Hydra Perseus – EMP December 2008 Eskom Holdings Limited 163 Farm Name Aloe Kop 662/0 Owner JJ Du Toit Cell No. 082 314 4485 Special Conditions Use Eskom gates where possible or install gates. Check line position in relation to irrigated lands. Farm Name Vaalpan 220/0 Owner Cell No. Special Conditions No Information Available

Transcript of Use Eskom gates where possible or install gates. Check ......Use Eskom gates where possible or...

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

163

Farm Name Aloe Kop 662/0 Owner JJ Du Toit Cell No. 082 314 4485 Special Conditions

Use Eskom gates where possible or install gates. Check line position in relation to irrigated lands.

Farm Name Vaalpan 220/0 Owner Cell No. Special Conditions

No Information Available

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

164

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

Towers 313-314

Bird collision risk – borrow pit, large pans, attractive habitat

Install suitable anti-collision marking devices on earth wires from T300 to T314 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 315-318

Bird collision risk – attractive habitat

Install suitable anti-collision marking devices on earth wires from T315 to T318 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 319-320

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T319 to T322 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 313-320

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

165

1999)

Towers 313-320

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

166

Farm Name Roodepan 90/0 Owner HBK Rynhoud Cell No. 053 272 1421 Special Conditions

No conditions stated.

Photo down the line towards T322 indicating open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

167

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 320-322

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T319 to T322 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 320-327

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 320-327

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

168

Farm Name Ludiksdam 325/0 Owner RJ Grobbelaar Cell No. 082 774 7623 Special Conditions

On the farm Poortjie which is a registered game reserve, there are approximately, 200 springbok, 100 blesbok and 40 gemsbok.

Photo down the line towards T329 indicating open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

169

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 327-334

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T327 to T337 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 327-334

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 327-334

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

170

Farm Name Sandkoppie 1208/0 (Towers 339) Owner PJ Piek Cell No. 083 309 4144 Special Conditions

No conditions stated.

Farm Name Roodedam 1211/0 (Towers 340-342) Owner RJ Grobbelaar Cell No. 082 774 7623 Special Conditions

On the farm Poortjie which is a registered game reserve, there are approximately, 200 springbok, 100 blesbok and 40 gemsbok.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

171

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 335-337

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T327 to T337 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 335-342

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

No

Towers 341-342

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T341 to T343 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 335-342

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

172

Farm Name Du Toits Put 249/0 (Towers 343-346) Owner RJ Grobbelaar Cell No. 082 774 7623 Special Conditions

On the farm Poortjie which is a registered game reserve, there are approximately, 200 springbok, 100 blesbok and 40 gemsbok.

Farm Name Mooidoorns 1224/0 (Towers 347-349) Owner AJ Viljoen Cell No. 082 772 7504 Special Conditions

No conditions stated.

Photo down the line towards T344 indicating open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

173

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Tower 343

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T341 to T343 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 343-350

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 343-350

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

174

Farm Name Lotzdam 235/0 Owner JJ Du Toit Cell No. 082 314 4485 Special Conditions

Use Eskom gates where possible or install gates. Check line position in relation to irrigated land.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

175

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 350-357

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 350-357

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 356-357

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T356 to T364 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

176

Farm Name Brakdam 704/0 Owner J Jooste Tel. No. 053 272 1503 Special Conditions

Payment before construction. Keep within servitude. No construction camp on farm.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

177

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 358-364

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T356 to T364 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 358- 365

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 358-360

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 361-363

Large pan wetland, sensitive fauna habitat

Moving not feasible (large deviation), pylon erection should be done in the dry season; no roads should be constructed within or around the pan; no access during the wet season; disturbance should be kept to an absolute minimum.

