Flooring & Base
* Sirina Fire Protection Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Fire Protection Systems
* Trystate Burns Mechanical 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
HVAC Systems
* United Drilling 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Drilling
* Westchester Metal Works 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Metal Stairs
* Woodworks Construction 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Drywall
0 0 0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
LenfestSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
78
University Forum
79
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 601,134
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W No Printing Service Yes $ - $ 17,389 $ 17,389
NON No Safeway Fire - Monitoring Yes $ - $ 1,295 $ 1,295
NON No Service Yes $ - $ 2,250 $ 2,250
NON No Furniture Yes $ - $ 573,734 $ 573,734
NON No Electrical Yes $ - $ 6,466 $ 6,466
$ - $ 601,134 $ 601,134
$ - $ 17,389 $ 17,389
Non-MWL Direct Spend Total $ - $ 583,745 $ 583,745
0% 3% 3%
Date: 12/31/2018
275 Technology Solutions dba Safeway Fire & Protection
Company
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University University Forum
NON:
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Green Girl Printing and Messenger Inc
Barbizon Elec Co Inc
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
Empire Off Inc
Live Wire Electric 1 LLC
80
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 74,033,230
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ 69,564,624 $ 74,033,230 $ 74,033,230
$ 69,564,624 $ 74,033,230 $ 74,033,230
$ - $ - $ -
Non-MWL Direct Spend Total $ 69,564,624 $ 74,033,230 $ 74,033,230
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University University Forum
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Skanska
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
81
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,303,418 $ 1,239,110
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ - $ 1,239,110 $ 1,239,110
$ - $ 1,239,110 $ 1,239,110
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 1,239,110 $ 1,239,110
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University University Forum
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
82
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 69,564,624 $ 74,033,230 $ 74,033,230
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Electric Yes $ 7,109,178 $ 8,239,524 $ 7,764,135
M-ESD No Electric Yes $ 4,144,000 $ 4,144,000 $ 3,857,237
M-ESD No Masonry Yes $ 1,200,000 $ 1,150,000 $ 1,075,265
M-ESD No Tiling Yes $ 310,000 $ 321,193 $ 282,263
L No Plumbing Yes $ 1,162,300 $ 1,264,836 $ 1,145,840
W-ESD No Electrical Equipment Yes $ 249,460 $ 272,710 $ 228,879
W-ESD No Signage Yes $ 144,643 $ 217,793 $ 98,203
W-ESD No Toilet Accessories Yes $ 48,810 $ 48,810 $ 38,405
NON No Access Flooring Yes $ 174,000 $ 198,282 $ 178,454
NON No Metal Panels Yes $ 470,000 $ 470,000 $ 334,746
NON No Roofing Yes $ 1,200,000 $ 1,302,899 $ 1,169,377
NON No Interior Glass Yes $ 845,000 $ 841,925 $ 781,960
NON No Millwork Yes $ 5,000,000 $ 6,112,124 $ 5,296,390
NON No Fire Protection Yes $ 565,000 $ 565,000 $ 532,084
NON No Structural Steel Yes $ 4,497,000 $ 6,844,219 $ 6,673,113
NON No Window Treatment Yes $ 237,500 $ 243,969 $ 212,129
NON No Plumbing Yes $ 8,000 $ 11,328 $ 11,328
NON No Painting Yes $ 280,000 $ 393,817 $ 305,140
NON No Polished Concrete Yes $ 365,000 $ 365,000 $ 216,607
NON No HVAC Equipment Yes $ 327,000 $ 327,000 $ 271,226
NON No Millwork Yes $ 298,000 $ 455,568 $ 403,621
NON No Spray on Thermal & Fire Proof Yes $ 387,000 $ 387,000 $ 342,977
NON No Auditorium Yes $ 250,000 $ 250,000 $ 219,015
NON No Doors, Frames & Hardware Yes $ 161,000 $ 221,347 $ 206,208
NON No Elevators Yes $ 1,869,000 $ 2,049,294 $ 1,794,009
NON No Flooring Yes $ 310,000 $ 362,345 $ 316,783
NON No Excavation/Foundation Yes $ 9,542,100 $ 9,994,137 $ 9,492,627
NON No Elevated Slabs on Deck Yes $ 1,038,000 $ 1,175,260 $ 1,064,226
NON No Misc Metals Yes $ 1,129,413 $ 1,416,835 $ 1,259,842
NON No HVAC Yes $ 6,697,000 $ 7,021,570 $ 6,647,747
NON No Epoxy Flooring Yes $ 17,920 $ 17,920 $ 16,128
NON No Wood Flooring Yes $ 310,000 $ 315,045 $ 244,121
NON No Interior Glass Partitions Yes $ 655,000 $ 750,740 $ 629,810
NON No Overhead Doors Yes $ 230,000 $ 230,000 $ 190,575
NON No Final Cleaning Yes $ 129,350 $ 129,350 $ 98,415
NON No Food Service Equipment Yes $ 80,198 $ 80,198 $ 56,404
NON No Landscaping Yes $ 389,500 $ 389,500 $ 287,325
$ 51,830,372 $ 58,580,538 $ 53,742,614
$ 14,368,391 $ 15,658,866 $ 14,490,227
Non-MWL Tier II Total $ 37,461,981 $ 42,921,672 $ 39,252,387
21% 21% 20%
Date: 12/31/2018
ARI Products Inc
Bamco Inc
Locker Lady
COMPANY (Tier I)
Construction Management Trades
659 West 131st Street, New York, NY 10027 347-918-7871
12/31/2018 In Progress
Name Trade
NON:
Skanska Construction Management
SUBCONTRACTORS (Tier II)
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska University Forum
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
A Tech Electric Enterprise Inc
Ashlar Construction LLC
Garcia Marble & Tile
Giachetti Plumbing & Heating
Turtle & Hughes
