Prepared by:
AECOM
105 Commerce Valley Drive West, Floor 7 905 886 7022 tel
Markham, ON, Canada L3T 7W3 905 886 9494 fax
www.aecom.com
Project Number:
60267668
Date:
May 10, 2016
Vale Limited / Glencore Limited
Annual SO2 Report Submission SO2 Monitoring Network for Sudbury January to December 2015
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final
Statement of Qualifications and Limitations
The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“Consultant”) for the benefit of the client
(“Client”) in accordance with the agreement between Consultant and Client, including the scope of work detailed therein (the
“Agreement”).
The information, data, recommendations and conclusions contained in the Report (collectively, the “Information”):
is subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications
contained in the Report (the “Limitations”)
represents Consultant’s professional judgement in light of the Limitations and industry standards for the preparation
of similar reports
may be based on information provided to Consultant which has not been independently verified
has not been updated since the date of issuance of the Report and its accuracy is limited to the time period and
circumstances in which it was collected, processed, made or issued
must be read as a whole and sections thereof should not be read out of such context
was prepared for the specific purposes described in the Report and the Agreement
in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the
assumption that such conditions are uniform and not variable either geographically or over time
Consultant shall be entitled to rely upon the accuracy and completeness of information that was provided to it and has no obligation
to update such information. Consultant accepts no responsibility for any events or circumstances that may have occurred since the
date on which the Report was prepared and, in the case of subsurface, environmental or geotechnical conditions, is not responsible
for any variability in such conditions, geographically or over time.
Consultant agrees that the Report represents its professional judgement as described above and that the Information has been
prepared for the specific purpose and use described in the Report and the Agreement, but Consultant makes no other
representations, or any guarantees or warranties whatsoever, whether express or implied, with respect to the Report, the
Information or any part thereof.
The Report is to be treated as confidential and may not be used or relied upon by third parties, except:
as agreed in writing by Consultant and Client
as required by law
for use by governmental reviewing agencies
Consultant accepts no responsibility, and denies any liability whatsoever, to parties other than Client who may obtain access to
the Report or the Information for any injury, loss or damage suffered by such parties arising from their use of, reliance upon, or
decisions or actions based on the Report or any of the Information (“improper use of the Report”), except to the extent those
parties have obtained the prior written consent of Consultant to use and rely upon the Report and the Information. Any damages
arising from improper use of the Report or parts thereof shall be borne by the party making such use.
This Statement of Qualifications and Limitations is attached to and forms part of the Report and any use of the Report is subject
to the terms hereof.
AECOM
105 Commerce Valley Drive West, Floor 7 905 886 7022 tel
Markham, ON, Canada L3T 7W3 905 886 9494 fax
www.aecom.com
Rpt 2015 Annual So2 Report_Final
May 13, 2016
Ministry of the Environment and Climate Change
Sudbury District Office
199 Larch St., Suite 1201
Sudbury, Ontario
P3E 5P9
Dear District Manager:
Project No: 60267668
Regarding: Annual SO2 Report Submission
SO2 Monitoring Network for Sudbury – January to December 2015
Enclosed is the Annual SO2 Report Submission for the Sudbury SO2 Monitoring Network. On behalf of Vale and
Glencore, AECOM prepared the attached annual report that includes presentation of monitoring data from January
to December 2015.
Please do not hesitate to contact me at (905) 390-2026, or by E-mail at [email protected] if you have
any questions or require further information.
Sincerely,
AECOM Canada Ltd.
Danielle Arsenault, P. Eng.
Environmental Engineer
cc: Guowang Qiu Monika Greenfield Chad Pearson Marc Gascon Air Quality Analyst Vale Limited Superintendent of Environment Manager, Product Support MOECC Copper Cliff Smelter Glencore Bestech 199 Larch Street, Suite 1201 (Technical Services) Sudbury Operations 1040 Lorne Street, Unit 3 Sudbury, ON 337 Power Street Falconbridge, ON Sudbury, ON P3E 5P9 Copper Cliff, ON P0M 1S0 P3C 4R9 P0M 1N0
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final
Distribution List
# of Hard Copies PDF Required Association / Company Name
Yes Ministry of Environment and Climate Change
1 Yes Vale
Yes Glencore
Yes Bestech
Revision Log
Revision # Revised By Date Issue / Revision Description
0 Yvonne Chiu April 8, 2016 Original
1 Yvonne Chiu May 10, 2016 Finalized with Bestech’s comments
AECOM Signatures
Report Prepared By:
Yvonne Chiu, CEPIT
Air Quality Compliance Specialist
Report Reviewed By:
Danielle Arsenault, P. Eng
Air Quality Engineer
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final i
Executive Summary
Bestech was retained by Vale and Glencore to operate and maintain eighteen (18) SO2 monitoring stations in the Sudbury area.
AECOM Canada Ltd. (AECOM) was retained by Bestech to perform data analysis and reporting on their behalf. Regular quality
assurance checks, data analysis and monthly, quarterly and annual reporting to the Ministry of the Environment and Climate
Change (MOECC) are key components of this assignment.
This annual report presents an overview of the SO2 concentrations observed at each of the monitoring stations and the
meteorological conditions observed at STN77025 and Falconbridge MET for a one (1) year period from January 1st to December
31st, 2015. This report also includes an overview of the monitoring equipment inventory, site visits, audits and valid data
collection performance parameters. These components provide a summary of the operational aspects of the monitoring network.
This report includes statistical analysis of the measured SO2 data for the eighteen (18) monitoring stations and meteorological
data for two (2) met stations equipped with meteorological instrumentation.
Bestech performs all field related activities, station maintenance and calibration, raw data retrieval, editing and storage. AECOM
performs the necessary data quality assurance, statistical analysis and reporting functions.
A summary of the monitoring stations and the annual arithmetic mean SO2 concentrations from January 1st to December 31
st,
2015 is presented in Table 1.
Table 1. Annual Arithmetic Mean SO2 Concentrations for January to December 2015
Station Measurements Annual Arithmetic Mean SO2
Concentration (ppb)
STN77012 (Skead) SO2 2.8
STN77013 (Hanmer) SO2 1.1
STN77028 (Coniston) SO2 1.4
STN77065 (Garson) SO2 1.9
STN77075 (New Sudbury) SO2 1.4
STN77203 (Science North) SO2 1.7
STN77206 (Rayside) SO2 0.8
STN77218 (Copper Cliff) SO2 2.3
STN77225 (Kelly Lake) SO2 1.8
STN77227 (Kinsmen) SO2 1.4
STN77228 (Dozzi Park) SO2 1.5
STN77230 (Spruce Street) SO2 3.4
STN77231 (Algonquin) SO2 1.8
STN77330 (Union) SO2 2.9
STN77600 (Edison) SO2 2.0
STN77601 (Parkinson) SO2 2.5
STN77602 (Sunderland) SO2 2.0
STN77603 (Wahnapitae) SO2 0.9
Notes: Annual AAQC for SO2 = 20 ppb
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final ii
All SO2 monitoring stations met the minimum performance criterion of 90% valid data availability as shown Table 2. The annual
valid data collection for the eighteen (18) monitoring stations was based on 8,760 hours.
Table 2. Summary of SO2 Annual Valid Data Collection for 2015
Station Annual Valid Data Collection (%)
STN77012 (Skead) 99.6%
STN77013 (Hanmer) 99.7%
STN77028 (Coniston) 99.7%
STN77065 (Garson) 99.2%
STN77075 (New Sudbury) 99.7%
STN77203 (Science North) 99.7%
STN77206 (Rayside) 99.3%
STN77218 (Copper Cliff) 99.7%
STN77225 (Kelly Lake) 96.2%
STN77227 (Kinsmen) 99.6%
STN77228 (Dozzi Park) 99.2%
STN77230 (Spruce Street) 99.7%
STN77231 (Algonquin) 99.3%
STN77330 (Union) 99.7%
STN77600 (Edison) 99.7%
STN77601 (Parkinson) 99.6%
STN77602 (Sunderland) 99.7%
STN77603 (Wahnapitae) 99.6%
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final iii
Tables 3 and 4 summarize the annual percent valid data collection at STN77025 and Falconbridge MET, respectively. Overall, all
the meteorological parameters met the 90% valid data availability criteria.
Table 3. Summary of Annual Valid Data Collection for Meteorological Data @ STN77025
Met Parameter
(STN77025)
Valid Data Collection
(%)
Temperature Elevation @ 12.5 m (T1) 99.9%
Temperature Elevation @ 91 m (T3) 99.7%
Delta T (DT2) 99.7%
Wind Direction Elevation @ 12.5 m (WD1) 99.9%
Wind Direction Elevation @ 91 m (WD3) 99.9%
Wind Speed Elevation @ 12.5 m (WS1) 99.9%
Wind Speed Elevation @ 91 m (WS3) 99.9%
Table 4. Summary of Annual Valid Data Collection for Meteorological Data @ Falconbridge MET
Met Parameter
(Falconbridge MET)
Valid Data Collection
(%)
Temperature Elevation @ 2 m (T1) 99.7%
Temperature Elevation @ 60 m (T3) 99.7%
Delta T (DT2) 99.7%
Wind Direction Elevation @ 60 m (WD1) 99.7%
Wind Speed Elevation @ 60 m (WS1) 99.7%
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final
Table of Contents
Statement of Qualifications and Limitations
Letter of Transmittal
Executive Summary
pa ge
1. Introduction .................................................................................................................................. 1
1.1 General Overview ................................................................................................................................................ 1
2. Summary of Overall Operations.................................................................................................. 2
2.1 Parameters Monitored .......................................................................................................................................... 2 2.2 Inventory of SO2 Equipment ................................................................................................................................. 3 2.3 Meteorological Measurement Equipment ............................................................................................................. 6 2.4 Summary of Site Visits – Bestech ........................................................................................................................ 6 2.5 MOECC Audits ..................................................................................................................................................... 7 2.6 Data Loss and Backup ......................................................................................................................................... 7
3. Percent Valid Data Statistics ....................................................................................................... 9
3.1 SO2 Valid Data Collection Performance ............................................................................................................... 9 3.2 Meteorological Valid Data Collection Performance ............................................................................................ 10
4. Annual Statistics ........................................................................................................................ 11
4.1 Hourly SO2 Concentrations Overview ................................................................................................................ 11 4.2 Maximum Daily SO2 Concentrations .................................................................................................................. 12 4.3 Summary of Measured SO2 Concentrations Above AAQC ................................................................................ 13 4.4 Source Contribution Assessment for Measured SO2 Concentrations Above AAQC........................................... 14 4.5 Annual SO2 Average Concentrations Overview ................................................................................................. 15
5. Annual SO2 Results Comparison .............................................................................................. 17
6. References ................................................................................................................................. 19
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final
Table of Contents
List of Tables
Table 1. Annual Arithmetic Mean SO2 Concentrations for January to December 2015 ............................................................. i Table 2. Summary of SO2 Annual Valid Data Collection for 2015 ............................................................................................ ii Table 3. Summary of Annual Valid Data Collection for Meteorological Data @ STN77025 ..................................................... iii Table 4. Summary of Annual Valid Data Collection for Meteorological Data @ Falconbridge MET ......................................... iii
Table 2-1. Parameters Monitored at Sudbury SO2 Monitoring Network ........................................................................................ 2 Table 2-2. SO2 Analyzer Inventory ............................................................................................................................................... 3 Table 2-3. Station Upgrades and Replacements in 2015 ............................................................................................................. 4 Table 2-4. Calibration Summary at Each Monitoring Station in 2015 ........................................................................................... 6 Table 2-5. MOECC Audits at Each SO2 Monitoring Station – Date & Result ................................................................................ 7 Table 3-1. SO2 Valid Data Collection at Each Monitoring Station ................................................................................................. 9 Table 3-2. Meteorological Valid Data Collection Performance @ STN77025 ............................................................................. 10 Table 3-3. Meteorological Valid Data Collection Performance @ Falconbridge MET ................................................................ 10 Table 4-1. Maximum Hourly SO2 Concentrations – January to December 2015 ........................................................................ 11 Table 4-2. Maximum Daily SO2 Concentrations – January to December 2015 .......................................................................... 12 Table 4-3. SO2 Measured Concentrations above AAQC ............................................................................................................ 13 Table 4-4. Source Contribution Assessment for the Measured SO2 Concentrations above the Hourly AAQC ........................... 14 Table 5-1. Average Annual SO2 Concentrations for 2014 and 2015 .......................................................................................... 17
List of Figures
Figure 4-1. Annual Mean SO2 Concentration – January to December 2015 .............................................................................. 16 Figure 5-1. Annual Mean SO2 Concentrations Comparison ........................................................................................................ 18
Appendices
Appendix A. Equipment Inventory
Appendix B. Summary of Site Visits & Lists of Problems
Appendix C. Figures
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 1
1. Introduction
Bestech was retained by Vale and Glencore to operate and maintain eighteen (18) SO2 monitoring stations in the Sudbury area.
AECOM Canada Ltd. (AECOM) was retained by Bestech to perform the data analysis and reporting on their behalf. Bestech and
AECOM conducted this work from January to December 2015. This annual report is a component of the reporting requirements
that Vale and Glencore must provide to the Ministry of the Environment and Climate Change (MOECC).
This report has been prepared following the guidance of the report issued by the MOECC Operations Manual for Air Quality
Monitoring in Ontario (MOECC, March 2008). AECOM is responsible for reporting monitoring data while Bestech is responsible for
calibration and maintenance of the monitoring equipment.
This annual report summarizes the measured ambient SO2 concentrations at the eighteen (18) monitoring stations and the
meteorological conditions from the two (2) meteorological stations (STN77025 and Falconbridge MET), located in Sudbury and
Falconbridge, Ontario.
1.1 General Overview
There are currently eighteen (18) SO2 monitoring stations and two (2) meteorological stations situated in Sudbury and its
surrounding area. Prior to April 2004, eleven (11) of these monitoring stations and one (1) meteorological station (STN77025)
were owned and operated by the MOECC. Since then, the ownership and responsibility for maintenance, calibration and data
reporting have been transferred jointly to Vale and Glencore and the following changes have occurred:
In 2007, two (2) new stations were added as the 12th
and 13th
stations (STN77230 and STN77231).
In May 2008, four (4) stations (STN77600, STN77601, STN77602 and STN77603) and one (1) MET station (Falconbridge
MET) were included in the reporting for the Sudbury SO2 Monitoring Network. They had been previously reported by
Glencore.
In December 2009, STN77201 (Mikkola) was relocated from 150 Patricia Street to 1 Mikkola Road and renamed
STN77227 (Kinsmen).
In November 2013, STN77330 (Union) was added to the monitoring network as the 18th station. Bestech and AECOM
were retained by Vale and Glencore to administer this monitoring network on their behalf.
Bestech has calibrated all of the eighteen (18) stations in accordance with the MOECC Operations Manual for Air Quality
Monitoring in Ontario (March 2008). Bestech and AECOM have carried out daily data checks, data editing and monthly data
checks.
A map showing the location of the monitoring stations, the MET stations and the Vale and Glencore sites is presented in Appendix
C.
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 2
2. Summary of Overall Operations
2.1 Parameters Monitored
The parameters monitored at the Sudbury SO2 Monitoring Network stations are mainly SO2 concentrations, wind speed, wind
direction, and ambient temperatures. Table 2-1 presents the parameters monitored at each of the monitoring stations.
