Useful Tips in Project System Configuration (Tools & Accelerator)
12th December 2008 by Joseph Alexander. S (SAP PS Consultant) I048301
Contents..
1
Validation & Substitution Business Area Determination at WBS element
2 Topics Covered
Change Document
3
User Status Management
Contents..
1
Validation & Substitution
Business Area Determination at WBS element
2 Topics Covered
Change Document
3
User Status Management
Validation & Substitution Business Area DeterminationBusiness Area is determined based on the plant and division from Table T134G. As division is not a standard field at WBS element level, customer enhancement field is used.
Using User Exit in Substitution Rule, Business Area is determined based on plant and division selected in the WBS element.Prerequisite: 1.Default dummy Business Area (BA) in Project Profile as BA is set as mandatory field (@ Company Code Level) 2.Using Field Selection at WBS element make Business Area as display field. 3. Put BA validation based on Plant & Division so that user is thrown out of the transaction, when the user tries to change the plant when cost is posted to the WBS element (BA could not be changed when cost is posted to the WBS element).
Validation & Substitution Business Area DeterminationBusiness Area is determined based on the plant and division from Table T134G. As division is not a standard field at WBS element level, customer enhancement field is used. Using User Exit in Substitution Rule, Business Area is determined based on plant and division selected in the WBS element. Prerequisite: 1.Default dummy Business Area (BA) in Project Profile as BA is set as mandatory field (@ Company Code Level) 2.Using Field Selection at WBS element make Business Area as display field. 3. Put BA validation based on Plant & Division so that user is thrown out of the transaction, when the user tries to change the plant when cost is posted to the WBS element (BA could not be changed when cost is posted to the WBS element).
Contents..
1
Validation & Substitution Business Area Determination at WBS element
2 Topics Covered
Change Document
3
User Status Management
Change Document
Prerequisite for Change Document: Change Document should be activated in Project Profile Data element of the field should be change document relevant in the Further Characteristic Tab Page. Project should be released. Execute the standard report CN60
Change Document
Project Profile
Change Document
Data Element of the Field
Change Document
Release Project
Change Document
Execute Report CN60
Contents..
1
Validation & Substitution Business Area Determination at WBS element
2 Topics Covered
Change Document
3
User Status Management
User Status Management
User Status could be used to control Business Transaction. User Status could be set based on System Status both forward & backward Forward: CRTD REL TECO CLSD Backward : CLSD TECO REL
User Status Management
User Status Configuration
1. In Created (CRTD) user status, creation of Sales Document is forbidden.2. For both forward & backward movement of User Status based on System status, set user status is used in REL, TECO & CLSD (User Status).
User Status Management
Forward User Status Change based on System Status change
User Status Management
Backward User Status Change based on System Status change