Environmental Control Officer

Yes

Towers 364-365

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

178

Farm Name Brakdam 704/0 Owner J Jooste Tel. No. 053 272 1503 Special Conditions

Payment before construction. Keep within servitude. No construction camp on farm.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

179

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 366-373

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 368-372

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T368 to T372 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 366-373

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

180

Farm Name Brakdam 704/0 Owner J Jooste Tel. No. 053 272 1503 Special Conditions

Payment before construction. Keep within servitude. No construction camp on farm.

View from farm road west of T379 proposed on top of left koppie

View north along the line from behind the farmstead

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

181

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 374-382

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 374-375

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 376

Drainage line, dam wall Move 150 m south in line towards T377 Environmental Control Officer; Engineer

Yes

Towers 377-378

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 379 Visual: This tower is located on top of a koppie and is therefore highly visible. Note: The profile drawing does not show the hill.

Move the tower either south or north onto the lower land form.

TAP/Surveyor

Tower relocation Design Revision

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

182

Tower 379

Ecology: Dolerite/rocky area Move 40 m in line towards T380 Environmental Control Officer; Engineer

Yes

Tower 380

Ecology: Drainage line Move 30 m in line towards T379 Environmental Control Officer; Engineer

Yes

Towers 381-382

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

183

Farm Name Begin 1227/0 Owner JUV Bredenkamp Cell No. 083 411 6605 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

184

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 382-389

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 385-389

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T385 to T399 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 382-383

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 384 Ecology: Dolemite/ rocky area Move 30 m south in line towards T385. No roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic mitigation measures.

Environmental Control Officer; Engineer

Yes

Towers 385-389

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

185

Farm Name Owner Cell No. Special Conditions

No Information Available

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

186

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 390-397

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T385 to T399 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 390-397

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 390-397

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

187

Farm Name Witfontein 1168/2 Owner JG van Zyl Tel. No. 053 207 0169 Special Conditions

The powerline must comply with legal requirements.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

188

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Tower 398

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 398-399

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T385 to T399 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Tower 399

Drainage line, flash floods and erosion could affect the stability of the pylon

Move 30 m south in line towards T400. Pylon erection should be done in the dry season; no roads should be constructed within or around the drainage line; no access during the wet season; disturbance should be kept to an absolute minimum; the necessary measures should be taken to prevent soil erosion.

Contractor/ECO

Yes

Towers 398-405

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 400-405

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

189

Farm Name Witfontein 1168/0 Owner SH du Plessis Tel. No. 012 347 8731 Special Conditions

No conditions stated.

T406: In a drainage line, move 30m North towards T405

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

190

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Tower 406

Drainage line Move 30 m north in line towards T405. Pylon erection should be done in the dry season; no roads should be constructed within or around the drainage line; no access during the wet season; disturbance should be kept to an absolute minimum; the necessary measures should be taken to prevent soil erosion.

Contractor; Environmental Control Officer

Yes

Towers 406-412

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 407-412

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T407 to T418 as per Eskom Transmission guidelines

Contractor/ECO

See Eskom Transmission guidelines

Towers 407-412

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

191

Farm Name Taay Bosch Draai 102/9 (Towers 412-415) Owner FG Badenhorst Tel. No. 083 773 1113 Special Conditions

ECO to see owner prior to construction.

Farm Name Taay Bosch Draai 102/16 (Towers 416-419) Owner D Kruger Tel. No. 082 773 2603 Special Conditions

ECO to see owner prior to construction.

View north from T413

View north from T419 to T418 on side slopes

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

192

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 412-419

Towers on side slope are highly visible and will fit awkwardly into the highly scenic landscape

Move towers 419 to 413 down to just west of foot of slope. Note: existing edge of centre pivot circle edge is approximately 100 m to the west i.e. radius is reduced by approximately 100 m leaving space for towers.