Crown Sign Systems Inc
A Tech Electric Enterprise Inc
Tier II Grand Total
Ruttura & Sons Co Inc
Ruttura & Sons Co Inc
Transcontinental Steel
Long Island Fireproof Door
Barrett Inc
Champion Metal & Glass Inc
Holden & Flynn Universal
Delphi Plumbing
Cord Contracting
Fromkin Brothers
Jezet Seating
MWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
United Air Conditioning
Nouveau Elevator Industries Inc
Pyramid Floor Covering Inc
McKeon Door East
Centron Enterprises
Haywood-Berk Floor
Modulo 3 Corporation DBA Unifor
Clean Tech
Singer Equipment Company Inc
Steven Dubner Landscaping Inc
Gil Bar Industries
Island Diversified
Current Fire Protection
Daniel Teutul DBA Orange County Iron Works
Decorating with Fabric
Fromkin Brothers
83
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 69,564,624 $ 74,033,230 $ 74,033,230
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Construction Management Yes $ - $ 897,872 $ 460,574
W-ESD No Vendor Yes $ - $ 2,684 $ 2,684
MW-ESD No Vendor Yes $ - $ 7,044 $ 7,044
W-ESD No Vendor Yes $ - $ 28,165 $ 28,165
MWL-ESD No Exteriminator Yes $ - $ 10,865 $ 10,865
MW-ESD No Security Yes $ - $ 418,739 $ 418,739
M-ESD No Scheduling Yes $ - $ 13,050 $ 13,050
M-ESD No Construction and Civil Engineering Yes $ - $ 337,003 $ 337,003
$ - $ 1,715,422 $ 1,278,124
$ - $ 1,715,422 $ 1,278,124
Non-MWL Tier II Total $ - $ - $ -
0% 2% 2%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska University Forum
Construction Management General Conditions
659 West 131st Street, New York, NY 10027 347-918-7871
12/31/2018 In Progress
COMPANY (Tier I)
Basu Technology Inc
Skanska Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Velez Organization
The Olympic Glove & Safety Co Inc
Deb Romain
Carter, Milchman & Frank
Pestrol Inc
Eddington Security Inc
JT Hicks Associates
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
84
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 1,303,418 $ 1,239,110
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Utilities Yes $ 1,277,929 $ 1,277,929 $ 1,103,502
L No Electrical Yes $ - $ 25,489 $ 22,940
$ 1,277,929 $ 1,303,418 $ 1,126,442
$ 1,277,929 $ 1,303,418 $ 1,126,442
Non-MWL Tier II Total $ - $ - $ -
0% 100% 91%
Date: 12/31/2018
COMPANY (Tier I)
Construction Management
622 West 132nd, 2nd fl, New York, NY 10027 347-918-7871
12/31/2018 In Progress
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease University Forum
Name Trade
Lend Lease Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
MFM Contracting Corp
MFM Contracting Corp
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
85
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 9,542,100 $ 9,994,137 $ 9,492,627
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
MW-ESD No Trucking/Disposal of Soil Yes $ 650,000 $ 820,719 $ 820,719
W-ESD No Rebar Detailer Yes $ 20,900 $ 28,020 $ 28,020
W-ESD No Dewatering Yes $ 1,000,000 $ 1,000,000 $ 683,491
M-ESD No Waterproofing Yes $ 328,600 $ 429,336 $ 407,903
W-ESD No Furnish/Install Rebar Yes $ 950,000 $ 1,253,810 $ 1,253,810
M-ESD No Main Switch Electrical Yes $ 25,000 $ 140,858 $ 133,815
Yes
NON No Equipment/Pump Rental Yes $ 51,000 $ 159,553 $ 159,553
NON No Concrete Supplier Yes $ 172,000 $ 550,582 $ 550,582
NON No Furnish/Install Temp. Fence Yes $ 157,036 $ 172,141 $ 172,141
NON No Supplier Yes $ 33,341 $ 36,571 $ 36,571
NON No Furnish/Install Piles Yes $ 185,500 $ 185,500 $ 185,500
NON No Furnish/Install Temp Water Svc Yes $ 43,400 $ 43,400 $ 41,230
NON No Furnish/Install DIP for Storm Yes $ 40,500 $ 62,100 $ 48,735
NON No Furnish/Install Tie-Backs Yes $ 276,000 $ 276,000 $ 262,200
$ 3,933,277 $ 5,158,590 $ 4,784,270
$ 2,974,500 $ 3,672,743 $ 3,327,758
Non-MWL Tier III Total $ 958,777 $ 1,485,847 $ 1,456,512
31% 37% 35%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
Moretrench American Corp
Madeline Lulley
AMG Demolition Inc
D Star Waterproofers
CGS Rebar Inc
A Tech Electric Enterprise Inc
NON:
Our Rental Corp
Jenna Concrete Corp
Eagle Fence
Tulnoy Lumber
Jet-Drive Contracting
Bancker Construction Corp
Metropolitan Sewer
Green Earth Solutions
200 Cabot Street, West Babylon, NY 11704 631-454-0291
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Ruttura & Sons Co Inc Excavation/Foundation
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Excavation/Foundation
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska
Ruttura & Sons Co Inc University Forum
86
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,038,000 $ 1,175,260 $ 1,064,226
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Install Rebar Yes $ 107,036 $ 107,036 $ 107,036
W-ESD No Rebar Detailer Yes $ 800 $ 1,480 $ 1,480
W-ESD No Pump Rental Yes $ 7,621 $ 14,643 $ 14,643
NON No Concrete Supplier Yes $ 99,478 $ 196,313 $ 196,313
NON No Rebar Supplier Yes $ 28,674 $ 29,046 $ 29,046
$ 243,609 $ 348,518 $ 348,518
$ 115,457 $ 123,159 $ 123,159
Non-MWL Tier III Total $ 128,152 $ 225,359 $ 225,359
11% 10% 12%
Date: 12/31/2018
Elevated Slabs on Deck
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska
Ruttura & Sons Co Inc University Forum
CGS Rebar Inc
200 Cabot Street, West Babylon, NY 11704 631-454-0291
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Ruttura & Sons Co Inc Elevated Slabs on Deck
