VCE: A FOUNDATION FOR IT TRANSFORMATION„¢ systems . supported . sustained . engineered ....

39
VCE: A FOUNDATION FOR IT TRANSFORMATION Juergen Hirtenfelder EMEA SI/SP

Transcript of VCE: A FOUNDATION FOR IT TRANSFORMATION„¢ systems . supported . sustained . engineered ....

VCE: A FOUNDATION FOR IT TRANSFORMATION

Juergen Hirtenfelder EMEA SI/SP

What happened on 9th Jan 2007?

A best in breed Networking Device

A best in breed Storage Device

A best in breed Server Device

A best in breed Virtualization Platform

Network Storage Server Virtualization

A best in breed Networking Device

A best in breed Storage Device

A best in breed Server Device

A best in breed Virtualization Platform

Network Storage Server Virtualization

© 2013 VCE Company, LLC. All rights reserved.

TRUE CONVERGED INFRASTRUCTURE

14

Vblock™ Systems

SUPPORTED

SUSTAINED

ENGINEERED

MANUFACTURED As ONE

PRODUCT MANAGED

API Enabled,ConvergedManagement

Integrated Protectionand Workload Mobility Solutions

Best-of-breedTechnology

Pre-engineered,Pre-validated,Pre-tested

ApplicationOptimization

Life CycleSystemAssurance

Customer Experience

Fastest Time to Business

Highest Availability

Lowest TCO

Converged Management

Lowest Risk

Highest Performance

VCE DIFFERENTIATION

COMPUTE STORAGE NETWORK

STORAGE COMPUTE NETWORK VIRTUALIZATION APPLICATION

New SoftwareInvestments

New HardwareInvestments

Maintaining OperationsCost

SUPPORT TEAMS

VIRTUALIZATION

70% 20% 10%

8

IT MUST SHIFT FROM MAINTAINING OPERATIONS TO BUSINESS INNOVATION

S Y S T E M 1 0 0

S Y S T E M 3 2 0

S Y S T E M 7 2 0

VCE Vision™ Intelligent Operations software

S Y S T E M 2 0 0

S P E C I A L I Z E D S Y S T E M S

DRIVING IT SIMPLICITY AND Efficiency

THE INDUSTRY’S BROADEST PORTFOLIO

VCE Confidential – Internal Use Only

ACCELERATING VIRTUALIZATION…

Run Multiple workloads on a shared, optimised Infrastructure

Enable Virtualization at Scale—Simplify IT

V V V V V V V V

V V V V V V V V

Database Virtual Desktops Email Custom Web

© 2013 VCE Company, LLC. All rights reserved.

•EXTEND THE VCE EXPERIENCE TO MASSIVE ORACLE ENVIRONMENTS

19

VBLOCK™ specialized system for HIGH PERFORMANCE DATABASES

High availability OLTP & OLAP at millions of IOPS

Mixed workload capable Multi-database version

support

Architected for high performance databases (Oracle) Increases productivity of Oracle applications and database teams

Lifecycle System Assurance Integrated data protection

options Lower TCO – operations

and licensing

© 2011 VCE Company LLC, All rights reserved.

20

VBLOCK™ SPECIALIZED SYSTEM FOR SAP HANA®

FULLY FACTORY-LOADED, TESTED, AND CONFIGURED

Vblock Specialized System for SAP HANA® Certified System

© 2011 VCE Company LLC, All rights reserved. 21

ONE RACK

UP TO

3500 DESKTOPS

IN ONE SYSTEM

TWO RACKS

UP TO

7000 DESKTOPS

IN ONE SYSTEM

OPTIONAL ISILON STORAGE ARRAY FOR USER AND APPLICATION DATA

Architected For extreme applications (VDI) VBLOCK SPECIALIZEDTM SYSTEMS

© 2011 VCE Company LLC, All rights reserved. 22

VBLOCK SYSTEM 340 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT

Cisco UCS 6246/6296UP Fabric Interconnects

Cisco UCS 5108 Blade Server Chassis

Cisco UCS B-Series Blades

Cisco UCS 2204XP/2208XP Fabric Extenders

B420 M3 Blade Server

XtremSW Cache

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT

© 2011 VCE Company LLC, All rights reserved. 23

VBLOCK SYSTEM 340 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT

Cisco Nexus 1000V Virtual Switch

Cisco Nexus 5548UP and 5596UP Switch

Cisco MDS 9148 FC Switch

Cisco Nexus 3048 Switch

© 2011 VCE Company LLC, All rights reserved. 24

VBLOCK SYSTEM 340 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT

EMC VNX Unified Storage Family

EMC VNX5400 EMC VNX5600 EMC

VNX5800

EMC VNX7600

EMC VNX8000

© 2011 VCE Company LLC, All rights reserved. 25

VBLOCK SYSTEM 340 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT

VMware vSphere 5.5 Server Enterprise Plus

VMware vCenter Server Standard

VMware ESXi

© 2011 VCE Company LLC, All rights reserved. 26

VBLOCK SYSTEM 340 COMPONENTS

COMPUTE

NETWORK

STORAGE

VIRTUALIZATION

MANAGEMENT

AMP-2

Cisco UCS Manager

EMC Unisphere

EMC VNX Local Protection Suite, Remote Protection Suite, Application Protection Suite, Security and Compliance Suite

EMC VNX FAST Suite, EMC Secure Remote Support, and EMC PowerPath/VE

© 2011 VCE Company LLC, All rights reserved.