TAP/Surveyor

Alignment Change

Towers 413-418

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T407 to T418 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 412-419

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

193

Towers 412-415

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 416-417

Ecology: Significant ridge/ koppie Move to footslopes; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic mitigation measures

Contractor; Environmental Control Officer

Yes

Tower 418-419

Ecology: Significant ridge/ koppie Movement not feasible Contractor; Environmental Control Officer

Yes

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

194

Farm Name Taay Bosch Draai 102/15 Owner Tel. No. Special Conditions

No Information Available

View north from T420 note the visual effect of the small existing tower

View east from T423 of dam in hanging valley. This is a unique visual feature.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

195

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 420-426

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 420-428

Towers on the side slope are highly visible and will fit awkwardly into the highly scenic landscape

Move towers 420 to 428 to just west of the foot of the slope in the valley.

TAP

Alignment Change

Towers 420-428

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 427-428

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T427 to T429 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 427-428

Ecology: Significant ridge/ koppie. Area represents a high floral and faunal diversity

Movement not feasible; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the

Environmental Control Officer

Yes

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

196

construction phase; also refer to generic mitigation measures

Farm Name Taay Bosch Poort 10/11 (Towers 429-433) Owner J de Swart Tel. No. 053 661 2180 Special Conditions

ECO to see owner prior to construction.

Farm Name TaayBosch 10/10 (Towers 434&435) Owner MJE du Toit Tel. No. 053 661 22031 Special Conditions

No conditions stated.

South over head of the valley from T428

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

197

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Tower 429

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T427 to T429 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 429-433

Towers are highly visible due to their position on side slope of hill. Height will project above hilltops

Move towers to just west of base of slope into valley at T 428. Note: line can be extended at T433 to allow length to T413 to be parallel to existing alignment but on eastern valley edge.

TAP

Design Aspect

Towers 429- 435

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 429-435

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

198

Farm Name Taay Bosch Poort 10/10 (Towers 436 & 437) Owner J de Swart Tel. No. 053 661 2180 Special Conditions

ECO to see owner prior to construction.

Farm Name Taay Bosch Poort 10/1 (Towers 438-443) Owner AH Mostert Tel. No. 082 957 3102 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

199

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 436-437

No specific ecological issues Refer to generic mitigation measures Environmental control officer

No

Towers 436-443

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental control officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 438-441

Ecology: Topographically diverse area with high habitat diversity, high potential for rich fauna and flora assemblages, no access due to time restrictions

Movement not feasible; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic mitigation measures

Environmental control officer; Engineer

Yes

Towers 439-443

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T439 to T462 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

200

Towers 442-443

Ecology: No access due to time restrictions

Refer to generic mitigation measures Environmental control officer

No

Farm Name Onrust Fountain 9/4 Owner AH Mostert Tel. No. 082 957 3102 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

201

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 444-449

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T439 to T462 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 444-449

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 444-449

Ecology: No access due to time restrictions.

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

202

Farm Name Onrust Fountain 9/5 Owner EF van der Waldt Tel. No. 053 631 3697 Special Conditions

No conditions stated.

Down the line towards T455 – Indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

203

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 450-457

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T439 to T462 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 450-457

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 450-452

Ecology: No access due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Towers 453-456

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

204

Tower 457

Ecology: No access due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Farm Name Leeuw Fontein 8/4 Owner JGM van der Merwe Tel. No. 083 388 0621 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

205

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 458-459

Ecology: No access due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Towers 458-462

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T439 to T462 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 458-465

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 460-465

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

206

Farm Name Owner Tel. No. Special Conditions

Down the line towards T471 – Indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

207

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 466-473

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental control officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 466-473

No specific ecological issues Refer to generic mitigation measures Environmental control officer

No

Towers 471-473

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T471 to T498 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

208

Farm Name Owner Tel. No. Special Conditions

No Information Available

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

209

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 474-476

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 474-481

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T471 to T498 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 474-481

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 477-481

Ecology: No access due to time restrictions.