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Madeline Lulley
Our RentalPumps
NON:
USC Jenna
Barker Steel
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
87
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 4,497,000 $ 6,844,219 $ 6,673,113
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Steel Supplier Yes $ 161,000 $ 230,000 $ 207,557
M-ESD No Trucking Yes $ 78,000 $ 110,000 $ 101,200
W-ESD No Steel Supplier Yes $ 10,000 $ 30,000 $ 27,657
M-ESD No Intumenscent Painting Yes $ 550,000 $ 555,900 $ 549,379
NON No Structural Steel Erection Yes $ 907,000 $ 3,003,341 $ 2,918,313
NON No Surveying Yes $ 30,000 $ 60,000 $ 53,042
$ 1,736,000 $ 3,989,241 $ 3,857,148
$ 799,000 $ 925,900 $ 885,793
Non-MWL Tier III Total $ 937,000 $ 3,063,341 $ 2,971,355
18% 14% 13%
Date: 12/31/2018
Fine Painting & Decorating Company Inc
Structural Steel
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska
Orange County Iron Works University Forum
The Steel Supply Co Inc
Contractors Line & Grade So LLC
Interstate Steel Sales Inc
36 Maybrook Road, Montgomery, NY 12549 845-769-3000
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Orange County Iron Works Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Speedway Transportation Inc
NON:
Gabriel Steel Erectors Inc
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
88
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 6,697,000 $ 7,021,570 $ 6,647,747
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Sheetmetal Yes $ 1,736,000 $ 1,736,000 $ 1,688,779
$ 1,736,000 $ 1,736,000 $ 1,688,779
$ 1,736,000 $ 1,736,000 $ 1,688,779
Non-MWL Tier III Total $ - $ - $ -
26% 25% 25%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska
United Air Conditioning University Forum
HVAC
27-20 Skillman Ave. Long Island City, NY 11101 718-893-6700
12/31/2018 In Progress
COMPANY (Tier II)
United Air Conditioning HVAC
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Center Sheet Metal
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
89
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 1,129,413 $ 1,416,835 $ 1,259,842
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Ironwork Yes $ 230,000 $ 626,046 $ 626,046
$ 230,000 $ 626,046 $ 626,046
$ 230,000 $ 626,046 $ 626,046
Non-MWL Tier III Total $ - $ - $ -
20% 44% 50%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska
Transcontinental Steel University Forum
Misc Metals
27-20 Skillman Ave. Long Island City, NY 11101 718-893-6700
12/31/2018 In Progress
COMPANY (Tier II)
Transcontinental Steel Misc Metals
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Anvil Iron Works
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
90
Schedule M3
CM Name:
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 12/1/2015 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 5,000,000 $ 6,112,124 $ 5,296,390
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W No Lather Yes $ 75,788 $ 84,898 $ 84,898
M-ESD No Accoustical Wall Panels Yes $ 41,370 $ 23,661 $ 23,661
W-ESD No Firestopping Yes $ 52,435 $ 71,857 $ 71,857
W No Taper Yes $ 181,311 $ 162,781 $ 162,781
M-ESD No Materials Yes $ - $ 192,919 $ 192,919
W No Materials Yes $ - $ 28,899 $ 28,899
$ 350,904 $ 565,015 $ 565,015
$ 350,904 $ 565,015 $ 565,015
Non-MWL Tier III Total $ - $ - $ -
7% 9% 11%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Skanska
Cord Contracting University Forum
Millwork
80 Crossways Park Drive, Ste. 300, Woodbury, NY 11797 516-626-8800
12/31/2018 In Progress
COMPANY (Tier II)
Cord Contracting Millwork
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Central Lathing
Eco Specialties
Hailey Insulation Corp
Linda Lee Construction
Park Avenue Building & Roofing Supplies LLC
City Lumber
Tier III Grand Total
MWL Tier III Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
91
GC/CM: Skanska
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II A Tech Electric Enterprises Inc 34,252 81% 0 0% 0 0% 1,336 3% 0 0% 0 0% 0 0% 35,588 84% 6,933 16% 42,521 39 72% 15 28% 54
Main Switch Electrical
* ARI Products 363 64% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 363 64% 202 36% 565 5 83% 1 17% 6
Access Flooring
* Ashlar Construction LLC 5,685 50% 7 0% 8 0% 0 0% 1,225 11% 0 0% 0 0% 6,924 61% 4,465 39% 11,389 32 68% 15 32% 47
Masonry
* Barrett 3,093 74% 0 0% 0 0% 0 0% 8 0% 0 0% 0 0% 3,101 74% 1,079 26% 4,180 40 77% 12 23% 52
Roofing
* Cord Contracting Co Inc 4,971 31% 0 0% 0 0% 0 0% 622 4% 0 0% 310 2% 5,903 37% 10,250 63% 16,152 17 26% 49 74% 66
Millwork
* Crown Sign Systems 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 8 100% 8 0 0% 1 100% 1
Signage
* Current Fire Protection Inc 1,471 42% 0 0% 0 0% 0 0% 42 1% 0 0% 0 0% 1,513 43% 1,967 57% 3,480 8 53% 7 47% 15
Fire Protection
* Eddington Security Inc 13,916 78% 0 0% 0 0% 0 0% 3,940 22% 0 0% 0 0% 17,856 100% 0 0% 17,856 36 100% 0 0% 36
Security
* Fromkin Brothers 1,678 42% 0 0% 113 3% 0 0% 16 0% 0 0% 0 0% 1,807 45% 2,169 55% 3,976 16 67% 8 33% 24
Painting
* Garcia Marble & Tile 1,628 96% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 1,628 96% 70 4% 1,698 9 90% 1 10% 10
Tiling
* Giachetti Plumbing & Heating Corp 1,793 24% 0 0% 0 0% 116 2% 0 0% 0 0% 0 0% 1,909 25% 5,593 75% 7,502 4 10% 37 90% 41