Table 2-1. Parameters Monitored at Sudbury SO2 Monitoring Network
Station ID Location Data
STN77012 (Skead) Bowlands Rd, Skead P0M 2Y0 SO2
STN77013 (Hanmer) 4896 Notre Dame, Hanmer P0M 1H0 SO2
STN77028 (Coniston) 103 Edward St., Coniston P0M 1M0 SO2
STN77065 (Garson) 3610 Falconbridge Hwy, Garson P3L 1E6 SO2
STN77075 (New Sudbury) 1400 Barrydowne Rd., Sudbury P3A 3V8 SO2
STN77227 (Kinsmen) 1 Mikkola Rd, Lively P3Y 1A5 SO2
STN77203 (Science North) Science North 3rd Floor, Sudbury P3E 5S9 SO2, Solar Radiation
STN77206 (Rayside) 3535 Regional Road 15, Chelmsford P0M 1L0 SO2
STN77218 (Copper Cliff) 43 Veteran St., Copper Cliff P0M 1N0 SO2
STN77225 (Kelly Lake) 1379 Stephen St., Sudbury P3E 2ME SO2
STN77228 (Dozzi Park) 15 Glover St., Sudbury P3C 5M5 SO2, Barometric Pressure
STN77230 (Spruce Street) 636 Spruce St., Sudbury P3C 1R2 SO2
STN77231 (Algonquin) 2646 Algonquin Rd, Sudbury P3E 4X6 SO2
STN77330 (Union) Union and Marconi P0M 1N0 SO2
STN77600 (Edison) 6 Edison Rd, Falconbridge P0M 1S0 SO2
STN77601 (Parkinson) Parkinson Rd, Playground, Falconbridge P0M 1S0 SO2
STN77602 (Sunderland) Lot 4, Sunderland Rd., Garson P3L 1E6 SO2
STN77603 (Wahnapitae) Dryden Twp, Wahnapitae P0M 3C0 SO2
STN77025 (CKNC Tower @ Frood) 699 Frood Rd., Sudbury P3C 5A3 Temperature, Wind Speed and Wind
Direction at 12.5 m and 91 m elevations
Falconbridge MET
(Met Tower @ Falconbridge) 6 Edison Rd, Falconbridge Bsmt of XPS P0M 1S0
Temperature at 2 m and 60 m elevations, Wind Speed and Wind
Direction at 60 m elevation
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 3
2.2 Inventory of SO2 Equipment
The existing SO2 sampling equipment is based on pulsed fluorescence SO2 analyzers. For instrument calibrations, the span gas is
drawn through an SO2 oven with an SO2 source and the zero gas is drawn through a charcoal source. Each analyzer is a self-
contained, rack mounted unit with associated sample conditioning system connected to an external sample port.
There are two (2) different vintages of analyzer in use in the current system: TECO 43I and TECO 43C. In 2015, the remaining
TECO 43C models used at the monitoring stations were replaced with newer TECO 43I models. The older TECO 43C models
were retained as spares. Table 2-2 lists each of the analyzer types, the age of the unit, measurement range and the station where
it is located.
Table 2-2. SO2 Analyzer Inventory
SO2 Analyzer Type Quantity Age Measurement Range (ppb)
Station
TECO 43I 19 < 8 years 0 – 10 000
Skead Hanmer Coniston Garson
Science North Rayside
Kelly Lake Kinsmen
Dozzi Park Spruce Street
Edison Parkinson
Sunderland Wahnapitae
Union Sudbury INO Spare #1 Sudbury INO Spare #2
Vale Spare #1 Vale Mobile
TECO 43C 3 ~ 15 years 0 – 10 000 Vale Spare #2 Vale Spare #3 Vale Spare #4
TECO 43I 3 < 3 years 0 – 10 000 New Sudbury Copper Cliff Algonquin
Notes: INO = Integrated Nickel Operations
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 4
Table 2-3 lists all of the station upgrades and replacements that were made in 2015 including the month in which the upgrades or
replacement occurred.
Table 2-3. Station Upgrades and Replacements in 2015
Station ID Upgrades Month of Upgrade
CKNC
12 Meter Temperature Sensor Replacement October
12 Meter Anemometer October
114 Meter Temperature Sensor October
114 Meter Anemometer October
STN77012 (Skead)
Small UPS Replacement February
Permeation Tube Replacement June
Pump Rebuild June
Flow Transducer Replacement October
Pump Replacement October
DSL Modem Replacement November
STN77013 (Hanmer)
Router Replacement February
Fence Gate Adjustment May
Permeation Tube Replacement June
Pump Rebuild June
Flow Transducer Replacement December
STN77028 (Coniston) Router Replacement February
Pump Rebuild June
STN77065 (Garson)
Pump Replacement April
Flow Sensor Repaired July
Lamp Replacement July
Wall GFCI Replaced for Standard Plug July
STN77075 (New Sudbury)
Gate Lock Replacement July
Inlet Tubing Replacement September
Pump Replacement November
DSL Modem Replacement November
STN77203 (Science North)
Permeation Tube Replacement May
Pump Replacement May
I/O Board Replacement June
Pump Replacement July
STN77206 (Rayside) Router Replacement February
STN77218 (Copper Cliff)
Router Replacement January
Air Conditioning Unit Replacement April
Permeation Tube Replacement June
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 5
Station ID Upgrades Month of Upgrade
STN77225 (Kelly Lake)
Router Replacement January
Permeation Tube Replacement September
I/O Board Replacement September
Large (Spare) UPS Installed September
SO2 Analyzer Replaced with Spare Unit September
Power Lines to Station Replacement November
STN77227 (Kinsmen) Station Door Lock Replacement January
Pump Rebuild June
STN77228 (Dozzi Park)
Router Replacement February
I/O Board Replacement September
Pump Replacement October
Pump Replacement October
STN77230 (Spruce Street)
Router Replacement January
Fire Extinguisher Replacement May
Permeation Tube Replacement September
I/O Board Replacement November
Station Stairs Replacement December
STN77231 (Algonquin)
Router Replacement February
Small UPS Replacement April
Permeation Tube Replacement May
Sheppard’s Cross and Inlet Tubing Replacement July
Fence Post Repaired July
STN77330 (Union) None
STN77600 (Edison) Mirror Assembly Repaired October
STN77601 (Parkinson) SO2 Analyzer Replaced with Spare Unit October
STN77602 (Sunderland) SO2 Analyzer Replaced with Spare Unit March
STN77603 (Wahnapitae) Permeation Tube Replacement May
SO2 Analyzer Replaced with Spare Unit May
The SO2 and meteorological data is collected using the Bestech data acquisition system which downloads station information to
the Bestech office in Sudbury. Additional details on the data back-up process are provided in Section 2.6.
Appendix A presents the equipment inventory for 2015 with all relevant details for each of the eighteen (18) monitoring stations.
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 6
2.3 Meteorological Measurement Equipment
There are two (2) stations equipped with meteorological measurement systems to provide continuous weather data: the CKNC
MET station and the Falconbridge MET station.
The STN77025 MET station is located at the CKNC transmission tower. It is a dedicated meteorological station that takes
measurements of temperature, wind speed and wind direction at 12.5 m and 91 m elevations.
The second meteorological tower is designated as Falconbridge MET, which is a dedicated meteorological station that takes
measurements of temperature at 2 m and 60 m elevations and wind speed and wind direction at a 60 m elevation. A back-up
anemometer was also added at a 24.3 m (80 foot) elevation in December 2013.
Appendix A presents the overall summary of the equipment at both MET stations.
2.4 Summary of Site Visits – Bestech
During the period from January to December 2015, each monitoring station was calibrated once per month resulting in (12)
calibrations during the year for each station. Additional site visits were made for MOECC audits and when the stations experienced
instrumentation or server problems. Table 2-4 identifies the calibration dates at each of the monitoring stations.
Table 2-4. Calibration Summary at Each Monitoring Station in 2015
Station ID Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
STN77012 (Skead) 27 Jan 13 Feb 27 Mar 27 Apr 05 May 01 Jun 08 Jul 04 Aug 24 Sept 08 Oct 24 Nov 01 Dec
STN77013 (Hanmer) 06 Jan 13 Feb 24 Mar 14 Apr 11 May 01 Jun 07 Jul 04 Aug 17 Sept 05 Oct 10 Nov 04 Dec
STN77028 (Coniston) 15 Jan 27 Feb 30 Mar 16 Apr 06 May 16 Jun 06 Jul 13 Aug 24 Sept 15 Oct 18 Nov 01 Dec
STN77065 (Garson) 15 Jan 24 Feb 27 Mar 07 Apr 06 May NA 08 Jul 04 Aug 17 Sept 08 Oct 16 Nov 03 Dec
STN77075 (New Sudbury) 29 Jan 25 Feb 13 Mar 17 Apr 15 May 02 Jun 10 Jul 21 Aug 23 Sept 26 Oct 10 Nov 23 Dec
STN77203 (Science North) 22 Jan 26 Feb 13 Mar 17 Apr 12 May 02 Jun 06 Jul 13 Aug 29 Sept 28 Oct 19 Nov 21 Dec
STN77206 (Rayside) 06 Jan 13 Feb
24 & 26 Mar
14 Apr 01 May 24 Jun 07 Jul 11 Aug 11 Sept 05 Oct 10 Nov 01 Dec
STN77218 (Copper Cliff) 16 Jan 10 Feb
16 & 25 Mar
13 Apr 07 May 29 Jun 09 Jul 11 Aug 15 Sept 13 Oct 29 Nov 02 Dec
STN77225 (Kelly Lake) 28 Jan 10 Feb 16 Mar 09 Apr 12 May 30 Jun 14 Jul 12 Aug 21 Sept 31 Oct 08 Nov 21 Dec
STN77227 (Kinsmen) 12 Jan 02 Feb 04 Mar 16 Apr 07 May 03 Jun 03 Jul 11 Aug 15 Sept 22 Oct 06 Nov 02 Dec
STN77228 (Dozzi Park) 28 Jan 25 Feb 30 Mar 23 Apr 13 May 30 Jun 08 Jul 12 Aug 25 Sept 26 Oct 30 Nov 21 Dec
STN77230 (Spruce Street) 29 Jan 24 Feb 13 Mar 27 Apr 13 May 30 Jun 14 Jul 10 Aug 29 Sept 31 Oct 12 Nov NA
STN77231 (Algonquin) 15 Jan 02 Feb 12 Mar 09 Apr 07 May 02 Jun 10 Jul 12 Aug 15 Sept 15 Oct 13 Nov 17 Dec
STN77330 (Union) 12 Jan 25 Feb
12 & 25 Mar
02 Apr 01 May 29 Jun 09 Jul 14 Aug 29 Sept 13 Oct 09 Nov 02 Dec
STN77600 (Edison) 23 Jan 19 Feb 18 Mar 20 Apr 19 May 23 Jun 24 Jul 19 Aug 28 Sept 29 Oct 26 Nov 15 Dec
STN77601 (Parkinson) 20 Jan 17 Feb 18 Mar 20 Apr 29 May 23 Jun 23 Jul 19 Aug 16 Sept 29 Oct 25 Nov 15 Dec
STN77602 (Sunderland) 20 Jan 17 Feb 17 Mar 24 Apr 19 May 22 Jun 23 Jul 19 Aug 16 Sept 27 Oct 26 Nov 18 Dec
STN77603 (Wahnapitae) 21 Jan 26 Feb 18 Mar 28 Apr 29 May 22 Jun 23 Jul 18 Aug 16 Sept 23 Oct 23 Nov 18 Dec
Notes: * NA – not available; Monthly calibration not performed due to unfavorable wind direction during available service hours.
Appendix B presents an overall summary of all site visits due to instrumentation and server problems at each station.
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 7
2.5 MOECC Audits
A representative from the Sudbury District MOECC office conducts audits at each station on a quarterly basis. Table 2-5
summarizes the dates when the audits were performed and the outcomes.
Table 2-5. MOECC Audits at Each SO2 Monitoring Station – Date & Result
STATION ID
First Quarter Second Quarter Third Quarter Fourth Quarter
Date Monitor
Performance Date
Monitor Performance
Date Monitor
Performance Date
Monitor Performance
STN77012 (Skead) F
ebru
ary
23,
24,
25,
27 a
nd M
arc
h 3
, 2015
Criteria Met
June 2
, 4, 8, 9,
10,
11 a
nd 1
2 , 2
015
Criteria Met
August 12, 20,
24,
25,
26 a
nd 2
7, 2015
Criteria Met
Decem
ber
1, 7, 8, 9,
10 a
nd 1
7, 2015
Criteria Met
STN77013 (Hanmer) Criteria Met Criteria Met Criteria Met Criteria Met
STN77028 (Coniston) Criteria Met Criteria Met Criteria Met Criteria Met
STN77065 (Garson) Criteria Met Criteria Met Criteria Met Criteria Met
STN77075 (New Sudbury) Criteria Met Criteria Met Criteria Met Criteria Met
STN77227 (Kinsmen) Criteria Met Criteria Met Criteria Met Criteria Met
STN77203 (Science North) Criteria Met Criteria Met Criteria Met Criteria Met
STN77206 (Rayside) Criteria Met Criteria Met Criteria Met Criteria Met
STN77218 (Copper Cliff) Criteria Met Criteria Met Criteria Met Criteria Met
STN77225 (Kelly Lake) Criteria Met Criteria Met Criteria Met Criteria Met
STN77228 (Dozzi Park) Criteria Met Criteria Met Criteria Met Criteria Met
STN77230 (Spruce Street) Criteria Met Criteria Met Criteria Met Criteria Met
STN77231 (Algonquin) Criteria Met Criteria Met Criteria Met Criteria Met
STN77330 (Union) Criteria Met Criteria Met Criteria Met Criteria Met
STN77600 (Edison) Criteria Met Criteria Met Criteria Met Criteria Met
STN77601 (Parkinson) Criteria Met Criteria Met Criteria Met Criteria Met
STN77602 (Sunderland) Criteria Met Criteria Met Criteria Met Criteria Met
STN77603 (Wahnapitae) Criteria Met Criteria Met Criteria Met Criteria Met
There were a total of four (4) audits performed by the MOECC at the eighteen (18) monitoring stations between January 2015 and
December 2015.
All audits (which were recorded in the MOECC Audit Reports) met the MOECC criteria. The audits indicate good performance at
each of the monitoring stations.
2.6 Data Loss and Backup
Bestech maintains a back-up of the raw data for each station on the Programmable Logic Controller (PLC) using a compact flash
card. In May and June 2015, these compact flash cards were exchanged at eighteen (18) stations maintained by Bestech. The
old compact flash cards containing the 2015 data are currently in storage at the Bestech Lorne office. In September and October,
PLC Revision 4 upgrades were performed at all stations.
Prior to September 2009, the raw data was downloaded to the Bestech office via modem, where it was also backed up on
magnetic tape drive. Since 2009, the Sudbury SO2 network data is collected over high speed internet connections. These changes
have had a direct impact on data collection and processing times further improving data reliability and relevance. In addition,
changes were made to the systems redundancy capabilities where the implementation of auto switching capabilities has been
added. These improvements assign a dial up modem as the backup communication protocol following high speed network
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 8
connection failure at any or all the stations. Furthermore, the systems database is now simultaneously seamlessly backed up via a
SQL database replication bridge. This system enables the storage of all raw and processed data for future or current data
retrieval and storage. The secondary server, known as the standby backup clone, is also capable of being swapped into becoming
the primary processing server, should the primary server fail. Server swaps are performed at regular intervals to ensure
transferability, should a hardware failure occur on the primary processing server. Hence, this feature further improves data
redundancy and insures maximum system up time and functionality.
During 2015, server swaps occurred on:
May 27th
– switch from primary to secondary server
October 28th
– replacement of existing primary and secondary servers with new primary and secondary servers
In January 2011 an upgrade to the AQM Web Portal was performed. This upgrade included the upload of a new E-log to the AQM
Web Portal page. The E-log is used to document all activities which relates to AQM server intervention, operation, modification
and/or maintenance. The user logs the reason for the system access and documents changes made to the system. All events
performed on the servers are documented in a similar fashion as the logs currently being kept at the stations.
During this annual reporting period, there were few significant losses of data. Those that did occur were mainly the result of station
upgrades and instrumentation problems.
The highest number of invalid hours recorded at the SO2 monitoring stations in 2015 was during the month of September at
STN77225 (Kelly Lake), which resulted in 262 invalid hours. This was mainly due to intermittent utilities power service. The
fluctuations in supply voltage (as high as 150 VAC) caused the instrument to lock up and stop collecting valid SO2 readings. These
instrument lock ups occurred at various times and caused several nightly auto calibration failures which resulted in invalidating
data to previous valid auto calibration values (sometimes over 24 hrs).
A summary of incidents that resulted in data losses for each of the SO2 monitoring stations and MET stations is presented in
Appendix B.
