Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 Page | 0 NAINA’s Integrated Approval Management System (NIAMS) User Manual for Licensed Architect Version – v 3.0 2019

Transcript of User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... ·...

Page 1: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 0

NAINA’s Integrated Approval Management System (NIAMS)

User Manual for Licensed Architect

Ve

rsio

n –

v 3

.0

20

19

Page 2: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

NAINA’s Integrated Approval Management System

(NIAMS) USER MANUAL

Navi Mumbai Airport Influence Notified Area (NAINA) Third Floor, Tower No. 10, Belapur Railway Station Complex,

CBD, Belapur- 400 614 Tel No. 61365227/233

Page 3: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

II Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019

Table of Content 1. INTRODUCTION ................................................................................................................................................... 6 2. NAINA’S INTEGRATED APPROVAL MANAGEMENT SYSTEM (NIAMS) ............................................................... 7

2.1. PERMISSION PROCESS....................................................................................................................................... 7 3. SCREEN HELP...................................................................................................................................................... 12

3.1. LINK FROM CIDCO WEBSITE. .......................................................................................................................... 12 4. NAINA LOGIN PAGE ........................................................................................................................................... 13

4.1. ARCHITECT REGISTRATION FORM ...................................................................................................................... 14 4.2. SIGN-IN TO THE NIAMS APPLICATION ............................................................................................................... 16 4.3. FORGET PASSWORD ....................................................................................................................................... 17

5. APPLICATION FOR PERMISSION ........................................................................................................................ 18 5.1. SCRUTINY STAGE CC APPLICATION .................................................................................................................... 18

5.1.1 Draft Application .................................................................................................................................. 19 5.1.2 General Information ............................................................................................................................ 19 5.1.3 Applicant Information .......................................................................................................................... 21 5.1.4 Plot Details ........................................................................................................................................... 23 5.1.5 Application Checklist ............................................................................................................................ 24 5.1.6 Geo Location ........................................................................................................................................ 25 5.1.7 Building Details .................................................................................................................................... 26 5.1.8 Documents Tab .................................................................................................................................... 27 5.1.9 Drawing Tab......................................................................................................................................... 28 5.1.10 Fees (Scrutiny Fee Payment) ........................................................................................................... 29 5.1.11 Submitted Files ................................................................................................................................ 33 5.1.12 Shortfall ........................................................................................................................................... 34 5.1.13 Scrutiny Stage Clearance ................................................................................................................. 34

5.2. FINAL STAGE CC APPLICATION ......................................................................................................................... 36 5.2.1 Submitted Files ..................................................................................................................................... 36 5.2.2 Approved File..................................................................................................................................... 36 5.2.3 Acceptance letter ................................................................................................................................. 37

5.3. APPLYING FOR OLD CASE ................................................................................................................................ 38 5.4. APPLICATION FOR PLINTH COMPLETION CERTIFICATE (PCC) ................................................................................... 40

5.4.1. Plinth Draft File .................................................................................................................................... 41 5.4.2. Plinth Document tab ............................................................................................................................ 42

5.5. APPLICATION FOR OCCUPANCY COMPLETION CERTIFICATE (OC) ............................................................................. 43 5.5.1. Occupancy Draft File ............................................................................................................................ 44 5.5.2. Occupancy Document tab .................................................................................................................... 45 5.5.3. Drawing Tab......................................................................................................................................... 46

5.6. CERTIFICATES AND LETTERS.............................................................................................................................. 48 5.6.1. Charges Intimation letter ..................................................................................................................... 48 5.6.2. Assessment Order ................................................................................................................................ 49 5.6.3. Drawing PDF ........................................................................................................................................ 49 5.6.4. Note sheet ............................................................................................................................................ 50 5.6.5. Site Visit Report .................................................................................................................................... 50 5.6.6. Scrutiny Reports ................................................................................................................................... 51 5.6.7. Form 1 Intimation letter....................................................................................................................... 52 5.1.1 Form 10 ................................................................................................................................................ 53 5.1.2 Commencement Certificate (With Digital Signature) .......................................................................... 54 5.1.3 Plinth Completion Certificate ............................................................................................................... 55 5.1.4 Occupancy Certificate .......................................................................................................................... 56

6. GUIDELINES FOR NOC FOR CC (COMMENCEMENT CERTIFICATE) .................................................................... 57

Page 4: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 III

6.1. PROVISIONAL FIRE NOC ................................................................................................................................. 57 7. GUIDELINES FOR NOC FOR OC (OCCUPANCY CERTIFICATE) ............................................................................. 59

7.1. FIRE NOC ................................................................................................................................................... 59 8. REVISED PREMIUM RATES FOR FSI FREE ELEMENTS ........................................................................................ 61 9. ATTACHMENT OF VIDEO CLIP/ FOOTAGE ......................................................................................................... 62

Page 5: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

IV Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019

Table of Figures Figure 1: Official CIDCO website ............................................................................................................ 12

Figure 2: NAINA Login Page ................................................................................................................... 13

Figure 3: Architect/ Licensed Engineer Registration Form ...................................................................... 14

Figure 4: Sign-In to the NIAMS Application ............................................................................................ 16

Figure 5: Forget Password pop-up Window ........................................................................................... 17

Figure 6: Architect’s Console ................................................................................................................. 18

Figure 7: Building Permission Page ........................................................................................................ 19

Figure 8: Applicant Information ............................................................................................................. 21

Figure 9: Pop-up Window to Save File .................................................................................................... 21

Figure 10: Draft Application Section....................................................................................................... 22

Figure 11: Plot Details Window .............................................................................................................. 23

Figure 12: Application Checklist Window ............................................................................................... 24

Figure 13: Geo-Location Window ........................................................................................................... 25

Figure 14: Building Details Tab ............................................................................................................... 26

Figure 15: Documents Details tab .......................................................................................................... 27

Figure 16: Drawing Attachment Tab ...................................................................................................... 28

Figure 17: Submitting Proposal file ........................................................................................................ 29

Figure 18: Fees Tab ................................................................................................................................ 29

Figure 19: Demand Note........................................................................................................................ 30