VBLOCK ARCHITECTURE (UNIFIED NETWORK, UNIFIED ACCESS)

27

External SAN access (migration)

SAN backup and common services

IP backup

Customer IP network

Business Continuance

Network

Compute

Storage EMC VNX

EMC RecoverPoint

X-Blade

Disk array enclosure

Disk array enclosure

Storage processor

FC interface card

Storage processor

FC interface card

Cisco UCS Chassis containing Cisco Blades

FEX FEX

Cisco UCS Chassis containing Cisco Blades

FEX FEX

Cisco UCS fabric interconnects

10 GbE ports

8 Gb FC ports Cisco UCS fabric

interconnects 10 GbE ports

8 Gb FC ports

Cisco Nexus switch Cisco Nexus switch Cisco MDS

switch

Cisco MDS switch

*Customer selectable: 1 GbE, 10 GbE, copper or optical, SW or LW

EMC RecoverPoint

X-Blade

(Transceiver choice*)

(Transceiver choice*)

6Gb SAS

6Gb SAS

Converged Ethernet

Converged Ethernet

© 2011 VCE Company LLC, All rights reserved.

vCenter Native Integration

CIAC

BMC

CA VCE

Visi

on In

telli

gent

Ope

ratio

ns

vCOPS

UIM

Native Integration

Connector

Connector

Connector

Connector

Vblock System Visibility

VMw

are

Hype

rvis

or

Stor

age

Com

pute

N

etw

ork

Vblo

ck A

PI

Software BLOCK Data Center Component

Infrastructure Management Tools

Vblock Management, Orchestration and Automation

Vblock System Visibility

Intelligently Informs

VCE™ Vision Intelligent Operations Software

© 2011 VCE Company LLC, All rights reserved. 29

INTEGRATED DATA PROTECTION OPTION

VBLOCKTM DATA PROTECTION Continuous availability, best

in class system uptime Advanced de-duplication Optimum resource utilization Eliminate risk, faster time

to value Support for entire

Vblock Systems portfolio

EMC VPLEX

EMC RecoverPoint

Avamar 7 plus Data Domain

What we do when we build systems

• Vblock System Physical Build – What equipment is used in system – How equipment is racked in system

• Base Logical Build – What software is used on system components – How software base configuration is deployed – How equipment is connected in system

• Logical Build Customization – How the systems advanced configuration is

implemented for customer standards/requirements – How the systems advanced configuration is

optimized for customer application/workload Vblock System Physical Build

Logical Build Custom

ization

Base Logical Build

VMware Hypervisor

Storage Compute Network

~95% Factory ~5% Onsite

VCE CONFIDENTIAL. FOR INTERNAL USE ONLY. 30

© 2011 VCE Company LLC, All rights reserved. 31

PHYSICAL INFRASTRUCTURE OPTIMIZATION

SPACE AND POWER EFFICIENT Optimized architectures

Balanced power

OPERATIONALLY EFFICIENT More efficient than traditional segmented architectures

Validated thermal performance

PURPOSE-BUILT FOR VIRTUAL WORKLOADS Minimizes downtime and reduces cost

© 2011 VCE Company LLC, All rights reserved.

• Single contact for support and warranty

• Three tiers of support • 24 x 7 follow-the-sun

access • Up to 5 Years Support

Included VCE™ Core Support

Integrated VCE support

VCE™ Plus Support

Expanded support providing proactive care and software

management

VCE™ Premier Support

Comprehensive support with complete platform and software

lifecycle management

Consolidated Support Contracts (Parts, Logistics, Field Service)

VCE Release Management (Code Currency), Tech Alerts, Matrices

VCE Technical Support (TSRs and vPSEs), Escalation Support

VCE Integrated Systems (B2B & CRM), Web Portal, Phone Support

VCE Support

32

VCE Lifecycle System Assurance: lowers TCO and Risk

Regression testing

Design for continuous interoperability

Interoperability testing

System optimization Update/ validation

Ongoing release matrix /code currency

Current and Optimized

VCE Confidential – Internal Use Only

30-45 DAYS TO DELIVERY

34

Traditional Datacenter Experience 90-120 Days From Order to Production

VCE Datacenter Experience ~45 Days From Order to Production

Receive Components

Staging Rack & Cable

Program & Provision

“Vblock shortens the time from business-thought to business-outcome because it is pre-engineered, deceptively simple, impressively cost effective and ready to “go as we grow”.

- Tony Kerrison CTO

© 2011 VCE 35

…OR VCE SEAMLESS SUPPORT

”With VCE there’s just one support number to call, which is also important to us. Especially since the people on the other end of the line understand the entire technology stack.“

- Michael Leeper Senior Manager IT

Manufacturing Financial Services Public bodies

Healthcare Energy/Utilities Service Providers/Telecom

Who uses vBlock converged infrastructure?

Not a believer, yet?

Not a believer, yet?

© Copyright 2013 EMC Corporation. All rights reserved.

EMC FORUM 2013