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

210

Farm Name Die Plaas 196/0 Owner JW de Villiers Tel. No. 083 236 6816 Special Conditions

Special care must be taken to avoid pollution of land during construction. The land must be rehabilitated and owner to be fully involved in rehabilitation. Owner to be consulted for the construction of gates. Refer to option.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

211

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 481-488

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T471 to T498 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 481-488

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 481-488

Ecology: No access due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

212

Farm Name Farm 199/0 (Towers 489-491) Owner GJF Jooste Tel. No. 053 661 2430 Special Conditions

No conditions stated.

Farm Name Farm 197/0 (Towers 492-496) Owner C Louw Tel. No. 053 203 0035 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

213

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 489-491

Ecology: No access due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Towers 489-496

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T471 to T498 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 489-496

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 492-496

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

214

Farm Name Grass Pan 40/1 Owner J Vermeulen Tel. No. 082 780 3407 Special Conditions

T503 – Located in a pan, needs to be moved north across the road

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

215

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 497-498

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T471 to T498 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 497-499

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 497-504

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Cfficer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Tower 500

Dolerite/rocky area Move 30 m south in line towards T501; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic mitigation measures

Environmental Control Officer; Engineer

Yes

Towers 501-502

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

216

Tower 503

Pan wetland system Move north across the road; pylon erection should be done in the dry season; no roads should be constructed within or around the pan area; no access during the wet season; disturbance should be kept to an absolute minimum; the necessary measures to prevent soil erosion should be taken

Contractor; Environmental Control Officer

Yes

Tower 504

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T504 to T530 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Tower 504

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

217

Farm Name Owner Tel. No. Special Conditions

No Information Available

T508 up the line to T511 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

218

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 505-511

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T504 to T530 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 505-511

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 505-511

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

219

Farm Name Tafelkop 39/0 Owner JP van der Berg Tel. No. 053 631 0535 Special Conditions

No conditions stated.

T512 up the line to T519 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

220

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 512-519

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T504 to T530 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 512-519

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

None Required

Towers 512-519

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

221

Farm Name Annex Donker Hoek 89/1 Owner JJ van Straaten Tel. No. 053 665 7001 Special Conditions

Eskom to repair all erosion and make provisions to avoid future erosion. Eskom to repair all damaged roads as a result of construction.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

222

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 520-527

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T504 to T530 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 520-527

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances; Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 520-527

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

223

Farm Name Annex Donker Hoek 89/2 Owner CJ Vermeulen Tel. No. 083 380 9913 Special Conditions

No damage to Camel Thorn tree. Contact owner prior to construction. Any damage will be for Eskom’s account. If capital gains tax is charged, Eskom must pay it. Existing line servitude roads to be repaired.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

224

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 527-530

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T504 to T530 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 527-534

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 527-534

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

225

Farm Name Kuhns Post 90/0 Owner JJ van Straaten Tel. No. 053 665 7001 Special Conditions

Eskom to repair all erosion and make provisions to avoid future erosion. Eskom to repair all damaged roads as a result of construction.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

226

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Tower 535

No specific ecological issues

Refer to generic mitigation measures Environmental control officer

No

Towers 535-541

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental control officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Tower 536

Ecology: Access to site denied by farmer

Refer to generic mitigation measures Environmental control officer

No

Tower 537

Ecology: Footslope of significant ridge

Move T537 200 m east Environmental control officer

Yes

Tower 538

Access to site denied by farmer; pylon situated on ridge

Move T538 200 m east (see above) Environmental control officer

Yes

Towers 539-541

Ecology: Access to site denied by farmer

Refer to generic mitigation measures Environmental control officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

227

Farm Name Driefontein 87/2 Owner PJ van Zyl Tel. No. 082 773 6781 Special Conditions

No conditions stated.

T542 up the line to T547 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

228

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 542-547

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T542 to T547 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 542-549

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 542-549

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

229

Farm Name Overschot 93/1 Owner PJ van Zyl Tel. No. 082 773 6781 Special Conditions

No conditions stated.

