DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

VALUE OF PROJECT OPPORTUNITIES WITHIN THE GCC AVAILABLE ON ZAWYA.COM

0

100,000,000,000

200,000,000,000

300,000,000,000

400,000,000,000

500,000,000,000

600,000,000,000

700,000,000,000

800,000,000,000

Saudi Arabia

UAE Kuwait Bahrain Oman Qatar

$ VALUE OF PROJECTS ONGOING

28%

41%

11%

3% 6%

11%

$ TOTAL VALUE OF PROJECTS

Saudi Arabia

UAE

Kuwait

Bahrain

Oman

Qatar

Page 3: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

UAE $Value Projects cancelled

$Value Projects completed

$Value Projects delayed

$Value Projects on hold

$Value Projects ongoing

$Value of all projects

61,964,230,000 119,751,234,830 811,000,000 345,139,771,000 758,166,580,000 1,285,832,815,830

Page 4: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

ADFEC - Masdar Carbon Free City Also Known As : Zero - Carbon City Country : UAE Project Value : USD 22,000,000,000 Sector : Real Estate | Community Development

Start Date : 2006

Consultants : Foster and Partners (Master Plan) | WS Atkins and Partners Overseas (Infrastructure

Concept Design) | WSP Middle East Limited (Engineering) PMCs : CH2M Hill (Phase 1) | Parsons Brinckerhoff Middle East Contractors : Al Jaber Group - UAE (Infrastructure) | Soletanche Bachy (Piling) Profile Type : Master Project | Related Projects (4)

Phase:

Construction - Execution

Completion: 2025

Overview Owner : Abu Dhabi Future Energy Company - UAE Location : Abu Dhabi , Abu Dhabi , UAE Contract Type : Construction Facility Type : Science and technology green community Capacity : Total land area: 6 million sq.m.

50,000 residents 1,500 businesses

Main Usage : Community Development Background Abu Dhabi Future Energy Company (ADFEC), also known as Masdar, plans to build an energy, science and technology

green community in Abu Dhabi, between Khalifa City and Abu Dhabi International Airport. The community, covering 6 million sq.m., will house Masdar Institute of Science and Technology (6% of the development), research labs (24%), residential village (30%), commercial offices and light manufacturing facilities (13%), service and transportation(19%), and shopping, leisure and cultural facilities (8%) in a "green" science park with a targeted "net-zero" carbon target.

The project's infrastructure will include an underground rapid transport system (as it will be inaccessible to cars), rail and public transport routes, and other renewable energy infrastructure projects that lead to carbon emission reductions by focusing on CO2 Capture and Storage (CCS).

WSP company was commissioned by Foster & Partners, the master planner, to develop the infrastructure strategies for waste management, drainage and treatment of water and sewage, energy and power distribution network, systems for IT and telecommunications including all the necessary infrastructures systems (security, fire sprinkler, cooling and wireless networks).

The development will use photovoltaic technologies for energy generation and solar power for the cooling system and water desalination plant. It will be car free, powered by renewable energy with services digitally managed and providing real time information.

The city will be surrounded by wind, photovoltaic farms (500 MW), research fields and plantations; these will be built after the construction of the photovoltaic power plant is completed. The research-based university (which will start receiving students in 2009), photovoltaic power plant and the headquarters of Masdar's global operations will be spread over 2 sq. km of the total area, and will be the first to be constructed.

Execution of the project will take place in 7 phases, starting with the development of energy generation facility and infrastructure works. The remaining 6 phases will include the construction of facilities. Phase 1 consists of MIST University and Masdar's headquarters, phase 2 consists of offices and residential units, phase 3 consists of ADFEC headquarters and public buildings, phase 4 consists of the community center, phase 5 consists of the Science Centre Complex, and phase 6 consists of the residential and technology park.

Upon completion, the community will be home for 1,500 businesses and 50,000 residents.

Foster and Partners is the master planner, Atkins is the infrastructure concept design consultant, Mott Macdonald is the infrastructure consultant, and Parsons Brinckerhoff and CH2M HILL are the project management consultants.

Current Status

In October 2012, the bids for the main construction contract of Masdar Headquarters were under evaluation and construction of phase 1B of MIST was ongoing.

In December 2012, the MIST is expected to be completed (delayed from September 2012).

In Q3 2013, the Swiss village is expected to be completed (delayed from Q1 2012).

In 2015, phase 1 is expected to be completed (delayed from 2013).

Page 5: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

In 2025, the project is expected to be completed (delayed for the second time from 2016).

Previous Actions

In July 2012, the bids for the main construction contract of Masdar Headquarters were under evaluation and construction of phase 1B of MIST was ongoing.

In February 2012, the bids for the main construction contract of masdar headquarter were under evaluation, design of the swiss village was ongoing and construction of phase 1B of MIST was ongoing.

In November 2011, Masdar headquarter was put on hold and phase 1A of MIST was completed.

In December 2010, the construction of phase 1 B of the MIST started.

In November 2010, the construction contract including the MEP works for phase 1B of the MIST was awarded to Arabian Construction Company.

In 2010, the infrastructure works were completed.

In June 2009, the infrastructure consultancy contract was awarded to Mott Macdonald.

In January 2009, the USD 1.6 billion infrastructure contract was awarded to Al Jaber Group.

In Q4 2008, the construction of phase 1 A of the MIST started.

In August 2008, the construction contract including MEP works for the phase 1A of the MIST was awarded to the joint venture of Al Ahmadiah Contracting and Trading Company and Hip Hing Construction Company.