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 9
3. Percent Valid Data Statistics
Overall, all parameters met the performance criteria with an annual valid data collection greater than 90% at the eighteen (18) SO2
monitoring stations and the meteorological towers (STN77025 and Falconbridge MET).
The following sections summarize the valid data collection performance for SO2 and for the meteorological data collected from
January to December 2015.
3.1 SO2 Valid Data Collection Performance
For the overall annual period, SO2 data availability at eighteen (18) of the monitoring stations met the 90% performance criterion.
Table 3-1. SO2 Valid Data Collection at Each Monitoring Station
Station ID
First Quarter
Valid Data
Performance (%)
Second Quarter
Valid Data
Performance (%)
Third Quarter
Valid Data
Performance (%)
Fourth Quarter
Valid Data
Performance (%)
Annual Valid
Data
Performance (%)
STN77012 (Skead) 99.6% 99.8% 99.6% 99.3% 99.6%
STN77013 (Hanmer) 99.7% 99.8% 99.8% 99.6% 99.7%
STN77028 (Coniston) 99.7% 99.7% 99.8% 99.8% 99.7%
STN77065 (Garson) 99.7% 98.2% 99.0% 99.7% 99.2%
STN77075 (New Sudbury) 99.7% 99.8% 99.8% 99.6% 99.7%
STN77203 (Science North) 99.7% 99.5% 99.6% 99.8% 99.7%
STN77206 (Rayside) 99.6% 99.5% 98.2% 99.6% 99.3%
STN77218 (Copper Cliff) 99.6% 99.8% 99.6% 99.7% 99.7%
STN77225 (Kelly Lake) 99.7% 99.7% 87.3% 98.2% 96.2%
STN77227 (Kinsmen) 99.6% 99.4% 99.8% 99.6% 99.6%
STN77228 (Dozzi Park) 99.6% 99.7% 98.5% 99.0% 99.2%
STN77230 (Spruce Street) 99.7% 99.8% 99.6% 99.8% 99.7%
STN77231 (Algonquin) 99.7% 99.5% 99.6% 98.6% 99.3%
STN77330 (Union) 99.6% 99.7% 99.7% 99.7% 99.7%
STN77600 (Edison) 99.7% 99.8% 99.8% 99.6% 99.7%
STN77601 (Parkinson) 99.6% 99.7% 99.8% 99.2% 99.6%
STN77602 (Sunderland) 99.6% 99.7% 99.8% 99.7% 99.7%
STN77603 (Wahnapitae) 99.8% 99.2% 99.7% 99.8% 99.6%
Total Hours 2160 2184 2208 2208 99.6%
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 10
3.2 Meteorological Valid Data Collection Performance
For the overall annual period, all of the meteorological parameters at STN77025 (CKNC Tower) and Falconbridge MET complied
with the 90% valid data collection criteria.
Table 3-2. Meteorological Valid Data Collection Performance @ STN77025
Met Parameter (STN77025)
First Quarter
Valid Data
Collection (%)
Second Quarter
Valid Data
Collection (%)
Third Quarter
Valid Data
Collection (%)
Fourth Quarter
Valid Data
Collection (%)
Annual Valid
Data Collection
(%)
T1 (Temperature @ 12.5 m) 100.0% 100.0% 100.0% 99.8% 99.9%
T3 (Temperature @ 91 m) 100.0% 100.0% 99.2% 99.8% 99.7%
DT2 (Delta T) 100.0% 100.0% 99.2% 99.8% 99.7%
WD1 (Wind Direction 1 @ 12.5 m) 100.0% 100.0% 100.0% 99.8% 99.9%
WD3 (Wind Direction 3 @ 91 m) 100.0% 100.0% 100.0% 99.6% 99.9%
WS1 (Wind Speed 1 @ 12.5 m) 100.0% 100.0% 100.0% 99.8% 99.9%
WS3 (Wind Speed 3 @ 91 m) 100.0% 100.0% 100.0% 99.8% 99.9%
Total Hours in Period 2,160 2,184 2,208 2,208 8,760
Table 3-3. Meteorological Valid Data Collection Performance @ Falconbridge MET
Met Parameter (Falconbridge MET)
First Quarter
Valid Data
Collection (%)
Second Quarter
Valid Data
Collection (%)
Third Quarter
Valid Data
Collection (%)
Fourth Quarter
Valid Data
Collection (%)
Annual Valid
Data Collection
(%)
T1 (Temperature @ 2 m) 100.0% 99.4% 99.9% 99.5% 99.7%
T3 (Temperature @ 60 m) 100.0% 99.4% 99.9% 99.5% 99.7%
DT2 (Delta T) 100.0% 99.4% 99.9% 99.5% 99.7%
WD1 (Wind Direction 1 @ 60 m) 100.0% 99.4% 99.9% 99.5% 99.7%
WS1 (Wind Speed 1 @ 60 m) 100.0% 99.4% 99.9% 99.5% 99.7%
Total Hours in Period 2,160 2,184 2,208 2,208 8,760
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 11
4. Annual Statistics
This section details the maximum hourly, daily, and annual arithmetic mean SO2 concentrations at each of the eighteen (18) SO2
monitoring stations.
The annual mean is calculated as the mean of twelve (12) monthly means and it requires the collection of 75% valid data (6,570
valid hourly means out of a possible 8,760 hours). A valid monthly mean requires at least twenty-three (23) valid daily means. A
valid daily mean requires at least eighteen (18) valid hourly averages out of twenty-four (24) hours as described in the “Operations
Manual for Air Quality Monitoring in Ontario” (March, 2008).
For further details regarding the monthly statistics, refer to the four (4) Quarterly Reports, which summarize the monthly SO2 and
meteorological data statistics (issued in May 2015, August 2015, November 2015 and February 2016). This section also compares
the annual data from 2015 with the annual data from 2014.
4.1 Hourly SO2 Concentrations Overview
The maximum hourly average SO2 concentration from January to December 2015 was found to be at STN77330 (Union) with a
concentration of 375 ppb in November 2015. The second highest maximum hourly SO2 concentration was found at STN77225
(Kelly Lake) with 274 ppb in December 2015.
Table 4-1 illustrates the maximum hourly SO2 concentrations at each of the monitoring stations.
Table 4-1. Maximum Hourly SO2 Concentrations – January to December 2015
Station ID Maximum Hourly Mean SO2 (ppb)
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Max
STN77012 (Skead) 59 119 117 132 124 93 58 79 90 100 117 117 132
STN77013 (Hanmer) 19 49 39 65 89 48 70 46 76 69 65 49 89
STN77028 (Coniston) 81 187 87 102 136 40 52 43 70 39 252 120 252
STN77065 (Garson) 48 83 67 70 87 59 80 52 76 75 134 81 134
STN77075 (New Sudbury) 73 68 35 96 60 43 98 50 72 88 112 67 112
STN77203 (Science North) 170 59 79 58 89 44 94 38 72 191 71 260 260
STN77206 (Rayside) 40 17 46 22 68 34 30 19 69 31 98 32 98
STN77218 (Copper Cliff) 71 62 98 55 99 242 152 60 122 127 68 236 242
STN77225 (Kelly Lake) 148 52 76 177 61 141 107 101 64 133 30 274 274
STN77227 (Kinsmen) 32 141 113 81 170 204 34 12 157 119 34 96 204
STN77228 (Dozzi Park) 45 51 53 101 77 62 103 29 59 94 32 197 197
STN77230 (Spruce Street) 60 54 75 113 86 144 148 83 100 156 55 155 156
STN77231 (Algonquin) 33 112 115 107 193 145 104 63 106 113 49 230 230
STN77330 (Union) 101 48 104 80 76 73 145 63 168 108 375 121 375
STN77600 (Edison) 44 65 107 73 228 91 62 243 114 120 132 82 243
STN77601 (Parkinson) 51 40 118 122 163 187 69 182 141 90 140 91 187
STN77602 (Sunderland) 66 133 65 96 66 60 89 164 84 80 143 84 164
STN77603 (Wahnapitae) 59 81 38 44 40 34 65 74 40 75 109 47 109
Notes: Hourly SO2 AAQC = 250 ppb
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 12
4.2 Maximum Daily SO2 Concentrations
The maximum daily average SO2 concentration from January to December 2015 was measured at STN77227 (Kinsmen) with a
concentration of 41.8 ppb in February 2015. The second highest maximum daily SO2 concentration was found at STN77330
(Union) with 41.2 ppb in September 2015. Table 4-2 illustrates the maximum daily SO2 concentrations at each of the monitoring
stations.
Table 4-2. Maximum Daily SO2 Concentrations – January to December 2015
Station ID Maximum Daily Mean SO2 (ppb)
Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Max
STN77012 (Skead) 13.1 17.3 29.9 18.0 11.8 12.3 6.1 14.8 19.2 18.9 29.8 13.5 29.9
STN77013 (Hanmer) 6.1 10.9 6.3 7.0 6.7 8.1 9.0 5.8 12.1 3.7 8.4 6.3 12.1
STN77028 (Coniston) 10.8 19.1 13.3 9.1 13.9 7.1 4.9 5.0 8.2 5.0 27.0 12.0 27.0
STN77065 (Garson) 6.1 7.1 7.1 11.0 12.8 3.4 14.3 8.1 12.0 26.5 15.6 14.2 26.5
STN77075 (New Sudbury) 5.2 4.8 3.0 10.5 8.7 3.1 17.9 8.7 7.8 10.4 12.5 14.0 17.9
STN77203 (Science North) 10.5 9.2 5.7 11.0 7.5 8.3 10.1 6.6 10.0 13.4 13.2 26.6 26.6
STN77206 (Rayside) 5.5 6.0 4.0 4.4 7.9 4.1 4.3 3.8 5.5 5.9 23.1 4.6 23.1
STN77218 (Copper Cliff) 9.6 17.0 11.0 6.5 17.5 15.9 14.1 7.5 34.8 22.1 9.3 21.8 34.8
STN77225 (Kelly Lake) 7.8 7.4 9.2 29.8 9.8 10.8 16.1 19.1 7.4 9.3 4.4 35.5 35.5
STN77227 (Kinsmen) 3.9 41.8 11.5 18.3 33.0 24.5 4.7 1.3 26.2 30.8 4.1 9.4 41.8
STN77228 (Dozzi Park) 5.5 6.6 5.6 11.2 5.7 5.1 13.5 4.6 5.8 9.1 6.0 18.2 18.2
STN77230 (Spruce Street) 14.9 7.5 9.3 19.8 12.8 16.7 25.3 14.4 10.7 12.4 13.2 20.3 25.3
STN77231 (Algonquin) 4.5 27.1 15.3 24.3 19.0 18.3 17.2 10.2 11.3 12.0 8.3 30.5 30.5
STN77330 (Union) 9.5 7.3 10.8 31.3 16.3 9.0 10.8 7.3 41.2 27.8 34.9 22.0 41.2
STN77600 (Edison) 7.9 6.0 8.6 22.0 13.2 13.4 10.1 20.1 16.4 15.3 20.3 15.0 22.0
STN77601 (Parkinson) 5.0 3.6 8.7 15.9 15.8 23.2 11.1 15.5 25.1 31.0 17.4 17.9 31.0
STN77602 (Sunderland) 15.2 11.5 6.1 11.1 6.3 4.5 10.2 24.3 9.5 8.5 15.6 14.9 24.3
STN77603 (Wahnapitae) 4.8 7.1 9.0 6.3 3.3 3.3 6.5 9.0 3.6 6.9 12.5 6.6 12.5
Notes: Daily SO2 AAQC = 100 ppb
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 13
4.3 Summary of Measured SO2 Concentrations Above AAQC
During the period of January to December 2015, there were a total of four (4) hourly measured SO2 concentrations above the
hourly AAQC of 250 ppb. There were no measured SO2 concentrations above the daily AAQC limit of 100 ppb.
Table 4-3 lists the total measured SO2 concentrations above the hourly and daily AAQC limits for the reporting period.
Table 4-3. SO2 Measured Concentrations above AAQC
Station ID Jan – Mar 2015 Apr – June 2015 Jul – Sept 2015 Oct – Dec 2015 Total
Hourly Daily Hourly Daily Hourly Daily Hourly Daily Hourly Daily
STN77012 (Skead) 0 0 0 0 0 0 0 0 0 0
STN77013 (Hanmer) 0 0 0 0 0 0 0 0 0 0
STN77028 (Coniston) 0 0 0 0 0 0 1 0 1 0
STN77065 (Garson) 0 0 0 0 0 0 0 0 0 0
STN77075 (New Sudbury) 0 0 0 0 0 0 0 0 0 0
STN77203 (Science North) 0 0 0 0 0 0 1 0 1 0
STN77206 (Rayside) 0 0 0 0 0 0 0 0 0 0
STN77218 (Copper Cliff) 0 0 0 0 0 0 0 0 0 0
STN77225 (Kelly Lake) 0 0 0 0 0 0 1 0 1 0
STN77227 (Kinsmen) 0 0 0 0 0 0 0 0 0 0
STN77228 (Dozzi Park) 0 0 0 0 0 0 0 0 0 0
STN77230 (Spruce Street) 0 0 0 0 0 0 0 0 0 0
STN77231 (Algonquin) 0 0 0 0 0 0 0 0 0 0
STN77330 (Union) 0 0 0 0 0 0 1 0 1 0
STN77600 (Edison) 0 0 0 0 0 0 0 0 0 0
STN77601 (Parkinson) 0 0 0 0 0 0 0 0 0 0
STN77602 (Sunderland) 0 0 0 0 0 0 0 0 0 0
STN77603 (Wahnapitae) 0 0 0 0 0 0 0 0 0 0
Total # of Measured SO2
Concentrations above AAQC 0 0 0 0 0 0 4 0 4 0
Notes: 1-hr AAQC for SO2 = 250 ppb
24-hr AAQC for SO2 = 100 ppb
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 14
4.4 Source Contribution Assessment for Measured SO2 Concentrations Above AAQC
As per the Operations Manual, each of the measured SO2 concentrations above the AAQC is to be evaluated by wind speed and
wind direction data for source contribution assessment. There were a total of four (4) measured SO2 concentrations above the
hourly AAQC limit in 2015.
Table 4-4 presents the date and hour of the measured SO2 concentrations above the hourly AAQC limit, the station where it was
measured and the corresponding wind speed and direction data for this assessment. The table also identifies the potential SO2
source, solely based on the hourly wind direction measured at the closest meteorological station and the assumption that the Vale
Smelter and Glencore Smelter are the major sources of SO2. The Vale Nickel Refinery is typically a low SO2 emitter but under
exceptional meteorological events may also contribute as a source if SO2 emissions are trapped under a low inversion.
The location of STN77025 (CKNC Tower) provides MET data that is closer in proximity (within five (5) kilometres) to the Vale
Smelter site. The Glencore site is located approximately seventeen (17) kilometres from CKNC MET station (STN77025). The
Falconbridge MET station (Falconbridge MET) is located on the Glencore site, northwest of the smelter. It is approximately twenty-
one (21) kilometres from the Vale Smelter. The Vale Nickel Refinery is located approximately four and a half (4.5) kilometres
southwest of the Vale Smelter.
A map showing the location of Vale Smelter and Nickel Refinery, Glencore Smelter and the monitoring stations is presented in
Appendix C.
Table 4-4. Source Contribution Assessment for the Measured SO2 Concentrations above the Hourly AAQC
Station Date & Time of Measured SO2 Concentration
SO2 Concentration
(ppb)
Closest MET Station
MET data Potential Upwind SO2 Source
WS1 WD1 WS3 WD3
Coniston (STN77028)
Nov. 24, 2015
14:00 – 15:00 252 Falconbridge 2 km/hr 253° Not available Not available
Vale Smelter / Vale Nickel Refinery
Science North (STN77203)
Dec. 07, 2015
16:00 – 17:00 260 CKNC Tower 20 km/hr 233° 28 km/hr 228° Vale Nickel Refinery
Kelly Lake (STN77225)
Dec. 07, 2015
16:00 – 17:00 274 CKNC Tower 6 km/hr 298° 8 km/hr 309° Vale Smelter
Union (STN77330)
Nov 17, 2015 15:00 – 16:00
375 CKNK Tower 13 km/hr 100° 15 km/hr 104° Vale Smelter
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 15
4.5 Annual SO2 Average Concentrations Overview
The monthly average and resulting annual arithmetic mean SO2 concentration in 2015 for each monitoring station are summarized
in Table 4-5. The annual average value is calculated by dividing the sum of the valid monthly mean SO2 concentrations for each
station by the total number of valid months in the year.
