Venice / Mose - Brigaidbrigaid.eu/wp-content/uploads/2017/12/08-Venice-MOSE-project.pdf · •...
Transcript of Venice / Mose - Brigaidbrigaid.eu/wp-content/uploads/2017/12/08-Venice-MOSE-project.pdf · •...
Venice / MoseTechnology, development and innovationfor coastal and environmental defence
BRIGAID 1st Conference - Venice 9th / 10th November 2017
The Vevice Lagoon
Adriatic Sea
Venice
Lagoon
A multiplicity of problemsto be addressed
Floods / Sea storms / Erosion / Pollution
70
60
50
40
30
20
10
0
1901
-1910
1911
-1920
1921
-1930
1931
-1940
1941
-1950
1951-1
960
1961
-1970
1971
-1980
1981
-1990
1991
-2000
2001
-2010
• The Italian State has guaranteed protection for Veniceand its lagoon through a major environmental, coastaland urban protection plan: the Mose system
The task
Environmentalprotection
Improvedenvironmentalresilience
Improvedurbanresilience
Control and management
Know-how"made in Italy"
Protectionfrom floods
The Mose
Protectionfrom sea storms
The Mose defence systemAn integrated solution for a complex environment
Protection from sea stormsWhat has been done
56 kmof reconstructedand protected beaches
12 kmof restored and naturalizedcoastal dunes
11 kmof reinforcedbreakwaters
Improved environmental resilienceWhat has been done
16 km2
of reconstructedand naturalized saltmarshes
39 kmof protectedsalt marshes
12 minor islandsrecuperated
Improvement of environmental resilienceSalt marshes reconstruction
Beginning of works
After works
Environmental protectionWhat has been done
40 kmof industrial canal bankssecured
7former dumpssecured
39 hectaresof phytobiopurification areasrecreated
Improved urban resilience
100 kmof urban and lagoon embankmentsraised and reinforced
What has been done
Improved urban resilience
Raised shores
Raised Paving
Baby Mose Gates
Defence barriers
Lido inlet
Venice
Lagoon
Malamocco inlet
Chioggia inlet
4rows of gates
78gates in total
1.6 kmtotal barriersextension
Mobile, invisible gates
Gate in operation
Gate in stand by
Hinge
Gate housing structures
< Lagoon Sea >
Mobile, invisible gatesDefence barriers
Lido inletDefence barriers / Construction
Lagoon
Venice
Sea
North Lido.Barriercompleted
South Lido. Housing structuresinstallated
Craft harbour
Technical building
Lagoon
Sea
Malamocco inlet
Operating lock
Temporary areafor fabricationof the caissons Barrier
completed
Breakwater
Technical building
Defence barriers / Construction
Lagoon
Chioggia
Sea
Housing structuresinstalled
Craft harbour
Technical building
Chioggia inletDefence barriers / Construction
Time schedule in imagesC
om
ple
tio
no
f th
e b
arr
iers
2017 / 2018 2018 / 2021
Sta
rtin
gu
p w
ith
p
rov
isio
na
lp
lan
tsa
nd
ha
nd
ov
er
Ma
na
ge
me
nt
of
the
sy
ste
m
Completion of civil works (buildings, abutments, etc)
Construction and supplying of the gates for South Lido row
Installation of the gates for Chioggia and South Lido rows
Continuation of monitoring and test on models
Maintenance of the gates
Completion of electromechanical works (hinge installation)
Completion of electromechanical works(plant installation)
Manoeuvringand test of the barriers
Definitive plants
Next work phasesManagement of the operations centre(final configuration)
Dissolved oxygen measured vs modelled
Dissolved oxygen minimum values forecast
The possibility of operating the MOSE
System to increase water renewal in critical
areas is object of investigations.
Present results obtained through the trophic
model suggest that significant increase in
water renewal and hence in oxygenation
of water column may be obtained
especially in the areas close to the sub-
basins borders.
Not only flood defensethe MOSE barriers used to implement environmental measures
Climate Change adaptation
General Plan of complementary adaptive measures to climate change
for Venice
Adaptive management shall try
to maintain current functions of
the Venice system, including
those related to living and
working opportunities.
A shared vision must be
therefore defined. To realize the
new vision, innovative and
shared project modalities are
needed, in particular to reduce
decision timing, conflicts and
oppositions.
In this perspective, climate
change challenges represent an
opportunity for the Venice
system.
• Venice protected from the negative effects of climate change; • Improvement in the quality of the environment (water, sediments, etc.);• Increase in the biodiversity of the ecosystem;• Development of a system of multi-disciplinary knowledge and expertise;• Venice has become a reference for other countries facing sea level rise
Results achievedA general improvement in the lagoon ecosystem
Management and Control
• Engineering• Project and management• Monitoring• Control room
The Venice ArsenalBefore intervention
The Venice ArsenalSustaniability: the lagoon water as a heating/cooling source for the
restored historic buildings
Start up of management procedures
Innovation and the Venice lagoonSafeguarding Venice. A wordwide reference
Special expertise in:
• Climate change and sea level rise adaptation measures;
• Coastal zones management and improvement of territory resilience;
• Balance in between natural and anthropic environment.
Multidisciplinary action:
Maritime, hydraulic and environmental engineering, construction management,
legal and administrative management, environmental sciences.
In such a context innovation plays a central role to provide new solutions to old
problems and to rethink existing instruments to face new challenges.
Thank youFor your attention