Figure 20: Online Payment Portal .......................................................................................................... 30

Figure 21: Payment Confirmation Window ............................................................................................ 31

Figure 22: PayU Biz Payment Portal ....................................................................................................... 31

Figure 23: Payment Details Page ............................................................................................................ 31

Figure 24: Payment Receipt ................................................................................................................... 32

Figure 25: Sending To Drawing Scrutiny .......................................................................................... 32

Figure 26: Proposal sending to a higher authority .................................................................................. 32

Figure 27: Submitted File Section........................................................................................................... 33

Figure 28: Checking Proposal Flow ......................................................................................................... 33

Figure 29: Shortfall Section .................................................................................................................... 34

Figure 30: Scrutiny Stage Clearance Section ........................................................................................... 34

Figure 31: Form 10................................................................................................................................ 35

Page 6: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 V

Figure 32: Applying for Final Submission ................................................................................................ 35

Figure 33: Final Stage CC Application Section ......................................................................................... 35

Figure 34: Approved File Section ........................................................................................................... 36

Figure 35: Acceptance Letter ................................................................................................................. 37

Figure 36: Alert message ....................................................................................................................... 37

Figure 37: Applying for Old Cases........................................................................................................... 38

Figure 38: Old Case File No. Created ...................................................................................................... 38

Figure 39: Old Case In Draft Section ....................................................................................................... 39

Figure 40:Filling Old Case Information ................................................................................................... 39

Figure 41: Applying for Plinth................................................................................................................. 40

Figure 42: Confirmation Window ........................................................................................................... 40

Figure 43: Plinth's Draft Proposal-file list ............................................................................................... 41

Figure 44: Plinth's Draft Proposal-file ..................................................................................................... 41

Figure 45: Plinth Document Checklist tab............................................................................................... 42

Figure 46: Sending File to Inward Clerk .................................................................................................. 42

Figure 47: Applying for Occupancy (OC) ................................................................................................. 43

Figure 48: Confirmation Window ........................................................................................................... 43

Figure 49: Occupancy’s Draft Proposal-file list ....................................................................................... 44

Figure 50: Occupancy’s Draft Proposal-file ............................................................................................. 44

Figure 51: Occupancy Document checklist tab ....................................................................................... 45

Figure 52: Occupancy Drawing Tab ........................................................................................................ 46

Figure 53: Sending File to Scrutiny Cell .................................................................................................. 46

Figure 54: Occupancy Submitted file section.......................................................................................... 47

Figure 55: Approved Proposal- File ........................................................................................................ 47

Page 7: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 6

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

1. Introduction CIDCO – India's Premiere Town Planning Agency. When it says, “We make Cities”, that does not solely attribute this claim on the creation of eminent housing infrastructure rather various urban development projects, which are unique, justifying CIDCO's vision in the city planning and development. The CIDCO planned city; Navi Mumbai is witnessing rapid development in the construction activities. Govt. of Maharashtra vide notification dated 10-1-2013 appointed CIDCO as The Special Planning Authority (SPA) for the area, identified as Navi Mumbai Airport Influence Notified Area (NAINA). Under section 40(1) of the MR & TP Act, 1966 for area admeasuring 560 sq.km. Comprising 256 villages of Raigad District and 14 Villages of Thane District. Subsequently, the Government of Maharashtra reduced the project area to 461 sq. km. comprising 224 Villages. As a part of the transparency and reform initiatives, NAINA is implementing NIAMS (NAINA’s Integrated Approval Management System) for sanction of building plans to make it simple, transparent, and stakeholder friendly, leveraging information and communication technology. It’s an initiative to make Navi Mumbai smart city with cutting-edge technology solutions likes GIS, Online Building Plan Approval system, SAP, etc. It is a unique and innovative Software solution NIAMS enables online plan submission, automatic scrutiny of building proposal by reading CAD (Computer-Aided Design) drawings submitted by Applicant/ Architect/Licensed Engineer, assessment of charges to be paid online and issue commencement, Occupancy, and another certificate online.

What is NIAMS?

NIAMS is the automation of the approval process, followed for approval of architectural plans. It is an application customized for efficient management and approval of the drawings. It helps in attaining standardization and hence transparency in the total process of building permission. The complete building approval management system will be a web-based system, where Architects submit the plans and attached required documents online. The customized software available for approval is based on the DCPR (Sanctioned NAINA IDP DCPRs 2017, Modified Draft DCPR) of NAINA. The submitted proposals will be scrutinized automatically and which will be accepted or rejected based on the scrutiny sheet generated by the system.

Advantages of NIAMS

NIAMS is an online application system that will be used for submission of a proposal for Building permission. It is a system driven scrutiny Building Plans and Approval Management System. It is a unique software to scan CAD drawings and map them to Development Control Regulation rules for approval by NAINA. The system seamlessly integrated into the online approval workflow to monitor the approval process with associated document scrutiny. SMS and Personal Digital Assistants are used for creating alerts and notifications at every stage of the approval process to the architect/owner.

Page 8: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 7

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

2. NAINA’s Integrated Approval Management System (NIAMS)

2.1. Permission Process

Planning Authority of the Department is the office concerned for grant of building permission of

(residential, commercial, and industrial, etc.) based on DCPRs (Sanctioned NAINA IDP DCPRs 2017,

Modified Draft DCPR), and stipulated set of rules and policies. As per the relevant provisions of the Act,

any person desirous of undertaking a construction activity (New as well as modifications), is required to

be obtained prior to clearances from the NAINA-CIDCO before embarking on the same.

Architect/Licensed Engineer shall also prepare and shall indicate his name, address, qualifications and

license number as allotted by the Council of Architecture/Indian Institute of Civil Engineering. The plans

shall also be duly signed by the Licensee indicating his address and submit the same on the proposal site.

The Planning Authority performs scrutiny and processing of building plans and issues Building Permissions

(CC). No person shall carry out building construction activity without obtaining permission from the

NAINA-CIDCO.