The maximum annual mean SO2 concentration (3.36 ppb) occurred at STN77230 (Spruce Street). The annual AAQC for SO2 is 20
ppb. Overall, the annual arithmetic means ranged from 0.83 to 3.36 ppb as illustrated in Table 4-5.
Table 4-5. Annual Mean SO2 Concentrations – January to December 2015
Station ID Monthly Mean SO2 (ppb) Annual
Mean Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec
STN77012 (Skead) 1.7 3.0 4.5 3.4 3.1 0.9 0.9 2.1 5.0 2.4 4.1 2.7 2.83
STN77013 (Hanmer) 0.9 1.5 1.7 0.6 1.0 1.0 1.2 0.6 2.1 0.5 1.5 0.8 1.11
STN77028 (Coniston) 1.8 2.3 1.7 2.1 1.6 1.0 1.0 0.4 0.8 0.7 1.5 1.9 1.41
STN77065 (Garson) 1.4 1.5 1.8 1.4 2.5 0.9 2.1 0.9 1.9 2.5 2.4 3.0 1.85
STN77075 (New Sudbury) 0.7 0.5 0.7 0.9 1.7 0.6 2.7 1.1 1.0 1.9 2.2 2.2 1.36
STN77203 (Science North) 1.7 1.4 0.8 2.4 1.0 1.2 2.4 0.9 1.6 2.0 1.9 3.4 1.73
STN77206 (Rayside) 0.5 0.5 1.3 0.6 0.5 0.6 0.5 0.3 0.8 1.2 2.4 0.7 0.83
STN77218 (Copper Cliff) 1.4 2.0 0.5 0.9 1.8 2.8 2.1 0.6 4.5 4.8 1.7 4.5 2.31
STN77225 (Kelly Lake) 1.3 1.1 2.3 2.9 1.1 2.0 3.4 1.3 NA 1.6 0.6 2.4 1.82
STN77227 (Kinsmen) 0.3 3.1 1.9 1.4 2.1 2.5 0.2 0.1 1.3 2.4 0.5 1.6 1.44
STN77228 (Dozzi Park) 1.7 1.8 1.7 1.6 0.9 1.3 2.6 0.8 0.8 1.4 1.3 1.7 1.46
STN77230 (Spruce Street) 3.0 1.8 3.4 4.3 3.3 4.2 5.9 2.1 2.0 3.2 2.9 4.2 3.36
STN77231 (Algonquin) 0.7 2.1 2.4 2.7 1.2 1.7 1.9 0.9 1.1 2.6 1.1 2.8 1.77
STN77330 (Union) 1.9 1.2 2.7 4.3 1.9 2.3 1.9 0.9 4.8 4.9 3.7 3.9 2.87
STN77600 (Edison) 2.0 0.9 2.0 3.6 2.4 1.3 1.5 1.9 1.8 2.5 2.7 1.8 2.03
STN77601 (Parkinson) 1.0 0.7 1.8 3.3 3.0 2.3 1.8 1.8 4.2 3.3 3.2 3.7 2.51
STN77602 (Sunderland) 2.1 2.1 1.6 3.3 2.3 1.3 1.9 2.0 1.4 2.0 3.0 1.5 2.05
STN77603 (Wahnapitae) 0.7 1.0 1.2 1.3 0.6 0.5 0.8 0.9 0.4 1.3 1.1 1.0 0.90
Note: Annual AAQC for SO2 = 20 ppb A valid monthly mean requires at least twenty-three (23) valid daily means
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 16
The annual average SO2 concentrations for each station are below the annual AAQC of 20 ppb as depicted in Figure 4-1.
Figure 4-1. Annual Mean SO2 Concentration – January to December 2015
0
5
10
15
20
25
An
nu
al
SO
2 A
vera
ge C
on
cen
trati
on
(p
pb
)
STATION ID
2015 Annual Mean (ppb)
Annual AAQC Limit (ppb)
0
5
10
15
20
25
An
nu
al
SO
2 A
vera
ge C
on
cen
trati
on
(p
pb
)
STATION ID
2014 Annual Mean (ppb)
Annual AAQC Limit (ppb)
0
5
10
15
20
25
An
nu
al
SO
2 A
vera
ge C
on
cen
trati
on
(p
pb
)
STATION ID
2015 Annual Mean (ppb)
Annual AAQC Limit (ppb)
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 17
5. Annual SO2 Results Comparison
This section compares the monthly SO2 average concentrations from January to December 2015 (2015 data) versus January
to December 2014 (2014 data). Figure 5-1 presents a graphical comparison.
Overall, the 2015 SO2 annual average concentrations are very similar to the concentrations recorded in 2014. Of the eighteen
monitoring stations eight (8) stations had annual concentrations decrease from the previous year and ten (10) stations had
annual concentrations increase from the previous year.
A comparison of each monitoring stations’ annual arithmetic means for the previous annual reporting period (January to
December 2014) and this reporting period (January to December 2015) is shown in Table 5-1.
Table 5-1. Average Annual SO2 Concentrations for 2014 and 2015
STATION ID
2014 Annual SO2
Average Concentration
(ppb)
2015 Annual SO2
Average Concentration
(ppb)
Difference
(ppb)
STN77012 (Skead) 2.44 2.83 0.39
STN77013 (Hanmer) 1.07 1.11 0.04
STN77028 (Coniston) 1.81 1.41 -0.40
STN77065 (Garson) 2.11 1.85 -0.26
STN77075 (New Sudbury) 1.95 1.36 -0.59
STN77203 (Science North) 1.68 1.73 0.04
STN77206 (Rayside) 0.82 0.83 0.01
STN77218 (Copper Cliff) 1.88 2.31 0.43
STN77225 (Kelly Lake) 1.43 1.82 0.39
STN77227 (Kinsmen) 0.86 1.44 0.58
STN77228 (Dozzi Park) 1.70 1.46 -0.24
STN77230 (Spruce Street) 3.26 3.36 0.10
STN77231 (Algonquin) 1.36 1.77 0.41
STN77330 (Union) 2.55 2.87 0.32
STN77600 (Edison) 2.56 2.03 -0.53
STN77601 (Parkinson) 3.06 2.51 -0.54
STN77602 (Sunderland) 2.26 2.05 -0.22
STN77603 (Wahnapitae) 1.18 0.90 -0.27
Notes: Annual AAQC = 20 ppb
The maximum annual arithmetic mean SO2 concentration in 2015 occurred at STN77230 (Spruce Street) with 3.36 ppb. Overall,
the annual average SO2 concentrations ranged from 0.83 to 3.36 ppb in 2015.
The maximum annual arithmetic mean SO2 concentration in 2014 occurred at STN77230 (Spruce Street) with 3.26 ppb. Overall,
the annual average SO2 concentrations ranged from 0.82 to 3.26 ppb in 2014.
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 18
Figure 5-1. Annual Mean SO2 Concentrations Comparison
As illustrated in Figure 5-1, the average annual SO2 concentrations were lower at eight (8) stations and higher at ten (10) stations
in 2015, in comparison to the same period in 2014.
On average, the SO2 concentration in 2015 was 1.87 ppb which was approximately the same average noted in 2014 (1.89 ppb).
The largest increase was seen at STN77227 (Kinsmen) with a 0.58 ppb increase from 2014 to 2015.
0
5
10
15
20
25A
nn
ual
SO
2 A
vera
ge C
on
cen
trati
on
(
pp
b)
STATION ID
2014 Annual Mean (ppb)
2015 Annual Mean (ppb)
Annual AAQC Limit (ppb)
AECOM Vale Limited / Glencore Limited
Annual SO2 Report Submission
Rpt 2015 Annual So2 Report_Final 19
6. References
Ministry of the Environment. Operations Division –Technical Support Section. “Operations Manual for Air Quality Monitoring in
Ontario”. March, 2008.
“Vale Limited / Glencore Limited: 2015 First Quarterly Report, SO2 Monitoring Network for Sudbury, January, February & March
2015”. May, 2015.
“Vale Limited / Glencore Limited: 2015 Second Quarterly Report, SO2 Monitoring Network for Sudbury, April, May & June 2015”.
August, 2015.
“Vale Limited / Glencore Limited: 2015 Third Quarterly Report, SO2 Monitoring Network for Sudbury, July, August & September
2015”. November, 2015.
“Vale Limited / Glencore Limited: 2015 Fourth Quarterly Report, SO2 Monitoring Network for Sudbury, October, November &
December 2015”. February, 2016.
Appendix A
Equipment Inventory
Equipment Serial Number Make Model Quantity
Aerovane, WS WD 81623, 80254 R.M Young 05103 VK 2
Meteorological tower n/a n/a n/a 1
Met. Temperature sen. 11671, 11672 R.M Young 41342VC 2
Modem 2ABLX9LF3283 US Robotics 5686 1
UPS n/a n/a n/a n/a
Heating/cooling syst n/a n/a n/a n/a
PLC Assembly n/a Allen Bradley Compactlogix 1
Shelter n/a n/a n/a n/a
High Speed Modem 166958826410697201012100 Motorola BEFSR41 1Router C572B016758 Linksys BEFSR41 1
Equipment Serial Number Make Model Quantity
Analyzer 1333159842 Thermo Scientific 43i 1
Modem 2ABLYACE052 US Robotics 5686 1
UPS n/a APC BE750G 1
Heating/cooling syst n/a n/a n/a n/a
Shelter n/a n/a n/a n/a
Fire extinguisher VU556393 Kidde P340ABC-VB-2 1
PLC Assembly n/a Alan Bradley Compactlogix 1
Indoor temp. sensor n/a Veris TEAJS 1
High Speed Modem 1215062XXF-AA002703 Comtrend DSL 1Router C2161G117274 Linksys BEFSR41 1
Station 77075 - New Sudbury
Station 77025 - CKNC Met Tower
Vale and Glencore Asset List as of January 2016
VALE ASSETS
-----
January 2014
Comments/Install Date
Comments/Install Date
-----
2006
No UPS
No A/C, Heated by CKNC
November 2013
Owned by CKNC
Rented from CKNC
November 2013
2006
-----
January 2014
December 2013
2006
November 2015 -----
No A/C, Heated by Cambrian
Cambrian
2006
Equipment Serial Number Make Model Quantity
Analyzer 0905535060 Thermo Scientific 43i 1
Modem 2ABLX9LF5437 US Robotics 5686 1
UPS 3B0551X74673 APC BE725B 1
Heating/cooling syst n/a n/a n/a n/a
Shelter n/a n/a n/a n/a
Fire extinguisher n/a n/a n/a n/a
PLC Assembly n/a Allen Bradley Compactlogix 1
Glass Manifold n/a n/a n/a 1
Indoor temp. sensor n/a Omega TAC80B-T 1
High Speed Modem 150758629304107401013031 Motorola SBS101 1Router C2171G425671 Linksys BEFSR41 1
Equipment Serial Number Make Model Quantity
Analyzer 818330854 Thermo Scientific 43i 1
Modem 2ABLX9LF3285 US Robotics 5686 1
UPS 300835X31698 APC BE-750G-ON 1
Cooling system 1265900511129150400 Heat Controller, Inc. RAD-123H 1
Heating System n/a Dimplex 6010012300 2
Shelter n/a n/a n/a 1
Fire extinguisher H651079C General C-TCP-5J 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a Veris TEAJS 1
High Speed Modem 16695826410718401012100 Motorolla SB5101 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell n/a 1
Station 77203 - Science North
Station 77206 - Rayside
Comments/Install Date
Comments/Install Date
-----
-----
September 2008
-----
May 2013
Cable Modem
Vale spare July 2013
Supplied by Science North
2006
Science North
Science North
-----
2006
Inlet glass manifold
-----
November 2013
2006
2008
2 baseboard heaters
2006
February 2015Digital
Cable Modem
Equipment Serial Number Make Model Quantity
Analyzer 1333159844 Thermo Scientific 43i 1
Modem 2ABLX9LF3284 US Robotics 5686 1
UPS 4A1349PO5659 APC BE750G 1
Cooling System n/a Whirlpool n/a 1
Heating System n/a Dimplex 6010012300 2
Thermostat n/a Honeywell n/a 1
Shelter 0906-01 Rotek AMS-812 1
Fire extinguisher VU-556395 Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a AMPROBE TMA-1 1
High Speed Modem 14005861250139560203301 Motorola SBS101 1
Router 1 C2171G452636 Linksys BEFSR41 1
Router 2 P1NK192000156 Dlink DI-604UP 1Ethernet Switch DR87394000370 Dlink DSS-5+ 1
Equipment Serial Number Make Model Quantity
Analyzer 4-58476-31 Teco 43c 1
Modem 2ABLX9LF5436 US Robotics 5686 1
UPS 4B1330P21250 APC BE750G 1
Large UPS PPY8X2000002 CyberPower PR1000LCDTXL2Ua 1
Cooling System 904TA00250 Comfort Aire RAD-183B 1
Heating System n/a Dimplex n/a 2
Shelter n/a Rotek n/a 1
Fire extinguisher VU-556394 Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a Veris TEAJS 1
High Speed Modem JCIEA3700037V Superlink SL2800 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell n/a 1
September 2015
Station 77218 - Copper Cliff
Station 77225 - Kelly Lake
-----
-----
December 2013
2006
2006
April 2015
May 2014
2 baseboard heaters
Digital thermostat
2008
Cable Modem
2007
From old Copper Cliff station
5 port 10/100 ethernet switch
Comments/Install Date
November 2015
September 2012
-----
May 2014
-----
-----
-----
July 2009
2006
Cable Modem
January 2015Digital
Comments/Install Date
Equipment Serial Number Make Model Quantity
Analyzer 0806027502 Thermo Scientific 43i 1
Vacuum pump n/a n/a n/a 1
Modem 2ABLX9LF3281 US Robotics 5686 1
UPS n/a APC BE750G 1
Cooling System 0808VV00162 Carrier KCA018301P 1
Heating System n/a Dimplex 6010010300 2
Shelter n/a n/a n/a 1
Fire extinguisher VP-473315 Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a AMPROBE TMA-1 1
High Speed Modem 314158918615984101011001 Motorola SB5101U 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell (digital) n/a 1
Equipment Serial Number Make Model Quantity
Analyzer 1215853081 Thermo Scientific 43i 1
Modem 2ABLY1VF0463 US Robotics Sportster 33.6 1
UPS 3B0709X01912 APC ES750BB-CN 1
Cooling System EU158523130Y Comfort Aire n/a 1
Heating System n/a Dimplex 6010012300 2
Shelter 0307-04 ROTECK AMS812 1
Fire extinguisher VU-556396 Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Barometer BP 02734 RM Young 61205V 1
Indoor temp. sensor n/a AMPROBE TMA-1 1
High Speed Modem 140058529215802602031001 Motorola SBS101 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell (digital) n/a 1
Station 77227 - Kinsmen
Station 77228 - Dozzi
Comments/Install Date
December 2009
2006
-----
Comments/Install Date
-----
-----
Cable Modem
March 2015
-----
Vale spare March 2013
-----
2005
-----
2006
January 2014
-----
November 2014 -----
-----
-----
Cable Modem
2007
2007
2007
-----
2007
Feb-15
Equipment Serial Number Make Model Quantity
Analyzer 0615817071 Thermo Scientific 43i 1
Modem 2ABLX9LF3282 US Robotics 5686 1
UPS 3B0536X02276 APC ES750BB-CN 1
Cooling System BU199709043Y Comfortaire CA1826ER-A 1
Heating System n/a Dimplex 6010012300 2
Shelter 0906-02 Rotek AMS-812 1
Fire extinguisher n/a Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a AMPROBE TMA-1 1
High Speed Modem 314750002807604701011008 Motorola SB5101N 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell n/a 1
Equipment Serial Number Make Model Quantity
Analyzer 1333159843 Thermo Scientific 43i 1
Modem 2ABLY1VF0756 US Robotics Sportster 33.6 1
UPS n/a APC ES750BB-CN 1
Cooling System 1265900511130150397 Comfortaire RAD-123H 1
Heating System n/a Dimplex 6010012300 2
Shelter 0307-05 ROTECK AMS58 1
Fire extinguisher VU-974358 Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor 06021774 Tsentry Model 140 1
