7/23/2019 Uts Teknik Produksi 1 2015 http://slidepdf.com/reader/full/uts-teknik-produksi-1-2015 1/2 UTS TEKNIK PRODUKSI 1 2015 1) A) OIL/GAS PRODUCTION SYSTEM IS A COMPOSITE TERM DESCRIBING THE ENTIRE PRODUCTION PROCESS OF AN OIL/GAS FIELD. DESCRIBE SHORTLY WITH SCHEMATIC AND TEXT PRINCIPAL COMPONENTS OF AN OIL/GAS PRODUCTION SYSTEM AND THE MAJOR FACTORS THAT DETERMINE THE PRODUCTION RATE OF AN OIL/GAS PRODUCTION SYSTEM. B) EXPLAIN (i) THE PURPOSE OF SAFETY SYSTEM, (ii) THE MAJOR OBJECTIVE OF SAFETY SYTEM AND (iii) HOW TO ACHIEVE THE OBJECTIVE 2) DILAKUKAN PENGUJIAN SUMUR PADA SUMUR “STT CERIA 1” DENGAN LAJU 200 STB/DAY DAN TEKANAN BAWAH SUMUR 3220 PSIA. TEKANAN BUBBLE POINT DIHITUNG PADA SEBUAH KORELASI MENGGUNAKAN DATA PERMUKAAN KETIKA SUMUR DIPRODUKSI PADA LAJU ALIR YANG RENDAH. TEKANAN BUBBLE POINT DIPERKIRAKAN 3980 PSIA DAN TEKANAN RESERVOIR ADALAH 4000 PSIA. A) TULIS PERSAMAAN YANG AKAN DIGUNAKAN UNTUK MEMBANGUN IPR PADA SUMUR INI BESERTA ALASANNYA. B) BUAT TABULASI NILAI Q PADA BERBAGAI NILAI PWF C)GAMBARKAN INFLOW PERFORMANCE RELATIONSHIP UNTUK SUMUR TERSEBUT. 3) SUATU UNDERSATURATED OIL RESERVOIR MEMPUNYAI DATA SEBAGAI BERIKUT : PARAMETER VALUE UNIT RESERVOIR PRESSURE 5651 PSIA BUBBLE POINT PRESSURE 3000 PSIA POROSITY 0.19 EFFECTIVE PERMEABILITY 8.2 Md TOTAL COMPRESSIBILITY 12.9 X 10 -6  Per PSI PAYZONE THICKNESS 53 FT DRAINAGE AREA 640 ACRE WELLBORE RADIUS 0.328 FT FLUID FORMATION VOLUME FACTOR 1.1 Rb/STB

Transcript of Uts Teknik Produksi 1 2015

Page 1: Uts Teknik Produksi 1 2015

7/23/2019 Uts Teknik Produksi 1 2015

http://slidepdf.com/reader/full/uts-teknik-produksi-1-2015 1/2

UTS TEKNIK PRODUKSI 1 2015

1)  A) OIL/GAS PRODUCTION SYSTEM IS A COMPOSITE TERM DESCRIBING THE

ENTIRE PRODUCTION PROCESS OF AN OIL/GAS FIELD. DESCRIBE SHORTLY WITH

SCHEMATIC AND TEXT PRINCIPAL COMPONENTS OF AN OIL/GAS PRODUCTION

SYSTEM AND THE MAJOR FACTORS THAT DETERMINE THE PRODUCTION RATE 

OF AN OIL/GAS PRODUCTION SYSTEM.

B) EXPLAIN (i) THE PURPOSE OF SAFETY SYSTEM, (ii) THE MAJOR OBJECTIVE OF

SAFETY SYTEM AND (iii) HOW TO ACHIEVE THE OBJECTIVE

2) 

DILAKUKAN PENGUJIAN SUMUR PADA SUMUR “STT CERIA 1” DENGAN LAJU 200

STB/DAY DAN TEKANAN BAWAH SUMUR 3220 PSIA. TEKANAN BUBBLE POINT

DIHITUNG PADA SEBUAH KORELASI MENGGUNAKAN DATA PERMUKAAN KETIKA

SUMUR DIPRODUKSI PADA LAJU ALIR YANG RENDAH. TEKANAN BUBBLE POINT

DIPERKIRAKAN 3980 PSIA DAN TEKANAN RESERVOIR ADALAH 4000 PSIA. A) TULIS

PERSAMAAN YANG AKAN DIGUNAKAN UNTUK MEMBANGUN IPR PADA SUMUR

INI BESERTA ALASANNYA. B) BUAT TABULASI NILAI Q PADA BERBAGAI NILAI

PWF C)GAMBARKAN INFLOW PERFORMANCE RELATIONSHIP UNTUK SUMUR

TERSEBUT.

3) 

SUATU UNDERSATURATED OIL RESERVOIR MEMPUNYAI DATA SEBAGAI

BERIKUT :

PARAMETER VALUE UNIT

RESERVOIR PRESSURE 5651 PSIA

BUBBLE POINT PRESSURE 3000 PSIA

POROSITY 0.19

EFFECTIVE PERMEABILITY 8.2 Md

TOTAL COMPRESSIBILITY 12.9 X 10-6

  Per PSI

PAYZONE THICKNESS 53 FT

DRAINAGE AREA 640 ACRE

WELLBORE RADIUS 0.328 FT

FLUID FORMATION

VOLUME FACTOR

1.1 Rb/STB

Page 2: Uts Teknik Produksi 1 2015

7/23/2019 Uts Teknik Produksi 1 2015

http://slidepdf.com/reader/full/uts-teknik-produksi-1-2015 2/2

FLUID VISCOSITY 1.7 CP

SKIN FACTOR 0

TENTUKAN PRODUKSI MINYAK PADA (a) PWF = 3100 PSIA DAN (b) PWF = 2000 PSIA

, LALU (c) GAMBARKAN IPR NYA.

4) 

PRESENT TIME FUTURE TIME

PR 2250 PSIG 1800 PSIG

µO 3.11 CP 3.59 CP

BO 1.173 BBL/STB 1.150 BBL/STB

SO 0.768 0.741

KRO 0.815 0.6855

PRESENT TIME TEST DATA :

QO : 400 STB/DAY

PWF : 1815 PSIG

BUAT IPR UNTUK PRESENT DAN FUTURE TIME BESERTA TABULASINYA

*SELAMAT MENGERJAKAN* DON’T CHEATING, CHEATING IS A CRIME*