In May 2008, the infrastructure concept design contract was awarded to Atkins.

In April 2008, the piling contract for phase 1awarded to Soletanche Bachy.

In October 2007, Masdar appointed CH2M HILL as the program manager for the first phase of the development. CH2M HILL will be responsible for technology integration and for aligning the efforts of the designers, contractors, and third parties to program goals and standards.

In June 2007, the consortium led by Foster and Partners was appointed to design the master plan.

In 2006, the project was launched. Scope of Work

Development of a 6 sq. km. purpose-built industrial and free zone with an underground rapid transport system, rail network, public transportation network, and other renewable energy infrastructure works.

Expected Schedule

Related Projects

Page 6: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Schedule & Bidders

Project Schedule

Schedule Phase Description 2006 Planning Project launched Jun 2007 Planning Master plan contract awarded to Foster and Partners 17 Oct 2007 PMC Contract awarded to CH2M HILL Q1 2008 Design Design started May 2008 Design Infrastructure concept design contract awarded to Atkins Aug 2008 Construction Construction contract including MEP works of phase 1 A of the MIST awarded to the JV of Al Ahmadiah

Contracting and Trading Company and Hip Hing Construction Company Jan 2009 Construction Infrastructure contract awarded to al Jaber Group Jun 2009 Construction Infrastructure consultancy contract awarded to Mott Macdonald Q4 2009 Construction Construction of phase 1 A of the MIST started 2010 Construction Infrastructure works completed Nov 2010 Construction Construction contract including MEP works of phase 1 B of the MIST awarded to Arabian Construction

Company Dec 2010 Construction Construction of phase 1 B of the MIST started Oct 2011 Construction Construction of phase 1A (MIST) completed Dec 2012 Construction MIST expected to be completed Q3 2013 Construction Swiss village expected to be completed 2015 Construction Phase 1 expected to be completed 2025 Completion Project expected to be completed

Project News

11-Nov-2010 Masdar City Begins Construction Of Masdar Institute Campus Second Phase - Press Release 25-Sep-2010 Masdar turns to Sun's Heat to Cool Buildings - Press Release 10-Jun-2010 Masdar To Build $600 Million, 100 MW Solar Power Plant - Gulf News 17-Mar-2010 Masdar adapts its strategy to leaner times - The National 25-Jan-2010 Masdar and Bayer MaterialScience sign co-operation on sustainable construction - Press Release 18-Jan-2010 Work in Full Swing at Masdar City Project - Khaleej Times 18-Jan-2010 Masdar Abu Dhabi in forefront of renewable energy initiative - Gulf News 25-Dec-2009 Neutral Group to operate in Masdar City - Arab News 09-Dec-2009 Neutral Group to Operatefrom Masdar City - Khaleej Times 25-Nov-2009 Masdar City Begins Exporting Clean Energy Technology - Khaleej Times

» More News

Abu Dhabi Future Energy Company Owner Abu Dhabi Future Energy Company Building, Airport Road, Masdar City, Khalifa City A, P.O. Box 54115, Abu Dhabi, United Arab Emirates, Abu Dhabi Tel: +971 2-653-3333 | Fax: +971 2-653-6002 | Email: [email protected] | Website: www.masdar.ae

Name: Hamad Al Matrooshi Position: Project Manager Email: [email protected]

Page 7: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Officers from this company (20)

WSP Middle East Limited Consultant - Engineering

DWTC Convention Tower, 7th Floor, Sheikh Zayed Road, P.O. Box 7497, Dubai, United Arab Emirates, Dubai Tel: +971 4-329-2399 | Fax: +971 4-329-2389 | Email: [email protected] | Website: www.wspgroup.ae

Name: Shaheed Sadik Position: Document Controller Tel: +971 2-667-3875

Officers from this company (13)

WS Atkins and Partners Overseas Consultant - Infrastructure Concept Design

P.O. Box 7562, Abu Dhabi, United Arab Emirates, Abu Dhabi Tel: +971 2-627-1500 | Fax: +971 2-627-0999 | Email: [email protected] | Website: www.atkinsglobal.com

Name: Ghassan Ziadat Position: Project Director

Foster and Partners Consultant - Master Plan

Al Saman Tower, 3rd Floor, Hamdan Street, P.O. Box 45715, Abu Dhabi, United Arab Emirates, Abu Dhabi Tel: +971 2-417-1700 | Fax: +971 2-626-2544 | Email: [email protected] | Website: www.fosterandpartners.com

Name: David Nelson Position: Head of Design Email: [email protected]

Officers from this company (12)

Al Jaber Group - UAE Contractor - Infrastructure

Al Jaber Group Building, Street 7 Street, Musafah Area, Petroleum Services Area, Plot 1 and 1A, P.O. Box 2175, Abu Dhabi, United Arab Emirates, Abu Dhabi Tel: +971 2-555-4300 | Fax: +971 2-555-3370 | Email: [email protected] | Website: www.aljaber.com

Name: Kamal Ammar Position: Administration Manager Tel: +971 2-502-0694 Email: [email protected]

Officers from this company (21)

Soletanche Bachy Contractor - Piling

European Business Center Building, 1st Floor, Dubai Investment Park, P.O. Box 261130, Dubai, United Arab Emirates, Dubai Tel: +971 4-813-5600 | Fax: +971 4-813-5601 | Website: www.bachy-soletanche.com