High Speed Modem 140058706239990502039001 Motorola SBS101 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell n/a 1
Station 77230 - Spruce
2007
2006
Cable Modem
February 2015
Station 77231 - Algonquin
Digital
Comments/Install Date
-----
2006
May 2015
2006
------
December 2006
Serial number under velcro
2007
2007
December 2013
-----
-----
2007
-----
Comments/Install Date
Cable Modem
January 2015Digital
-----
April 2015
Equipment Serial Number Make Model Quantity
Analyzer 0710321459 Thermo Scientific 43i 1
Modem 2ABLY1VF0439 US Robotics Sportster 33.6 1
UPS 3B1227X25221 APC BE750G 1
Cooling System 904TA0000067 Comfort Aire RAD-183B 1
Heating System n/a Dimplex 6010012300 2
Shelter n/a Rotek AMS-812 1
Fire extinguisher VU-556396 Kidde P340ABC-VB-2 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a Veris TEAJS 1
High Speed Modem 355581219901000702010017 Motorola SBG6580 1
Router 10820C64212303 Linksys E1200 1Thermostat n/a Ouellet (digital) n/a 1
Equipment Serial Number Make Model Quantity
Analyzer 1026444319 Thermo Scientific 43i 1
Modem 2ABLYAQF0562 US Robotics 5686 1
Small UPS n/a APC ES750BB-CN 1
Large UPS G092B25208 EATON 5PX3000RT2U 1
Cooling System EU158204130Y Climette CA1826ER-A 1
Heating System n/a Dimplex 6010012300 2
Shelter 1007-07 ROTECK AMS812 1
Fire extinguisher H651070C General C-TCP-5J 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a AMPROBE TMA-1 1
High Speed Modem 12A5062XXXF-AA004977 Comtrend DSL 1
Router C572B016758 Linksys BEFSR41 1Thermostat n/a Honeywell n/a 1
Station 77330 - Union
Station 77012 - Skead
GLENCORE ASSETS
November 2015
-----Digital
-----
3000 VA
2006
November 2012
Comments/Install Date
November 2012
Comments/Install Date
November 2012
November 2012
November 2012
November 2012
November 2012
November 2012
February 2015
November 2012
November 2012November 2012
November 2012
October 2007
October 2007
2006
Subury INO spare 2013
October 2007
-----
Equipment Serial Number Make Model Quantity
Analyzer 700319945 Thermo Scientific 43i 1
Modem 2ABLY9GE3698 US Robotics 5686 1
Small UPS 3B0709X03793 APC BE750BB-CN 1
Large UPS G092B2504 EATON 5PX3000RT2U 1
Cooling System EU158532130Y Climette CA1826ER-A 1
Heating System n/a Dimplex 6010012300 2
Shelter 1206-03 ROTECK AMS812 1
Fire extinguisher YW-971218 Ansul Sentry A05 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a Veris TEAJS 1
High Speed Modem 140058701949675602039001 Motorola SBS101 1
Router n/a Linksys BEFSR41 1Thermostat n/a Honeywell (digital) n/a 1
Equipment Serial Number Make Model Quantity
Analyzer 0806027499 Thermo Scientific 43i 1
Modem 2ABLYACE1061 US Robotics 5686 1
Small UPS 380535X10177 APC BE750BB-CN 1
Large UPS G092B25207 EATON 5PX3000RT2U 1
Cooling System 11635808101061592 Comfort Aire RADS-101G 1
Heating System n/a n/a n/a 2
Thermostat n/a Ouellet n/a 1
Shelter n/a Pacwill n/a 1
Fire extinguisher H651059C General C-TCP-5J 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a AMPROBE TMA-1 1
High Speed Modem 140058523033867101021001 Motorola SBS101 1Router n/a Linksys BEFSR41 1
Station 77013 - Hanmer
Station 77028 - Coniston
February 2015Contactor 2013
3000 VA UPS
Spare October 2013
Comments/Install Date
Comments/Install Date
3000 VA
Transferred to new shelter
Cable Modem
Unmarked baseboard heaters
Digital
Serviced yearly
2006
Cable Modem
-----
September 2010
750 VA UPS
December 2006
February 2015
December 2006
December 2006
December 2006
May 2014
December 2006
December 2006
December 2006
2006
-----
Equipment Serial Number Make Model Quantity
Analyzer 1018243126 Thermo Scientific 43i 1
Modem 2ABLYATE0749 US Robotics 5686 1
Small UPS 3B1208X10974 APC BE750G 1
Large UPS G092B25183 EATON 5PX3000ET2U 1
Cooling System 1163580810106151593 Comfort Aire RADS101G 1
Heating System n/a n/a n/a 2
Thermostat n/a Ouellet n/a 1
Shelter n/a Pacwill n/a 1
Fire extinguisher L441052C General C-TCP-5JH 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor n/a Veris TEAJS 1
High Speed Modem 355581203414764659550017 Motorola SBG6580 1Router C2171G425666 Linksys BEFSR41 1
Equipment Serial Number Make Model Quantity
Analyzer 0826632106 Thermo Scientific 43i 1
Modem 2ABLYX9LF7981 US Robotics 5686 1
Small UPS 3B0746X71371 APC BE750G-CN 1
Large UPS n/a EATON 9130 1
Cooling/Heating System F08F02571E Trane PTEE1501UA8A 1
Shelter n/a n/a n/a 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor 08016898 Tsentry 140-100HV 1
High Speed Modem 073G4FX1TDN9 Motorola SB5101 1Router C2181H3122 Linksys BEFSR41 1
Station 77065 - Garson
Station 77600 - Edison
Comments/Install Date
-----
2006
Cable Modem -----
Digital
Unmarked baseboard heaters
-----
December 2014
2006
-----
-----
April 2008
July 2014
April 2008
Cable Modem
750 VA
August 2012
February 2013
-----
September 2010
Serviced yearly
Comments/Install Date
September 2010
2006
Equipment Serial Number Make Model Quantity
Analyzer 0806027503 Thermo Scientific 43i 1
Modem 3ABLY2213320 US Robotics 5686 1
Small UPS 3B0746X67850 APC BE750G-CN 1
Large UPS 1 n/a EATON 9130 1
Large UPS 2 n/a EATON 9130 1
Cooling/Heating System F05W00481A Trane PTED1C0JCA 1
Shelter n/a n/a n/a 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor 08016899 Tsentry 140-100HV 1
High Speed Modem 073G4FX1TF66 Motorola SB5101 1
Thermostat n/a Honeywell n/a 1Router C2181H312199 Linksys BEFSR41 1
Equipment Serial Number Make Model Quantity
Analyzer 1218153498 Thermo Scientific 43i 1
Modem 2ABLYCLD2726 US Robotics 5686 1
Small UPS 3B0746X73814 APC BE750G-CN 1
Large UPS GE203A0250 EATON 9130 1
Cooling/Heating System A98C02965 Trane PTEC1501GCA 1
Shelter n/a Pacwill n/a 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor 08016901 Tsentry 140-100HV 1
High Speed Modem 073G4FX1W852 Motorola SB5101 1
Thermostat n/a Honeywell n/a 1Router C2181H312289 Linksys BEFSR41 1
Station 77601 - Parkinson
Station 77602 - Sunderland
Comments/Install Date
Comments/Install Date
November 2015
2006
Cable Modem
Analog -----
3000 VA
April 2008
Cable Modem
Digital
April 2008
-----
May 2010
-----
750 VA
April 2008
March 2015
-----
-----
750 VA
2006
April 2008
3000VA
3000VA
Equipment Serial Number Make Model Quantity
Analyzer 0806027500 Thermo Scientific 43i 1
Modem 3ABLYCJH4747 US Robotics 5686 1
Small UPS 3B1229X21248 APC BE750G-CN 1
Large UPS GE321A1210 EATON 9130 1
Cooling/Heating System A01B00485 Trane PTEC1501GCA 1
Shelter n/a n/a n/a 1
PLC Assembly n/a Allen Bradley Compactlogix 1
Indoor temp. sensor 08016900 Tsentry 140-100HV 1
High Speed Modem 073G4FSGN8X3 Motorola SB5101 1Router C2181H312267 Linksys BEFSR41 1
Equipment Serial Number Make Model Quantity
Ultrasonic, WS WD n/a R.M Young 85004 1
Meteorological tower n/a n/a n/a 1
Met. Temperature sen. n/a R.M Young 41382VC 2
Solar radiometer na Kipp & Zonen SP lite 1
Modem 2ABLY7SG2073 US Robotics 5686 1
UPS 5B0751T59507 APC BE650R-CN 1
Cooling/Heating System n/a Trane n/a n/a
PLC Assembly n/a Allen Bradley Compactlogix 1
Shelter n/a n/a n/a 1
High Speed Modem n/a n/a n/a n/aRouter C2181H312214 Linksys BEFSR41 1
Station 77603 - Wahnapitae
Station - Falconbridge Met Tower
Comments/Install Date
Comments/Install Date
June 2008
-----
-----
June 2008
March 2009
May 2015
June 2008
-----
April 2008
3000 VA
April 2008
Cable Modem
June 2008
No high speed -----
October 2013
-----
2006
-----
October 2014
-----
BESTECH OFFICE AQM Spare Parts January 2016
PART NUMBER DESCRIPTION QTY Manufacturer
4119 8 Thermo Scientific
8919 3 Thermo Scientific
4800 18 Thermo Scientific
102029-00 1 Thermo Scientific
204668 8 Thermo Scientific
112021-00 7 Thermo Scientific
8606 1 Thermo Scientific
102888-00 2 Thermo Scientific
102891-00 1 Thermo Scientific
100533-00 1 Thermo Scientific
100862-00 3 Thermo Scientific
8666 3 Thermo Scientific
8888 2 Thermo Scientific
8884 3 Thermo Scientific
1784CF128A 9 Thermo Scientific
T050A047A 100 Thermo Scientific
101035-00 1 Thermo Scientific
2 Thermo Scientific
101267-00 1 Thermo Scientific
11553-01 3 Thermo Scientific
101390-00 1 Thermo Scientific
4158 2 Thermo Scientific
2 Thermo Scientific
8774 2 Thermo Scientific
101411-00 1 Thermo Scientific
8746 1 Thermo Scientific
101023-00 1 Thermo Scientific
102029-01 1 Thermo Scientific
102055-00 1 Thermo Scientific
4291 2 Thermo Scientific
6 Thermo Scientific
Teco 43i 1 Thermo Scientific
Teco 43c 1 Thermo Scientific
Teco 43c 1 Thermo ScientificTeco 43c 1 Thermo Scientific
PART NUMBER DESCRIPTION QTY Manufacturer
2020-5143 2 Sabio Instruments
2020-3618 1 Sabio Instruments
2020-2540 1 Sabio Instruments
2020-2536 1 Sabio Instruments
2020-2541 1 Sabio Instruments
2020-2105 1 Sabio Instruments
50106 2 Sabio Instruments
2020-2104 2 Sabio Instruments
Thermo Scientific 43i and 43c Parts
Calibration Equipment
Pump Rebuild Kit, Sabio 2020
Sabio Inlet Filter, 2020
Sabio PCB fuse, 4 amp
Sabio PCB fuse, 1 amp
Sabio PCB fuse, 6.3 amp
Sabio Charcoal
Sabio ValveSabio Purafil
Capillaries 0.008" ID (Red)
Capillaries 0.013" ID (Blue/yellow)
Capilarry O-ring
Perm Oven Thermistor
Round Pump Rebuild Kit
Shock Bumper Kit
Square Pump Rebuild kit
Terminal Board PCB Assembly (DB37F)
Terminal Board PCB Assembly (DB37M)
Motherboard Assembly
Measurement Interface Board Assembly
Flashtube Lamp
Mirror Housing Assem
Flash Intensity (Photocell) Assembly
PLC Compact Flash Card
PTFE Inlet Filter
DC input to motherboard cable
Inlet Filter Housing
Teco 43i S/N 818330854
Fan power cable
Replacement Pump
TECO valve
Activated Charcoal Zero Scrubber
Inlet Filter Wrench
Socket Assembly
Teco 43c S/N 515812182
Perm Oven Assembly
Kicker Assembly
Pressure Transducer Assembly
Teco 43c S/N 4-58476-316Teco 43c S/N 4-58475-318
Thermister & Cap Assembly
Flow Transducer
Zero Scrubber Assembly
Permeation Wafer
PART NUMBER DESCRIPTION QTY Manufacturer
41382VC RH and Temp Sensor S/N 11672, 11671, 9773 3
SP Lite 2 Pyranometer S/N 90960, 75227, 139438 305103V Wind Monitor S/N 50254, 70877, 81623 3
PART NUMBER DESCRIPTION QTY Manufacturer
52224-01 1
52226 1
5222 1
52224-04 1
PART NUMBER DESCRIPTION QTY Manufacturer
96000-02 25 ft
ACQ108PW 1
----- 5
----- 1
----- 3
----- 1
1769-ECR 1
----- 11606-XLP 1
Other AQM Station Equipment
R.M. Young Rain Gauge
Met Equipment
Bearing Bracket
R.M. Young
R.M Young
Kipp & ZonenR.M Young
R.M. Young
R.M. Young
R.M. Young
Saint Gobain
Air Conditioner S/N MQA1LSB0438
Pneonix Contact
Allen Bradley
Allen BradleyAllen Bradley
Whirlpool
APC Schneider Electric
-----
TEAJS
Honeywell Backup Station Heater
Wall Mount Temperature Transmitter
24V 3.5A Power Supply S/N 140958
Compact I/O
Compact Logix L35E
Switch Bracket Assembly
Bucket and PivotBearing
Tubing 1/8"
Power Supply
APC Backup UPS 750VAC
Rpt 2015 Annual So2 Report_Final
Appendix B
Summary of Site Visits & List of Problems
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for January 2015
The following are the flagged conditions for each station for January 2015.
Vale Sites
Algonquin 77231
January 15, 2015: Monthly calibration from 10:07 – 11:24. 2 invalid hour(s).
Copper Cliff 77218
January 16, 2015: Monthly calibration from 14:10 – 15:19. 2 invalid hour(s).
Dozzi Park 77228
January 27, 2015: Brief power outage at 12:34. 0 invalid hour(s).
January 28, 2015: Monthly calibration from 9:39 – 10:54. 2 invalid hour(s).
Kelly Lake 77225
January 28, 2015: Monthly calibration from 12:33 – 13:43. 2 invalid hour(s).
Kinsmen 77227
January 12, 2015: Monthly calibration from 11:42 – 12:53. 2 invalid hour(s).
New Sudbury 77075
January 29, 2015: Monthly calibration from 11:13 – 12:29. 2 invalid hour(s).
Rayside 77206
January 6, 2015: Monthly calibration from 12:55 – 14:03. 1 invalid hour(s).
Science North 77203
January 22, 2015: Monthly calibration from 14:20 – 15:36. 2 invalid hour(s).
Spruce St 77230 January 29, 2015: Monthly calibration from 14:08 – 15:19. 2 invalid hour(s).
Union 77330 January 12, 2015: Monthly calibration from 13:34 – 15:27. 3 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028 January 15, 2015: Monthly calibration from 12:09 – 13:26. 2 invalid hour(s).
Edison 77600 January 23, 2015: Monthly calibration from 10:02 – 11:58. 2 invalid hour(s).
Garson 77065
January 15, 2015: Monthly calibration from 14:46 – 15:59. 1 invalid hour(s).
Hanmer 77013
January 6, 2015: Monthly calibration from 14:40 – 15:47. 2 invalid hour(s).
Parkinson 77601
January 20, 2015: Monthly calibration from 10:08 – 11:26. 2 invalid hour(s).
Skead 77012
January 20, 2015: Brief negative under range from 23:22 – 23:24 and 23:49 – 23:51. 0 invalid hour(s).