In case the Owner/LTP of authorized & legal plot wishes to carry out construction, he/she shall apply to

the Planning Authority, NAINA-CIDCO in the prescribed (Pre-DCR) format with plan and building drawing

prepared by using AutoCAD (architectural) in a particular format along with the requisite scrutiny fees and

mandatory documents. Compliance with the provisions of Development Control and Promotion

Regulations (DCPR) (Sanctioned NAINA IDP DCPRs 2017, Modified Draft DCPR), MR & TP (Maharashtra

Regional and Town Planning) Act & Rules to DCPRs is must for any building plans. Architectural drawings

submitted by the architect would be scrutinized using NIAMS and scrutiny reports are generated.

All construction or work for which permissions are required shall be subject to inspection /scrutiny of

Document, Site, and Drawing by the NAINA-CIDCO. Inspection, where required, shall be made within the

stipulated time period following the receipt of application. The plan may be approved or shortfall after

scrutiny. Once the plan is approved and Commencement Certificate (CC) is issued after which the owner

shall be free to carry out the construction according to the sanctioned plan.

Page 9: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 8

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Architects should submit site photographs with latitude and longitude from all sides (as plot shapes may

be zigzag and not geometrical). Site inspection authority should also take site photographs with latitude

and longitude from all sides during the site inspection and the system would match the coordinates

(latitude & longitude) of submitted site photographs for the correctness and further processing. The

system provides verification checkboxes and space to write comments for site photographs provided by

the architect and option to attach site photographs with latitude and longitude taken by site inspection

authority during the site inspection.

Proposal for building permission may be shortfall after scrutiny (Scrutiny of Documents, Site, and Drawing)

by Planning Authority. In case of shortfall after scrutiny, the subsequent resubmission can be made by the

architect/licensed engineer.

The system generates buildings as well as fire scrutiny reports using NIAMS based on building bye-laws

(DCPRs), fire norms and NBC norms.

Architect /License Engineer should submit the proposal with attached documents, site image and drawing

to pre scrutiny cell, once the scrutiny is done the file move to a higher authority (for further Process) that

base on a load balance system.

Once Scrutiny of Document, Site and Drawing Scrutiny is completed. At the first inspection, the Authority

shall determine to the best of its ability that the building has been located in accordance with the

approved site plans.

Planning Authority of the planning department provides details of various fees such as scrutiny fees,

security deposits, developmental charges, infrastructure development charges, premium charges for fees

of FSI components, etc.

Online Payment (Challan Payment) can be done by using a Credit card, Debit card, Internet Banking or e-

payment request slip. Once the payment is done, a payment receipt will be generated.

Architect or (Owner) is required to pay scrutiny fees on proposal submission. Proposal acceptance

acknowledgment and permanent file number are generated by the system after payment of scrutiny fees.

The system provides an interface to both the Architect and Owner to view and pay scrutiny and other fees

(challans) online.

The application system has the provision of reassignment of the proposal for scrutiny to the competent

authority by the higher level of authority to deal with unforeseen situations that arrived due to sickness,

leaves, etc.

A resubmission (Revision) of drawing due to deviations as per building bye-laws (DCPR) (Sanctioned NAINA

IDP DCPRs 2017, Modified Draft DCPR), is allowed for a maximum 5 times.

Page 10: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 9

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

The application system has provisions to blacklist or cancels the registration of Architects based on

malpractices such as submission of false documents, a number of attempts for submission of false

documents, submission of drawings with failed entities >3 times, etc.

Once the submitted plans are in accordance with the DCPR (Sanctioned NAINA IDP DCPRs 2017, Modified

Draft DCPR), rules at the compliances are made the Building permission shall be granted online including

parameters. The architects/Licensed engineer/owner shall be communicated through SMS / email alerts.

It is expected that through the system a maximum of 30 working days would be required for seeking

permission subject to all required compliances to be made by the applicant. In case any compliance not

made, the permission cannot proceed further till the same complied.

Only registered Architects/Licensed Engineers with a valid license should be allowed for proposal

submission. Architects/Licensed Engineers with invalid/expired licenses will not be allowed to

submit/resubmit proposals. Such architects would have view-only rights of earlier submitted proposals.

NAINA-CIDCO issues LETTER OF INTENT (LOI) for proposals with gross built-up an area greater than 20,000

square meters for obtaining Environmental Clearance from authorities concerned and issues CC after

receiving Environmental Clearance Certificate.

The permission once accorded shall remain valid for up to one year. The permission shall be got

revalidated before the expiry of this period. Such revalidation may be permitted for three consecutive

terms of one year each (i.e. 1 + 3), after which proposals shall have to be submitted afresh. No drawing

scrutiny is done at the time of CC renewal, only documents are validated. Renewal fees (Premium for

extension of the time period) is taken. CC extension /Revalidation letter is issued by the NAINA-CDICO

after renewal.

Renewal of Building Permission (CC) will not be required if the plinth completion certificate is already

granted within one year from C.C.

The Authority may either sanction or shortfall the plans and specification or may sanction them with such

modifications or directions as it may deem necessary and thereupon shall communicate its decisions to

the person giving the application.

In the case of a shortfall, the Authority shall give the reasons and relevant provisions of the rule which the

plans contravene. The Authority shall as far as possible advise all the objections to the plans and

specifications in the first instance itself and ensure that no new objections are raised when they are

resubmitted (revised) after compliance of earlier objections.

Page 11: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 10

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

The Authority may revoke any permit issued under the provisions of these rules wherever there has been

any false statement or any misrepresentation of any material fact in the application on which the

permission was based.

Once Building Permission (Commencement Certificate) is issued /granted, the Owner/ Architect will start

building construction work strictly as per approved plan and complete up to the plinth level.

After giving Building Permission, NAINA-CIDCO would upload Commencement Certificate (CC), approved

drawing and building floor details on its website that should be viewable/downloadable to everyone.

(Owner/Architect/Citizen).

As the CC is valid till plinth, on completion of the construction of the plinth the owner of the building shall

obtain from the NAINA-CDICO, a certificate to the effect that the plinth has been constructed strictly in

accordance with the permissible covered area. The owner shall give an application to the NAINA-CDICO,

which shall either issue the Plinth Completion Certificate (PCC) or order suitable changes to be made as

per the approved plan. The owner shall carry out such instructions as are given, failing which the authority

will be competent to demolish such part of the plinth as in under objection. The granting of a certificate

or the issue of instructions (Shortfall) regarding necessary changes will be done in the application, failing

which it will be deemed that the certificate has been issued.