Name: Rami Karouche Position: Proposals Manager Email: [email protected]

CH2M Hill PMC - Phase 1

P.O. Box 46844, Abu Dhabi, United Arab Emirates, Abu Dhabi Tel: +971 2-513-3437 | Fax: +971 2-678-4145 | Website: www.ch2m.com

Page 8: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Name: Mike Abdel Fattah Position: General Manager Email: [email protected]

Parsons Brinckerhoff Middle East PMC

Abu Dhabi, United Arab Emirates, Abu Dhabi Tel: +971 2-652-9222 | Fax: +971 2-677-9772 | Email: [email protected] | Website: www.pbworld.com

Name: Mark Bugg Position: Project Manager Email: [email protected]

Officers from this company (9)

Page 9: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

Qatar $Value Projects cancelled

$Value Projects completed

$Value Projects delayed

$Value Projects on hold

$Value Projects ongoing

$Value of all projects

10,500,000,000 93,051,500,000 2,500,000,000 22,289,000,000 219,447,643,500 347,788,143,500

Page 10: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Phase Schedule Description Completion Mar 2014 Project expected to be completed

Equinox - Northgate Mall Also Known As : Northgate Shopping Development Country : Qatar Project Value : USD 327,000,000 Estimated Sector : Real Estate | Retail, Commercial

Start Date : 2009

Consultant : Callison (Design) PMC : Associated Consulting Engineers - Qatar Contractors : Al Habtoor Leighton (Construction) | Voltas Limited (MEP) Profile Type : Standalone Project

Phase:

Construction - Execution

Completion: Mar 2014

Overview Owner : Equinox Location : Doha , Qatar Contract Type : Construction Facility Type : Shopping complex Capacity : Built up area: 417,500 sq.m. Main Usage : Retail Office Background Equinox plans to develop Northgate Mall, a shopping complex in Doha, in Qatar.

The project will cover an area of 417,500 sq.m. and will consist of office buildings and a shopping mall that will include retail units, a supermarket, a cinema and food and beverage outlets.

Associated Consulting Engineers is the PMC and Callison is the design consultant.

Current Status In March 2012, the construction of the mall was ongoing. In March 2014, the project is expected to be completed.

Previous Actions

In August 2011, the main construction contract was awarded to Al Habtoor Leighton and construction works started.

On 10 April 2011, the bids for the main construction contract were submitted.

In Q1 2011, the ITB for the main construction contract was issued. In 2009, the design was completed.

Scope of Work Construction of a 417,500 sq.m. shopping complex including: - Office buildings - Retail units - Supermarket - Cinema - Food and beverage outlets

Expected Schedule

Page 11: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Schedule & Bidders

Project Schedule

Schedule Phase Description 2009 Design Design completed Q1 2011 Construction ITB for the main contsruction contract issued 10 Apr 2011 Construction Bids for the main construction contract submitted Aug 2011 Construction Main construction contract awarded to Al Habtoor Leighton Construction Construction started Mar 2014 Completion Project expected to be completed

Equinox Owner Qatar, Doha Tel: +974 4492-2446

Callison Consultant - Design Arenco Tower, 12th Floor, Port Saeed Road, P.O. Box 126541, Dubai, United Arab Emirates, Dubai Tel: +971 4-447-1166 | Fax: +971 4-447 -5524 | Email: [email protected] | Website: www.callison.com

Al Habtoor Leighton Contractor - Construction Al Jassim Tower, 4th, Near Ramada Signal, C-ring Road, P.O. Box 22478, Qatar, Doha Tel: +974 4405-9444 | Fax: +974 4441-0563 | Website: www.hlgroup.com

Name: Mohamad Palkhan Position: Project Manager Tel: +974 4-478-3970

Officers from this company (24)

Voltas Limited Contractor - MEP

Al Emadi Building, 1st Floor, Airport Road, Qatar, Doha Tel: +974 4456-9941/6 | Fax: +974 4455-1268 | Email: [email protected]

Name: Bhushan Besai Position: Project Manager Tel: +974 4-479-0665,+974 3-328-7024

Officers from this company (1)

Associated Consulting Engineers - Qatar PMC

Al Maneh Building, 3rd Floor, Office 7, Suhaim Bin Hamad Road, P.O. Box 39304, Doha, Qatar Tel: +974 4-498-2536, +974 4-498-2537 | Fax: +974 4-421-0720 | Email: [email protected]

Name: Joseph Bou Zaidan Position: Area Manager

Officers from this company (10)

Page 12: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

Saudi Arabia $Value Projects cancelled

$Value Projects completed

$Value Projects delayed

$Value Projects on hold

$Value Projects ongoing

$Value of all projects

29,446,300,000 134,280,851,000 10,620,000,000 125,392,000,000 591,263,757,636 891,002,908,636

Page 13: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

SRO - Haramain High-Speed Rail (HHR) Also Known As : Makkah, Madinah Rail Link (MMRL) Country : Saudi Arabia Project Value : USD 14,200,000,000 Estimated Sector : Infrastructure | Railways

Start Date : 2006

Consultants : Foster and Partners (Design - Stations) | JV of Getinsa and Dar Al Handasah Shair and

Partners (Supervision) | Saudi Consolidated Engineering Company (Khatib and Alami) (Design)

PMC : Scott Wilson Group Profile Type : Master Project | Related Projects (2)

Phase:

DB - Execution Completion: Q1 2017

Overview Owner : Saudi Railways Organization - Saudi Arabia Location : From Makkah , Makkah , Saudi Arabia

To Medina , Medina , Saudi Arabia Contract Type : DB - Design, Build Facility Type : Rail link Capacity : 440 Km long

3 million passengers per year Background The Saudi Railways Organization (SRO) plans to develop the Haramain High-Speed Rail (HHR), which was previously

known as the Makkah-Madinah Rail Link (MMRL) project, in Mecca, Saudi Arabia. The purpose of the project is to ease the inflow of pilgrims arriving in Jeddah and traveling on to the holy cities and to create a high-speed passenger rail link between the holy cities (Makkah and Madinah) and Jeddah.