January 27, 2015: Monthly calibration from 14:45 – 15:52. 1 invalid hour(s).
Sunderland 77602
January 20, 2015: Monthly calibration from 13:12 – 14:18. 2 invalid hour(s).
Wahnapitae 77603
January 21, 2015: Monthly calibration from 10:20 – 11:30. 2 invalid hour(s).
Falconbridge Met
DT2 January 5, 2015: Brief power outage from 10:46 – 10:47. 0 invalid hour(s).
TEM1 January 5, 2015: Brief power outage from 10:46 – 10:47. 0 invalid hour(s).
TEM3
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
January 5, 2015: Brief power outage from 10:46 – 10:47. 0 invalid hour(s).
WD January 5, 2015: Brief power outage from 10:46 – 10:47. 0 invalid hour(s).
WS January 5, 2015: Brief power outage from 10:46 – 10:47. 0 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for February 2015
The following are the flagged conditions for each station for February 2015.
Vale Sites
Algonquin 77231
February 2, 2015: Monthly calibration from 14:40 – 15:45. 2 invalid hour(s). February 23, 2015: Government audit from 10:25 – 10:59. 1 invalid hour(s).
Copper Cliff 77218 February 10, 2015: Monthly calibration from 10:17 – 11:49. 2 invalid hour(s).
February 23, 2015: Government audit from 13:06 – 13:35. 1 invalid hour(s).
Dozzi Park 77228 February 24, 2015: Government audit from 13:09 – 13:37. 1 invalid hour(s).
February 25, 2015: Monthly calibration from 13:06 – 14:23. 2 invalid hour(s).
Kelly Lake 77225
February 10, 2015: Monthly calibration from 12:11 – 13:12. 1 invalid hour(s).
February 23, 2015: Government audit from 11:15 – 11:44. 1 invalid hour(s).
Kinsmen 77227
February 2, 2015: Monthly calibration from 12:54 – 14:02. 1 invalid hour(s).
February 23, 2015: Servicing from 9:54 – 12:02. 2 invalid hour(s). February 24, 2015: Government audit from 11:25 – 11:50. 1 invalid hour(s).
New Sudbury 77075 February 25, 2015: Monthly calibration from 15:35 – 16:34. 2 invalid hour(s).
Rayside 77206 February 13, 2015: Monthly calibration from 14:20 – 15:39. 2 invalid hour(s).
February 25, 2015: Government audit from 13:46 – 14:15. 1 invalid hour(s).
Science North 77203 February 24, 2015: Government audit from 10:26 – 10:54. 1 invalid hour(s).
February 26, 2015: Monthly calibration from 10:15 – 11:45. 2 invalid hour(s).
Spruce St 77230 February 24, 2015: Monthly calibration from 10:33 – 11:49. 2 invalid hour(s).
February 24, 2015: Government audit from 13:55 – 14:23. 1 invalid hour(s).
Union 77330
February 23, 2015: Government audit from 13:44 – 14:13. 1 invalid hour(s).
February 25, 2015: Monthly calibration from 11:00 – 12:19. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
February 27, 2015: Monthly calibration from 10:21 – 11:43. 2 invalid hour(s).
Edison 77600
February 19, 2015: Monthly calibration from 10:35 – 11:43. 2 invalid hour(s).
February 27, 2015: Government audit from 10:22 – 10:50. 1 invalid hour(s).
Garson 77065
February 24, 2015: Monthly calibration from 13:45 – 14:56. 1 invalid hour(s). February 25, 2015: Government audit from 10:43 – 11:15. 2 invalid hour(s).
Hanmer 77013 February 13, 2015: Monthly calibration from 12:30 – 13:43. 2 invalid hour(s).
February 25, 2015: Government audit from 12:48 – 13:20. 1 invalid hour(s).
Parkinson 77601 February 17, 2015: Monthly calibration from 10:31 – 11:39. 2 invalid hour(s).
February 27, 2015: Government audit from 11:13 – 11:45. 1 invalid hour(s).
Skead 77012
February 13, 2015: Monthly calibration from 10:31 – 11:49. 2 invalid hour(s).
February 15, 2015: Missing data due to UPS problems from 16:03 – 17:39. 2 invalid hour(s).
February 17, 2015: Servicing from 15:16 – 15:28. 0 invalid hour(s). February 25, 2015: Government audit from 11:38 – 12:15. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Sunderland 77602 February 17, 2015: Monthly calibration from 13:12 – 14:31. 2 invalid hour(s).
February 27, 2015: Government audit from 13:00 – 13:27. 1 invalid hour(s).
Wahnapitae 77603 February 26, 2015: Monthly calibration from 13:56 – 15:14. 1 invalid hour(s).
February 27, 2015: Government audit from 13:55 – 14:24. 1 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for March 2015
The following are the flagged conditions for each station for March 2015.
Vale Sites
Algonquin 77231
March 12, 2015: Monthly calibration from 12:58 – 14:22. 2 invalid hour(s).
Copper Cliff 77218
March 16, 2015: Monthly calibration from 11:31 – 12:45. 2 invalid hour(s). March 25, 2015: Benchmarked calibrator from 13:37 – 14:03. 1 invalid hour(s).
Dozzi Park 77228
March 30, 2015: Monthly calibration from 12:44 – 14:15. 3 invalid hour(s).
Kelly Lake 77225
March 16, 2015: Monthly calibration from 9:10 – 10:46. 2 invalid hour(s).
Kinsmen 77227
March 4, 2015: Analyzer swap and monthly calibration from 13:29 – 16:09. 3 invalid hour(s).
New Sudbury 77075
March 3, 2015: Government audit from 11:18 – 11:45. 1 invalid hour(s).
March 13, 2015: Monthly calibration from 11:47 – 12:54. 1 invalid hour(s).
Rayside 77206
March 24, 2015: Monthly calibration from 11:25 – 12:38. 2 invalid hour(s). March 26, 2015: Re-calibration from 10:30 – 11:53. 2 invalid hour(s).
Science North 77203 March 13, 2015: Monthly calibration from 9:03 – 10:20. 2 invalid hour(s).
Spruce St 77230
March 13, 2015: Monthly calibration from 13:40 – 14:44. 2 invalid hour(s).
Union 77330
March 12, 2015: Monthly calibration from 10:44 – 11:55. 2 invalid hour(s).
March 24, 2015: SO2/TRS servicing from 14:39 – 14:40. 0 invalid hour(s). March 25, 2015: Benchmarked calibrator from 14:19 – 14:44. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
March 3, 2015: Government audit from 10:20 – 10:46. 1 invalid hour(s). March 30, 2015: Monthly calibration from 10:24 – 11:57. 2 invalid hour(s).
Edison 77600 March 18, 2015: Monthly calibration from 12:47 – 14:02. 1 invalid hour(s).
Garson 77065
March 27, 2015: Monthly calibration from 12:30 – 13:37. 2 invalid hour(s).
Hanmer 77013
March 24, 2015: Monthly calibration from 13:12 – 14:20. 2 invalid hour(s).
Parkinson 77601
March 18, 2015: Monthly calibration from 11:24 – 12:27. 2 invalid hour(s). March 27, 2015: Brief negative under range from 9:31. 0 invalid hour(s).
March 27, 2015: Missing data due to power outage from 15:04 – 16:20. 2 invalid hour(s).
Skead 77012 March 27, 2015: Monthly calibration from 10:35 – 11:46. 2 invalid hour(s).
Sunderland 77602 March 17, 2015: Analyzer swap, servicing and monthly calibration from 9:17 – 12:49. 4 invalid hour(s).
Wahnapitae 77603
March 18, 2015: Monthly calibration from 8:54 – 10:00. 1 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for April 2015
The following are the flagged conditions for each station for April 2015.
Vale Sites
Algonquin 77231
April 9, 2015: Monthly calibration from 13:29 – 14:18. 2 invalid hour(s). April 29, 2015: Servicing from 9:12 – 9:19. 0 invalid hour(s).
Copper Cliff 77218 April 13, 2015: Monthly calibration from 12:54 – 13:49. 1 invalid hour(s).
Dozzi Park 77228
April 13, 2015: Brief negative under range from 9:03 – 9:05. 0 invalid hour(s). April 23, 2015: Monthly calibration from 13:14 – 14:26. 2 invalid hour(s).
April 27, 2015: Calibration verification from 7:45 – 8:40. 1 invalid hour(s).
Kelly Lake 77225
April 5, 2015: Brief negative under range from 11:05 – 11:07. 0 invalid hour (s).
April 9, 2015: Monthly calibration from 12:06 – 13:07. 1 invalid hour (s). April 13, 2015: Brief negative under range from 9:03 – 9:04. 0 invalid hour (s).
April 27, 2015: Power outage from 8:57 – 9:52 and 10:22 – 10:25. 1 invalid hour(s).
April 30, 2015: Power outage from 10:32 – 10:34 and 11:29 – 11:36. 0 invalid hour (s).
Kinsmen 77227
April 16, 2015: Monthly calibration from 10:46 – 11:53. 1 invalid hour(s).
New Sudbury 77075
April 17, 2015: Monthly calibration from 12:55 – 14:02. 1 invalid hour (s).
Rayside 77206
April 14, 2015: Monthly calibration from 11:49 – 13:12. 1 invalid hour (s).
Science North 77203 April 17, 2015: Monthly calibration from 9:45 – 10:46. 1 invalid hour (s).
Spruce St 77230
April 27, 2015: Monthly calibration from 13:29 – 14:13. 1 invalid hour (s).
Union 77330
April 1, 2015: Servicing from 10:10 – 10:42. 1 invalid hour (s). April 2, 2015: Auto-calibration delay failure from 3:11 – 3:30. 1 invalid hour (s).
April 13, 2015: Brief negative under range from 9:03 – 9:05. 0 invalid hour (s).
April 14, 2015: Monthly calibration from 8:52- 10:07. 1 invalid hour (s).
April 29, 2015: Servicing from 14:53 – 15:07. 0 invalid hour (s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Union 77330 - Total Reduced Sulfur April 1, 2015: Servicing from 0:00 – 11:21. 12 invalid hour (s).
April 13, 2015: Brief negative under range from 9:03 – 9:04. 0 invalid hour (s).
April 29, 2015: Servicing from 14:53 – 15:29. 1 invalid hour (s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
April 6, 2015: Brief positive over range at 12:20. 0 invalid hour(s).
April 10, 2015: Brief positive over range at 11:50
WD3
April 2, 2015: Brief positive over range from 20:38 – 21:00. 1 invalid hour(s).
April 6, 2015: Brief positive over range at 12:20. 0 invalid hour(s).
April 10, 2015: Brief positive over range at 11:35, 11:37 – 11:40 and 11:52 – 11:55. 0 invalid hour(s).
WS1
April 6, 2015: Brief positive over range at 12:20. 0 invalid hour(s).
WS3
April 6, 2015: Brief positive over range at 12:20. 0 invalid hour(s).
Glencore Sites
Coniston 77028
April 16, 2015: Monthly calibration from 12:58 – 13:57. 1 invalid hour(s).
Edison 77600
April 20, 2015: Monthly calibration from 11:46 – 12:59. 1 invalid hour(s)
Garson 77065
April 7, 2015 at 3:11 – April 8 at 13:01: Instrument problems then servicing and monthly calibration. 34
invalid hour(s).
Hanmer 77013
April 14, 2015: Monthly calibration from 13:46 – 14:27. 1 invalid hour(s).
Parkinson 77601
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
April 20, 2015: Monthly calibration from 9:01 – 10:16. 2 invalid hour(s).
Skead 77012
April 27, 2015: Monthly calibration from 11:46 – 12:29. 1 invalid hour(s).
Sunderland 77602
April 24, 2015: Monthly calibration from 10:47 – 11:19. 1 invalid hour(s).
April 27, 2015: Servicing from 10:30 – 11:07. 1 invalid hour(s).
Wahnapitae 77603
April 28, 2015: Monthly calibration from 12:40 – 13:50. 2 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for May 2015
The following are the flagged conditions for each station for May 2015.
Vale Sites
Algonquin 77231
May 7, 2015: Monthly calibration from 12:42 – 13:57 and 14:52 – 16:17. 4 invalid hour(s).
May 21, 2015: Annual preventative maintenance from 12:25 – 13:45. 2 invalid hour(s).
Copper Cliff 77218
May 7, 2015: Monthly calibration from 11:02 – 12:00. 1 invalid hour(s).
Dozzi Park 77228
May 13, 2015: Monthly calibration from 9:39 – 10:19. 2 invalid hour(s).
Kelly Lake 77225
May 12, 2015: Monthly calibration from 9:47 – 10:33. 1 invalid hour(s).
Kinsmen 77227
May 7, 2015: Monthly calibration from 9:46 – 10:26. 1 invalid hour(s).
May 21, 2015: Servicing from 7:45 – 7:49 and 14:07 – 14:21. 0 invalid hour(s).
New Sudbury 77075
May 15, 2015: Monthly calibration from 10:49 – 12:05. 1 invalid hour(s).
Rayside 77206
May 1, 2015: Monthly calibration from 12:53 – 13:41. 1 invalid hour(s).
May 29, 2015: Servicing from 9:36 – 10:38. 2 invalid hour(s).
Science North 77203
May 3, 2015: Brief negative under range at 17:42 – 17:43. 0 invalid hour(s) May 12, 2015: Monthly calibration from 8:13 – 9:10. 1 invalid hour(s).
May 21, 2015: Servicing from 8:46 – 10:18. 2 invalid hour(s).
Spruce St 77230 May 13, 2015: Monthly calibration from 10:49 – 11:26. 1 invalid hour(s).
Union 77330 May 1, 2015: Monthly calibration from 9:31- 10:04. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
May 6, 2015: Monthly calibration from 9:41 – 10:47. 2 invalid hour(s).
Edison 77600
May 19, 2015: Monthly calibration from 12:23 – 13:09. 1 invalid hour(s)
Garson 77065
May 6, 2015: Monthly calibration from 11:09 – 12:22. 2 invalid hour(s).
Hanmer 77013
May 11, 2015: Monthly calibration from 12:52 – 13:25. 1 invalid hour(s).
Parkinson 77601
May 22, 2015: Servicing from 9:19 – 10:24. 2 invalid hour(s).
May 29, 2015: Monthly calibration from 11:49 – 12:26. 1 invalid hour(s).
Skead 77012
May 5, 2015: Monthly calibration from 13:18 – 14:10. 1 invalid hour(s).
Sunderland 77602
May 19, 2015: Monthly calibration from 10:46 – 11:40. 1 invalid hour(s).
Wahnapitae 77603
May 25, 2015: Servicing from 9:02 – 11:56 and 14:05 - 14:15. 3 invalid hour(s).
May 26, 2015: Servicing from 8:38 – 11:39 and 13:04 – 14:20 and 15:19 – 17:05. 8 invalid hour(s).
May 27, 2015: Servicing from 8:19 – 8:32. 0 invalid hours(s). May 29, 2015: Monthly calibration from 13:05 – 13:49. 1 invalid hour(s).
Falconbridge Met
DT2
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for June 2015
The following are the flagged conditions for each station for June 2015.
Vale Sites
Algonquin 77231
June 2, 2015: Monthly calibration from 12:36 – 14:17. 3 invalid hour(s).
June 8, 2015: Government audit from 9:13 – 9:53. 1 invalid hour(s).
Copper Cliff 77218
June 8, 2015: Government audit from 10:18 – 10:54. 1 invalid hour(s). June 29, 2015: Monthly calibration from 11:12 – 12:03. 1 invalid hour (s).
June 30, 2015: Servicing from 12:12 – 12:20. 0 invalid hour(s).
Dozzi Park 77228 June 12, 2015: Government audit from 9:52– 10:22. 1 invalid hour(s).
June 30, 2015: Monthly calibration from 13:14 – 13:45. 1 invalid hour(s).
Kelly Lake 77225
June 8, 2015: Government audit from12:37 – 13:25. 2 invalid hour(s).
June 15, 2015: Brief power outage from 14:37 – 14:41. 0 invalid hour(s).
June 30, 2015: Monthly calibration from 12:21 – 12:55. 1 invalid hour(s).
