Vale’s Keynote Address

37
0 0 Mozambique Coal A Privilege and a Responsibility Mauro Neves Global Coal Director The 4th Mozambique Coal & Energy conference 15-16 July Maputo

Transcript of Vale’s Keynote Address

Page 1: Vale’s Keynote Address

0 0

Mozambique Coal

A Privilege and a Responsibility Mauro Neves

Global Coal Director

The 4th Mozambique Coal & Energy conference

15-16 July Maputo

Page 2: Vale’s Keynote Address

1

“This presentation may include statements that present Vale's expectations about future

events or results. All statements, when based upon expectations about the future and not

on historical facts, involve various risks and uncertainties. Vale cannot guarantee that such

statements will prove correct. These risks and uncertainties include factors related to the

following: (a) the countries where we operate, especially Brazil and Canada; (b) the global

economy; (c) the capital markets; (d) the mining and metals prices and their dependence

on global industrial production, which is cyclical by nature; and (e) global competition in the

markets in which Vale operates. To obtain further information on factors that may lead to

results different from those forecast by Vale, please consult the reports Vale files with the

U.S. Securities and Exchange Commission (SEC), the Brazilian Comissão de Valores

Mobiliários (CVM), the French Autorité des Marchés Financiers (AMF), and The Stock

Exchange of Hong Kong Limited, and in particular the factors discussed under “Forward-

Looking Statements” and “Risk Factors” in Vale’s annual report on Form 20-F.”

Disclaimer

Page 3: Vale’s Keynote Address

2 2

Page 4: Vale’s Keynote Address

3

Our Goal is

Zero Harm

Page 5: Vale’s Keynote Address

4

Our Goal is Zero Harm Life matters most

Page 6: Vale’s Keynote Address

5

Vale in the World

Headquartered in Brazil, Vale is a global diversified mining company, with

offices and world-class assets on all continents.

Page 7: Vale’s Keynote Address

6

Our Coal Business

Page 8: Vale’s Keynote Address

7

China JVs:

Longyu: coal and

related products;

Yankuang:

metallurgical coke

Moatize Coal Project in Mozambique - Phase 1 capacity 11 million tons per year

Coal Operations and advanced

coal projects in Australia - Integra, Carborough Downs, and Isaac

Plains JVs with a nominal capacity to

produce up to 8Mta;

- Belvedere, Eagle Downs, etc.

- Plus 10,000 sq km of coal exploration

assets in Queensland

Our current global footprint

Page 9: Vale’s Keynote Address

8

2013

Moatize

2014 2015 2016 2017

Australia

Operations

and Projects

47%

63% 64%

70%

Current plan aims to achieve over 30 Mtpa of production capacity in the next

5 years, with a diversified platform of growth with projects and operations in 2

continents.

We expect Moatize to become our largest coal operation by 2014

50%

Production – Marketed tons - Mtpa

Production Capacity

Page 10: Vale’s Keynote Address

9

Vale in Mozambique,

the privilege

Page 11: Vale’s Keynote Address

10

Coal-related projects:

Moatize I

Moatize II

Nacala Corridor

Sena Line

Also, a Power Plant is projected to

supply our local operations

Sena Line

Nacala

Beira

Moatize

Nacala Corridor

MAPUTO

Cahora Bassa Dam

HARARE

PRETORIA

Moatize Coal Project

Page 12: Vale’s Keynote Address

11

Industrial Area

Page 13: Vale’s Keynote Address

12

Rehabilitation

of Beira line to

full 6 Mtpa

capacity

Ramping Up of Moatize since its 2004 Inception

Loading

of 1st

capesize

vessel

Actions

to

maximize

the Beira

line

Start-up of railway

at Nacala / Moatize

expansion

production

Commissioning

of # 2 CHPP

Start-up of

Nacala railway

Q1 ‘15 H2 ‘15 Q4 ‘14

Jan ‘13 Oct ‘12 Feb ‘13

MOATIZE I - RAMP-UP AFTER MINING START-UP IN 2008

MOATIZE II - IS IN CONSTRUCTION

Start coal

production

Aug ‘11

Start coal

exports

Sep ‘11

First Train Loaded

August 2011

First Cargo

September 2011

First Capesize

January 2013

Page 14: Vale’s Keynote Address

13

Moatize Products

VITRINITE

Key attributes are:

High hot strength (CSR=69)

High cold strength (M40=84)

High vitrinite (81%) – provides

ability to carry more high inerts

coals in the blend

Genuine high quality hard coking

coal alternative to Australia

Rank/ Volatile Matter and CSR sits

close to optimum coke oven coal

blend targets, providing flexibility

in the number and type of coals

used in the blend

Excellent caking properties (G=92)

providing ability to be used as the

foundation of the coal blend

Delivering to our customers, strong coking properties with high carrying capacity for

low grade coals.