The Haramain Railway will run from Makkah's Third Ring Road in the Al-Russaifa district, follow the Makkah to Jeddah highway through Bahrah, move on to the district of Guwaizah east of the Jeddah to Madina highway, and continue from there to Abraq Al-Raghamah.

The project will be executed in 2 phases. Part 1 of phase 1 includes the civil works of a 450 km railway extending from Makkah to Madinah, passing through King Abdulaziz International Airport in Jeddah. The first line will run from Jeddah to Mekkah and the second will run from Jeddah to Madinah. Part 2 of phase 1 includes the construction of 4 train stations (located in Makkah Central, Jeddah Central, Medinah, King Abdullah Econamic City). Phase 2 comprises the railway tracks, signaling and communication systems, and operations and maintenance.

MMRL is part of the Saudi railway expansion program that involves the construction of a new 950 Km long track network between Riyadh and Jeddah and a 115 Km long tracks network between Dammam and Jubail.

The JV of Dar Al Handasah Shair and Partners and Getinsa is the supervision consultant.

Foster and Partners is the design consultant for the stations.

Scott Wilson is the PMC. Saudi Consolidated Engineering Company (Khatib and Alami) is the design consultant.

Current Status

In October 2012, the construction works for phase 1 and mobilization works for phase 2 were ongoing and King Abdullah approved the formation of a new Public Transport Authority that will be responsible for funding and supervising transport services including the Haramain high speed rail.

In January 2014, phase 1 is expected to be completed.

In Q1 2017, the project is expected to be completed. Previous Actions

On 14 January 2012, the EPC contract was officially signed with Al Shoula Group led-consortium for phase 2. In July 2011, the construction works for part 1 of phase 1 and the mobilization works for part 2 of phase 1 were ongoing. The EPC contract of phase 2 was awarded to Al Shoula Group led-consortium.

In February 2011, the DB contract for the second part of phase 1 was awarded to the consortium of Saudi Binladin Group and Yapi Merkezi Construction (Mekkah and Medinah stations) and Saudi Oger (Jeddah and King Abdullah Economic City stations).

In September 2010, the contract to supply electricity for the project was awarded to Saudi Electricity Company.

In Q1 2010, the ITB for the DB contract for the second part of phase 1 was issued.

Page 14: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

In January 2010, the PMC contract was awarded to Scott Wilson. In October 2009, the final route of the railway was determined and the RFP for the technical bids of the DB contract for the second part of phase 1 was issued.

In June 2009, the contract to provide reinforced steel was awarded to Al Rajhi Steel Industries.

In April 2009, the design consultancy contract for the stations was awarded to Foster and Partners.

In February 2009, the USD 1.87 billion DB civil contract for part 1 of phase 1 was awarded to the consortium of Al Rajhi, Alstom and China Railway Engineering; which appointed a consortium led by Al Arrab Contracting Company (ACC) to conduct the construction. The consortium includes Mohammed Ali Al Swailem Company (MASCO)and China Railway 18.

In September 2008, the ITB for the DB civil contract of part 1 of phase 1 was issued.

On 27 August 2007, SRO announced that it has issued the Request for Technical Proposals (RFTP) to six short-listed companies.

On 28 February 2007, developers submitted the prequalification documents.

In October 2006, the prequalification was launched. Scope of Work

Construction of a 450 Km railway including: Part 1 of Phase I involves civil works, roadway excavation, the body of the track and building bridges and culverts including: - 93 bridges (10,000 m total) - 4 tunnels - 142 flood water drainage channels

Part 2 of Phase I involves the design and construction of passenger stations including: - arrival and departure concourses - shops, restaurants and cafes - mosques accommodating approximately 600 people - short and long term car parking - a helipad - VIP lounges

Phase 2:

- tracks - signalling and telecommunications - operational control center - procurement and maintenance of the trains - 25 rail bridges - 157 crossings including wadi bridges and culverts - 70 crossings for cars and camels

Expected Schedule

Financing Source

Linklaters and the law office of Abdulaziz H. Fahad are the legal advisers. In February 2010, SRO selected the Public Investment Fund (PIF) to provide interest - free loans for the project.

A consortium comprising UBS Investment Bank, the National Commercial Bank and SNCF International has been retained by the Saudi Railways Organization (SRO) to provide financial and technical advisory services for the project.