Kinsmen 77227
June 3, 2015: Monthly calibration from 12:35 – 13:35. 2 invalid hour(s). June7, 2015: Servicing from 13:28 – 14:39. 2 invalid hour(s).
June 8, 2015: Instrument verification from 7:54 – 8:15. 1 invalid hour(s).
June 8, 2015: Government audit from 11:12 – 12:09. 1 invalid hour(s). June 24, 2015: Servicing from 6:32 – 7:59, 10:21 – 10:51 and 11:14 –11:29. 3 invalid hour(s).
June 25, 2015: Servicing from 11:00 – 11:23. 1 invalid hour(s).
New Sudbury 77075 June 2, 2015: Monthly calibration from 8:51 – 9:58. 1 invalid hour(s).
June 10, 2015: Government audit from 12:16 – 13:00.1 invalid hour(s).
June 25, 2015: Brief power outage from 13:17 – 13:23. 0 invalid hour(s).
Rayside 77206
June 9, 2015: Government audit 9:31 – 9:57. 1 invalid hour(s). June 17, 2015: Power outage from 19:12– 21:53. 3 invalid hour(s).
June 17, 2015: Missing data due to power outage 21:54 – 22:31. 1 invalid hour (s).
June 24, 2015: Monthly calibration 12:46 – 13:25. 1 invalid hour(s).
Science North 77203
June 2, 2015: Monthly calibration from 10:56 – 11:54. 1 invalid hour(s)
June 11, 2015: Government audit from 9:23 – 9:59. 1 invalid hour(s). June 18, 2015: Annual preventative maintenance from 12:25 – 12:57. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
June 23, 2015: Servicing from 13:52 – 14:25. 1 invalid hour(s). June 25, 2015: Servicing from12:30 – 13:17. 2 invalid hour(s).
Spruce St 77230
June 10, 2015: Government audit from 13:32 – 14:06. 1 invalid hour(s). June 30, 2015: Monthly calibration from 14:03 – 14:35. 1 invalid hour(s).
Union 77330 June 11, 2015: Government audit from 11:01 – 11:30. 1 invalid hour(s).
June 29, 2015: Monthly calibration from 12:23 – 13:48. 2 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028 June 10, 2015: Government audit from 10:23 – 10:59. 1 invalid hour(s).
June 16, 2015: Annual preventive maintenance from 12:44 – 13:51 and monthly calibration from 14:14 –
14:25 and brief negative under range from 14:27 – 14:30. 2 invalid hour(s).
Edison 77600
June 4, 2015: Government audit 11:30 – 12:04. 1 invalid hour(s).
June 23, 2015: Monthly calibration from 9:20 – 10:09. 1 invalid hour(s).
Garson 77065
June 9, 2015: Government audit from 13:23 – 13:50. 1 invalid hour(s).
June 10, 2015: Government audit from 9:38 – 10:07. 1 invalid hour(s). June 17, 2015: Annual preventative maintenance from 12:02 – 13:07. 1 invalid hour(s).
Hanmer 77013 June 1, 2015: Monthly calibration from 9:21 – 9:56. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
June 9, 2015: Government audit from 10:26 – 11:00. 1 invalid hour(s). June 16, 2015: Servicing from 9:16-9:30, 9:36-9:38 and 11:19 – 11:26. 1 invalid hour(s).
Parkinson 77601
June 4, 2015: Government audit from 9:58 – 10:40. 1 invalid hour(s). June 23, 2015: Monthly calibration from 7:53 – 8:56. 1 invalid hour(s).
Skead 77012 June 1, 2015: Monthly calibration from 10:48 – 11:28. 1 invalid hour(s).
June 3, 2015: Brief negative under range from 11:46 – 11:49. 0 invalid hour(s).
June 9, 2015: Government audit from 12:25 – 12:59. 1 invalid hour(s). June 15, 2015: Servicing from 11:41- 11:51 and monthly calibration from 13:00 – 13:48. 1 invalid hour(s).
June 25, 2015: Brief negative under range from 13:17 – 13:24. 0 invalid hour(s).
June 29, 2015: Brief negative under range from 16:48 – 16:49. 0 invalid hour(s).
Sunderland 77602
June 2, 2015: Government audit from 11:49 – 12:23. 1 invalid hour(s).
June 3, 2015: Brief negative under range from 11:46 – 11:48. 0 invalid hour(s). June 22, 2015: Monthly calibration from 11:51 – 13:44. 2 invalid hour(s).
June 25, 2015: Brief negative under range from 13:17 – 13:24. 0 invalid hour(s).
Wahnapitae 77603 June 2, 2015: Government audit from 9:55 – 10:32. 1 invalid hour(s).
June 22, 2015: Monthly calibration from 8:43 – 9:47. 2 invalid hour(s).
Falconbridge Met
DT2
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
TEM1
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
TEM3
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
WD
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
WS
June 14, 2015: Power outage from 6:02 – 8:18 and missing data from 8:19 – 18:34. 13 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for July 2015
The following are the flagged conditions for each station for July 2015.
Vale Sites
Algonquin 77231 July 2, 2015: Annual preventative maintenance from 10:36 – 12:32. 3 invalid hour(s).
July 3, 2015: Annual preventative maintenance from 12:19 – 13:28. 2 invalid hour(s).
July 10, 2015: Monthly calibration from 13:09 – 13:56. 1 invalid hour(s). July 31, 2015: Power outage at 16:00 and from 16:03 – 16:36 and missing data from 16:37 – 17:33. 2
invalid hour(s).
Copper Cliff 77218
July 9, 2015: Monthly calibration from 9:50 – 10:37. 1 invalid hour(s).
Dozzi Park 77228 July 8, 2015: Monthly calibration from 13:21 – 14:01. 1 invalid hour(s).
Kelly Lake 77225 July 14, 2015: Monthly calibration from 8:23 – 9:22. 2 invalid hour(s).
Kinsmen 77227
July 3, 2015: Monthly calibration from 8:45 – 10:07. 1 invalid hour(s).
New Sudbury 77075
July 10, 2015: Monthly calibration from 10:14 – 11:14. 1 invalid hour(s).
Rayside 77206
July 7, 2015: Monthly calibration from 10:24 – 11:18. 2 invalid hour(s). July 19, 2015 at 3:11 – July 20 at 10:45: Instrument problems then servicing. 32 invalid hour(s).
Science North 77203
July 6, 2015: Monthly calibration from 9:46 – 10:38. 1 invalid hour(s) July 25, 2015: Servicing from 14:06 – 15:10. 1 invalid hour(s).
July 27, 2015: Servicing from 13:41 – 14:26. 2 invalid hour(s).
July 31, 2015: Power outage from 16:03 – 16:44 and brief under range at 16:01 and from 16:45 – 16:46. 1 invalid hour(s).
Spruce St 77230 July 14, 2015: Monthly calibration from 10:45 – 11:42. 1 invalid hour(s).
Union 77330
July 9, 2015: Monthly calibration from 12:01 – 12:42. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
CKNC Met
DT2
July 7, 2015: Instrument problems from 9:09 –14:41. 6 invalid hour(s).
TEM1
Nothing to report
TEM3
July 7, 2015: Instrument problems from 9:09 –14:41. 6 invalid hour(s).
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028 July 6, 2015: Monthly calibration from 12:01 – 13:03. 1 invalid hour(s).
Edison 77600 July 24, 2015: Monthly calibration from 10:27 – 11:25. 2 invalid hour(s).
Garson 77065 July 8, 2015: Monthly calibration from 11:26 – 12:09. 1 invalid hour(s).
July 20, 2015: Servicing from 7:34 – 9:00. 2 invalid hour(s).
July 26, 2015: Servicing from 12:20 – 12:38. 1 invalid hours(s).
July 27, 2015: Servicing from 9:07 – 11:39. 3 invalid hour(s). July 29, 2015: Servicing from 12:51 – 13:31. 1 invalid hour(s).
Hanmer 77013 July 7, 2015: Monthly calibration from 11:59 – 13:04. 1 invalid hour(s).
Parkinson 77601 July 23, 2015: Monthly calibration from 12:45 – 13:47. 1 invalid hour(s).
Skead 77012
July 8, 2015: Monthly calibration from 9:46 – 10:37. 1 invalid hour(s).
Sunderland 77602
July 23, 2015: Monthly calibration from 10:33 – 11:24. 2 invalid hour(s).
Wahnapitae 77603
July 23, 2015: Monthly calibration from 8:32 – 9:25. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for August 2015
The following are the flagged conditions for each station for August 2015.
Vale Sites
Algonquin 77231 August 12, 2015: Monthly calibration from 8:57 – 10:01. 1 invalid hour(s).
August 24, 2015: Government audit from 11:26 – 11:56. 1 invalid hour(s).
Copper Cliff 77218
August 11, 2015: Monthly calibration from 12:50 – 13:47. 1 invalid hour(s).
August 24, 2015: Government audit from 10:07 – 10:42. 1 invalid hour(s).
Dozzi Park 77228
August 12, 2015: Monthly calibration from 13:03 – 13:56. 1 invalid hour(s).
August 26, 2015: Government audit from 12:20 – 12:59. 1 invalid hour(s).
Kelly Lake 77225
August 12, 2015: Monthly calibration from 10:58 – 12:05. 1 invalid hour(s). August 21, 2015: Power outage from 16:13 – 16:16. 0 invalid hour(s).
August 26, 2015: Government audit from 13:18 – 13:48. 1 invalid hour(s).
August 31, 2015: Instrument problems from 14:54 – 23:59. 9 invalid hour(s).
Kinsmen 77227
August 9, 2015: Brief negative under range at 13:45. 0 invalid hour(s).
August 11, 2015: Monthly calibration from 11:14 – 12:14. 1 invalid hour(s). August 24, 2015: Government audit from 9:22 – 9:51. 1 invalid hour(s).
New Sudbury 77075 August 21, 2015: Monthly calibration from 12:44 – 13:37. 2 invalid hour(s).
August 26, 2015: Government audit from 10:52 – 11:27. 1 invalid hour(s).
Rayside 77206 August 11, 2015: Monthly calibration from 9:10 – 10:19. 2 invalid hour(s).
August 25, 2015: Government audit from 12:50 – 13:22. 1 invalid hour(s).
Science North 77203
August 13, 2015: Monthly calibration from 13:23 – 14:08. 1 invalid hour(s).
August 24, 2015: Government audit from 12:29 – 12:58. 1 invalid hour(s). August 31, 2015: Brief negative under range from 10:14 – 10:15. 0 invalid hour(s).
Spruce St 77230
August 10, 2015: Servicing from 7:36 – 7:45 and monthly calibration 9:44 – 11:15. 3 invalid hour(s). August 18, 2015: Servicing from 9:45 – 9:49. 0 invalid hour(s).
August 27, 2015: Government audit from 9:21 – 10:09. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Union 77330
August 14, 2015: Monthly calibration from 9:45 – 10:50. 1 invalid hour(s).
August 25, 2015: Calibration verification from 9:44 – 10:45. 2 invalid hour(s).
August 27, 2015: Government audit from 10:49 – 11:44. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
August 13, 2015: Monthly calibration from 11:32 – 12:51. 2 invalid hour(s). August 26, 2015: Government audit from 9:41 – 10:13. 1 invalid hour(s).
Edison 77600
August 19, 2015: Monthly calibration from 10:19 – 11:13. 1 invalid hour(s). August 20, 2015: Government audit from 12:53 – 13:26. 1 invalid hour(s).
Garson 77065 August 4, 2015: Monthly calibration from 9:29 – 10:28. 2 invalid hour(s).
August 25, 2015: Government audit at 9: 20 and from 9:22 – 10:42. 2 invalid hour(s).
Hanmer 77013 August 4, 2015: Monthly calibration from 13:12 – 14:00. 1 invalid hour(s).
August 25, 2015: Government audit from 11:52 – 12:24. 1 invalid hour(s).
Parkinson 77601
August 19, 2015: Monthly calibration from 9:11 – 9:57. 1 invalid hour(s).
August 20, 2015: Government audit from 12:07 – 12:39. 1 invalid hour(s).
Skead 77012
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
August 2, 2015: Brief negative under range from 7:48 – 7:50. 0 invalid hour(s). August 4, 2015: Monthly calibration from 11:46 – 12:41. 1 invalid hour(s).
August 7, 2015: Brief negative under range from 14:03 – 14:05. 0 invalid hour(s).
August 25, 2015: Government audit from 10:35 – 11:25. 2 invalid hour(s).
Sunderland 77602
August 1, 2015: Brief negative under range 18:21 – 18:23. 0 invalid hour(s). August 2, 2015: Brief negative under range at 7:50. 0 invalid hour(s).
August 19, 2015: Monthly calibration from 11:46– 12:40. 1 invalid hour(s).
August 20, 2015: Government audit from 11:15– 11:53. 1 invalid hour(s).
Wahnapitae 77603
August 18, 2015: Monthly calibration from 8:08 – 9:05. 1 invalid hour(s).
August 20, 2015: Government audit from 9:41 – 10:15. 2 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for September 2015
The following are the flagged conditions for each station for September 2015.
Vale Sites
Algonquin 77231 September 5, 2015: Brief negative under range from 14:17 – 14:19. 0 invalid hour(s).
September 15, 2015: Monthly calibration from 13:05 – 14:02. 1 invalid hour(s).
Copper Cliff 77218
September 15, 2015: Monthly calibration and servicing from 11:21 – 16:05. 5 invalid hour(s).
September 21, 2015: Servicing from 8:46 – 8:59. 0 invalid hour(s).
Dozzi Park 77228
September 1, 2015 at 4:11 – September 2, 2015 at 7:28 and 7:44 – 8:39: Instrument problems then
servicing. 29 invalid hour(s). September 25, 2015: Monthly calibration from 12:10 – 13:12. 1 invalid hour(s).
Kelly Lake 77225 September 1, 2015 at 12:00 – September 2, 2015 at 10:29: Instrument problems and servicing. 35 invalid
hour(s).
September 4, 2015 at 3:11 – September 5, 2015 at 5:20: Instrument problems then servicing. 27 invalid
hour(s). September 8, 2015 at 3:11 – September 9, 2015 at 6:56: Instrument problems then servicing. 28 invalid
hour(s).
September 12, 2015 at 3:11 – September 13, 2015 at 8:24: Instrument problems then servicing. 30 invalid hour(s).
September 14, 2015: Servicing and missing data from 8:46 – 9:16, 9:39 – 10:53, 11:34 – 11:38, 11:57 –
13:21. 4 invalid hour(s). September 17, 2015 at 3:11 – September 19, 2015 at 7:20: Instrument problems and servicing. 53 invalid
hour(s).
September 19, 2015: Servicing from 13:16 – 13:27. 0 invalid hour(s).
September 20, 2015 at 3:11 – September 21, 2015 at 5:58: Instrument problems then servicing. 27 invalid hour(s).
September 21, 2015: Servicing and monthly calibration from 9:46 – 11:19 and 11:27 – 14:05. 4 invalid
hour(s). September 23, 2015 at 17:06 – September 25, 2015 at 20:27: Instrument problems then servicing. 52
invalid hour(s).
September 27, 2015: Brief negative under range from 18:02 – 18:04. 0 invalid hour(s). September 30, 2015: Servicing from 12:33 – 14:10. 2 invalid hour(s).
The large number of invalid hours for Kelly Lake station was due to an intermittent utilities power service.
The fluctuations in supply voltage (as high as 150 VAC) caused the instrument to lock up and stop collecting valid SO2 readings. These instrument lock ups occurred at various times and caused several
nightly auto calibration failures which resulted in invalidating data to previous valid auto calibration values
(sometimes over 24 hrs).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Kinsmen 77227
September 15, 2015: Monthly calibration from 7:46 – 8:53. 1 invalid hour(s).
New Sudbury 77075 September 23, 2015: Monthly calibration from 9:48 – 11:09. 1 invalid hour(s).
Rayside 77206 September 11, 2015: Monthly calibration from 8:47 – 9:53. 1 invalid hour(s).
September 17, 2015: Servicing from 14:00 – 14:31. 1 invalid hour(s).
Science North 77203
September 29, 2015: Monthly calibration from 10:58 – 11:55. 1 invalid hour(s).