Page 15: Vale’s Keynote Address

14

Hampton

Roads

Vancouver

Praia

Mole

Beira

Constanza

Gangavaram Goa

Beilun

Dalrymple

Bay

Market Regions

Supply Regions

Rotterdam

Kimitsu

Fos-sur-Mer

Well positioned to supply cost competitive premium hard coking coal to global

markets

Metallurgical Coal: market and supply regions

• Over 3.0Mt of shipments to date

• Tested worldwide with over global 30 customers with great success.

• Trialed at ratio’s between 10% and 40% of the coke oven coal blend

Target Market

Page 16: Vale’s Keynote Address

15

Moatize Expansion

Project and

New Investiments in

Africa

Page 17: Vale’s Keynote Address

16

Investment planned for the coming years

Total Investments: 8,2 bi

Page 18: Vale’s Keynote Address

17

Moatize Expansion Project

Additional 11 Mtpa of nominal production capacity, totaling of 22 Mtpa,

including duplication of the coal handling and preparation plant (CHPP) and

expansion of the infrastructure.

Production is estimated to be predominantly HCC .

Mine Operations Capex: US$ 2.0 billion.

Start up: 2H 2015

CHPP Plateau Retaining Wall

Page 19: Vale’s Keynote Address

18

Nacala Project

Capacity: estimated at 18

Mtpa of coal with potential to

expand further

Capex: US$ 4.4 billion

• US$3.4bn railway

• US$1.0bn port terminal

Start up: 2H 2015

Physical Progress: 30% by

Jul 13

Nacala corridor: 912 km long railway and port terminal

Page 20: Vale’s Keynote Address

19

Railway to link Moatize mine to

Nacala, crossing Malawi, comprising

the construction of 230 km of new

railway sections and rehabilitation of

682 km of the existing railway.

75%

25%

Railway Extension

237 km

675 km

Mozambique

Malawi

Railway characteristics

Greenfield

Brownfield

682 km

230 km

237 km

Nacala Railway

Increase the logistics capacity to export

coal from the expanded Moatize mine to

a new port in Nacala.

230 km

682 km

Page 21: Vale’s Keynote Address

20

6 7

8

2

3

5 CLIN

Greenfield Mz

62.5km

CLIN

Greenfield Mz

29.3 km

VLL

Greenfield Mw

138.5 km

CLIN

Porto

CEAR

Brownfield Mw

98.6 km

CDN

Brownfield Mz

504.2 km

Nacala Rail Corridor

CDN

Brownfield Mz

79.1 km

GF Moz 91,8 Km

BF Moz 583 Km

GF Mlw 138,5 Km

BF Mlw 98,6 Km

Page 22: Vale’s Keynote Address

21

Nacala Port

Natural sea bay with deep water channel (berth with > 20m draft)

Installed capacity for 18 Mpta with potential for further expansions

Page 23: Vale’s Keynote Address

22

Environment

Page 24: Vale’s Keynote Address

23

Environmental

High performance environmental

programs such as:

• Air quality control

• Weather condition control

• Control of noise and vibrations

• Quality control of water and

effluents

• Fauna and flora tracking

• Waste control

• Environmental Management

system implemented accorded to

ISO 14001

• Environmental training and

education program implemented.

Page 25: Vale’s Keynote Address

24

Opportunities

Page 26: Vale’s Keynote Address

25

Strategy Recruitment & Selection

Page 27: Vale’s Keynote Address

26

Strategy Recruitment & Selection

Moatize Mine

53% employees from the Mine are from

Mozambican central region (Tete and

Sofala provinces)

Most employees originally from Tete,

35%, are from Moatize district

Also, 520 of Vale and contractor

employees are from Cateme and 25 de

Setembro, ressetled areas

Page 28: Vale’s Keynote Address

27

People Development – Professional Training

Page 29: Vale’s Keynote Address

28

Training of Hydraulics, Diesel Engines and Electric

Grades average

Hydraulics : 94,7%

Electric: 96,5%

Diesel Engines: 97,5%

Page 30: Vale’s Keynote Address

29

Local Suppliers

186

211 249

579

Development of local suppliers

contracts 2009-2012

Today, 839 companies

provide service to Vale, about

200 companies are from Tete

Our selection is based on suppliers that are

technically and commercially competitive

Page 31: Vale’s Keynote Address

30

Social development

Page 32: Vale’s Keynote Address

31

The resettlement process of Moatize’s project was the biggest ever realized by

Vale, moving more than 5,000 people.

Resettlement Program

About the program:

Total number of people: 5,104

Rural and Urban Resettlement (Cateme

and 25 de Setembro)

Average of habitants by family: 4.88

hab/AF

Total number of families: 1,356

Transferences finalized in September

2011, currently in post-resettlement and

social program phase.

Page 33: Vale’s Keynote Address

32

Social Investments - Infrastructure improvements

Page 34: Vale’s Keynote Address

33

Social Investments - Infrastructure improvements

Page 35: Vale’s Keynote Address

34

Lecture about Economic gains of the mining chain Visit of Minarte school

Visit of Somane Machado school

Visit of Cateme Primary School

Page 36: Vale’s Keynote Address

35

Page 37: Vale’s Keynote Address

36

Thank you!

Mauro Neves

Vale Moçambique

Maputo, July 2013