Plumbing
* McKeon Door East 240 67% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 240 67% 120 33% 360 6 86% 1 14% 7
Overhead Doors
* Orange County Ironworks, LLC 7,541 46% 0 0% 0 0% 183 1% 0 0% 0 0% 0 0% 7,724 47% 8,569 53% 16,293 32 38% 53 62% 85
Structural Steel
* Pyramid Floor Covering 175 65% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 175 65% 96 35% 271 2 29% 5 71% 7
Flooring* Ruttura & Sons 19,645 55% 163 0% 0 0% 0 0% 304 1% 0 0% 0 0% 20,112 56% 15,529 44% 35,640 115 45% 138 55% 253
Excavation/Foundation* Transcontinental Contracting Inc 3,763 86% 0 0% 0 0% 0 0% 113 3% 0 0% 0 0% 3,876 88% 515 12% 4,391 24 86% 4 14% 28
Misc Metals* United Air Conditioning Corp 5,528 56% 0 0% 0 0% 0 0% 171 2% 0 0% 0 0% 5,699 58% 4,159 42% 9,858 12 57% 9 43% 21
HVAC105,740 170 121 1,635 6,441 0 310 114,415 61,723 176,137 397 356 753
60% 0% 0% 1% 4% 0% 0% 65% 35% 100% 53% 47% 100%
Contractor Start
A Tech Electric Enterprises Inc 11/23/2016
ARI Products 4/16/2018
Ashlar Construction LLC 5/23/2017
Barrett 1/8/2017
Cord Contracting Co Inc 7/2/2017
Crown Sign Systems 6/30/2018
Current Fire Protection Inc 10/3/2017
Eddington Security Inc 8/17/2016
Fromkin Brothers 11/6/2017
Garcia Marble & Tile 3/18/2018
Giachetti Plumbing & Heating Corp 11/22/2016
McKeon Door East 5/11/2018
Orange County Ironworks, LLC 1/6/2017
Pyramid Floor Covering 8/7/2018
Ruttura & Sons 1/4/2016
Transcontinental Contracting Inc 5/21/2017
United Air Conditioning Corp 8/22/2017
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
Total Hours
In Progress
Overall % of Total
University ForumSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
92
GC/CM: Skanska
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier II A Tech Electric Enterprises Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Main Switch Electrical
* ARI Products 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Access Flooring
* Ashlar Construction LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Masonry
* Barrett 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Roofing
* Cord Contracting Co Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Millwork
* Crown Sign Systems 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Signage
* Current Fire Protection Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Fire Protection
* Eddington Security Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Security
* Fromkin Brothers 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Painting
* Garcia Marble & Tile 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Tiling
* Giachetti Plumbing & Heating Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Plumbing
* McKeon Door East 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Overhead Doors
* Orange County Ironworks, LLC 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Structural Steel
* Pyramid Floor Covering 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Flooring* Ruttura & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Excavation/Foundation
* Transcontinental Contracting Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Misc Metals
* United Air Conditioning Corp 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
HVAC
0 0 0 0 0 0 0 0 0 0 0 0 0
0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
* Denotes active contractors
University ForumSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
93
Phase 2 Below Grade
94
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 153,290
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
W-ESD No Pest Control Yes $ - $ 337 $ 337
L No Electrical Yes $ - $ 3,117 $ 3,117
W No Printing Service Yes $ - $ 3,178 $ 3,178
L No General Contractor Yes $ - $ 30,212 $ 30,212
WL-ESD No General Contractor Yes $ - $ 5,621 $ 5,621
MWL-ESD No Cleaning Yes $ - $ 86,243 $ 86,243
W No Signage Yes $ - $ 488 $ 488
L No Plumbing Yes $ - $ 1,731 $ 1,731
W-ESD No Air Conditioning Yes $ - $ 3,637 $ 3,637
NON No Security Systems Yes $ - $ 185 $ 185
NON No Waste Management Yes $ - $ 518 $ 518
NON No Doors & Windows Yes $ - $ 304 $ 304
NON No Telecommunication Yes $ - $ 17,719 $ 17,719
$ - $ 153,290 $ 153,290
$ - $ 134,564 $ 134,564
Non-MWL Direct Spend Total $ - $ 18,726 $ 18,726
0% 88% 88%
Date: 12/31/2018
Black Widow Termite & Pest Control Corp
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Phase 2 Below Grade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
12/31/2018 In Progress
OWNER
Doumas Electric Inc
Green Girl Printing and Messenger Inc
Scrub Clean Maintenance Corp
The Sign Works Inc
Watsons Plumbing and Heating
Izzo Construction Corp
King Rose of NY Inc
M & J Mechanical Corp
Name Trade
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
NON:
Access Control Technologies Inc
Action Carting Environmental Servic
SOS Locksmith Corp
StarCom Communications Service
95
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 167,207,685
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ - $ 167,207,685 $ 167,207,685
$ - $ 167,207,685 $ 167,207,685
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 167,207,685 $ 167,207,685
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Phase 2 Below Grade