After completion of the building and on the application of the licensee, NAINA-CIDCO will scrutinize and

validate as-built drawing for deviations if any at the occupancy stage and issue an occupancy certificate

or shortfall of the building occupancy within 30 days from the receipt of such request.

The system identifies gaps in CC and OC stage drawings. In the case of major deviations, amended CC will

be required.

At the request of the owner, Part Occupancy may be granted as per “DCPR” (Sanctioned NAINA IDP DCPRs

2017, Modified Draft DCPR) for one or more buildings in a layout of multiple buildings. In the case of multi-

dwelling units, part of the building where more than 50% construction is completed and safe occupation

of completed structure is not obstructed due to ongoing activities. In the case of Residential-cum-

Commercial Plots, either residential or commercial part provided that the portion, for which Part OC is

applied, shall be completed in all respects. Provided further that the owner/supervisor of the project shall

take responsibility for public safety and health of the occupants in such part Occupancy issued buildings

and indemnify NAINA-CIDCO in the prescribed format. As per the direction is given by Honorable MD, Part

OC in a single building may be permitted.

Page 12: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 11

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

If any construction is initiated without permission/work is commenced beyond plinth without obtaining

PCC / possession is given without OC, suitable action will be taken by the NAINA-CIDCO and if the

construction is strictly in accordance with law and regulations the same may be regularized after

Paying the condonation charges as approved by the NAINA-CIDCO Board.

As per the High Court order (2005), no construction activity is allowed within 50 meters buffer area of

mangroves.

The system generates MIS reports, displays status on a GIS map, displays site photographs, plan drawing

in PDF, permission certificates, online payment interface, and proposal status on the citizen search

interface.

The license will not be required to obtain the NOCs being issued by various NAINA-CIDCO departments.

The application will be processed further after receiving all the documents including NOCs. However, in

special cases of additional FSI requesting exemptions, an extension of time limits will be given.

For speedy clearances of OC proposals and to bring out transparency, the licensee shall be required to

attach video footage of the site showing main features.

Page 13: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 12

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

3. Screen Help This Architect’s User Manual will illustrate the basic steps to be followed for the submission of a proposal in the NAINA Integrated Approval Management System (NIAMS).

3.1. Link from CIDCO Website.

The NIAMS link is available on the City & Industrial Development Corporation of Maharashtra Ltd, i.e. (CIDCO) website.

1. Go to https://cidco.maharashtra.gov.in/#. On the official CIDCO website.

2. Move the cursor over CITIZEN/ BUSINESS SERVICES.

3. Click NIAMS, it redirects you to the NAINA Login page.

Figure 1: Official CIDCO website

Page 14: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 13

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

4. NAINA Login Page

Figure 2: NAINA Login Page

Figure 2 shows the Login page of NAINA. If an architect is registered and having the credentials (username and password), he/she can log in directly to the NIAMS. Otherwise, register yourself with NIAMS (Click “Register” link) if you are not registered. The following options are also available on the NAINA login page:

Links Description

ZCS

ZCS stands for Zone Confirmation Statement, it is a certificate of land use zone of the plot.

Part plan

Click, When an architect wants to search plot area on MAP with the help of GIS application.

Payment

Click, when an architect/LTP wants to do online payment from the login page.

Search

Click, When an architect wants to search the information regarding submitted proposal.

Download

Click, to download the help manuals, PreDCR Software, Document Checklist etc.

Page 15: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 14

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

4.1. Architect Registration Form

Figure 3: Architect/ Licensed Engineer Registration Form

Page 16: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 15

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

For new architect registration:

1. Click Register link on NAINA login Page (Registration form opens). Refer (FIGURE 2: NAINA LOGIN PAGE)

2. Fill the Registration form with all the required information as shown in Architect Registration Form Figure 3 above.

3. Click Submit, to submit the registration form.

After submission of the registration form, all the details will be sent to the NAINA authority for approval. Once approved by the NAINA authority, the User Name and Password will be sent to the architect via SMS and E-Mail. Now, Architect can log into NIAMS using login credentials received and submit the application for different permissions.

Note: Asterisk marked (*) fields are mandatory to fill.

Page 17: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 16

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

4.2. Sign-In to the NIAMS Application

Figure 4: Sign-In to the NIAMS Application

Type your User Name and Password and click SIGN-IN. In case, if you forget your password, click the Forgot Password link.

Page 18: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 17

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

4.3. Forget Password

Figure 5: Forget Password pop-up Window

1. Click Forgot Password Button, the pop-up window appears, Type your Login Name, E-mail ID, and

Mobile No.

2. Click Submit.

Your password will be sent to your Mobile No. via SMS and on your E-mail ID.

Page 19: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 18

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5. Application for Permission

Following Building permission application stages are provided in the left menu panel of the architect’s console.

Scrutiny Stage CC Application

Final Stage CC Application

Plinth Completion Certificate

Occupancy Certificate

The workflow (file movement and user actions) as required is configured into the NIAMS system.

5.1. Scrutiny Stage CC Application

Figure 6: Architect’s Console

After clicking on the SIGN-IN button, the architect’s console opens as shown in Figure 6 above.

1. Under the Scrutiny Stage CC Application on the left menu panel. , Click Draft Application link.

2. Then, click Apply For.

There are three permission options available:

a. Building Permission

b. Layout Permission

c. Revalidation of CC

3. Select the required permission option.

Page 20: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 19

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.1 Draft Application

Select Building Permission (say), now the following sections “General Information” and “Applicant Information” display for providing the details.

5.1.2 General Information

Figure 7: Building Permission Page

Go to Scrutiny Stage CC Application->Draft application->Select the proposal-> General Information section.

1. Choose the Case Type as per requirement.

TABLE 1: CASE TYPE Case Type Description

New Choose this option, when you want to create a new proposal-file. Amended( Revised )

Choose this option, when you want to change the given information in the existing proposal-file.