Farm Name Stryd Dam 107/4 Owner SA Menne Tel. No. 053 665 7010 Special Conditions

Contact land owner with regard to the windmill and water points around Eskom servitude area.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

230

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 549-556

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 549-556

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Towers 551-556

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T551 to T563 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

231

Farm Name Stryd Dam 107/3 Owner SA Menne Tel. No. 053 665 7010 Special Conditions

Contact land owner with regard to the windmill and water points around Eskom servitude area.

T557 up the line to T563 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

232

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 557-563

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T551 to T563 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 557-564

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 557-564

No specific ecological issues

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

233

Farm Name Roodekraal 106/0 Owner JD Du Toit Tel. No. 082 378 3413 Special Conditions

No conditions stated.

View south of T567 positioned on solid rock

View south from T567 showing interesting vegetation and solid rock texture

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

234

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Tower 565

Ecology: Dolerite/ rocky area

Move T565 150 m south; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic mitigation measures

Environmental control officer; Engineer

Yes

Tower 565-566

Heritage: Circular stone structure at S 30º 24’ 038 and E 24º 09’ 201

The line should be moved to avoid this site; Generic mitigation measures apply

Environmental control officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

Move line 100-200 m east or west.

Towers 565-572

Visual: Low outcrop of hard dark igneous rock has intact form close to district road. The form is visually important in form and texture and is a unit alone in a wide plain.

Avoid the entire outcrop by realigning the transmission line to the east. The realignment can start further south to not exceed 2 % so that no straining tower is required

TAP

Realignment Design matter

Tower 566

Ecology: Dolerite/ rocky area

Move T566 200 m south; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic

Environmental control officer; Engineer

Yes

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

235

mitigation measures

Tower 567

Ecology: Dolerite/ rocky area

Move in line 50 m towards T568; no roads to be constructed within this habitat; disturbance due to construction should be kept to an absolute minimum; rescue and relocate all Aloe plants that may be damaged or destroyed during the construction phase; also refer to generic mitigation measures

Environmental Control Officer; Engineer

Yes

Towers 565-572

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T568 to T580 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 567-572

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 568-572

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

236

Farm Name Owner Tel. No. Special Conditions

No Information Available

T573 up the line to T580 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

237

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 573-580

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T568 to T580 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 573-580

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 573-580

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

238

Farm Name Nuwe De Kalk 190/0 Owner JD Du Toit Tel. No. 082 378 3413 Special Conditions

No conditions stated.

T586 located in a drainage line, needs to be moved 100 m along the line

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

239

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 581-588

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 581-585

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 586

Ecology: Drainage line and dam wall; flash floods and erosion could affect the stability of the pylon.

Move in line 100 m towards T587; move north across the road; pylon erection should be done in the dry season; no roads should be constructed within or around the drainage line; no access during the wet season; disturbance should be kept to an absolute minimum; the necessary measures should be taken to prevent soil erosion.

Contractor; Environmental Control Officer

Yes

Towers 584-588

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T584 to T598 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 587-588

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

240

Farm Name Nuwe De Kalk 190/0 Owner JD Du Toit Tel. No. 082 378 3413 Special Conditions

No conditions stated.

Farm Name Nuwe Tafelkop 189/0 Owner PJ van Zyl Tel. No. 082 773 6781 Special Conditions

No conditions stated.

View south from dam wall near T591 along alignment which is along drainage line and over windmill.

View north from dam wall near T591

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

241

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 589-591

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 592

Ecology: Drainage line, dam wall Move 100 m west; move north across the road; pylon erection should be done in the dry season; no roads should be constructed within or around the drainage line; no access during the wet season; disturbance should be kept to an absolute minimum; the necessary measures to prevent soil erosion should be taken

Contractor Yes

Towers 593-596

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Towers 589-596

Visual: The alignment of towers is within the drainage line between T589 and T593 and visually conflicts with the dam, vegetation and is over a windmill.