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Lend Lease US Construction LMB
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
96
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 167,207,685 $ 167,207,685
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Excavation Yes $ - $ 66,007,211 $ 62,159,831
L No Foundation Yes $ - $ 78,558,265 $ 72,248,136
MW-ESD No Security Yes $ - $ 101,285 $ 101,285
MWL-ESD No Security Yes $ - $ 1,055,961 $ 1,055,961
The McKissack Group MWL-ESD No Construction Management Yes $ - $ 96,474 $ 96,474
M No Concrete Yes $ - $ 8,899,955 $ 4,993,931
NON No Structural Steel Yes $ - $ 15,388,617 $ 13,550,990
NON No Protection Yes $ - $ 425,000 $ 404,682
NON No Electrical Yes $ - $ 1,380,000 $ 1,150,875
$ - $ 171,912,768 $ 155,762,165
$ - $ 154,719,151 $ 140,655,618
Non-MWL Tier II Total $ - $ 17,193,617 $ 15,106,547
0% 93% 84%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease Phase 2 Below Grade
Construction Management
622 West 132nd, 2nd fl, New York, NY 10027 212-939-9580
12/31/2018 In Progress
COMPANY (Tier I)
Cives Corp
Lend Lease Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Civetta Cousins
Eddington Security Inc
Johnson Security Bureau Inc
NON:
Civetta Cousins
Roger & Sons Concrete Inc
Par Environmental Corp
ASR Electrical Contracting Inc
Tier II Grand Total
MWL Tier II Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier I
97
Schedule M3
CM Name:
Company Name: Civetta Cousins Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No $ 66,007,211 $ 66,007,211 $ 62,159,831
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Reinforcing Steel Supplier Yes $ 42,120 $ 107,809 $ 107,809
W-ESD No Reinforcing Steel Installation Yes $ 91,800 $ 123,827 $ 117,635
W No Saw Cutting & Core Drilling Yes $ 177,965 $ 203,798 $ 191,908
NON No Waterproofing Yes $ 177,900 $ 179,381 $ 152,105
NON No Electrical Contractor Yes $ 425,000 $ 508,235 $ 503,308
NON No Furnish & Installation of Deep Wells Yes $ 660,000 $ 849,688 $ 677,709
NON Yes Installation of Piles and Anchors Yes $ 12,500,000 $ 14,447,368 $ 13,988,516
$ 14,074,785 $ 16,420,106 $ 15,738,990
$ 311,885 $ 435,434 $ 417,352
Non-MWL Tier III Total $ 13,762,900 $ 15,984,672 $ 15,321,638
0% 1% 1%
Date: 12/31/2018
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
J&E Industries LLC
NON:
JJ Rosenberg Electrical Contractors
Moretrench American Corp
Moretrench / Hayward Baker Inc
Eagle One Roofing Contractors Inc
JP Hogan Coring
CFS Steel Co
1100 East 156th Street Bronx, NY 10474 718-991-5100
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Civetta Cousins Excavation
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Phase 2 Below Grade
Excavation
98
Schedule M3
CM Name:
Company Name: Civetta Cousins Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No $ 78,558,265 $ 78,558,265 $ 72,248,136
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Reinforcing Steel Supplier Yes $ 2,500,000 $ 2,500,000 $ 2,410,355
W-ESD No Reinforcing Steel Installation Yes $ 5,750,000 $ 5,750,000 $ 4,738,927
NON Yes Installation of Piles and Anchors Yes $ 24,000,000 $ 24,000,000 $ 22,307,500
NON No Electrical Contractor Yes $ 652,000 $ 745,817 $ 588,999
NON No Waterproofing Yes $ 3,300,000 $ 3,454,063 $ 1,616,887
$ 36,202,000 $ 36,449,880 $ 31,662,668
$ 8,250,000 $ 8,250,000 $ 7,149,282
Non-MWL Tier III Total $ 27,952,000 $ 28,199,880 $ 24,513,386
11% 11% 10%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Phase 2 Below Grade
Foundation
1100 East 156th Street Bronx, NY 10474 718-991-5100
12/31/2018 In Progress
COMPANY (Tier II)
Foundation
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
CFS Steel Co
J&E Industries LLC
NON:
Moretrench / Hayward Baker Inc
Civetta Cousins
JA Lee Electrical Services
Melric Systems Corp
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier II
Tier III Grand Total
MWL Tier III Total
99
Schedule M3
CM Name:
Company Name: Par Environmental Corp Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 425,000 $ 425,000 $ 404,682
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON Yes Concrete Masonry Fireproofing Yes $ 33,672 $ 33,672 $ 33,672
$ 33,672 $ 33,672 $ 33,672
$ - $ - $ -
Non-MWL Tier III Total $ 33,672 $ 33,672 $ 33,672
0% 0% 0%
Date: 12/31/2018
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Phase 2 Below Grade
Protection
Par Environmental Corp Protection
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
313 Spook Rock Road, Suffern, New York 10901 854-369-7500
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
NON:
Commodore Construction Corporation
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
100
Schedule M3
CM Name:
Company Name: Cives Corp Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 15,388,617 $ 15,388,617 $ 13,550,990
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Misc Steel Yes $ 500,000 $ 572,509 $ 541,342
W-ESD No Material Yes $ 1,750,000 $ 1,787,268 $ 1,779,435
NON No Steel Erection Yes $ 8,790,000 $ 8,790,000 $ 4,399,959
$ 11,040,000 $ 11,149,777 $ 6,720,736
$ 2,250,000 $ 2,359,777 $ 2,320,777
Non-MWL Tier III Total $ 8,790,000 $ 8,790,000 $ 4,399,959
15% 15% 17%
Date: 12/31/2018
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Phase 2 Below Grade