Addition and Alteration in the building plan

Choose this option, when you want addition and alternation in the existing building plan. (Enter the File No. accordingly).

Compound Structure/ Regularization

Choose this option, if there are any discrepancies in the actual structure and the sanctioned drawing, in this case, an applicant can apply for compounding/ regularization. In this, he/she can get the case sanctioned as per the actual construction. There are rules for compounding too.

1. Select the Location from the drop-down list.

Page 21: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 20

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

i. IPD 23 Villages.

ii. Other 201 Villages.

2. Select the Permission Type as required:

i. Building Permission

ii. Compound Wall

iii. Temporary Structure

iv. Mobile Tower

3. Select the City, District, Tahsil, and Village accordingly.

4. Fill other required fields.

Page 22: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 21

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.3 Applicant Information

1. Select the Application Information tab.

2. Click +Add, Check the box and add the owner information.

3. Select the ownership value (Freehold or Leasehold).

4. Fill up other fields and also add Consultant information.

Figure 8: Applicant Information

5. Click Save, to save the information, the following window pop-ups.

6. Click OK, to proceed further.

Figure 9: Pop-up Window to Save File

After submitting the general and applicant information, the temporary file gets created that is available under the Draft Application tab and other details like Plot Details, Application Checklist, Geo-Location, and Building details get visible to the architect for providing further details of the application.

Page 23: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 22

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Figure 10: Draft Application Section

The temporary file created that is stored under the Draft Application tab as shown in above figure 10.

Page 24: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 23

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.4 Plot Details

Figure 11: Plot Details Window

1. Select the Proposal File (For e.g. - CIDCO/NAINA/DRAFT/00128/2019).

2. Go to Plot Details tab, fill up all the other required fields.

Page 25: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 24

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.5 Application Checklist

Figure 12: Application Checklist Window

1. Go to Application Checklist tab.

2. As applicable, respond to the questions on the Application Checklist by selecting Yes or No option and enter a Remarks in the remark section if required.

3. Click Save & Continue, to save the responses.

Page 26: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 25

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.6 Geo Location

Figure 13: Geo-Location Window Adding geo-location coordinates:

1. Click the checkbox “Select plot co-ordinates from map”.

2. Select the corners (geo coordinates) of the plot on a map.

3. When you select the geo-coordinates on the map, the system automatically fetches the latitude and

longitude (geo coordinates) into the form.

4. Enter length (Mt.) between two geo-location coordinates and then click Save.

Note: Select the co-ordinate on the map in the clockwise direction.

Page 27: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 26

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.7 Building Details

Figure 14: Building Details Tab Go to the Building Details tab to add or remove buildings' information.

1. Click Add, to add the building details.

2. Enter building name, select building use, sub-use, and building type. Enter a number of tenements, building

height and number of floors.

3. Click Save, to save the building details.

4. Select the checkbox beside the Sr. No. And click Delete or × button to delete the selected building details.

Page 28: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 27

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.8 Documents Tab

Figure 15: Documents Details tab To upload the documents, go to the Document tab. There are three sub-tabs under the Document tab as follows.

Mandatory Documents: These documents are mandatory for all the proposals and are selected as default.

Conditional Mandatory Documents: These documents display based on the yes responses on the Application

Checklist.

Additional Documents: These documents are additional required documents and added by the deputy

planners based on the proposal requirement during scrutiny. If some additional documents are required then

Deputy Planner adds the document under Additional Documents tab and raises documents shortfall

(objection) and a file is returned to the Architect to provide required documents as attachment.

An architect needs to attach files (PDF, JPEG, PNG, BMP) against all selected documents under all the document sub-tabs as shown in figure 15 above.

Page 29: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 28

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.9 Drawing Tab

Go to the Drawing tab. There are two sections namely Architectural Drawing and Super Imposed Drawing under the Drawing tab. Attach .dwg file against Architectural Drawing and .zip or .rar file against Super Imposed Drawing.

The .zip/.rar file should contain:

i. Superimposed AutoCAD drawing for physical survey & TILR map.

ii. Scanned images of physical survey and TILR map.

iii. In case of reservation, Road widening/Acquisition, Attach DP sheet or road NOC/Acquisition sheet.

Figure 16: Drawing Attachment Tab

1. Go to the Architectural Drawing section and click Select Files button to attach the Architectural Drawing (.dwg) file. (You cannot attach more than one drawing).

2. Go to the Super Imposed Drawing section and click Select Files button to Attach Super Imposed Drawing (.zip or .rar file) file. Click on Submit button to submit the attached Super Imposed Drawing.

Important: The system does not accept the file which contains special character as a file name.

Note: Attach .dwg format files only.

Page 30: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 29

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Figure 17: Submitting Proposal file

3. Click Submit, the confirmation window appears, check the “Agree” checkbox and then click OK, as shown in the figure 17.

4. Now the scrutiny fees challan is generated and file moves to Submission Pending tab for making scrutiny challan payment and submitting the proposal-file to NAINA for scrutiny.

5.1.10 Fees (Scrutiny Fee Payment)

Figure 18: Fees Tab

You can pay the scrutiny fees online using the Pay Now button provided against a proposal-file under Submission Pending option left menu panel in your console. Alternatively, you can pay the scrutiny fees online using the Payment link provided on the login page of the NAINA online application.

1. Go to the Submission Pending tab on the left menu panel, by clicking on the file number link opens your proposal-file.

2. Go to the Fees tab. Click Pay Now, it redirects you to the online payment portal for making payment.

Page 31: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 30

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

To view the scrutiny demand note (scrutiny challan), click , under Print Challan option. Refer to figure 18

Figure 19: Demand Note To make an online payment, follow the steps as shown in the below screens.

Figure 20: Online Payment Portal

The above online payment page automatically fetches payment details.

1. Select the payment option and click Pay.

2. The payment confirmation page appears as shown below in figure 21.

3. Click Pay.

Page 32: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 31

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Figure 21: Payment Confirmation Window

4. Enter the card number and other details and click Pay Now.

Figure 22: PayU Biz Payment Portal

By clicking on the Pay Now button, the “Payment Status” page appears.