Related Projects

Page 15: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Schedule & Bidders

Project Schedule

Schedule Phase Description Oct 2006 DB Prequalification launched 28 Feb 2007 DB Developers submitted prequalification documents (SOQ) 24 Jun 2007 DB SRO issued notification of prequalification Aug 2007 DB RFP issued Sep 2008 DB ITB issued for the contract for part 1 of phase 1 Feb 2009 DB Contract for part 1 of phase 1 awarded to consortium of Al Rajhi, Alstom and China Railway Engineering Apr 2009 Design Contract for the 5 stations awarded to Foster and Partners Jun 2009 Construction Contract to provide reinforced steel for the project awarded to Al Rajhi Steel Industries Oct 2009 DB RFP for technical bids of the contract for the part 2 of phase 1 issued Jan 2010 PMC Contract awarded to Scott Wilson Q1 2010 DB ITB for contract for part 2 of phase 1 issued Sep 2010 Construction Contract to supply electricity awarded to Saudi Electricity Company Feb 2011 DB Contract of second part of phase 1 awarded to Saudi Binladin Group (Mekkah and Medinah stations) and

Saudi Oger (Jeddah and King Abdullah Economic City stations) Apr 2011 DB Phase 1's part 2 mobilization works started Jul 2011 EPC Phase 2 contract awarded to Al Shoula Group led-consortium Jan 2014 Completion Phase 1 expected to be completed Q1 2017 Completion Project expected to be completed

Project News

14-Oct-2012 Haramain Railway to begin operation in 52 months - Arab News 13-Oct-2012 CITC governor tours STC's Haj preparations - The Saudi Gazette 26-Sep-2012 Deal to supply components for Haramain rail project signed - Arab News 21-Sep-2012 SR 1.37 bn contract to boost Haramain Railway - Arab News 24-Aug-2012 Makkah-Madinah train set to roll by January 2014 - Arab News 09-Apr-2012 Saudi Haramain High-Speed Rail To Start Operations In 2014-SPA - Zawya Dow Jones News 09-Apr-2012 Haramain railway main station in Makkah to cost SR3.2bn - Arab News 08-Apr-2012 Haramain High Speed Rail to start operations by 2014 - Arab News 19-Mar-2012 SRO chief says Haramain rail project progressing well - Arab News 29-Feb-2012 ررالوودد ررايیلم 14 نم رثكأأ خضت ةيیددوعسلاا ةموكاا ننآلاا ىتح نيیمراا رراطق - Zawya

» More News

Saudi Railways Organization Owner Saudi Railways Organization Building, Najd Street, Al Tubaishi District, P.O. Box 36, Dammam 31241, Saudi Arabia, Al Sharqiyah Tel: +966 3-871-2222 | Fax: +966 3-871-4117 | Email: [email protected] | Website: www.saudirailways.org

Name: Salim Ahmad Position: Project Manager

Name: Mohammed Bu Hlaigah Position: Projects Coordinator Tel: +966 3-871-3003 Email: [email protected]

Page 16: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Officers from this company (17)

Saudi Consolidated Engineering Company (Khatib and Alami) Consultant - Design

Saudi Consolidated Engineering Company Building, Al Nil Street, King Abdulaziz Quarter, Al Malaz Area, P.O. Box 3928, Riyadh 11481, Saudi Arabia, Riyadh Tel: +966 1-477-8384, +966 1-477-9794, +966 1-477-8385 | Fax: +966 1-477-9793 | Email: [email protected]

Name: Haytham Al Najem Position: Department Manager Tel: +966 1-477-8385 ext:235

Name: Ramadan Harb Position: Deputy of Road Department

Officers from this company (9)

Foster and Partners Consultant - Design - Stations

22 Hester Road, London SW114AN, United Kingdom Tel: +44 207-738-0455 | Fax: +44 207-738-1107 | Email: [email protected] | Website: www.fosterandpartners.com

Officers from this company (12)

JV of Getinsa and Dar Al Handasah Shair and Partners Consultant - Supervision

Getinsa

Ibn Ali Building, Saudi Arabia Tel: +966 3-832-8948

Dar Al Handasah Shair and Partners

Olaya Al Mass Centre Building, King Fahd Road, P.O. Box 612, Riyadh 11421, Saudi Arabia, Riyadh Tel: +966 1-201-3001 | Fax: +966 1-201-2827 | Email: [email protected] | Website: www.dargroup.com

Name: Rabih Batal

Position: Construction and Contracts Director

Name: Maamoun Al Habian Position: Projects Director

Officers from this company (28)

Scott Wilson Group PMC

Jeddah, Saudi Arabia, Makkah Tel: +966 2-264-3675 | Website: www.ursglobal.com

Name: Abdel Rahim Al Zahrani

Position: Project Director - Haramain Expansion

Tel: +966 2264-3675 ext:246

Page 17: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

Kuwait $Value Projects cancelled

$Value Projects completed

$Value Projects delayed

$Value Projects on hold

$Value Projects ongoing

$Value of all projects

8,655,000,000 21,557,900,000 176,000,000 144,155,100,000 168,408,302,500 342,952,302,500

Page 18: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Kuwait MOH - Al-Amiri Hospital Expansion Country : Kuwait Project Value : USD 3,520,000,000 Sector : Real Estate | Healthcare

Start Date : 2010

PMC : Hill-System Development Project Management Contractor : Associated Construction Company (ASCo) (Design, Build) Profile Type : Standalone Project

Phase:

DB - Awarded Completion: 2013

Overview

Owner : Ministry of Health - Kuwait - Kuwait Location : Safat , Kuwait City , Al Assimah , Kuwait Contract Type : DB - Design, Build Facility Type : Hospital Capacity : Built up area: 90,000 sq.m.

360 beds Main Usage : Healthcare Background The Kuwaiti Ministry of Health plans to expand its existing Al-Amiri Hospital in Safat, Kuwait City, Kuwait.

The project will spread over 90,000 sq.m. and will comprise a 10-storey tower including a 4-storey podium, 360 beds, 65 clinics, a physiotherapy department, laboratories, a radiology department and a pharmacy.