Structural Steel
Baco Enterprises Inc
8 Church Street, Gouverneur, NY 13642 315-287-2200
12/31/2018 In Progress
COMPANY (Tier II)
Name Trade
Cives Corp Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Commonwealth Metal Co
NON:
JF Stearns
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
101
Schedule M3
CM Name:
Company Name: Roger & Sons Concrete Inc Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 10/1/2016 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M No $ 8,899,955 $ 8,899,955 $ 4,993,931
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
M-ESD No Reinforcing Supply Yes $ 2,606,273 $ 2,606,273 $ 768,890
$ 2,606,273 $ 2,606,273 $ 768,890
$ 2,606,273 $ 2,606,273 $ 768,890
Non-MWL Tier III Total $ - $ - $ -
29% 29% 15%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Lend Lease
Phase 2 Below Grade
Concrete
1474 RT. 55 LAGRANGEVILLE, NY 12540 845-227-6033
12/31/2018 In Progress
COMPANY (Tier II)
Roger & Sons Concrete Inc Concrete
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Tonage Inc
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
102
GC/CM: Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 3,072 49% 1,313 21% 0 0% 0 0% 0 0% 0 0% 0 0% 4,385 69% 1,930 31% 6,314 9 75% 3 25% 12
Construction Management
* Tier II ASR Electrical Contracting Inc 545 15% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 545 15% 3,028 85% 3,572 4 16% 21 84% 25
Electrical
* Cives Steel 6,506 15% 0 0% 0 0% 8 0% 64 0% 0 0% 0 0% 6,578 15% 37,756 85% 44,334 28 24% 91 76% 119
Structural Steel
* Civetta Cousins JV 102,503 36% 2,192 1% 368 0% 2,568 1% 3,780 1% 0 0% 0 0% 111,411 39% 176,239 61% 287,649 231 39% 367 61% 598
Street Structures
* J D'Annunzio & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 40 100% 40 0 0% 2 100% 2
Utility
* Par Environmental Corporation 2,256 57% 0 0% 0 0% 16 0% 0 0% 0 0% 0 0% 2,272 57% 1,714 43% 3,986 19 56% 15 44% 34
Protection
* Roger & Sons 13,060 40% 29 0% 0 0% 176 1% 95 0% 0 0% 44 0% 13,404 41% 19,594 59% 32,998 119 44% 154 56% 273
Concrete
127,942 3,534 368 2,768 3,938 0 44 138,593 240,299 378,892 410 653 1,063
34% 1% 0% 1% 1% 0% 0% 37% 63% 100% 39% 61% 100%
Contractor Start
ASR Electrical Contracting Inc 12/6/2017
Cives Steel 10/8/2016
Civetta Cousins JV 10/8/2016
J D'Annunzio & Sons 12/29/2018
Par Environmental Corporation 5/7/2017
Roger & Sons 2/27/2018
Overall % of Total
Phase 2 Below GradeSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
Total Hours
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
In Progress
In Progress
In Progress
In Progress
In Progress
103
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 1,812 58% 529 17% 0 0% 0 0% 0 0% 0 0% 0 0% 2,340 75% 785 25% 3,125 0 0% 2 100% 2
Construction Management
* Tier II ASR Electrical Contracting Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Electrical
* Cives Steel 2,649 19% 0 0% 0 0% 0 0% 64 0% 0 0% 0 0% 2,713 20% 11,028 80% 13,741 19 25% 58 75% 77
Structural Steel
* Civetta Cousins JV 3,535 36% 0 0% 0 0% 0 0% 238 2% 0 0% 0 0% 3,773 38% 6,121 62% 9,894 27 38% 45 63% 72
Street Structures
* J D'Annunzio & Sons 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 40 100% 40 70 41% 102 59% 172
Utility
* Par Environmental Corporation 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Protection
* Roger & Sons 5,891 37% 29 0% 0 0% 56 0% 8 0% 0 0% 0 0% 5,984 38% 9,858 62% 15,842 9 82% 2 18% 11
Concrete
13,886 558 0 56 310 0 0 14,810 27,832 42,642 125 209 334
33% 1% 0% 0% 1% 0% 0% 35% 65% 100% 37% 63% 100%
Phase 2 Below GradeSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
104
Columbia Business School
105
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 21,542 $ 21,542
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Electrical Yes $ - $ 2,765 $ 2,765
W No Signs Yes $ - $ 3,923 $ 3,923
L No General Contractor Yes $ - $ 663 $ 663
MWL-ESD No Cleaning Yes $ - $ 14,191 $ 14,191
$ - $ 21,542 $ 21,542
$ - $ 21,542 $ 21,542
Non-MWL Direct Spend Total $ - $ - $ -
0% 100% 100%
Date: 12/31/2018
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Above Grade
410 West 118th Street, NY, NY 10027
12/31/2018 In Progress
OWNER
Name Trade
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Doumas Electric Inc
Green Girl Printing and Messenger Inc
King Rose of NY Inc
Scrub Clean Maintenance Corp
Direct Spend Grand Total
MWL Direct Spend Total
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Total
106
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 16,219,744 $ 16,219,744
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ - $ 16,219,744 $ 16,219,744
$ - $ 16,219,744 $ 16,219,744
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 16,219,744 $ 16,219,744
0% 0% 0%
Date: 12/31/2018
Columbia University Owner
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Above Grade
410 West 118th Street, NY, NY 10027
12/31/2018 In Progress
OWNER
Name Trade
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Turner Construction Company
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
107
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 16,219,744 $ 16,219,744
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Office Supplies Yes $ - $ 34 $ 34
L No Miscellanous Expenses Yes $ - $ 2,325 $ 2,325