Figure 23: Payment Details Page

Page 33: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 32

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Click icon to view and print the payment receipt under the Print Receipt option.

Figure 24: Payment Receipt

After paying scrutiny fees, click Send (Send to Drawing Scrutiny) button. The proposal is sent to the Deputy Planner (Scrutiny stage) for scrutinizing of drawing, documents and site inspection based on load balancing system and the file is displayed under “Submitted Files” tab of left menu panel with the message in red color displayed on the screen as shown in figure 26. Note: An architect can submit the proposal files to Deputy Planner (Scrutiny stage) for scrutinizing drawing, documents and site inspection only after making scrutiny challan payment.

Figure 25: Sending To Drawing Scrutiny

1. Click Send, then select Send to Drawing Scrutiny. The proposal-file will move to higher authority as

shown in red text in figure 26.

Figure 26: Proposal sending to a higher authority

Page 34: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 33

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.11 Submitted Files

Figure 27: Submitted File Section

Now, the proposal-file is available in the Submitted Files section as shown in above figure 27.

1. Go to Submitted Files tab, select and open a proposal- file.

2. Click Proposal Flow link, to check the file movement and current file holder as shown in Figure 28 below.

Figure 28: Checking Proposal Flow

Page 35: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 34

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.12 Shortfall

Figure 29: Shortfall Section

If the proposal is lacking in required documents, site conditions, deviation in drawing format or drawing scrutiny report is not as per DCPR rules, then scrutiny officer i.e. (Deputy Planner) can raise the objections and proposal will display under shortfalls tab of the left-hand side panel as shown in figure 29 above. An architect can check the Site Visit Report, Shortfall Letter, Scrutiny Report and Drawing PDF using the Report link provided on the top right corner of the file. The architect needs to comply with the objections raised and resubmit the proposal to the scrutiny officer after compliance.

5.1.13 Scrutiny Stage Clearance

Figure 30: Scrutiny Stage Clearance Section

After scrutiny of the proposal-file, Deputy Planner sends the file to the Associate Planner for verification and remarks. If all documents & NOCs are received and the file is found okay, Associate Planner sends intimation letter (i.e. Form 1) to the architect for final submission under section 44 and the file is displayed under Scrutiny Stage Clearance tab on the left menu-panel.

On receiving intimation for final submission from Associate Planner, Architect submits Form10 (FORM OF APPLICATION FOR DEVELOPMENT PERMISSION UNDER M R & TP ACT, 1966) duly signed by Architect and owner and the file is displayed to Architect under Final Stage CC Application >>Submitted Files tab of the left menu panel. Refer to figure 33.

Page 36: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 35

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Figure 31: Form 10

1. Choose proposal-file, for which you want to generate FORM 10.

2. Select the Application Form tab, click From 10.

3. Below Form 10 appears, click Download, to download the form. The architect and owner need to sign

Form 10.

4. Click Upload, to upload signed Form 10 for final submission.

5. Click Application for Final Submission, to send the proposal file for Final Stage CC application.

Figure 32: Applying for Final Submission

Figure 33: Final Stage CC Application Section

Page 37: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 36

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.2. Final Stage CC Application

5.2.1 Submitted Files

Deputy Planner receives the file under “Received Files “and opens it by clicking the file number link.

The Deputy Planner generates the permanent file number, verifies the documents and sends it to the Associate Planner for further approval.

5.2.2 Approved File

Figure 34: Approved File Section

Once the Associate Planner approves the proposal, then the file is accessible to Architect from the

“Approved File” tab in the final stage CC application.

After approval charges intimation letter (Development, labor cess, FLP, BEP, etc. Charges, etc.) And Assessment Order will be displayed to the Architect for payment.

Page 38: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 37

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.2.3 Acceptance letter

Figure 35: Acceptance Letter

1. Click Report, and then click Acceptance Letter. The below alert message appears, click Ok to proceed further.

Figure 36: Alert message

2. Click Pay now, to pay online, once payment is done, the Associate planner will issue CC letter and the same can be downloaded by the Architect from Report link.

For further approvals, an architect can apply for Plinth and Occupancy certificates.

Note: By Clicking on Acceptance letter the deputy planner can able to generate Assessment letter

from their console.

Page 39: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 38

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.3. Applying for Old Cases

Figure 37: Applying for Old Cases If an architect/owner already possesses the CC letter and wants to apply for Plinth or Occupancy then use the Apply For old Cases option.

1. Under the Scrutiny Stage CC Application tab, click Apply for Old Cases option as shown in the above figure 37.

Now an architect needs to fill all necessary fields, upload approved drawing pdf and CC letter.

2. Click Save, to save the CC information. The below message appears. Click OK.

Figure 38: Old Case File No. Created

Page 40: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 39

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Now the proposal file is available in the draft section as shown in figure 39.

. Figure 39: Old Case In Draft Section

Where an architect needs to fill in other information like Plot Details, Application Checklist, etc. as shown in figure 40.

Figure 40:Filling Old Case Information

Likewise, attach documents and drawings, and then click Submit Old case. Now Proposal file directly moves to Approved Files section under Final Stage CC Application. Where an architect can directly apply for plinth and Occupancy stage.

Note: 1. Drawing Scrutiny will be bypass in the Old case proposal-files.

2. An architect can wish to omit the Plinth stage and can directly apply for Occupancy stage.

Page 41: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 40

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.4. Application for Plinth Completion certificate (PCC)

Figure 41: Applying for Plinth

Based on the earlier sanctioned CC file number, an architect can apply for the Plinth completion

certificate (PCC) and Occupancy Certificate (OC).

To apply for Plinth Completion Certificate (PCC) follow the step given below:

1. Log in to architect’s console

2. Under Final Stage CC Application, select Approved Files.

3. Choose the proposal.

4. Click Apply for button.

5. Select Apply for Plinth, confirmation window appears.

6. Click OK.

Figure 42: Confirmation Window Now the proposal-file is available in the Draft File section of the Plinth Completion certificate as shown in figure 43.