The project is part of the Health Ministry's plan to expand 9 existing hospitals in Kuwait.

Hill-System Development Project Management is the PMC. Current Status In September 2012, the construction of the project is expected to start.

In 2013, the project is expected to be completed.

Previous Actions

In June 2012, the DB contract was awarded to Associated Construction Company.

In March 2012, the bids for the DB contract were under evaluation.

On 11 December 2011, the bids for the Design Build (DB) contract were submitted(delayed from 11 September 2011).

In April 2011, the ITB for the DB contract was issued.

In Q1 2011, the pre-qualification documents for the DB contract were submitted. In October 2010, the PMC contract was awarded to Hill-SDPM (the JV of Hill International and SDPM).

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Page 19: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Phase Schedule Description Construction Sep 2012 Construction expected to start Completion 2013 Project expected to be completed

Previous Actions In June 2012, the DB contract was awarded to Associated Construction Company.

In March 2012, the bids for the DB contract were under evaluation.

On 11 December 2011, the bids for the Design Build (DB) contract were submitted(delayed from 11 September 2011).

In April 2011, the ITB for the DB contract was issued.

In Q1 2011, the pre-qualification documents for the DB contract were submitted.

In October 2010, the PMC contract was awarded to Hill-SDPM (the JV of Hill International and SDPM).

Scope of Work Construction of a 10-storey tower including: - 4-storey podium - 360 beds - 65 clinics - physiotherapy department - laboratories - radiology department - pharmacy

Expected Schedule

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Page 20: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Schedule & Bidders

Project Schedule

Schedule Phase Description Oct 2010 PMC Contract awarded to Hill-SDPM Q1 2011 DB Pre-qualification documents submitted Apr 2011 DB ITB issued 11 Dec 2011 DB Bids submitted

*Combined Group Contracting Company submitted the lowest bid Jun 2012 DB Contract awarded to Associated Construction Company Sep 2012 Construction Construction expected to start 2013 Completion Project expected to be completed

Ministry of Health - Kuwait Owner Ministry of Health Building, Jamal Abdulnasser Street, Al Solaibeykhat Area, P.O. Box 5, Kuwait City Safat 13001, Kuwait, Al Assimah Tel: +965 2487-7422 | Fax: +965 2486-5414 | Email: [email protected] | Website: www.moh.gov.kw

Name: Khaled Al-Razni Position: Director of Media Department Email: [email protected]

Officers from this company (18)

Associated Construction Company (ASCo) Contractor - Design, Build

safat, P.O. Box 1099, Kuwait Tel: +965 242-2460 | Fax: +965 240-4584

Hill-System Development Project Management PMC Al Jazeera Building, 1st and 2nd, Al-Mutanabi Street, Kaifan, P.O. Box 13385, Kuwait Tel: +965 247-2574 | Fax: +965 247-2583 | Website: www.hill-sdpm.com

Name: Raghida Al Harmi Position: Project Director Email: [email protected]

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Page 21: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

Oman $Value Projects cancelled

$Value Projects completed

$Value Projects delayed

$Value Projects on hold

$Value Projects ongoing

$Value of all projects

8,560,000,000 19,250,740,000 1,654,000,000 28,456,500,000 129,220,477,000 187,141,717,000

Page 22: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

The Wave - The Wave Muscat - Kempinski Hotel Country : Oman Project Value : N/A Sector : Real Estate | Hotels

Start Date : Aug 2008

Consultant : Woods Bagot (Architect and Interior design) PMC : Turner International Middle East Profile Type : Contract Package | Related Projects (1)

Phase:

Construction - Bid Evaluation

Completion: Q1 2013

Overview Owner : The Wave Muscat - Oman Shareholders : Waterfront Investments - 40.00 %

MAF Investments - 50.00 % National Investment Funds Company - Oman - 10.00 %

Location : Muscat , Muscat , Oman Contract Type : Construction Facility Type : Hotel Capacity : 5-star hotel

300 rooms Main Usage : Hotel Background The Wave Muscat plans to build Kempinski Hotel within the Wave Development in Muscat, Oman.

The 300-room, 5-star hotel will be part of the community development the Wave Muscat and will include 68 serviced apartments, a gym, a spa, two swimming pools, food and beverage outlets, and a ballroom.

Woods Bagot is the architect and interior design consultant.

Current Status In June 2012, the bids for the main construction contract were still under evaluation.

In Q3 2012, the main construction contract is expected to be awarded (delayed from May 2011).

In Q1 2013, the project is expected to be completed. Previous Actions

In January 2011, the bids for the main construction contract were submitted.

In November 2010, the ITB for the main construction contract was issued.

In Q4 2010, the design was completed. In September 2008, the Wave resort signed a final agreement with the Germany-based Kempinski Hotels for the management of the 5-star hotel Kempinski.

In August 2008, Kempinksi hotel was launched.

Page 23: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Previous Actions In January 2011, the bids for the main construction contract were submitted.

In November 2010, the ITB for the main construction contract was issued.

In Q4 2010, the design was completed. In September 2008, the Wave resort signed a final agreement with the Germany-based Kempinski Hotels for the management of the 5-star hotel Kempinski.

In August 2008, Kempinksi hotel was launched.