L No Miscellanous Expenses Yes $ - $ 135 $ 135
L No Miscellanous Expenses Yes $ - $ 33 $ 33
MW-ESD No Office Supplies Yes $ - $ 30,284 $ 30,284
MW-ESD No Safety Supplies Yes $ - $ 54,473 $ 54,473
W-ESD No Fire Protection Yes $ 3,961,400 $ 3,961,400 $ 70,557
M No Concrete Yes $ 10,887,633 $ 10,887,633 $ 154,850
NON No Structural Steel Yes $ 34,842,383 $ 38,732,791 $ 9,707,242
NON No Pre-Purchase Electrical Switchgear Yes $ 2,413,235 $ 2,552,235 $ 564,697
NON No Pre-Purchase Indoor AHUs Yes $ 634,418 $ 634,418 $ 77,081
NON No Pre-Purchase Outdoor AHUs-DOAs/RTUs Yes $ 4,213,575 $ 4,213,575 $ 511,948
NON No Pre-Purchase Chilled Beams Yes $ 899,812 $ 899,812 $ 121,474
NON No Pre-Purchase CRAC Units Yes $ 308,675 $ 308,675 $ 37,504
NON No Elevator Yes $ 8,558,816 $ 8,558,816 $ 374,308
NON No Roofing & Waterproofing Yes $ 3,107,892 $ 3,107,892 $ 30,075
NON No Above Grade Plumbing Yes $ 8,619,000 $ 8,536,000 $ 228,022
NON No Façade Maintenance Yes $ 1,787,170 $ 1,787,170 $ 44,711
$ 80,234,009 $ 84,267,701 $ 12,009,753
$ 14,849,033 $ 14,936,317 $ 312,691
Non-MWL Tier II Total $ 65,384,976 $ 69,331,384 $ 11,697,062
0% 92% 2%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction Company Columbia Business School Above Grade
Construction Management
375 Hudson Street, 6th Floor, New York, NY 10014 (212) 229-6000
12/31/2018 In Progress
COMPANY (Tier I)
Cives Corp
Turner Construction Company Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
433 Hardware Supplies Inc
NON:
Fairway Market
A & H Co
Sugar Hill Creamery
Golden Deli
First Women's Fire Systems
Roger & Sons Concrete Inc
Venus Fire Protection
Turner Logistics LLC
Transel Elevator & Electric
Wolkow Braker
Almar Plumbing
Global BMU
Turner Logistics LLC
Turner Logistics LLC
Turner Logistics LLC
Turner Logistics LLC
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
MWL % of Tier I
Tier II Grand Total
MWL Tier II Total
108
Schedule M3
CM Name:
Company Name: Cives Corp Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ 34,842,383 $ 38,732,791 $ 9,707,242
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Misc. Steel & Deck Yes $ 600,000 $ 600,000 $ 17,207
W-ESD No Metals Service Center Yes $ 4,000,000 $ 4,000,000 $ 3,391,770
$ 4,600,000 $ 4,600,000 $ 3,408,977
$ 4,600,000 $ 4,600,000 $ 3,408,977
Non-MWL Tier III Total $ - $ - $ -
13% 12% 35%
Date: 12/31/2018
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction Company
Columbia Business School Above Grade
Structural Steel
8 Church Street, Gouverneur, NY 13642 315-287-2200
12/31/2018 In Progress
COMPANY (Tier II)
Cives Corp Structural Steel
SUBCONTRACTORS (Tier III)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
Commonwealth Metal Co
Baco Enterprises Inc
Tier III Grand Total
MWL Tier III Total
MWL % of Tier II
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
109
Schedule M1
Owner Name: Project:
Address: Telephone:
As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 2,963,343 $ 2,963,343
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No Construction Management Yes $ - $ 2,963,343 $ 2,963,343
$ - $ 2,963,343 $ 2,963,343
$ - $ - $ -
Non-MWL Direct Spend Total $ - $ 2,963,343 $ 2,963,343
0% 0% 0%
Date: 12/31/2018
410 West 118th Street, NY, NY 10027
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Columbia University Columbia Business School Below Grade
12/31/2018 In Progress
OWNER
Name Trade
Columbia University Owner
DIRECT SPEND VENDORS (Tier I)
Name/Address/Phone # (if available) otherwise enter Trade
NON:
Turner Construction Company
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Direct Spend Grand Total
MWL Direct Spend Total
MWL % of Total
110
Schedule M2
Company Name: Project:
Trade: Contract:
Address: Telephone:
As of Date: Project Start: 1/1/2018 Project End:
MWL Designation Joint Venture?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
NON No $ - $ 2,963,343 $ 2,963,343
MWL Designation Joint Venture? Trade Awarded?Original Plan Amount
$'s
Current Plan Amount
(incl CO's)
$'s
Total Payment
to Date
$'s
L No Office Supplies Yes $ - $ 17 $ 17
L No Miscellanous Expenses Yes $ - $ 930 $ 930
L No Miscellanous Expenses Yes $ - $ 71 $ 71
L No Miscellanous Expenses Yes $ - $ 16 $ 16
MW-ESD No Office Supplies Yes $ - $ 14,246 $ 14,246
W No Safety Supplies Yes $ - $ 27,420 $ 27,420
W No Fire Protection Yes $ 2,768,600 $ 2,768,600 $ 54,185
M No Concrete Yes $ 3,739,879 $ 6,410,907 $ 53,207
NON No Pre-Purchase Electrical Switchgear Yes $ 3,392,505 $ 3,462,115 $ 793,846
NON No Pre-Purchase Indoor AHU's Yes $ 582,706 $ 582,706 $ 144,219
NON No Pre-Purchase CRAC Units Yes $ 534,039 $ 534,039 $ 36,047
NON No Elevator Yes $ 596,900 $ 596,900 $ 20,274
NON No Roofing & Waterproofing Yes $ 2,377,108 $ 2,377,108 $ 26,550
$ 13,991,737 $ 16,775,075 $ 1,171,028
$ 6,508,479 $ 9,222,207 $ 150,092
Non-MWL Tier II Total $ 7,483,258 $ 7,552,868 $ 1,020,936
0% 311% 5%
Date: 12/31/2018
Venus Fire Protection
Name Trade
SCHEDULE OF MINORITY/WOMEN/LOCAL OWNED BUSINESS PARTICIPATION UTILIZATION PLAN
(No substitutions may be made on this submission except by prior written approval by Owner)
Turner Construction Company Columbia Business School Below Grade
Construction Management