Page 42: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 41

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.4.1. Plinth Draft File

Figure 43: Plinth's Draft Proposal-file list

7. Select the proposal (file number).

8. Click on the drop-down list for Plinth Completion requirement, select the full or part as

required. (If Part is selected, then select the part from (1st to 10th). Refer to figure 44.

9. Select the Completion Date, by clicking on this icon .

10. Click Save, to save the details.

Figure 44: Plinth's Draft Proposal-file

Note: If Part is selected as a plinth then do the same for occupancy and vice versa.

Page 43: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 42

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.4.2. Plinth Document tab

Figure 45: Plinth Document Checklist tab

Go to the Documents tab, attach all the required PCC documents as per the NAINA documents checklist as shown in figure 45.

1. Click , to attach all required documents as given in the list.

2. Click Save, and then click Submit Button, the file sends to NAINA-Office (Inward Clerk).

Figure 46: Sending File to Inward Clerk

3. Click Send, to send the file.

You cannot change the given information after the proposal-file is submitted to the higher authority.

Page 44: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 43

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Once the Plinth stage is approved, the plinth certificate gets generated as shown in Certificate and Letters. After completion of the above procedure, the architect can able to apply for obtaining the Occupancy Certificate.

5.5. Application for Occupancy Completion Certificate (OC)

Figure 47: Applying for Occupancy (OC) To apply for occupancy follow the steps given below: Based on the earlier sanctioned CC file number an architect applies for Occupancy completion

certificate (OC).

To apply for Occupancy (OC) follow the step given below.

1. Log in to your console.

2. Under Final Stage CC Application tab select Approved Files

3. Choose the proposal.

4. Click Apply For button.

5. Select Apply for Occupancy, confirmation window appears.

6. Click OK.

Figure 48: Confirmation Window Now the proposal-file is available in the Draft File section of Occupancy certificate as shown in figure 49 below.

Page 45: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 44

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.5.1. Occupancy Draft File

Figure 49: Occupancy’s Draft Proposal-file list

1. Select the proposal (File Number).

2. Click on the drop-down list, select the full or part as required. (If Part is selected, then select

the part from (1st to 10th). Refer to figure 50.

3. Select the Completion Date, by clicking on this icon .

4. Click Save, to save the details.

Figure 50: Occupancy’s Draft Proposal-file

Page 46: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 45

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.5.2. Occupancy Document tab

Figure 51: Occupancy Document checklist tab

Go to the Documents tab, attach all the required OCC documents as per the NAINA documents checklist as shown in figure 51.

1. Click to attach all required documents as given in the list.

2. Click Save and then click Submit, to send the proposal-file to NAINA-Office (Inward Clerk).

By clicking on View, an architect can view and download the document.

Note: The system allows .jpg, .gif, .png, .bmp, or .pdf files only.

Page 47: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 46

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.5.3. Drawing Tab

Figure 52: Occupancy Drawing Tab

1. Go to the Drawing tab, click Select Files button to attach the drawing file. (You cannot attach more than one file).

2. Click Save, to save the file.

Note: Attach .dwg file only.

Important: The system does not accept the file which contains special character as their filename.

3. Click Submit, the below screen appears.

4. Click Send, to send the proposal-file for scrutiny of as-built drawing.

Figure 53: Sending File to Scrutiny Cell

Page 48: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 47

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

Figure 54: Occupancy Submitted file section

The file is sent to a higher authority to verify the proposal’s document, visit a site and do drawing scrutiny and add remarks. Once everything is correct then the OC certificate gets generated and the same can be seen by an architect. The proposal-file can be seen in the Approved Files section under the Occupancy certificate tab.

Figure 55: Approved Proposal- File

Page 49: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 48

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.6. Certificates and Letters

5.6.1. Charges Intimation letter

Page 50: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 49

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.6.2. Assessment Order

5.6.3. Drawing PDF

Page 51: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 50

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.6.4. Note sheet

5.6.5. Site Visit Report

Page 52: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 51

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.6.6. Scrutiny Reports

Page 53: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 52

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.6.7. Form 1 Intimation letter

Page 54: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 53

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.1 Form 10

Page 55: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 54

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.2 Commencement Certificate (With Digital Signature)

Page 56: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 55

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.3 Plinth Completion Certificate

Page 57: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 56

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

5.1.4 Occupancy Certificate

Page 58: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 57

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

6. GUIDELINES FOR NOC FOR CC (COMMENCEMENT CERTIFICATE)

6.1. Provisional Fire NOC

DOCUMENTS REQUIRED FOR OBTAINING FIRE APPROVAL OR PROVISIONAL NO-OBJECTION CERTIFICATE.

S. No. Description Yes No

1. The application shall be addressed to “Fire Officer, CIDCO”

2. Registration Certificate of Architect from Architect Council.

3. Lease Agreement Copy

4. Receipt of Possession of Plot/land

5. Confirmed Demarcation Plan

6. All Registered Agreement Documents

7. Final Transfer Order letter from Estate Section

8. Letter of Power of Attorney, if any

9. Amalgamation NOC of Estate Section, If any

10. Approved Location of Electric Sub Station with size of MSEDCL, If any

11. NOC of Society if redevelopment/ if any

12. Application from the Individual/Company/ Society on letterhead duly stamped and signed by authorized signatory or the Architect/ Civil Engineers appointed by the company along with Authorization letter issued by the company. It should also indicate Detailed address of the site.

13. Submit online all architectural drawings in the metric system which should include Block Plan, Typical Floor Plan, Section & Elevation Plan etc. and floor wise area calculation certificate duly signed by Architect/ Civil Engineer. (Including free of FSI areas like basement, underground tanks, underground solvent storage areas Etc.) After approved by Town Planning department plans will be Forwarded to the Fire Department.

14. Block Plan of the building should be given with the details such as width of the main road on which plot is located, activities of the adjacent plots, the width of the main entrance, other entrance to the plot, Basement if any, Details of the activity carried out in Basement, Marginal spaces, approach roads around the building, and other details for industrial activities like transformer yard, utility block, raw material & finish goods storage, tank farm area, storage of hazardous gases, liquids, etc., for e.g. LPG, “A”, “B” and “C”- class

Page 59: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 58

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

petroleum products, LDO, etc.