Move the line westwards out of the drainage line. Do not move it eastwards as the adjacent landform there rises and will make the towers even more visually prominent. It is possible to extend the alignment south at 584 and angle the line slightly south of 593 to avoid the stream. Ideally the line from 588 to 598 should be moved east or west out of drainage line.

TAP Environmental Control Officer

Design Realignment

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

242

Towers 589-596

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

243

Farm Name Owner Tel. No. Special Conditions

No Conditions Stated

T597-598 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

244

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 597-598

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T584 to T598 as per Eskom Transmission guidelines Ideally the line from T588 to T598 should be moved east or west out of drainage line.

Contractor

See Eskom Transmission guidelines

Towers 597-604

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 597-604

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 604

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T604 to T638 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

245

Farm Name Paarde Valley 145/0 Owner PJ van Zyl Tel. No. 082 773 6781 Special Conditions

Phone owner prior to construction.

Farm Name Paarde Valley 145/5 Owner PJ van Zyl Tel. No. 082 773 6781 Special Conditions

Phone owner prior to construction.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

246

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 604-612

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T604 to T638 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 604-612

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 604-612

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

247

Farm Name Paarde Valley 145/3 Owner CJ du Plessis Tel. No. Special Conditions

One owner to be further compensated should irrigation area be affected.

T618 indicates drainage line, move tower south towards T619

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

248

TOWER

NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY METHOD

STATEMENT REQUIRED

LINE A Towers 612-620

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T604 to T638 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 612-620

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 612-617

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 618

Drainage line; erosion already present; flash floods and erosion could affect the stability of the pylon

Move 20 m south towards T619 (in line), no roads to be constructed through drainage line; construction should take place in dry season; the necessary measures should be taken to curb and prevent soil erosion

Contractor Yes

Towers 619-620

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

249

Farm Name Paarde Valley 145/18 (Towers 620) Owner RS Du Plessis Tel. No. 053 631 0302 Special Conditions

No conditions stated.

Farm Name Paarde Valley 145/12 (Towers 621-623) Owner RS Du Plessis Tel. No. 053 631 0302 Special Conditions

No conditions stated.

Farm Name Du Plessis Dam 179/0 (Towers 624-627) Owner RS Du Plessis Tel. No. 053 631 0302 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

250

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 620-627

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T604 to T638 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 620-627

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 620-626

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Tower 627

Ecology: No access to site due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

251

Farm Name De Aar 180/4 Owner K Samson Tel. No. 053 631 1659 Special Conditions

No conditions stated.

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

252

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 628-630

Ecology: No access to site due to time restrictions

Refer to generic mitigation measures Environmental Control Officer

No

Towers 628-635

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T604 to T638 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 628-635

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances. Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 631-635

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

253

Farm Name De Aar 180/1 Owner Tel. No. Special Conditions

No Information Available

T636 up the line to T638 indicates open plain

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

254

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 636-638

Bird collision risk

Install suitable anti-collision marking devices on earth wires from T604 to T638 as per Eskom Transmission guidelines

Contractor

See Eskom Transmission guidelines

Towers 636-643

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area.

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 636-643

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

255

Farm Name De Aar 180/1 Owner Tel. No. Special Conditions

No Information Available

Farm Name Hartebeestplaat Owner Tel. No. Special Conditions

No Information Available

Hydra Perseus – EMP December 2008 Eskom Holdings Limited

256

TOWER NO ENVIRONMENTAL ASPECT MITIGATION MEASURES RESPONSIBILITY OF PENALTY

METHOD STATEMENT REQUIRED

LINE A Towers 644-647

Artefact scatters from Acheullian period to Smithfield period very sparsely scattered over entire study area

No collection of artefacts under any circumstances Generic mitigation measures apply

Environmental Control Officer; Engineer; Environmental Liaison officer; Farmer

Fine and/or imprisonment in terms of National Heritage Resources Act, 1999 (Act No. 25 of 1999)

No

Towers 644-647

No specific ecological issues Refer to generic mitigation measures Environmental Control Officer

No