375 Hudson Street, 6th Floor, New York, NY 10014 (212) 229-6000
12/31/2018 In Progress
COMPANY (Tier I)
Turner Logistics LLC
Turner Construction Company Construction Management
SUBCONTRACTORS (Tier II)
Name/Address/Phone # (if available) otherwise enter Trade
MWL:
433 Hardware Supplies Inc
Fairway Market
A & H Co
NON:
Turner Logistics LLC
Sugar Hill Creamery
Golden Deli
First Women's Fire Systems
Roger & Sons Concrete Inc
Turner Logistics LLC
Transel Elevator & Electric
Wolkow Braker
If there is no Original Plan then vendors were paid on an as-needed basis or vendors were contracted after the
Original Plan
Tier II Grand Total
MWL Tier II Total
MWL % of Tier I
111
GC/CM: Turner Construction Company
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Turner Construction Company 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Construction Management
* Tier II Almar Plumbing 216 8% 0 0% 0 0% 32 1% 0 0% 0 0% 0 0% 248 9% 2,530 91% 2,778 3 21% 11 79% 14
Plumbing
* Cives Steel Company 255 40% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 255 40% 383 60% 638 3 38% 5 63% 8
Structural Steel
* Island International Enterprises 80 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 80 100% 0 0% 80 5 100% 0 0% 5
SOFP
* Roger & Sons 168 34% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 168 34% 332 66% 500 5 38% 8 62% 13
Concrete
* Safway Atlantic 595 69% 0 0% 0 0% 0 0% 40 5% 0 0% 0 0% 635 74% 228 26% 863 17 65% 9 35% 26
Hoisting & Public Protection
* Zwicker Electric Company 0 0% 0 0% 0 0% 0 0% 32 25% 0 0% 0 0% 32 25% 96 75% 128 1 25% 3 75% 4
Electrical
1,314 0 0 32 72 0 0 1,418 3,569 4,987 34 36 70
26% 0% 0% 1% 1% 0% 0% 28% 72% 100% 49% 51% 100%
Contractor Start
Almar Plumbing 6/19/2018
Cives Steel Company 11/25/2018
Island International Enterprises 12/25/2018
Roger & Sons 10/16/2018
Safway Atlantic 10/17/2018
Zwicker Electric Company 12/26/2018
Total MWL Non-MWL Total MWL Non-MWL
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
Total Hours
Overall % of Total
In Progress
In Progress
In Progress
In Progress
In Progress
Columbia Business SchoolSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
112
GC/CM: Turner Construction Company
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Turner Construction Company 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Construction Management
* Tier II Almar Plumbing 216 10% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 216 10% 1,879 90% 2,095 2 18% 9 82% 11
Plumbing
* Cives Steel Company 255 40% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 255 40% 383 60% 638 3 38% 5 63% 8
Structural Steel
* Island International Enterprises 80 100% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 80 100% 0 0% 80 5 100% 0 0% 5
SOFP
* Roger & Sons 168 34% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 168 34% 332 66% 500 5 38% 8 62% 13
Concrete
* Safway Atlantic 595 69% 0 0% 0 0% 0 0% 40 5% 0 0% 0 0% 635 74% 228 26% 863 17 65% 9 35% 26
Hoisting & Public Protection
* Zwicker Electric Company 0 0% 0 0% 0 0% 0 0% 32 25% 0 0% 0 0% 32 25% 96 75% 128 1 25% 3 75% 4
Electrical
1,314 0 0 0 72 0 0 1,386 2,918 4,304 33 34 67
31% 0% 0% 0% 2% 0% 0% 32% 68% 100% 49% 51% 100%
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
Columbia Business SchoolSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
113
Shared Services
114
GC/CM: Lend Lease
Date Range: 8/1/2008 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 92,640 32% 2,939 1% 13,996 5% 19,956 7% 49,345 17% 0 0% 2,537 1% 181,413 63% 107,940 37% 289,353 133 42% 182 58% 315
Construction Management
* Tier II Johnson Security Inc 148,887 60% 0 0% 2,042 1% 30,793 12% 54,030 22% 0 0% 11,142 4% 246,894 99% 3,068 1% 249,962 298 97% 8 3% 306
Security
* Eddington Security Inc 110,679 76% 0 0% 0 0% 304 0% 35,032 24% 0 0% 0 0% 146,015 100% 8 0% 146,023 167 99% 1 1% 168
Security
352,206 2,939 16,038 51,053 138,406 0 13,679 574,321 111,016 685,337 598 191 789
51% 0% 2% 7% 20% 0% 2% 84% 16% 100% 76% 24% 100%
Contractor Start
Johnson Security Inc 7/11/2010
Eddington Security Inc 2/4/2010 In Progress
Total Hours
* Denotes active contractors
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
End
In Progress
Overall % of Total
Shared ServicesSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL Total MWL Non-MWL Total MWL Non-MWL
115
GC/CM: Lend Lease
Date Range: 10/01/2018 - 12/31/2018
As of : 03/07/2019
Tier Contractor Total Hours Total
Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs %¹ Hrs # %¹ # %¹ #
* Tier I (Direct) Lend Lease US Construction LMB 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Construction Management
* Tier II Johnson Security Inc 4,479 76% 0 0% 0 0% 712 12% 680 11% 0 0% 0 0% 5,871 99% 56 1% 5,927 33 97% 1 3% 34
Security
* Eddington Security Inc 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0% 0 0 0% 0 0% 0
Security
4,479 0 0 712 680 0 0 5,871 56 5,927 33 1 34
76% 0% 0% 12% 11% 0% 0% 99% 1% 100% 97% 3% 100%
1 Denotes percentages of the individual MWL designation to the total workforce hours or total headcount
Total MWL Non-MWL Total MWL Non-MWL
Total Hours
Overall % of Total
* Denotes active contractors
Shared ServicesSCHEDULE OF WORKFORCE PARTICIPATION
HeadcountM W L MW ML WL MWL
116