Scope of Work Construction of a 300-room hotel including: - 68 serviced apartments - gym - spa - two swimming pools - food and beverage outlets - ballroom

Expected Schedule

Related Projects

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Page 24: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Schedule & Bidders

Project Schedule

Schedule Phase Description Aug 2008 Announcement Kempinski hotel launched Sep 2008 Announcement The Wave resort signed a final agreement with the Germany-based Kempinski Hotels for the management

of the 5-star hotel Kempinski Q4 2010 Design Design completed Nov 2010 Construction ITB for the main construction contract issued Jan 2011 Construction Bids for the main construction contract submitted Q3 2012 Construction Main construction contract expected to be awarded Q1 2013 Completion Project expected to be completed

Project News

11-Apr-2011 Kempinski to Add Five New Properties to their GCC Collection by 2012 - Press Release 25-Jan-2011 Starwood to open hotels, relaunch Sheraton in 2011 - Times of Oman 01-May-2010 Kempinski highlights 2010 Hotel Openings at Arabian Travel Market as part of a Robust GCC Development Pipeline -

Press Release

The Wave Muscat Owner The Wave Muscat Building, 18 November Street, Al Hail Area, P.O. Box 87, Muscat Al Harthy 118, Oman, Muscat Tel: +968 24-600083, +968 24-545428, +968 24-534400 | Fax: +968 24-534401, +968 24-545158, +968 24-534709 | Email: [email protected], [email protected] | Website: www.thewavemuscat.com

Name:

David Cummings

Name:

Craig Clulow

Name:

Andrea Linehan Position: Vice President of Delivery Position: Vice President - Hotels Position: Marketing Manager Email: [email protected] Tel: +968 2-453-4486 Tel: +968 2-454-5428 ext:583

Email: [email protected] Email: [email protected]

Officers from this company (16)

Woods Bagot Consultant - Architect and Interior design

Emarat Arium Building, Sheikh Zayed Road, Dubai, United Arab Emirates, Dubai Tel: +971 4-321-2166 | Fax: +971 4-321-2177 | Email: [email protected] | Website: www.woodsbagot.com.au

Name: Matt Hederics Position: Project Manager Email: [email protected]

Turner International Middle East PMC

Gulf Towers, P.O. Box 13036, Dubai, United Arab Emirates, Dubai Tel: +971 4-337-0990 | Website: www.turnerconstruction.com

Name: Martin Toogood Position: Project Manager Email: [email protected]

Page 25: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Officers from this company (4)

JV of Waterfront Investments, MAF Investments and National Investment Funds Company Shareholder

Waterfront Investments

The Wave Muscat Building, 18 November Street, Al Hail Area, P.O. Box 87, Muscat Al Harthy 118, Oman, Muscat Tel: +968 24-600083 | Fax: +968 24-534401

MAF Investments

C/O Majid Al Futtaim Tower 2, Port Saeed Street, Deira, P.O. Box 60811, United Arab Emirates, Dubai Tel: +971 4-294-2444 | Fax: +971 4-294-2555 | Website: www.majidalfuttaimproperties.com

National Investment Funds Company

Muscat International Center Building, 5th Floor, Central Business District, P.O. Box 3028, Muscat Ruwi 112, Oman, Muscat Tel: +968 24-813143 | Fax: +968 24-813241

Officers from this company (13)

Page 26: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

DATA EXTRACTED FROM ZAWYA.COM PROJECTS DATABASE OCTOBER 2012

Bahrain $Value Projects cancelled

$Value Projects completed

$Value Projects on hold

$Value Projects ongoing

$Value of all projects

3,912,600,000 8,675,700,000 11,680,000,000 78,387,355,000 102,655,655,000

Page 27: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Lulu Tourism Company - Bahrain Reef Island Also Known As : Lulu Island Country : Bahrain Project Value : USD 1,300,000,000 Sector : Real Estate | Community Development

Start Date : 2005

Consultants : Scott Wilson Group (Infrastructure - Phase 2 (part 1)) | Spowers and Pentago

(Architect) PMC : Davis Langdon and Seah International Contractors : Ahmed Mansoor Al A'ali Company (Infrastructure - maritime) | Al Hamad Contracting

Company (Construction and MEP - Phase 1 ) Profile Type : Standalone Project

Phase:

Construction - Execution

Completion: 2013

Overview Owner : Lulu Tourism Company - Bahrain Shareholders : Robert Mouawad Real Estate Group - Lebanon - 50.00 %

Bahrain Mumtalakat Holding Company - Bahrain - 50.00 % Location : Manama , Capital , Bahrain Contract Type : Construction Facility Type : Residential development Capacity : Land area: 579,000 sq.m.

1,217 residential units Main Usage : Community Development Background Lulu Tourism Company plans to develop Reef Island, a residential development along the northern shore of Manama,

Bahrain.

Reef Island will be spread over a 579,000 sq.m. area of reclaimed land and is designed in the shape of number nine.

The development include the construction of 1,217 residential units (categorized as follows: 39 residential buildings, 65 villas, and 49 beach villas), a 250-room hotel, a spa, a shopping mall, restaurants, a medical center, a marina and a yacht club. Real Estate facilities will only occupy 30% of the total area. The remaining area will consist of gardens, walkways, and pools.

The project will be constructed in phases. Phase 1, developed by Lulu Tourism Company, will include dredging, land reclamation, and maritime works.

Phase 2, developed by private developers, will be executed in 2 phases taking place simultaneously and will include infrastructure works as well as construction works. The first phase will include construction of 8 residential buildings, 49 beach villas and 14 villas while the second phase will include construction of the remaining facilities.