15. Brief Note on Activities to be carried out in the building. If it is a Industrial or storage building then the Process flow chart of the plant duly certified by an authorized person on his/her letterhead Should be submitted.

16. In the case of industry the list of raw material (including Consumable Materials like LPG Cylinders, Storage Qty for Diesel Generators Etc.) and finished goods with their quantity, their storage place in The plant should be marked on the block plan.

17. If handling, processed or storage of any materials which requires permission from Govt. Agencies then, Copies of approvals taken from Govt. agencies like Chief Controller of Explosives (CCE), Excise Dept. Gas Authority, MPCB, DISH, FDA, etc. In the case of high rise building falling around the airport, NOC from Civil Aviation Authority is required.

18. If the building is in existence and has obtained Occupancy The certificate then, Fire Approval and occupancy certificate issued by the planning authority, copy of the same should be submitted. The set of approved drawings shall be submitted.

19. Copy of Registration and License of the company/ society should Be submitted.

20. The Architect/ Civil Engineer shall certify that the plans of proposed construction are confirming with the development control rules of concern competent authority and or provisions of NBC – 2005.

21. Built-up area statement on Architect letterhead as follow Total plot area in sq. mtr. Total built-up area in sq. mtr. ( Include free) Break up of total built up in sq. mtr.

Sr. No. Name of the Building

Floors Area (include FSI )

Height of Building

22. Fire Protection Fund Fees shall be accepted after plans by Fire Officer scrutinize the

Page 60: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 59

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

7. GUIDELINES FOR NOC FOR OC (OCCUPANCY CERTIFICATE)

7.1. FIRE NOC

The following are the guidelines for the issuance of Fire NOC for the occupancy certificate.

S. No.

Description Yes No

1. Application from the Individual/ Company or the Architect/ Civil Engineer appointed by the company along with Authorization letter issued by the company.

2. One set of all drawings approved by the fire department, which Should include Block Plan, Typical Floor Plan, Section and Elevation Plan etc., along with a copy of the Provisional NOC Issued by this office if any. OR Sets of Revised Drawings if any modification had done while Constructing the unit with amendment NOCs

3. Application of Licensed Agency for completion of Fire Protection work as per Provisional NOC, along with “A” Certificate as per Maharashtra Fire Prevention and Life Safety Measures Act, 2006.

4. Fire Protection Installation material used the list on the letterhead Of Licensed Agency.

5. Fire Protection Installation material used the list on the letterhead of Individual/ Company or the Architect/ Civil Engineer/ Developer.

6. Certificate issued by the License Agency approved by Director, Maharashtra Fire & Emergency Services.

7. Certificate from the Architect that all building is constructed as per the plan submitted to the office for obtaining “Provisional No-Objection Certificate “

8. Certificate of Fire Resistance Door.

9. Purchase Receipt of Fire Pump.

10. Lift License Document including Fire Lift Certificate.

11. Purchase Receipt of DG set Installation

12. Town Planning Department C.C.

13. Photographs of Fire Protection System provided in the Building.

Page 61: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 60

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

14. Physical inspection will be carried out by the Fire Officer after receiving the application and a further report Will be generated.

Page 62: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 61

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

8. REVISED PREMIUM RATES FOR FSI FREE ELEMENTS

The premium rates for FSI free elements have been revised and the same shall be charged as

mentioned below:-

Sr. Revised Rates

Contents Unit (Double the

No.

present Rates)

Area up to 5 sq .mts Rs. 1600/- per No.

Area from 5.00 sq. mts. to Rs. 2400/- per No.

7.50 sq .mts

Balcony

Area from 7.50 sq. mts. to Rs. 3200/- per No.

9.00 sq .mts

1 Enclosure

Charges Area from 9.00 sq. mts. to Rs. 4000/- per No.

11.50 sq .mts

Rs. 325 per Sq. mts.

Area 11.50 sq. mts. Above for above 11.50 sq.mt

balcony area

2 Cupboard

Rs. 1000/- per No.

Premium

3 Flower Bed

Rs. 1000/- per No.

Premium

4 Projected

Rs. 600/- per sq. mts

Pocket Terrace

Area up to 15% of the net BUA for

more than 4 residential

5 Staircase and units per floor Rs. 200/- per sq. mts

Lift Lobbies

Area up to 12.5% of the net BUA

for 4 or less

residential units per floor

Page 63: User Manual for Licensed Architect202.191.151.13/bpamsclient/seConfigFiles/Downloads/... · 2019-12-27 · NAINA’s Integrated Approval Management System (NIAMS) USER MANUAL Navi

Navi Mumbai Airport Influence Notified Area (NAINA) © Copyright 2019 P a g e | 62

NA

INA

(IN

TE

GR

AT

ED

AP

PR

OV

AL

MA

NA

GE

ME

NT

SY

ST

EM

)

9. ATTACHMENT OF VIDEO CLIP/ FOOTAGE

As a step towards speedy clearances, a new approach is introduced in the NIAMS. As a part of this, the

applicant at the time of seeking O.C., will upload a video clip featuring the site, type of construction carried

out, trees planted, execution of works related to drainage system, sewerage system, the testing

conducted for Fire protection/ equipment’s installed in this respect, provision of parking made within the

plot, etc., which will comprehensively cover all the aspects verified by each Dept. before issuance of NOC.

This video clip will be kept in the public domain for the benefit of citizens.

The video clip has to indicate the location of the plot through its co-ordinates (GPS), the date and time of

the video footage. The Architect has to submit this video clip as a self-certification of the completed

project, for which the OC is sought. Also, Architect's and Owner's name shall be displayed and they will

be part of the Video Footage.

As this will be the basis for the Authorities to process the application for granting NOCs, misrepresentation

of facts and malpractices shall be treated serious and punishable. It is proposed to take penal action

against the Architect and also the Owner in such cases, which the NAINA/CIDCO authority may determine. This will ensure that the Departments issuing NOC to visually assess for themselves the status of work

carried out at the site by the applicant and if the prior conditions for issuance of NOC are fulfilled or

otherwise. By keeping this in the public domain, it will bring in transparency.