Spruce St 77230 September 29, 2015: Monthly calibration from 9:32 – 10:18. 2 invalid hour(s).
September 30, 2015: Servicing from 7:45 – 9:03. 1 invalid hour(s).
Union 77330
September 29, 2015: Monthly calibration from 13:34 – 14:28. 2 invalid hour(s).
CKNC Met
DT2 September 19, 2015: Instrument problems from 9:53 – 21:55. 12 invalid hour(s).
TEM1
Nothing to report
TEM3
September 19, 2015: Instrument problems from 9:53 – 21:55. 12 invalid hour(s).
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
September 24, 2015: Monthly calibration from 14:10 – 15:06. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Edison 77600 September 27, 2015: Power outage from 8:57 – 8:59 and 16:05 – 16:07. 0 invalid hour(s).
September 28, 2015: Monthly calibration from 10:05 – 11:06. 1 invalid hour(s).
Garson 77065 September 17, 2015: Monthly calibration from 12:06 – 13:12. 1 invalid hour(s).
September 27, 2015: Power outage then missing data from 8:01 – 16:06. 8 invalid hour(s).
Hanmer 77013
September 17, 2015: Monthly calibration from 10:10 – 11:13. 1 invalid hour(s).
Parkinson 77601
September 16, 2015: Monthly calibration from 12:29 – 13:16. 2 invalid hour(s).
September 27, 2015: Power outage at 8:01 – 8:12 and at 16:16. 0 invalid hour(s).
Skead 77012
September 24, 2015: Monthly calibration from 12:46 – 13:29. 1 invalid hour(s).
September 27, 2015: Power outage from 8:01 – 11:00. 3 invalid hour(s).
Sunderland 77602
September 16, 2015: Monthly calibration from 10:54 – 12:00. 1 invalid hour(s).
September 27, 2015: Brief power outage at 7:58, 9:20 and 16:27. 0 invalid hour(s).
Wahnapitae 77603
September 16, 2015: Monthly calibration from 8:47 – 9:49. 1 invalid hour(s).
Falconbridge Met
DT2 September 30, 2015: Power outage from 9:44 – 11:13. 2 invalid hour(s).
TEM1
September 30, 2015: Power outage from 9:44 – 11:13. 2 invalid hour(s).
TEM3 September 30, 2015: Power outage from 9:44 – 11:13. 2 invalid hour(s).
WD
September 30, 2015: Power outage from 9:44 – 11:13. 2 invalid hour(s).
WS September 30, 2015: Power outage from 9:44 – 11:13. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for October 2015
The following are the flagged conditions for each station for October 2015.
Vale Sites
Algonquin 77231 October 15, 2015: Monthly calibration from 12:17 – 13:16. 2 invalid hour(s).
Copper Cliff 77218 October 13, 2015: Monthly calibration from 12:24 – 14:00. 2 invalid hour(s).
October 15, 2015: Power outage from 12:59 – 13:55. 1 invalid hour(s).
Dozzi Park 77228
October 15, 2015: Power outage from 12:59 – 14:14. 1 invalid hour(s).
October 26, 2015: Monthly calibration from 11:07 – 12:39. 2 invalid hour(s).
October 27, 2015: Instrument problems and servicing from 11:23 – 14:21. 4 invalid hour(s). October 29, 2015 at 23:42 – October 30, 2015 at 9:27: Instrument problems and then servicing. 11 invalid
hour(s).
Kelly Lake 77225
October 15, 2015: Power outage from 12:59 – 14:35. 2 invalid hour(s).
October 31, 2015: Servicing and monthly calibration from 20:48 – 22:10 and 22:14 – 22:28. 2 invalid
hour(s).
Kinsmen 77227
October 15, 2015: Power outage from 12:40 – 12:49 and 12:59 – 14:27. 2 invalid hour(s). October 22, 2015: Monthly calibration from 13:16 – 14:23. 2 invalid hour(s).
New Sudbury 77075 October 26, 2015: Monthly calibration from 8:11 – 9:46. 2 invalid hour(s).
Rayside 77206
October 5, 2015: Monthly calibration from 10:34 – 11:53. 2 invalid hour(s). October 15, 2015: Power outage from 12:45 – 12:48 and 12:59 – 14:28. 2 invalid hour(s).
Science North 77203 October 28, 2015: Monthly calibration from 9:50 – 10:41. 1 invalid hour(s).
Spruce St 77230 October 31, 2015: Monthly calibration from 18:38 – 19:56. 2 invalid hour(s).
Union 77330
October 13, 2015: Monthly calibration from 9:49 – 11:53. 2 invalid hour(s). October 15, 2015: Power outage from 12:59 – 13:59 and brief negative under range at 14:01. 1 invalid
hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
CKNC Met
DT2 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
TEM1 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
TEM3 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WD1
October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WD3 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WS1 October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
WS3
October 27, 2015: Missing data due to servicing from 9:37 – 14:00. 5 invalid hour(s).
Glencore Sites
Coniston 77028
October 15, 2015: Monthly calibration from 9:46 – 10:53. 1 invalid hour(s). October 15, 2015: Brief power outage at 13:17 and 14:11. 0 invalid hour(s).
Edison 77600
October 15, 2015: Brief power outage from 13:37 – 13:39. 0 invalid hour(s). October 29, 2015: Monthly calibration from 10:43 – 14:22. 5 invalid hour(s).
Garson 77065 October 8, 2015: Monthly calibration from 12:40 – 13:46. 2 invalid hour(s).
October 15, 2015: Brief power outage from 13:37 – 13:39. 0 invalid hour(s).
October 19, 2015: Brief power outage from 11:19 – 11:33. 0 invalid hour(s).
Hanmer 77013
October 5, 2015: Monthly calibration from 12:28 – 13:41. 2 invalid hour(s).
October 21, 2015: Servicing from 14:10 – 14:28. 1 invalid hour(s).
Parkinson 77601
October 15, 2015: Brief power outage from 13:37 – 13:39. 0 invalid hour(s). October 29, 2015: Monthly calibration from 8:33 – 10:22. 3 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
October 31, 2015: Instrument problems from 3:11 – 4:28, brief negative under range at 10:08 and servicing from 13:59 – 15:52. 4 invalid hour(s).
Skead 77012
October 8, 2015: Monthly calibration from 10:45 – 12:02. 1 invalid hour(s). October 20, 2015: Instrument problems and servicing from 1:29 – 5:16 and 9:52 – 10:33. 6 invalid hour(s).
October 22, 2015: Servicing from 7:27 – 10:31. 4 invalid hour(s).
Sunderland 77602
October 15, 2015: Power outage from 13:37 – 13:39. 0 invalid hour(s).
October 27, 2015: Monthly calibration from 9:34 – 10:30. 2 invalid hour(s).
Wahnapitae 77603
October 15, 2015: Brief power outage at 13:17 and 14:11. 0 invalid hour(s).
October 23, 2015: Monthly calibration from 12:45 – 13:50. 1 invalid hour(s).
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for November 2015
The following are the flagged conditions for each station for November 2015.
Vale Sites
Algonquin 77231 November 13, 2015: Monthly calibration from 11:31 – 12:34. 2 invalid hour(s).
Copper Cliff 77218 November 9, 2015: Monthly calibration from 8:47 – 9:41. 1 invalid hour(s).
Dozzi Park 77228 November 30, 2015: Monthly calibration from 13:56 – 15:11. 1 invalid hour(s).
Kelly Lake 77225
November 8, 2015 at 3:11 – November 9. 2015 at 7:50: Instrument problems, then servicing and monthly calibration. 29 invalid hour(s).
November 13, 2015: Servicing from 9:58 – 10:09. 0 invalid hour(s).
November 19, 2015: Servicing from 13:12 – 13:28. 1 invalid hour(s). November 25, 2015: Servicing from 9:35 – 11:14. 2 invalid hour(s).
Kinsmen 77227
November 6, 2015: Monthly calibration from 12:25 – 13:21. 2 invalid hour(s).
New Sudbury 77075
November 10, 2015: Servicing and monthly calibration from 16:46 – 19:32. 3 invalid hour(s).
Rayside 77206
November 10, 2015: Monthly calibration from 11:20 – 12:37. 2 invalid hour(s). November 22, 2015: Brief power outage from 7:37 – 7:39 and 14:26 – 14:31. 0 invalid hour(s).
Science North 77203
November 19, 2015: Monthly calibration from 10:24 – 11:29. 2 invalid hour(s).
Spruce St 77230
November 12, 2015: Monthly calibration and servicing from 12:47 – 14:34. 2 invalid hour(s). November 23, 2015: Servicing from 11:45 – 12:05. 0 invalid hour(s).
Union 77330 November 9, 2015: Monthly calibration from 10:16 – 11:01. 1 invalid hour(s).
November 18, 2015: Calibration verification from 10:03 – 10:58. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3 November 6, 2015: Positive over range from 8:10 – 8:13, 8:17 – 10:33. 3 invalid hour(s).
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028
November 10, 2015: Brief power outage from 17:14, 17:37 and 17:38. 0 invalid hour(s). November 18, 2015: Monthly calibration from 13:56 – 15:08. 1 invalid hour(s).
Edison 77600
November 26, 2015: Monthly calibration from 12:07 – 12:57. 1 invalid hour(s).
Garson 77065
November 16, 2015: Monthly calibration from 14:26 -15:19. 2 invalid hour(s).
Hanmer 77013
November 10, 2015: Monthly calibration from 13:47 – 14:47. 1 invalid hour(s). November 30, 2015: Servicing from 12:50 – 13:07. 0 invalid hour(s).
Parkinson 77601
November 25, 2015: Monthly calibration and servicing from 9:45 – 14:40. 5 invalid hour(s). November 29, 2015: Servicing from 13:30 – 15:10. 2 invalid hour(s).
Skead 77012 November 24, 2015: Monthly calibration from 11:34 – 12:28. 2 invalid hour(s).
Sunderland 77602
November 24, 2015: Servicing from 10:09 – 10:46. 1 invalid hour(s). November 26, 2015: Monthly calibration from 9:01 – 10:09. 1 invalid hour(s).
Wahnapitae 77603 November 23, 2015: Monthly calibration from 13:42 – 14:39. 2 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Falconbridge Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD
Nothing to report
WS
Nothing to report
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
Data Editing for December 2015
The following are the flagged conditions for each station for December 2015.
Vale Sites
Algonquin 77231 December 3, 2015 at 3:11 – December 4, 2015 at 5:08: Instrument problems, then servicing. 26 invalid
hour(s).
December 8, 2015: Government audit from 13:34 – 14:03. 1 invalid hour(s). December 17, 2015: Monthly calibration from 10:26 – 11:12. 1 invalid hour(s).
Copper Cliff 77218 December 2, 2015: Monthly calibration from 11:26 – 12:44. 2 invalid hour(s).
December 17, 2015: Government audit from 10:10 – 10:49. 1 invalid hour(s).
December 24, 2015: Brief negative under range from 6:51 – 6:53. 0 invalid hour(s).
Dozzi Park 77228
December 10, 2015: Government audit from 12:43 – 13:17. 2 invalid hour(s).
December 21, 2015: Monthly calibration from 9:34 – 10:35. 2 invalid hour(s).
Kelly Lake 77225
December 10, 2015: Government audit from 13:31 – 13:57. 1 invalid hour(s).
December 13, 2015: Servicing from 11:46 – 12:07. 0 invalid hour(s). December 21, 2015: Monthly calibration from 12:35 – 13:42. 2 invalid hour(s).
December 24, 2015: Brief power outage at 12:11. 0 invalid hour(s).
Kinsmen 77227
December 2, 2015: Monthly calibration from 9:47 – 11:02. 1 invalid hour(s).
December 9, 2015: Government audit from 14:25 – 15:02. 1 invalid hour(s).
New Sudbury 77075
December 10, 2015: Government audit from 10:43 – 11:33. 2 invalid hour(s).
December 23, 2015: Monthly calibration from 9:58 – 10:52. 1 invalid hour(s).
Rayside 77206
December 1, 2015: Monthly calibration from 9:48 – 11:04. 1 invalid hour(s). December 7, 2015: Government audit from 14:12 – 14:42. 1 invalid hour(s).
December 24, 2015: Brief negative under range from 7:04 – 7:06. 0 invalid hour(s).
Science North 77203
December 8, 2015: Government audit from 12:39 – 13:14. 1 invalid hour(s).
December 21, 2015: Monthly calibration from 11:02 – 11:53. 1 invalid hour(s).
Spruce St 77230
December 7, 2015: Government audit from 12:49 – 13:26. 1 invalid hour(s).
Union 77330
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
December 2, 2015: Monthly calibration from 13:48 – 14:47 . 1 invalid hour(s). December 17, 2015: Government audit from 12:08 – 12:46. 1 invalid hour(s).
CKNC Met
DT2
Nothing to report
TEM1
Nothing to report
TEM3
Nothing to report
WD1
Nothing to report
WD3
Nothing to report
WS1
Nothing to report
WS3
Nothing to report
Glencore Sites
Coniston 77028 December 1, 2015: Monthly calibration from 13:40 – 14:40. 2 invalid hour(s).
December 8, 2015: Government audit from 10:25 – 10:59. 1 invalid hour(s).
Edison 77600 December 1, 2015: Government audit from 10:52 – 11:19. 1 invalid hour(s).
December 15, 2015: Monthly calibration from 14:13 – 15:00. 1 invalid hour(s).
Garson 77065
December 3, 2015: Monthly calibration from 14:08 – 15:09. 1 invalid hour(s).
December 8, 2015: Government audit from 11:19 – 11:50. 1 invalid hour(s).
Hanmer 77013
December 4, 2015: Monthly calibration from 11:17 – 12:36. 2 invalid hour(s).
December 9, 2015: Government audit from 13:00 – 13:34. 1 invalid hour(s). December 16, 2015: Servicing from 13:51 – 14:43. 1 invalid hour(s).
December 24, 2015: Power outage from 7:20 – 8:42. 2 invalid hour(s).
Parkinson 77601
December 1, 2015: Government audit from 10:09 – 10:39. 1 invalid hour(s).
December 15, 2015: Monthly calibration from 12:32 – 13:45. 2 invalid hour(s).
Skead 77012
December 1, 2015: Monthly calibration from 11:53 – 12:50. 1 invalid hour(s).
A Division of Boudreau-Espley-Pitre Corporation
1040 Lorne Street, Unit 3, Sudbury, ON P3C 4R9 Tel.(705)675-7720 Fax (705)675-5507
E-mail: [email protected]
December 9, 2015: Government audit from 11:16 – 11:56. 1 invalid hour(s).
Sunderland 77602
December 1, 2015: Government audit from 12:05 – 12:37. 1 invalid hour(s).
December 18, 2015: Monthly calibration from 10:42 – 11:56. 2 invalid hour(s).
Wahnapitae 77603
December 1, 2015: Government audit from 13:58 – 14:30. 1 invalid hour(s). December 18, 2015: Monthly calibration from 8:53 – 10:00. 1 invalid hour(s).
Falconbridge Met
DT2 December 24, 2015: Power outage from 5:44 – 5:47, 5:56, 5:57, 6:25 – 6:29, and 6:46 – 17:05. 11 invalid
hour(s).
TEM1
December 24, 2015: Power outage from 5:44 – 5:47, 5:56, 5:57, 6:25 – 6:29, and 6:46 – 17:05. 11 invalid hour(s).
TEM3 December 24, 2015: Power outage from 5:44 – 5:47, 5:56, 5:57, 6:25 – 6:29, and 6:46 – 17:05. 11 invalid
hour(s).
WD December 24, 2015: Power outage from 5:44 – 5:47, 5:56, 5:57, 6:25 – 6:29, and 6:46 – 17:05. 11 invalid
hour(s).
WS December 24, 2015: Power outage from 5:44 – 5:47, 5:56, 5:57, 6:25 – 6:29, and 6:46 – 17:05. 11 invalid
hour(s).
Rpt 2015 Annual So2 Report_Final
Appendix C
Figures
Monitoring Station Location Map
Figure C1: Monitoring Station Location Map
Source: Google Earth Pro, February 2014