Davis Langdon and Seah International is the PMC, Spowers and Pentago is the architect, and Scott Wilson is the Infrastructure consultant (Phase 2 part 1).

Current Status

In September 2012, the construction of the project was ongoing. In 2013, the project is expected to be completed.

Previous Actions

In December 2011, phase 1 was completed (delayed from March 2011).

In Q2 2008, the construction of phase 1 started.

In April 2008, the infrastructure works were completed. In July 2007, the main construction contract for phase 1 buildings and MEP contract (developed by Lulu Tourism Company) was awarded to Al Hamad Contracting Company.

In early 2007, the marine works were completed.

In July 2006, the infrastructure works contract was awarded to Ahmed Mansoor Al Aali (AMA).

In November 2005, the maritime works contract was awarded to Ahmed Mansoor Al Aali (AMA).

In 2005, land reclamation was completed.

Page 28: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Phase Schedule Description Completion 2013 Project expected to be completed

Scope of Work

Phase 1: Dredging, land reclamation, and marine works.

Phase 2: Infrastructure works including roads, electricity, water, sewerage and telecommunications.

Construction of the following facilities: - 39 residential buildings - 65 villas - 49 beach villas - 250-room hotel - Spa - 30,000 sq.m. shopping mall - Medical center - Marina - Yacht club

Expected Schedule

Page 29: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Schedule & Bidders

Project Schedule

Schedule Phase Description 2005 Construction Land reclamation completed Nov 2005 Construction Contract for maritime works awarded to Ahmed Mansoor Al Aali Jul 2006 Construction Contract for infrastructure works awarded to Ahmed Mansoor Al Aali Q1 2007 Construction Marine works completed Jul 2007 Construction Contract for building works and MEP (phase 1) awarded to Al Hamad Contracting Company Apr 2008 Construction Infrastructure works for phase 1 completed Q2 2008 Construction Construction of phase 1 started Dec 2011 Construction Construction of phase 1 completed 2013 Completion Project expected to be completed

Project News

11-Feb-2008 Reef Island Marketing Tent Set to Open - Press Release 29-Sep-2007 Reef Island flaunts its unique blend of architectural styles - Press Release 11-Jun-2007 Bahrain: Al Hamad gets BD60m Reef phase-I contract - Bahrain Tribune

Lulu Tourism Company Owner Building 2875 Building, 30th Floor, Office 3004, Road 4652 Street, Reef Island Area, P.O. Box 31405, Manama , Bahrain, Capital Tel: +973 17-564810 | Fax: +973 17-564861 | Email: [email protected]

Name: Cherif Saumia Position: Project Manager Email: [email protected]

Officers from this company (12)

Spowers and Pentago Consultant - Architect Kuala Lumpur 59200, Malaysia Tel: +603 2282-3016 | Fax: +603 2282-1016 | Website: www.pentagospowers.com

Scott Wilson Group Consultant - Infrastructure - Phase 2 (part 1) Euro Tower, 485, road 1010 Street, Sanabis, Manama 410, Bahrain, Capital Tel: +973 17-556634 | Fax: +973 17-550151 | Website: www.ursglobal.com

Al Hamad Contracting Company Contractor - Construction and MEP - Phase 1

Al Hamad Contracting Building, Emirates Road, Sharjah Industrial Area 13, P.O. Box 6275, Sharjah, United Arab Emirates, Sharjah Tel: +971 6-534-9666 | Fax: +971 6-534-9966 | Email: [email protected]

Name: Fadi Habib Position: Project Manager

Page 30: VALUE OF PROJECT OPPORTUNITIES WITHIN THE … Masdar City Begins Exporting Clean Energy Technology - Khaleej Times » More News Abu Dhabi Future Energy Company Owner Abu Dhabi Future

Copyright ©2012Zawya Ltd. All rights reserved. Project information provided by www.zawya.com

Officers from this company (13)

Ahmed Mansoor Al A'ali Company Contractor - Infrastructure - maritime

Ahmed Mansoor Al A'ali Company Building, Ground Floor, Sheikh Salman Highway, Al Salhiya Area, P.O. Box 778, Manama , Bahrain, Capital Tel: +973 17-265555 | Fax: +973 17-262323, +973 17-258899 | Email: [email protected] | Website: www.al-aali.com

Name: Colin Mc Leeds Position: Project Manager Tel: +973 17-210699 Email: [email protected]

Officers from this company (18)

Davis Langdon and Seah International PMC

MidCity Place Building, 71 High Holborn Street, London, United Kingdom Tel: +44 20-7061-7000 | Fax: +44 20-7061-7061 | Website: www.davislangdon.com

Name: Spencer Wylie Position: Project Manager Tel: +973 17-588-796

Bahrain Mumtalakat Holding Company Shareholder Addax Tower, Building 1006, 5th-7th Floor, Road 2813 Street, Al Seef District, P.O. Box 820, Manama 428, Bahrain, Capital Tel: +973 17-561111 | Fax: +973 17-561109 | Email: [email protected] | Website: www.bmhc.bh

Name: Ahmad Janahi Position: Project Manager Email: [email protected]

Officers from this company (26)

Robert Mouawad Real Estate Group Shareholder MHL building, Sassine Area Street, Ashrafieh, Beirut, Lebanon, Beirut Tel: +961 1-201801 | Fax: +961 1-202009, +961 1-332672 | Email: [email protected]

Name: Najeb Abi Karim Position: Technical Director Tel: +973 17-564577